CN107035152A - The safe discharging platform of assembled for construction - Google Patents

The safe discharging platform of assembled for construction Download PDF

Info

Publication number
CN107035152A
CN107035152A CN201710256245.4A CN201710256245A CN107035152A CN 107035152 A CN107035152 A CN 107035152A CN 201710256245 A CN201710256245 A CN 201710256245A CN 107035152 A CN107035152 A CN 107035152A
Authority
CN
China
Prior art keywords
main frame
column
assembled
construction
discharging platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710256245.4A
Other languages
Chinese (zh)
Inventor
朱嘉
董菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Huahong Engineering Equipment Co Ltd
Original Assignee
Jiaxing Huahong Engineering Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Huahong Engineering Equipment Co Ltd filed Critical Jiaxing Huahong Engineering Equipment Co Ltd
Priority to CN201710256245.4A priority Critical patent/CN107035152A/en
Publication of CN107035152A publication Critical patent/CN107035152A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms

Abstract

The safe discharging platform of assembled for construction, including unit assembly, the unit assembly, which is overlapped mutually assembling and formed, is used for the safe discharging platform of assembled of construction;The unit assembly includes main frame, the foot pad plate for being laid on main frame bottom surface, protective door and protective sheet located at main frame side, the main frame is the hexahedron framework being made of metal material, when installing and using, the main frame side is close to wall, protective door is provided with close to the opposite side of wall on main frame, connection is tensed using tensioning mechanism between unit assembly and wall.

