CN107034923A - A kind of steel fibre quick lock in well lid - Google Patents

A kind of steel fibre quick lock in well lid Download PDF

Info

Publication number
CN107034923A
CN107034923A CN201710321907.1A CN201710321907A CN107034923A CN 107034923 A CN107034923 A CN 107034923A CN 201710321907 A CN201710321907 A CN 201710321907A CN 107034923 A CN107034923 A CN 107034923A
Authority
CN
China
Prior art keywords
well lid
pedestal
steel fibre
undergauge
chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710321907.1A
Other languages
Chinese (zh)
Inventor
杨自成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGXING COUNTY LIJIAXIANG FOUNDRY PLANT
Original Assignee
CHANGXING COUNTY LIJIAXIANG FOUNDRY PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGXING COUNTY LIJIAXIANG FOUNDRY PLANT filed Critical CHANGXING COUNTY LIJIAXIANG FOUNDRY PLANT
Priority to CN201710321907.1A priority Critical patent/CN107034923A/en
Publication of CN107034923A publication Critical patent/CN107034923A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • E02D29/1427Locking devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of steel fibre quick lock in well lid of the present invention belongs to city auxiliary facility, it is to be made up of pedestal and well lid, its described pedestal and well lid are that rounded engagement is used, the bottom of base internal wall is provided with undergauge chuck, vertical uniform more than two lockholes in undergauge chuck, the uniform vertical circular arc raised line of two or more on undergauge chuck top base inwall, well lid outer wall is provided with the vertical groove used cooperatively with circular arc raised line, axis hole is equipped with well lid above described lockhole, axis hole is built-in with lock shaft, and the bottom of lock shaft is fixedly connected horizontal locking bar.A kind of steel fibre quick lock in well lid of the present invention, simple in construction, the easy to use, construction time is short and construction cost is relatively low, easy to operate, service life is longer, it can realize and quickly be locked well lid with cover seat of manhole, lock that the latter two stability are strong, security performance is significantly lifted.It is convenient to change and open.

Description

A kind of steel fibre quick lock in well lid
Technical field
The invention belongs to city auxiliary facility, more particularly to a kind of steel fibre quick lock in well lid.
Background technology
Substantially direct lid pressure mode is used between well lid and cover seat of manhole on cement road or on bituminous highway, it is this Mode is more convenient for the installation and replacing and unlatching work of well lid, but security is relatively low, and the two is using simple Cover buckle mode so that the stability between well lid and cover seat of manhole is not relative high, is influenceed by external force factor and produces disengaging, lateral deviation It is relatively large etc. the probability that phenomenon occurs, when well lid and cover seat of manhole depart from or occur lateral deviation, pedestrian can be given and passing Vehicle cause certain potential safety hazard, and by well lid with cover seat of manhole by way of jointed shaft is connected, and strong influence pair The installation of cover seat of manhole, and well lid damage more change jobs.
The content of the invention
It is contemplated that deficiency present in background technology is directed to, and a kind of steel fibre quick lock in well lid provided.
A kind of well lid of quick lock in of the present invention, is to be made up of pedestal and well lid, its described pedestal and well lid are circle Shape is used cooperatively, and the bottom of base internal wall is provided with vertical uniform more than two lockholes, undergauge card in undergauge chuck, undergauge chuck The vertical circular arc raised line of uniform two or more on platform top base inwall, well lid outer wall is provided with what is used cooperatively with circular arc raised line Axis hole is equipped with well lid above vertical groove, described lockhole, axis hole is built-in with lock shaft, and the bottom of lock shaft is fixedly connected Horizontal locking bar.
As a preference of the present invention, the specification of described lockhole is more than the specification of locking bar.
As a preference of the present invention, the thickness of described well lid 2 and the undergauge chuck upper surface of pedestal 1 to pedestal upper surface it Between height.
As a preference of the present invention, the top of described lock shaft is provided with rotation neck.
As a preference of the present invention, the length in well lid bottom of described lock shaft is more than the thickness of undergauge chuck.
As a preference of the present invention, the periphery bottom of described pedestal 1 is provided with bearing, between bearing and pedestal it is uniform even Connect reinforcement.
As a preference of the present invention, described well lid be provided with longitudinally through hole slot.
As a preference of the present invention, described well lid is made up of steel fiber material.
A kind of steel fibre quick lock in well lid of the present invention, simple in construction, the easy to use, construction time is short and is constructed into This relatively low, easy to operate, service life is longer, can realize and quickly be locked well lid with cover seat of manhole, lock the latter two It is fixed by locking bar, stability is strong, occur the problem of avoid well lid with pedestal disengaging and lateral deviation, security performance is significantly Degree lifting, changes and opens also more convenient.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Embodiment
A kind of 1 pair of steel fibre quick lock in well lid of the invention, is described further below in conjunction with the accompanying drawings.
Embodiment 1
A kind of steel fibre quick lock in well lid of the present invention, is to be made up of pedestal 1 and well lid 2, its described pedestal 1 and well lid 2 are equal Used for rounded engagement, the bottom of the inwall of pedestal 1 is provided with vertical uniform more than two lockholes in undergauge chuck 3, undergauge chuck 3 4, the vertical circular arc raised line 5 of uniform two or more on the inwall of 3 top base of undergauge chuck 1, the outer wall of well lid 2 is provided with convex with circular arc Axis hole 6 is equipped with well lid 2 above the vertical groove 6 that bar 5 is used cooperatively, described lockhole 4, axis hole 6 is built-in with lock shaft 7, The bottom of lock shaft 7 is fixedly connected horizontal locking bar 8.
Embodiment 2
A kind of steel fibre quick lock in well lid of the present invention, is to be made up of pedestal 1 and well lid 2, its described pedestal 1 and well lid 2 are equal Used for rounded engagement, the bottom of the inwall of pedestal 1 is provided with vertical uniform more than two lockholes in undergauge chuck 3, undergauge chuck 3 4, the vertical circular arc raised line 5 of uniform two or more on the inwall of 3 top base of undergauge chuck 1, the outer wall of well lid 2 is provided with convex with circular arc Axis hole 6 is equipped with well lid 2 above the vertical groove 6 that bar 5 is used cooperatively, described lockhole 4, axis hole 6 is built-in with lock shaft 7, The bottom of lock shaft 7 is fixedly connected horizontal locking bar 8.The specification of lockhole 4 is more than the specification of locking bar 8, and locking bar 8 is passed through after lockhole 4 Rotate 7 nine ten degree of lock shaft i.e. lockable.The thickness of well lid 2 and the upper surface of 1 undergauge chuck of pedestal 3 are between the upper surface of pedestal 1 Highly, plane is kept after covering without depression, it is good by property.The top of lock shaft 7 is convenient that lock shaft is revolved provided with rotation neck 9 Turn.The length in the bottom of well lid 2 of lock shaft 7 is more than the thickness of undergauge chuck 3.The periphery bottom of pedestal 1 is provided with bearing 10, bearing Uniform connection strengthening rib 11, strengthens intensity and stability between 10 and pedestal 1.Well lid 2 be provided with longitudinally through hole slot 12.For open manhole cover.Well lid 1 is made up of steel fiber material.
As known by the technical knowledge, the present invention can be by the embodiment party of other essence or essential feature without departing from its spirit Case is realized.Therefore, embodiment disclosed above, for each side, is all merely illustrative, and is not only.Institute Have within the scope of the present invention or be included in the invention in the change being equal in the scope of the present invention.

