Safety rail with dredging with positioning floor function Download PDF

Info

Publication number
CN107035083A
CN107035083A CN201710419770.3A CN201710419770A CN107035083A CN 107035083 A CN107035083 A CN 107035083A CN 201710419770 A CN201710419770 A CN 201710419770A CN 107035083 A CN107035083 A CN 107035083A
Authority
CN
China
Prior art keywords
armrest
dredging
control unit
alarm switch
stair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710419770.3A
Other languages
Chinese (zh)
Inventor
陈海霞
李溪稳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710419770.3A priority Critical patent/CN107035083A/en
Publication of CN107035083A publication Critical patent/CN107035083A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/1802Handrails mounted on walls, e.g. on the wall side of stairs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/1802Handrails mounted on walls, e.g. on the wall side of stairs
    • E04F11/1808Handrail members; Connections between handrail members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Alarm Systems (AREA)

Abstract

A kind of safety rail for having dredging and positioning floor function is provided, with armrest I and armrest II, the armrest I and armrest II are respectively arranged on the wall of the outside of each floor stair and inner side, and the armrest II of each floor is connected with each other, the armrest II is provided with the alarm switch being connected with the control unit in Control Room, and is controlled to dredge notice and the dredging of realizing stair emergency after prompting element by control unit by unlatching/closing of alarm switch.The present invention passes through outside setting armrest I and armrest II in stair, improve the security of skidding people inside and outside stair, simultaneously provided with the alarm switch being connected with control unit inside armrest II, realize notice and dredging of the quick transmission of message with emergency at stair, it is prevented effectively from the deterioration of accident, ability simple in construction, it is easy to operate, provide guarantee for the personal safety of people.

