CN106437121A - Outside construction operating platform of industrial assembly engineering for preventing objects from hitting - Google Patents
Outside construction operating platform of industrial assembly engineering for preventing objects from hitting Download PDFInfo
- Publication number
- CN106437121A CN106437121A CN201611023018.9A CN201611023018A CN106437121A CN 106437121 A CN106437121 A CN 106437121A CN 201611023018 A CN201611023018 A CN 201611023018A CN 106437121 A CN106437121 A CN 106437121A
- Authority
- CN
- China
- Prior art keywords
- platform
- building
- operating platform
- operating
- protective door
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/20—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/141—Railings with an access door or the like therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Wing Frames And Configurations (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses an outside construction operating platform of industrial assembly engineering for preventing objects from hitting, comprising a frame body which is removably connected with the construction exterior wall, and an operating platform horizontally arranged on the frame body and an outer protective board vertically arranged. The outer protective board, operating platform and corresponding construction exterior wall collectively compose the operating space of construction personnel. The two sides of the outer protective board are respectively hinged with a protective door. A plurality of operating platforms are arranged horizontally along the construction exterior wall to form an operating channel. When any working platform needs cutting off, the protective door on any side or both sides of the corresponding working platform is closed. The outside construction operating platform of industrial assembly engineering for preventing objects from hitting is combined with the actual situation of engineering and engineering characteristics, to effectively solve the problem that the construction personnel working in the external wall do not have the operating platform by a plurality of operating platforms installed and fixed on the construction exterior wall to form a worker operating channel. And the outside construction operating platform of industrial assembly engineering for preventing objects from hitting has the advantages of being simple and reliable in structure, convenient and normative in installation, capable of repeated use, and more beautiful than the traditional frame.
Description
Technical field
The invention belongs to technical field of building construction, hit building particularly to a kind of anti-object of industrialization assembled engineering
Outer construction operation platform.
Background technology
Currently for the industrialized building engineering of high-rise building, because its building structure is complicated, and external wall is pre-
Shear wall processed, therefore cannot set up suspension scaffold using traditional construction technique, simultaneously because of complex structure, using integral lifting rack expense
Prohibitively expensive and cost performance is too low.
Content of the invention
It is an object of the invention to:For above-mentioned problem, provide a kind of simple and reliable for structure, easy for installation fast
Victory, the anti-object of industrialization assembled engineering in energy effectively solving workmen's outer wall operation space hits the outer construction operation of building and puts down
Platform.
The technical scheme is that and be achieved in that:The anti-object of industrialization assembled engineering hits builds outer construction operation
Platform it is characterised in that:Including with skin detachable connection ground support body and be arranged on horizontally disposed on support body
Operating platform and be vertically arranged and protect sideboard outside ground, described outer protection sideboard, operating platform and corresponding skin
Collectively form the working place of workmen, described outer protection sideboard both sides side is hinged with protective door respectively, multiple job platforms
Along skin transversely arranged composition operating walk way, when needing to separate any job platform, close corresponding job platform and appoint
The protective door of meaning one or both sides.
The industrialization assembled engineering of the present invention anti-object strike outer construction operation platform of building, its described outer protection
Sideboard is arranged in parallel with skin face, and when described protective door is closed, described protective door is vertical with skin face, and
Protection is blocked to job platform both sides.
The industrialization assembled engineering of the present invention anti-object strike outer construction operation platform of building, its described protective door
When turning to closed or open position, pass through respectively to protect latch jack corresponding with operating platform cooperation positioning.
The industrialization assembled engineering of the present invention anti-object strike outer construction operation platform of building, it is in described operation
It is respectively arranged with suspension ring at the angle of each end, described suspension ring are located at the outside when closed position for the protective door, and are used on platform
Limit the limit position that protective door rotates.
The industrialization assembled engineering of the present invention anti-object strike outer construction operation platform of building, its spy is in described frame
Wall-through pull rod is provided with body, during installation, described wall-through pull rod passes through reserved through hole on building masonry wall, and will by nut
Job platform is fixed on skin.