Claims (8)

1. a kind of steel fibre quick lock in well lid, is by pedestal(1)And well lid(2)Constitute, it is characterised in that the pedestal(1)With Well lid(2)It is that rounded engagement is used, pedestal(1)The bottom of inwall is provided with undergauge chuck(3), undergauge chuck(3)It is upper vertical The more than two lockholes of cloth(4), undergauge chuck(3)Top base(1)The vertical circular arc raised line of uniform two or more on inwall (5), well lid(2)Outer wall is provided with and circular arc raised line(5)The vertical groove used cooperatively(6), described lockhole(4)The well of top Lid(2)On be equipped with axis hole(6), axis hole(6)It is built-in with lock shaft(7), lock shaft(7)Bottom be fixedly connected horizontal locking bar (8).
2. a kind of steel fibre quick lock in well lid as claimed in claim 1, it is characterised in that described lockhole(4)Specification it is big In locking bar(8)Specification.
3. a kind of steel fibre quick lock in well lid as claimed in claim 1 or 2, it is characterised in that described well lid(2)Thickness Degree and pedestal(1)Undergauge chuck(3)Upper surface is to pedestal(1)Height between upper surface.
4. a kind of steel fibre quick lock in well lid as claimed in claim 1 or 2, it is characterised in that described lock shaft(7)Top Portion is provided with rotation neck(9).
5. a kind of steel fibre quick lock in well lid as claimed in claim 1 or 2, it is characterised in that described lock shaft(7) Well lid(2)The length of bottom is more than undergauge chuck(3)Thickness.
6. a kind of steel fibre quick lock in well lid as claimed in claim 1 or 2, it is characterised in that described pedestal(1)It is outer All bottoms are provided with bearing(10), bearing(10)With pedestal(1)Between uniform connection strengthening rib(11).
7. a kind of steel fibre quick lock in well lid as claimed in claim 1 or 2, it is characterised in that described well lid(2)On set Have longitudinally through hole slot(12).
8. a kind of steel fibre quick lock in well lid as claimed in claim 1 or 2, it is characterised in that described well lid(1)By steel Fibrous material is made.
CN201710321907.1A 2017-05-09 2017-05-09 A kind of steel fibre quick lock in well lid Pending CN107034923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710321907.1A CN107034923A (en) 2017-05-09 2017-05-09 A kind of steel fibre quick lock in well lid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710321907.1A CN107034923A (en) 2017-05-09 2017-05-09 A kind of steel fibre quick lock in well lid