Description

Safety rail with dredging with positioning floor function
Technical field
There is dredging and the safety rail of positioning floor function the present invention relates to a kind of.
Background technology
At present, the handrail function on residential building building stair and school instruction building, dormitory building stair is single, only in stair Outside is provided with handrail, and this substantially increases the danger coefficient of resident or student of the walking on the inside of stair, and larger for flow of the people School, during student's stair activity, the tread event taken place frequently in dangerous accident, such as school can occur often, when Stair activity occurs after accident, due to message transmission not in time, delay events processing, can cause serious consequence, work as When tread event occurs for school, such as dredge not in time, to the timely processing of the wounded, then can aggravate the consequence of tread event, if In residential building, occur Falls Among Old People or other accidents, if message transmission is not in time, processing not in time, then can be good for old man Health even life threatens, in view of the above-mentioned problems, being necessary to be improved.
The content of the invention
Present invention solves the technical problem that:There is provided it is a kind of have dredging with positioning floor function safety rail, by Outside sets armrest I and armrest II in stair, the security of skidding people inside and outside stair is improved, while in handrail knot Quick transmission and the notice of emergency at stair of message are realized provided with the alarm switch being connected with control unit in the inside of structure II With dredging, the deterioration of accident is prevented effectively from, ability simple in construction is easy to operate, and guarantee is provided for the personal safety of people.
The technical solution adopted by the present invention:Safety rail with dredging with positioning floor function, with the He of armrest I Armrest II, the armrest I and armrest II are respectively arranged on the wall of the outside of each floor stair and inner side, and The armrest II of each floor is connected with each other, and the armrest II is provided with the alarm being connected with the control unit in Control Room Switch, and controlled to realize stair emergency after dredging prompting element by control unit by unlatching/closing of alarm switch Notice and dredging.
Wherein, the prompting element of dredging is sound equipment, first output end of described control unit and the input of display End connection, second output end of described control unit and the input of sound equipment are connected, first input of described control unit End is connected with the output end of display, and second input of described control unit and the output end of alarm switch are connected, described 3rd input of control unit and the output end of camera are connected.
Further, the armrest I includes U rows pipe I and U rows pipe II, the mouth of pipe and metope at the two ends of U rows pipe I Be vertically arranged and be fixed in wall, the U rows pipe II is located at the lower section of U rows pipe I and the two ends mouth of pipe of U rows pipe II is set upward and with U rows pipe I is fixedly connected.
Further, the alarm switch is located at the main pipeline bottom of the terraced corner armrest II per floor, the master The wire for connecting alarm switch and control element is provided with pipeline.
Further, be fixed with attachment cap on the main pipeline and attachment cap be threadedly coupled with alarm switch after alarm is opened Main pipeline bottom is fixed in pass.
The advantage of the present invention compared with prior art:
1st, by outside setting armrest I and armrest II in stair, the peace of skidding people inside and outside stair is improved Quan Xing, safety assurance is provided for the pedestrian of stair activity;
2nd, the alarm switch that main pipeline is provided with is easy to people to pass burst information rapidly, and position substantially, is operated It is convenient;
3rd, this programme can realize the quick transmission of unexpected message and the notice of emergency at stair and dredging, be prevented effectively from The deterioration of accident, alarm switch is threadedly coupled with main pipeline and is integrated, and is easy to the maintenance to alarm switch and inner lead With replacing, ability simple in construction is easy to operate, and guarantee is provided for the personal safety of people.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is that the present invention is main pipeline and alarm switch attachment structure schematic diagram;
Fig. 3 is principle of the invention sketch.
Embodiment
1-3 describes a kind of embodiment of the present invention below in conjunction with the accompanying drawings.
Safety rail with dredging with positioning floor function, with armrest I 1 and armrest II 2, the handrail Structure I 1 and armrest II 2 are respectively arranged on the wall of the outside of each floor stair and inner side, and the armrest of each floor II 2 are connected with each other, and the armrest II 2 is provided with the alarm switch 4 being connected with the control unit 3 in Control Room, and passes through Unlatching/closing of alarm switch 4 controls to dredge the notice that stair emergency is realized after prompting element with dredging by control unit 3 It is logical;Specifically, the prompting element of dredging is sound equipment 5, first output end of described control unit 3 and the input of display 6 End connection, second output end of described control unit 3 is connected with the input of sound equipment 5, and first of described control unit 3 is defeated Enter end to be connected with the output end of display 6, second input of described control unit 3 is connected with the output end of alarm switch 4, 3rd input of described control unit 3 is connected with the output end of camera 7;Specifically, the armrest I 1 includes U rows Pipe I 11 and U rows pipe II 12, the mouth of pipe and the metope at the two ends of U rows pipe I 11 are vertically arranged and are fixed in wall, the U rows pipe II 12 below U rows pipe I 11 and the two ends mouth of pipe of U rows pipe II 12 sets and is fixedly connected with U rows pipe I 11 upward;Specifically, institute The bottom of main pipeline 8 that alarm switch 4 is located at the terraced corner armrest II 2 per floor is stated, interior be provided with of the main pipeline 8 will alarm The wire 10 that switch 4 and control element 3 are connected;Specifically, being fixed with attachment cap 9 on the main pipeline 8 and attachment cap 9 and alarm Alarm switch 4 is fixed on the bottom of main pipeline 8 after the threaded connection of switch 4.
When accident occurs in school instruction building or lodging building, the image information that camera 7 is shot is transferred to control Shown on the display 6 after unit 3, the student near alarm switch 4 presses alarm switch 4, this information will be transmitted Control unit 3 in Control Room, control unit 3 is received can show accident floor after information on the image that display 6 is shown, The voice set after internal voice chip operation by the broadcasting of sound equipment 5 is controlled by control unit 3 simultaneously, is dredged by the voice of broadcasting Staff in the logical crowd in confusion, Control Room is notified that related director is reached at the scene of the accident rapidly After the completion of reason, accident treatment, warning message can be closed by the button on alarm switch 4 or display 6, control unit 3 After the information for receiving Alerts Off, sound equipment 5 is closed;When occur in residential building old man fall down, tumble injury or other emergency situations Afterwards, old man is pressed after alarm switch 4, and the control unit 3 of control unit 3. that this signal is transferred in Control Room is received will after information Accident floor can be shown on the display 6, and according to the specific accident conditions shot according to camera 7, dial 120 ambulance calls After send someone to rush for scene, be resident personal safety improve powerful guarantee.Pass through the outside setting He of armrest I 1 in stair Armrest II 2, improves the security of skidding people inside and outside stair, and safety assurance, main pipeline 8 are provided for the pedestrian of stair activity The alarm switch 4 being provided with is easy to people to pass burst information rapidly, and substantially, easy to operate, this programme can be real for position Notice and dredging of the quick transmission of existing unexpected message with emergency at stair, are prevented effectively from the deterioration of accident, alarm Switch 4 is threadedly coupled with main pipeline 8 to be integrated, and is easy to the maintenance and replacing to alarm switch 4 and inner lead 10, simple in construction , it is easy to operate, provide guarantee for the personal safety of people.
Above-described embodiment, simply presently preferred embodiments of the present invention, not for limiting the scope of the present invention, thus it is all with this The equivalence changes that content described in invention claim is done, all should be included within scope of the invention as claimed.

Claims (5)