The industrialization assembled engineering of the present invention anti-object strike outer construction operation platform of building, it is in described operation
A platform side corresponding with skin is hinged with protection turnover panel, and described protection turnover panel leading section is folded upward at, during use,
The kink of described protection turnover panel front end is fitted with skin face, and described protection turnover panel shelters from operating platform completely and builds
Build the gap between beyond the region of objective existence wall.
Incorporation engineering practical situation of the present invention and engineering characteristic, by being fixed on building beyond the region of objective existence by multiple job platforms
Wall and form the operating walk way of workmen, efficiently solve the problems, such as workmen's outer wall operation no operating platform, Er Qieben
Inventive structure is simple and reliable, easy for installation, specification, installs and saved for 70% time than traditional discharging platform, can save than traditional builder's jack
Duration about 10%-15%, and can Reusability, and more more attractive than traditional builder's jack.
Brief description
Fig. 1 and Fig. 2 is the structural representation that in the present invention, side protects during door closure state.
Fig. 3 is structural representation during protective door equal open mode in both sides in the present invention.
In figure labelling:1 is support body, and 2 is operating platform, and 3 is outer protection sideboard, and 4 is protective door, and 5 is protection latch, and 6 are
Suspension ring, 7 is wall-through pull rod, and 8 is protection turnover panel, and 8a is kink.
Specific embodiment
Below in conjunction with the accompanying drawings, the present invention is described in detail.
In order that the objects, technical solutions and advantages of the present invention become more apparent, below in conjunction with drawings and Examples, right
The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only in order to explain the present invention, and
It is not used in the restriction present invention.
As shown in Figure 1,2 and 3, a kind of industrialization assembled engineering anti-object strike outer construction operation platform of building, including
With skin detachable connection ground support body 1 and be arranged on support body 1 horizontally disposed ground operating platform 2 and vertical cloth
Put protection sideboard 3 outside ground, described support body 1 is provided with wall-through pull rod 7, during installation, described wall-through pull rod 7 passes through building wall
Reserved through hole on body, and by nut, job platform is fixed on skin;Described outer protection sideboard 3 and building
Build beyond the region of objective existence metope to be arranged in parallel, as workman on the operational platform operation when guard rail, described outer protection sideboard 3, operation are flat
Platform 2 and corresponding skin collectively form the working place of workmen, described outer protection 3 liang of sides of sideboard respectively with
Protective door 4 is hinged, and multiple job platforms, along skin transversely arranged composition operating walk way, are needing to separate any operation horizontal
During platform, close the protective door 4 of corresponding any one or both sides of job platform, described operating platform 2 is punished near each end angle
When not being provided with suspension ring 6, described suspension ring 6 are located at the outside when closed position for the protective door 4, and being used for limiting protective door 4 closing
The limit position rotating, when described protective door 4 is closed, described protective door 4 is vertical with skin face, and to job platform two
Protection is blocked in side;Described protective door 4, when turning to closed or open position, passes through to protect on latch 5 and operating platform 2 respectively
Corresponding jack cooperation positioning.
Wherein, it is hinged with protection turnover panel 8, described protection in described operating platform 2 side corresponding with skin
Turnover panel 8 leading section is folded upward at, and during use, the kink 8a of described protection turnover panel 8 front end is fitted with skin face, described
Protection turnover panel 8 shelters from the gap between operating platform 2 and skin completely, to prevent the thing on operating platform further
Body falls phenomenon.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention
Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.
Claims (6)
1. the anti-object of industrialization assembled engineering hit build outer construction operation platform it is characterised in that:Including with building beyond the region of objective existence
Wall detachable connection ground support body(1)And it is arranged on support body(1)Upper horizontally disposed ground operating platform(2)And it is vertically arranged ground
Outer protection sideboard(3), described outer protection sideboard(3), operating platform(2)And corresponding skin collectively forms constructor
The working place of member, described outer protection sideboard(3)Two sides respectively with protective door(4)Hinged, multiple job platforms are along building
Exterior wall transversely arranged composition operating walk way, when needing to separate any job platform, close corresponding any side of job platform or
The protective door of both sides(4).