Description

The safe discharging platform of assembled for construction
Technical field
The present invention relates to construction utensil, and in particular to the safe discharging platform of assembled for construction.
Background technology
The safe discharging platform of current construction for building is generally built using steel pipe and steel pipe lock, is taken using conventional steel Building construction scaffolding and discharging platform needs professional scaffolder to implement, and builds that to need to expend many manpowers and build efficiency low, because Using lock locking between steel pipe, manually build that to there is the tight quality of steel tube lock padlock unstable, and once steel pipe lock relaxation Easily trigger security incident, and profile is uneven, aesthetics is poor.
The content of the invention
The purpose of the present invention is to be that the problem of solution prior art is present is stable, real there is provided a kind of reasonable in design The safe discharging platform of the assembled for construction of existing modular assembly.
The technical solution adopted by the present invention is as follows:The safe discharging platform of assembled for construction, including unit dress Part, the unit assembly, which is overlapped mutually assembling and formed, is used for the safe discharging platform of assembled of construction;The unit Assembly includes main frame, the foot pad plate for being laid on main frame bottom surface, protective door and protective sheet located at main frame side, described Main frame is the hexahedron framework being made of metal material, and when installing and using, the main frame side is close to wall, main frame The upper opposite side close to wall is provided with protective door, and connection is tensed using tensioning mechanism between unit assembly and wall.
Furtherly, the main frame includes column, cross bar, and the column is vertically arranged, is adopted between two adjacent columns It is fixedly connected with cross bar.
Furtherly, the main frame is divided into Zuo Qu, You Qu and middle area, and the column is 8, and cross bar is 20,8 pieces points Into 2 rows, 4 are often arranged, cross bar is 20 and is divided into each 10 up and down, and cross bar is respectively adopted between two adjacent upright and is fixedly connected;Institute It is cuboid framework to state main frame.
Furtherly, in addition to adapt to the regulation vertical rod that different building floor heights are constructed, the regulation vertical rod is arranged on phase Between two unit assemblies being mutually superimposed, the regulation vertical rod two ends are fixedly connected with column respectively.
Furtherly, in addition to flange bindiny mechanism, connected between the column of two superimposed unit assemblies using flange Connection mechanism is connected, and the flange mechanism includes installing plate, and the installing plate is respectively fixedly connected with column end face, installing plate extension Go out column plane of structure, installing plate is provided between mounting hole, two installing plates and fixed using fastener.
Furtherly, in addition to flange bindiny mechanism, using the connection of flange bindiny mechanism, institute between regulation vertical rod and column Stating flange mechanism includes installing plate, and the installing plate is respectively fixedly connected with column end face, and installing plate extends column plane of structure, peace Dress plate is provided between mounting hole, two installing plates and fixed using fastener.
Furtherly, the fixed connection structure between the column and cross bar is, the cross bar is channel-section steel or square steel, described Column is respectively arranged with contiguous block, and channel-section steel or square steel are arranged between two columns, channel-section steel or square steel is opening down rides over two connections On block, channel-section steel or square steel are connected with contiguous block using fastener or bearing pin.
Furtherly, the column is square tube or pipe.
Furtherly, the tensioning mechanism includes support fixture, wall fixture, pull bar, nut;The support is fixed Part is fixedly connected with main frame, and wall fixture is fixedly connected with wall, and pull bar two ends are fixed with support fixture, wall respectively Part is connected, and pull bar one end is provided with external screw thread, and pull bar is tensed using nut with support fixture or wall fixture and is connected.
Furtherly, the support fixture includes anchor ear and embraces piece, and the anchor ear, an armful piece are set in column and using tight Firmware is locked.
Furtherly, in addition to latch lock door mechanism, the latch lock door mechanism sets the outside of main frame, and latch is locked a door Mechanism includes pin rod, pipe sleeve, and the pipe sleeve is respectively fixedly disposed at protective door and main frame, and pin rod insertion is arranged on main frame Pipe sleeve when, protective door locking;When pin rod disengaging is arranged on the pipe sleeve on main frame, protective door can be opened.
Furtherly, in addition to hound, the hound is arranged on middle area, and hound two ends are vertical with adjacent two respectively Post is fixedly connected.
The present invention is had the advantage that compared with prior art:Unit assembly is made in modularization of the present invention, then by each list First assembly is assembled into transfer platform, and it has assembling speed fast, and protection effect is excellent after the completion of assembling, overall structure stabilization, The beneficial effects such as safety.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 is the structural representation at another visual angles of Fig. 1.
Fig. 3 is the structural representation after Fig. 2 is decomposed.
Fig. 4 is schematic view of the mounting position of the invention.
Embodiment
With reference to specific embodiment, the present invention is described in detail.Following examples will be helpful to the technology of this area Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that to the ordinary skill of this area For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention Protection domain.
Embodiment 1