1. the safety rail with dredging with positioning floor function, with armrest I (1) and armrest II (2), its feature It is:The armrest I (1) and armrest II (2) are respectively arranged on the wall of the outside of each floor stair and inner side, and The armrest II (2) of each floor is connected with each other, and the armrest II (2) is provided with and the control unit (3) in Control Room The alarm switch (4) of connection, and dredged by unlatching/closing of alarm switch (4) by control unit (3) control after prompting element Realize the notice of emergency and dredging at stair.
2. according to claim 1 have dredging and the safety rail of positioning floor function, it is characterised in that:It is described to dredge Prompting element is sound equipment (5), and first output end of described control unit (3) is connected with the input of display (6), the control Second output end of unit (3) processed is connected with the input of sound equipment (5), first input of described control unit (3) with The output end connection of display (6), second input of described control unit (3) is connected with the output end of alarm switch (4), 3rd input of described control unit (3) is connected with the output end of camera (7).
3. according to claim 1 or 2 have dredging and the safety rail of positioning floor function, it is characterised in that:It is described Armrest I (1) includes U rows pipe I (11) and U rows pipe II (12), and the mouth of pipe at described (11) two ends of U rows pipe I is vertical with metope to be set Put and be fixed in wall, the U rows pipe II (12) is located at below U rows pipe I (11) and (12) two ends mouth of pipe of U rows pipe II is set upward Put and be fixedly connected with U rows pipe I (11).
4. according to claim 1 or 2 have dredging and the safety rail of positioning floor function, it is characterised in that:It is described Alarm switch (4) is located in main pipeline (8) bottom of the terraced corner armrest II (2) per floor, the main pipeline (8) and is provided with The wire (10) that alarm switch (4) and control element (3) are connected.
5. according to claim 4 have dredging and the safety rail of positioning floor function, it is characterised in that:The supervisor Be fixed with attachment cap (9) on road (8) and attachment cap (9) be threadedly coupled with alarm switch (4) after alarm switch (4) is fixed on master Pipeline (8) bottom.
CN201710419770.3A 2017-06-06 2017-06-06 Safety rail with dredging with positioning floor function Withdrawn CN107035083A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710419770.3A CN107035083A (en) 2017-06-06 2017-06-06 Safety rail with dredging with positioning floor function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710419770.3A CN107035083A (en) 2017-06-06 2017-06-06 Safety rail with dredging with positioning floor function

Publications (1)

Publication Number Publication Date
CN107035083A true CN107035083A (en) 2017-08-11

Family

ID=59541490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710419770.3A Withdrawn CN107035083A (en) 2017-06-06 2017-06-06 Safety rail with dredging with positioning floor function

Country Status (1)

Country Link
CN (1) CN107035083A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204081A (en) * 2018-03-13 2018-06-26 安徽虎邦建设有限公司 A kind of stair railing for students' dormitory

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008002064A (en) * 2006-06-20 2008-01-10 Ito Komuten:Kk Handrail
US20090309086A1 (en) * 2008-06-17 2009-12-17 Julie Behan Monitoring handrails to reduce falls
CN201991154U (en) * 2011-03-10 2011-09-28 王立新 Teaching building staircase
CN201991153U (en) * 2011-02-22 2011-09-28 袁浩 Bidirectional stair
CN205259498U (en) * 2015-12-03 2016-05-25 武汉大学 Novel stair railing
CN205899759U (en) * 2016-07-12 2017-01-18 杨骥林 Warning circuit and prevent trampling alarm system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008002064A (en) * 2006-06-20 2008-01-10 Ito Komuten:Kk Handrail
US20090309086A1 (en) * 2008-06-17 2009-12-17 Julie Behan Monitoring handrails to reduce falls
CN201991153U (en) * 2011-02-22 2011-09-28 袁浩 Bidirectional stair
CN201991154U (en) * 2011-03-10 2011-09-28 王立新 Teaching building staircase
CN205259498U (en) * 2015-12-03 2016-05-25 武汉大学 Novel stair railing
CN205899759U (en) * 2016-07-12 2017-01-18 杨骥林 Warning circuit and prevent trampling alarm system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204081A (en) * 2018-03-13 2018-06-26 安徽虎邦建设有限公司 A kind of stair railing for students' dormitory

Similar Documents

Publication Publication Date Title
CN104570988B (en) A kind of pedestrian's street crossing intelligent gate control system
KR101514696B1 (en) Safety Accident Management System Of Bridge
CN107035083A (en) Safety rail with dredging with positioning floor function
US20180111794A1 (en) Elevator with function of escaping upon failure
US20150056905A1 (en) Oxygen supply elevator
CN106668986A (en) Safety drop infusion and blood transfusion monitoring system and monitoring method thereof
CN104192657A (en) Remote rescue communication device for passengers trapped in elevator
KR20210059104A (en) Smart stick for blind
CN105788128A (en) Household antitheft monitor system
CN108221520B (en) A kind of monitoring of region flow of the people and leading method and its system
CN107341940A (en) A kind of safety monitoring system and monitoring method
JP2007246230A (en) Rescue system for elevator
KR101281126B1 (en) Emergency escaping control system and method thereof
CN206209367U (en) A kind of subdistrict intelligent monitoring system
CN107564303A (en) A kind of traffic accident monitoring and regulator control system
CN205788593U (en) Warning brick burglary-resisting system
KR20180064762A (en) Scream recognition device located in indoor space
EP2192562A1 (en) Emergency door control device and door system
CN216360331U (en) Aluminum alloy pedestrian bridge with safe elevator operation
CN205076648U (en) Moving staircase control system
CN107866010A (en) A kind of multifunctional emergency life-saving hammer for being used to escape car accident
JPH04159987A (en) Emergency informing device
CN208540053U (en) Flash appeal alarm column
CN109138060B (en) Intelligent post fire hydrant
CN203334922U (en) Window guard bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20170811