2. the industrialization assembled engineering according to claim 1 anti-object strike outer construction operation platform of building, its feature
It is:Described outer protection sideboard(3)It is arranged in parallel with skin face, when described protective door(4)During closing, described protective door
(4)Vertical with skin face, and protection is blocked to job platform both sides.
3. the industrialization assembled engineering according to claim 2 anti-object strike outer construction operation platform of building, its feature
It is:Described protective door(4)When turning to closed or open position, pass through respectively to protect latch(5)With operating platform(2)On
Corresponding jack cooperation positioning.
4. the industrialization assembled engineering according to claim 2 anti-object strike outer construction operation platform of building, its feature
It is:In described operating platform(2)It is respectively arranged with suspension ring at upper close each end angle(6), described suspension ring(6)Positioned at protective door
(4)Outside when closed position, and be used for limiting protective door(4)The limit position rotating.
5. the industrialization assembled engineering according to claim 1 anti-object strike outer construction operation platform of building, its feature
It is:In described support body(1)On be provided with wall-through pull rod(7), during installation, described wall-through pull rod(7)Through on building masonry wall
Reserved through hole, and by nut, job platform is fixed on skin.
6. the anti-object of industrialization assembled engineering as claimed in any of claims 1 to 5 hits the outer construction of building and makees
Industry platform it is characterised in that:In described operating platform(2)A side corresponding with skin is hinged with protection turnover panel(8),
Described protection turnover panel(8)Leading section is folded upward at, during use, described protection turnover panel(8)The kink of front end(8a)With building
Wall face is fitted, described protection turnover panel(8)Shelter from operating platform completely(2)Gap and skin between.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611023018.9A CN106437121B (en) | 2016-11-21 | 2016-11-21 | It industrializes the anti-object strike of assembled engineering and builds outer construction operation platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611023018.9A CN106437121B (en) | 2016-11-21 | 2016-11-21 | It industrializes the anti-object strike of assembled engineering and builds outer construction operation platform |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106437121A true CN106437121A (en) | 2017-02-22 |
| CN106437121B CN106437121B (en) | 2019-04-16 |
Family
ID=58220331
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611023018.9A Active CN106437121B (en) | 2016-11-21 | 2016-11-21 | It industrializes the anti-object strike of assembled engineering and builds outer construction operation platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106437121B (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107035152A (en) * | 2017-04-19 | 2017-08-11 | 嘉兴市华弘工程设备有限公司 | The safe discharging platform of assembled for construction |
| CN107060306A (en) * | 2017-04-28 | 2017-08-18 | 胡德 | A kind of outer protective scaffold of novel architecture |
| CN110950183A (en) * | 2019-11-25 | 2020-04-03 | 西安优信机电工程有限公司 | A multi-stage lifting deformable support device |
| CN111042505A (en) * | 2020-01-02 | 2020-04-21 | 李小强 | Scaffold device for building decoration capable of preventing floor damage |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111074785B (en) * | 2020-01-18 | 2021-10-22 | 山西路桥第三工程有限公司 | Suspension construction platform for bridge |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201619105U (en) * | 2010-01-27 | 2010-11-03 | 珠海格力电器股份有限公司 | Equipment maintenance platform |
| EP2706168A2 (en) * | 2012-09-10 | 2014-03-12 | Pohjolan Design-Talo Oy | Wall bracket and working platform |
| CN204001652U (en) * | 2014-08-04 | 2014-12-10 | 江苏省苏中建设集团股份有限公司沈阳分公司 | The portable exterior wall operating platform of fabricated shear wall structure |
| CN104420641A (en) * | 2013-09-03 | 2015-03-18 | 中铁建工集团有限公司 | Extensible lifting construction platform |