Publications (1)

Publication Number Publication Date
CN107034923A true CN107034923A (en) 2017-08-11

Family

ID=59537583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710321907.1A Pending CN107034923A (en) 2017-05-09 2017-05-09 A kind of steel fibre quick lock in well lid

Country Status (1)

Country Link
CN (1) CN107034923A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882434A (en) * 2020-07-02 2022-01-04 江苏润来建设集团有限公司 Rotation type that municipal works used prevents stifled well lid

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2227148Y (en) * 1995-06-21 1996-05-15 朱万麟 Anti-theft cover for sewer monhole
CN2232055Y (en) * 1995-03-29 1996-07-31 张宝成 Double protective cover for manhole shaft
CN2619975Y (en) * 2003-05-21 2004-06-09 上海市信息管线有限公司 Anti-theft manhole cover device
KR20060008437A (en) * 2004-07-20 2006-01-27 정현철 Manhole structure for locking make use of fixing means
CN202718143U (en) * 2012-08-10 2013-02-06 山东金光复合材料股份有限公司 Well lid seal structure
CN203096898U (en) * 2012-12-24 2013-07-31 沈阳嘉润市政工程有限公司 Machining mute well lid
CN204456391U (en) * 2015-01-16 2015-07-08 刘哲铭 Safe theft-proof well cover
CN205776381U (en) * 2016-05-17 2016-12-07 浙江璟恩物联网科技有限公司 A kind of pattern manhole cover lock
CN207047900U (en) * 2017-05-09 2018-02-27 长兴县李家巷铸造厂 A kind of steel fibre quick lock in well lid

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2232055Y (en) * 1995-03-29 1996-07-31 张宝成 Double protective cover for manhole shaft
CN2227148Y (en) * 1995-06-21 1996-05-15 朱万麟 Anti-theft cover for sewer monhole
CN2619975Y (en) * 2003-05-21 2004-06-09 上海市信息管线有限公司 Anti-theft manhole cover device
KR20060008437A (en) * 2004-07-20 2006-01-27 정현철 Manhole structure for locking make use of fixing means
CN202718143U (en) * 2012-08-10 2013-02-06 山东金光复合材料股份有限公司 Well lid seal structure
CN203096898U (en) * 2012-12-24 2013-07-31 沈阳嘉润市政工程有限公司 Machining mute well lid
CN204456391U (en) * 2015-01-16 2015-07-08 刘哲铭 Safe theft-proof well cover
CN205776381U (en) * 2016-05-17 2016-12-07 浙江璟恩物联网科技有限公司 A kind of pattern manhole cover lock
CN207047900U (en) * 2017-05-09 2018-02-27 长兴县李家巷铸造厂 A kind of steel fibre quick lock in well lid

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882434A (en) * 2020-07-02 2022-01-04 江苏润来建设集团有限公司 Rotation type that municipal works used prevents stifled well lid

Similar Documents

Publication Publication Date Title
CN207047900U (en) A kind of steel fibre quick lock in well lid
CN107034923A (en) A kind of steel fibre quick lock in well lid
CN213508106U (en) Pier reinforcing apparatus who adapts to different domatic
CN202012091U (en) Plunger type manhole cover
CN203947496U (en) High-strength safe antitheft combined manhole cover
CN201485876U (en) High-strength steel fiber inspection well cover
CN107034924A (en) A kind of steel fibre high stability well lid
CN205776390U (en) Integral type well lid
CN203939055U (en) A kind of reinforced compound well curb well lid
CN213597041U (en) Anti-theft resin municipal manhole cover with lock
KR101203184B1 (en) Ultra High Performance Concrete Fabricated Cap for Manhole
CN204059415U (en) A kind of fall arrest inspection shaft
CN207295778U (en) A kind of steel fibre high stability well lid
CN203034488U (en) Manhole cover
CN106245685B (en) Easy-to-mount spring shock absorption noise reduction manhole cover
CN203256800U (en) Pressure-proof environment-friendly well lid
CN204000952U (en) High polymer composite material manhole lid and well seat combined piece
CN209975584U (en) Anti-theft communication well cover
CN102808424A (en) Anti-theft well cover with wooden core coated with compound material
CN106836308A (en) A kind of inspection well cover of the anti-tilting of damping
CN205804409U (en) A kind of anti-settling manhole cover base
CN208618463U (en) Rimless square inspection well lid
CN204590080U (en) Underground inspection well cover
CN207862987U (en) A kind of anti-settling manhole cover
CN2711250Y (en) Steel fiber reinforced concrete man-hole cover

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811