As shown in Figure 1 to Figure 3, the safe discharging platform of assembled of construction, including unit are used for described in the present embodiment Assembly, the unit assembly, which is overlapped mutually assembling and formed, is used for the safe discharging platform of assembled of construction;The list First assembly includes main frame 1, the foot pad plate 2 for being laid on the bottom surface of main frame 1, the protective door 3 located at the side of main frame 1 and protection Piece 4, the main frame 1 is the hexahedron framework being made of metal material, and when installing and using, the side of main frame 1 is close Protective door 3 is provided with close to the opposite side of wall on wall, main frame 1, is drawn between unit assembly and wall using tensioning mechanism 6 It is close to and connects.Front side sets protective door 3 in the present embodiment, and rear side is people's Cargo Lift, main frame 1 or so close to wall, the outside of protective door 3 Both sides are provided with protective sheet 4;The unit assembly up can be superimposed to reach construction height successively.
Main frame 1 described in the present embodiment includes column 11, cross bar 12, two vertically arranged, adjacent columns of the column 11 It is fixedly connected between 11 using cross bar 12.
The Fen Weizuo areas A of main frame 1, right area C and middle area B described in the present embodiment, the column 11 are 8, and cross bar 12 is 20,8 are divided into 2 rows, often arrange 4, and cross bar 12 is divided between each 10 up and down, two adjacent upright 11 for 20 is respectively adopted horizontal stroke Bar 12 is fixedly connected;The main frame 1 is cuboid framework.
The present embodiment is also included to adapt to the regulation vertical rod 13 of different building floor height constructions, and the regulation vertical rod 13 is arranged on Between two unit assemblies being overlapped mutually, regulation vertical rod 13 two ends are fixedly connected with column 11 respectively.In practice of construction When, the floor height of floor is indefinite, and unit assembly is generally arranged at floor, by setting regulation vertical rod 13 adjustable single The setting height of first assembly, makes unit assembly consistent with floor.
The present embodiment also includes using flange connecting between flange bindiny mechanism, the column 11 of superimposed two unit assemblies Connection mechanism is connected, and the flange mechanism includes installing plate 5, and the installing plate 5 is respectively fixedly connected with the end face of column 11, installing plate 5 extend the plane of structure of column 11, and installing plate 5 is provided between mounting hole, two installing plates 5 and fixed using fastener.Flange connects machine Structure makes the stability after assembling between column 11 higher, and the superposition height of unit assembly can be higher.
The present embodiment also includes flange bindiny mechanism, is connected between regulation vertical rod 13 and column 11 using flange bindiny mechanism Connect, the flange mechanism includes installing plate 5, the installing plate 5 is respectively fixedly connected with the end face of column 11, and installing plate 5 extends The plane of structure of column 11, installing plate 5 is provided between mounting hole, two installing plates 5 and fixed using fastener.Flange bindiny mechanism makes regulation Stability after being assembled between vertical rod 13 and column 11 is higher, and the superposition height of unit assembly can be higher.Column 11 and column Flange connection between 11 is identical with the flange connection between column 11 with regulation vertical rod 13.
Fixed connection structure described in the present embodiment between column 11 and cross bar 12 is that the cross bar 12 is channel-section steel, described Column 11 is respectively arranged with contiguous block 14, and channel-section steel is arranged between two columns 11, and channel-section steel is opening down to be ridden on two contiguous blocks 14, Channel-section steel is connected with contiguous block 14 using fastener or bearing pin.When cross bar 12 is square steel, the side wall of square steel two opens up opening, described Column 11 is respectively arranged with contiguous block 14, and square steel is arranged between two columns 11, and square steel is opening down to be ridden on two contiguous blocks 14, Square steel is connected with contiguous block 14 using fastener or bearing pin.The Standard is simple, and channel-section steel or square steel are ridden on two contiguous blocks 14 Preliminary fixation can be completed, secondary fastening is then completed using fastener or bearing pin connection again.
The Standard is simple, and channel-section steel or square steel ride over can complete preliminary fixation on two contiguous blocks 14, then use again Fastener or bearing pin connection complete secondary fastening.
Column 11 described in the present embodiment is square tube or pipe.
Tensioning mechanism 6 described in the present embodiment includes support fixture 61, wall fixture 62, pull bar 63, nut;The branch Frame fixture 61 is fixedly connected with main frame 1, and wall fixture 62 is fixedly connected with wall, and the two ends of pull bar 63 are solid with support respectively Determine part 61, wall fixture 62 to connect, the one end of pull bar 63 is provided with external screw thread, pull bar 63 and support fixture 61 or wall fixture 62 tense connection using nut.Unit assembly and building are fixed as one by tensioning mechanism 6, and part stress is married again to building Thing, therefore the safe discharging platform integrated model of the assembled for construction after building is stable, constructs safer.
Support fixture 61 described in the present embodiment includes anchor ear and embraces piece, and the anchor ear, an armful piece are set in column 11 and adopted Locked with fastener.The structure is that assembled is connected and fastening effect is good.
The present embodiment also includes latch lock door mechanism, and the latch lock door mechanism sets the outside of main frame, and latch is locked a door Mechanism includes pin rod 71, pipe sleeve 72, and the pipe sleeve 72 is respectively fixedly disposed at protective door and main frame, and the insertion of pin rod 71 is arranged on During pipe sleeve 72 on main frame, protective door locking;When the disengaging of pin rod 71 is arranged on the pipe sleeve 72 on main frame, protective door can be beaten Open.Protective door is arranged on outside, and the operative employee of someone's Cargo Lift could open the door, therefore safer.
The present embodiment also includes hound 15, and the hound 15 is arranged on middle area B, the two ends of hound 15 respectively with it is adjacent Two columns 11 be fixedly connected.
As shown in figure 4, the present invention is located between people's Cargo Lift and building, it is material transfer between people's Cargo Lift and building Platform.
The specific embodiment of the present invention is described above.It is to be appreciated that the invention is not limited in above-mentioned Particular implementation, those skilled in the art can make various deformations or amendments within the scope of the claims, this not shadow Ring the substantive content of the present invention.

Claims (12)

1. for the safe discharging platform of assembled of construction, it is characterized in that:Including unit assembly, the unit assembly Being overlapped mutually assembling and being formed is used for the safe discharging platform of assembled of construction;The unit assembly includes main frame, paving The foot pad plate of main frame bottom surface, protective door and protective sheet located at main frame side are located at, the main frame is to use metal material Expect the hexahedron framework being made, when installing and using, the main frame side is on wall, main frame close to the opposite side of wall Provided with protective door, connection is tensed using tensioning mechanism between unit assembly and wall.
2. it is used for the safe discharging platform of assembled of construction as claimed in claim 1, it is characterized in that:The main frame bag Column, cross bar are included, the column is vertically arranged, be fixedly connected between two adjacent columns using cross bar.
3. it is used for the safe discharging platform of assembled of construction as claimed in claim 2, it is characterized in that:The main frame point For Zuo Qu, You Qu and middle area, the column is 8, and cross bar is 20, and 8 are divided into 2 rows, often arranges 4, cross bar is 20 and is divided into Each 10 up and down, cross bar is respectively adopted between two adjacent upright and is fixedly connected;The main frame is cuboid framework.
4. it is used for the safe discharging platform of assembled of construction as claimed in claim 2 or claim 3, it is characterized in that:Also including being The regulation vertical rod of different building floor height constructions is adapted to, the regulation vertical rod is arranged between two unit assemblies being overlapped mutually, The regulation vertical rod two ends are fixedly connected with column respectively.
5. it is used for the safe discharging platform of assembled of construction as claimed in claim 2, it is characterized in that:Also include flange to connect Using the connection of flange bindiny mechanism between connection mechanism, the column of superimposed two unit assemblies, the flange mechanism includes peace Plate is filled, the installing plate is respectively fixedly connected with column end face, installing plate extends column plane of structure, and installing plate is provided with installation Fixed between hole, two installing plates using fastener.
6. it is used for the safe discharging platform of assembled of construction as claimed in claim 4, it is characterized in that:Also include flange to connect Connection mechanism, using the connection of flange bindiny mechanism between regulation vertical rod and column, the flange mechanism includes installing plate, the installation Plate is respectively fixedly connected with column end face, and installing plate extends column plane of structure, and installing plate is provided between mounting hole, two installing plates Fixed using fastener.
7. it is used for the safe discharging platform of assembled of construction as claimed in claim 2 or claim 3, it is characterized in that:The column Fixed connection structure between cross bar is that the cross bar is channel-section steel or square steel, and the column is respectively arranged with contiguous block, channel-section steel Or square steel is arranged between two columns, channel-section steel or square steel is opening down rides on two contiguous blocks, channel-section steel or square steel are adopted with contiguous block Connected with fastener or bearing pin.
8. it is used for the safe discharging platform of assembled of construction as claimed in claim 2 or claim 3, it is characterized in that:The column For square tube or pipe.
9. it is used for the safe discharging platform of assembled of construction as claimed in claim 2 or claim 3, it is characterized in that:It is described to tense Mechanism includes support fixture, wall fixture, pull bar, nut;The support fixture is fixedly connected with main frame, and wall is solid Determine part to be fixedly connected with wall, pull bar two ends are connected with support fixture, wall fixture respectively, pull bar one end is provided with outer spiral shell Line, pull bar is tensed using nut with support fixture or wall fixture and is connected.
10. it is used for the safe discharging platform of assembled of construction as claimed in claim 9, it is characterized in that:The support is consolidated Part is determined including anchor ear and piece is embraced, and the anchor ear, an armful piece are set in column and using fastener locking.
11. it is used for the safe discharging platform of assembled of construction as claimed in claim 1 or 2, it is characterized in that:Also include inserting Lock door mechanism is sold, the latch lock door mechanism sets the outside of main frame, and latch lock door mechanism includes pin rod, pipe sleeve, the pipe Set is respectively fixedly disposed at protective door and main frame, when pin rod insertion is arranged on the pipe sleeve on main frame, protective door locking;Pin rod When disengaging is arranged on the pipe sleeve on main frame, protective door can be opened.
12. it is used for the safe discharging platform of assembled of construction as claimed in claim 3, it is characterized in that:Also include diagonal brace Bar, the hound is arranged on middle area, and hound two ends are fixedly connected with two adjacent columns respectively.
CN201710256245.4A 2017-04-19 2017-04-19 The safe discharging platform of assembled for construction Pending CN107035152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710256245.4A CN107035152A (en) 2017-04-19 2017-04-19 The safe discharging platform of assembled for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710256245.4A CN107035152A (en) 2017-04-19 2017-04-19 The safe discharging platform of assembled for construction

Publications (1)

Publication Number Publication Date
CN107035152A true CN107035152A (en) 2017-08-11

Family

ID=59536497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710256245.4A Pending CN107035152A (en) 2017-04-19 2017-04-19 The safe discharging platform of assembled for construction

Country Status (1)

Country Link
CN (1) CN107035152A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113651212A (en) * 2021-08-31 2021-11-16 浙江德为建材科技股份有限公司 People goods ladder protection platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090113042A (en) * 2008-04-25 2009-10-29 주식회사 미래에스에프이 Gang form assembly
CN101949211A (en) * 2010-10-29 2011-01-19 中建三局建设工程股份有限公司 Low-position few-fulcrum modularized integral jacking steel platform formwork system
CN202064623U (en) * 2011-04-11 2011-12-07 河北亿安工程技术有限公司 Assembly type integral lifting scaffold
CN205777445U (en) * 2016-05-26 2016-12-07 青岛海川建设集团有限公司 A kind of external scaffolding assembled drawknot dot structure
CN106437121A (en) * 2016-11-21 2017-02-22 成都建筑工程集团总公司 Outside construction operating platform of industrial assembly engineering for preventing objects from hitting
CN206753084U (en) * 2017-04-19 2017-12-15 嘉兴市华弘工程设备有限公司 The safe discharging platform of assembled for construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090113042A (en) * 2008-04-25 2009-10-29 주식회사 미래에스에프이 Gang form assembly
CN101949211A (en) * 2010-10-29 2011-01-19 中建三局建设工程股份有限公司 Low-position few-fulcrum modularized integral jacking steel platform formwork system
CN202064623U (en) * 2011-04-11 2011-12-07 河北亿安工程技术有限公司 Assembly type integral lifting scaffold
CN205777445U (en) * 2016-05-26 2016-12-07 青岛海川建设集团有限公司 A kind of external scaffolding assembled drawknot dot structure
CN106437121A (en) * 2016-11-21 2017-02-22 成都建筑工程集团总公司 Outside construction operating platform of industrial assembly engineering for preventing objects from hitting
CN206753084U (en) * 2017-04-19 2017-12-15 嘉兴市华弘工程设备有限公司 The safe discharging platform of assembled for construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113651212A (en) * 2021-08-31 2021-11-16 浙江德为建材科技股份有限公司 People goods ladder protection platform

Similar Documents

Publication Publication Date Title
CN109629810B (en) Closed type overhanging scaffold and construction method
CN109235861A (en) A kind of fabricated scaffold applied to small sized multiple story building
CN208220164U (en) Architecture construction security maintenance cantilevered structure
CN206753084U (en) The safe discharging platform of assembled for construction
CN107035152A (en) The safe discharging platform of assembled for construction
CN206418587U (en) A kind of easy-to-dismount prefabricated balcony
CN206048160U (en) A kind of height-adjustable split heads
CN211850938U (en) Frame structure of assembled material transferring platform
CN213837658U (en) Insert hanging steel column construction high altitude operation platform
CN212897455U (en) Prevent portable scaffold frame that topples
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN207228594U (en) A kind of door-type scaffold of adjustment height
CN206801071U (en) One kind building outer climbing frame and its protection network
CN203188596U (en) Rapidly installed combination stairs
CN206769342U (en) A kind of traveling centering for building
CN207538481U (en) A kind of floor height changeable type input and output material platform
CN219100689U (en) Attachment structure suitable for super high floor attached lifting scaffold
CN205369861U (en) Support scaffold for building
CN205990748U (en) A kind of fabricated scaffold constructing device
CN217508096U (en) Easily install electric power circuit modularization crossing structure
CN215926657U (en) Construction engineering site operation platform
CN220599146U (en) Adjustable overhanging outer scaffold upright rod fixing base and overhanging outer scaffold
CN220167444U (en) Building engineering is with climbing frame
CN204370784U (en) A kind of tool-type construction elevator discharging platform
CN108331328A (en) A kind of scaffold latch closure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811

RJ01 Rejection of invention patent application after publication