| CN206205412U (en) * | 2016-11-21 | 2017-05-31 | 成都建筑工程集团总公司 | The anti-object strike outer construction operation platform of building of industrialization assembled engineering |
-
2016
- 2016-11-21 CN CN201611023018.9A patent/CN106437121B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201619105U (en) * | 2010-01-27 | 2010-11-03 | 珠海格力电器股份有限公司 | Equipment maintenance platform |
| EP2706168A2 (en) * | 2012-09-10 | 2014-03-12 | Pohjolan Design-Talo Oy | Wall bracket and working platform |
| CN104420641A (en) * | 2013-09-03 | 2015-03-18 | 中铁建工集团有限公司 | Extensible lifting construction platform |
| CN204001652U (en) * | 2014-08-04 | 2014-12-10 | 江苏省苏中建设集团股份有限公司沈阳分公司 | The portable exterior wall operating platform of fabricated shear wall structure |
| CN206205412U (en) * | 2016-11-21 | 2017-05-31 | 成都建筑工程集团总公司 | The anti-object strike outer construction operation platform of building of industrialization assembled engineering |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107035152A (en) * | 2017-04-19 | 2017-08-11 | 嘉兴市华弘工程设备有限公司 | The safe discharging platform of assembled for construction |
| CN107060306A (en) * | 2017-04-28 | 2017-08-18 | 胡德 | A kind of outer protective scaffold of novel architecture |
| CN110950183A (en) * | 2019-11-25 | 2020-04-03 | 西安优信机电工程有限公司 | A multi-stage lifting deformable support device |
| CN111042505A (en) * | 2020-01-02 | 2020-04-21 | 李小强 | Scaffold device for building decoration capable of preventing floor damage |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106437121B (en) | 2019-04-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106437121B (en) | It industrializes the anti-object strike of assembled engineering and builds outer construction operation platform | |
| AU2016203815B2 (en) | Hoisting Apparatus and System | |
| CN113006506B (en) | Detachable anti-falling device for multi-storey house and installation method thereof | |
| CN206233562U (en) | The safety device of revealing all the details of hydraulic pressure lift form frame system | |
| CN206205412U (en) | The anti-object strike outer construction operation platform of building of industrialization assembled engineering | |
| CN202450762U (en) | Construction lifting platform | |
| CN204418632U (en) | Climbing type safety guard net | |
| CN207658909U (en) | A kind of construction elevator cage door | |
| CN102733586A (en) | Scaffold cart | |
| CN205259571U (en) | Hanging flower basket structure for building engineering | |
| CN210193252U (en) | Climb a formula tower crane driver passageway that adheres to | |
| CN105155832B (en) | A kind of hanging basket equipment and its moving method | |
| CN202324680U (en) | Protection device of elevator shaft | |
| CN207739605U (en) | Elevator shaft three-dimensional construction protection system | |
| CN203319469U (en) | Cage enclosing wall and cage | |
| CN207142695U (en) | A kind of mould bases platform can multistage dig tower crane passage | |
| CN201671311U (en) | Elevator shaft inside construction protecting rack | |
| CN205422060U (en) | Interim storehouse in portable building site | |
| CN203451012U (en) | Double-cage elevator safety protective door spindle device | |
| CN204040510U (en) | A kind of safety protective door for elevator hoistways | |
| CN209874520U (en) | A kind of border protection fence in building construction | |
| CN106081830A (en) | Bridging type safety door construction elevator | |
| CN206987350U (en) | Exterior wall finishing hanging basket | |
| CN208310158U (en) | Construction protection crosshead | |
| CN206635934U (en) | The fire-fighting rack standing cabin of support base is reinforced in bottom installation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information | ||
| CB02 | Change of applicant information |
Address after: 610031 No. 111 Babao Street, Qingyang District, Chengdu City, Sichuan Province Applicant after: Chengdu Construction Industry Group Co., Ltd. Applicant after: Chengdu Construction Engineering No. 7 Construction Engineering Co., Ltd. Address before: 610031 No. 111 Babao Street, Qingyang District, Chengdu City, Sichuan Province Applicant before: Chengdu Construction Engineering Group Corp. Applicant before: Chengdu No.7 Construction Engineering Co., Ltd. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant |