CN201485876U - High-strength steel fiber inspection well cover - Google Patents

High-strength steel fiber inspection well cover Download PDF

Info

Publication number
CN201485876U
CN201485876U CN2009201902750U CN200920190275U CN201485876U CN 201485876 U CN201485876 U CN 201485876U CN 2009201902750 U CN2009201902750 U CN 2009201902750U CN 200920190275 U CN200920190275 U CN 200920190275U CN 201485876 U CN201485876 U CN 201485876U
Authority
CN
China
Prior art keywords
inspection shaft
lid
strength steel
shaft lid
carrier base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201902750U
Other languages
Chinese (zh)
Inventor
李彦府
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201902750U priority Critical patent/CN201485876U/en
Application granted granted Critical
Publication of CN201485876U publication Critical patent/CN201485876U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to an inspection well cover, in particular to a high-strength steel fiber inspection well cover, Aiming at providing a high-strength steel fiber inspection well cover which has the advantages of simple and reasonable structure, high punching-resistant strength, low noise and low production cost. The utility model adopts the technical scheme that the high-strength steel fiber inspection well cover comprises a support seat and a tubular inspection well cover covered on the support seat. The high-strength steel fiber inspection well cover is characterized in that the inspection well cover comprises an upper-layer cover body, a lower-layer cover body and a cover ring arranged between the upper-layer cover body and the lower-layer cover body, and the lower-layer cover body and the cover ring form an integral piece formed by molding an iron plate. By arranging the cover ring and the lower-layer cover body which are formed by the iron plate below the upper-layer cover body, the compression resistance and the bearing capacity of the well cover are enhanced, the service life is prolonged, and the well cover can be avoided from being crushed when a large quantity of vehicles pass by.

Description

A kind of high-strength steel fibre inspection shaft lid
Technical field
The utility model relates to a kind of inspection shaft lid, specifically is a kind of high-intensity steel fibre inspection shaft lid.
Background technology
Along with economy, fast development of society, various inspection shafts are more and more on the road, comprise the maintenance inspection shaft of drainage system, electrical cable, and the inspection shaft of equipment such as communication network and coal gas.Inspection shaft lid commonly used is made of Moveable lid body and the lining that is fixed on the road surface, and Moveable lid body can be opened or close, and identical smooth with the road surface, guarantees the unimpeded of pedestrian, vehicle.This type of inspection shaft lid is generally made by cast iron, have the strong characteristics of anti-impact force, but cast iron itself has higher economic value, often becomes the object that the undesirable steals; More particularly be positioned at the inspection shaft lid of remote position, often stolen and be difficult in time redistribute installation, constitute dangerous pedestrian and driving.In addition, because inspection shaft lid quality problems are damaged by pressure by vehicle, in time do not repair or change; Or open the draining of inspection shaft lid and forget and cover back that these do not cover or uncap forgets that situation about resetting again all constitutes danger to pedestrian or driving, often there is vehicle to be absorbed in inspection shaft or pedestrian and falls into accident generation in the well, cause everybody strong attention.Simultaneously castiron inspection shaft lid is in use also found, when motor vehicle passes through well lid, owing to do not have shock-absorbing capacity and well lid quality really up to the mark between well lid and the carrier base, carrier base is given in the impact force pressure transmission that dynamic load is produced easily, make carrier base and infrastructure suffer conquassation and breakage occur, also, consequently influence the living environment of surrounding resident with bigger noise.
At problem last time, people select for use a kind of inspection shaft lid of composite material to replace cast iron inspection shaft lid, characteristics such as that though the inspection shaft that composite material is made lid has is in light weight, technology simple, good looking appearance, cost of production are low, and the phenomenon of being stolen can not appear, but because its anti-impact presses hit intensity poor, use soon, defectives such as well lid fracture or breakage will occur; Simultaneously, when the vehicle KDT was crossed this inspection shaft lid, well lid also can start from carrier base, and hinders its normal use, and therefore such structure has influenced promoting the use of of it on certain program.
At present, also do not address the above problem better technical scheme.
The utility model content
Technical problem to be solved in the utility model is to overcome above-mentioned the deficiencies in the prior art, and a kind of high-intensity steel fibre inspection shaft lid is provided, and that this inspection shaft lid should have is simple and reasonable, anti-impact pressure degree height, noise is little, cost of production is low characteristics.
The technical solution adopted in the utility model is: a kind of high-strength steel fibre inspection shaft lid, the tubular inspection shaft that comprises carrier base and be covered on the carrier base covers, it is characterized in that: described inspection shaft lid is formed by upper strata lid, lower floor's lid with around being arranged between the upper and lower layer lid decorative cover, and described lower floor lid and decorative cover are the integral piece of an iron plate moulding.By decorative cover and the lower floor's lid that is made of iron plate is set, thereby strengthen the crushing resistance and the bearing of well lid under the lid of upper strata, improved application life, avoided well lid conquassation well lid when a large amount of vehicles pass through.
Described inspection shaft lid is for columnar structured, and the lower floor's lid of inspection shaft lid and the thickness of decorative cover are 3~8 centimetres.
Be provided with one in the described inspection shaft lid through the steel member skeleton between the upper and lower layer lid, steel member skeleton is the integral piece that is welded into by integral plate and crisscross the channel-section steel that is distributed in this surface of steel plate.Satisfied the designing requirement of intensity of load, made that inspection shaft lid supporting capacity is strong, resistance to compression, tension, bending resistance, excellent in cushion effect promptly have robust characteristics.
Also be filled with cement or sandstone between the space of described steel member skeleton.
In the described inspection shaft lid also correspondence two latch grooves are set, correspondingly be arranged to right pinhole on the decorative cover of inspection shaft lid with on the carrier base sidewall, the steel dowel inserts pinhole and inspection shaft is covered fixedlys connected with carrier base.Have the latch of locking function by setting, reinforced the annexation between inspection shaft lid and the carrier base, prevent that the thing that the inspection shaft lid is stolen from taking place thereby further play.
Described upper strata lid is formed by concreting, and the external surface of upper strata lid is provided with anti-skidding, wear-resisting Argyle bar, increases the frictional force of upper strata lid, to reach current purpose of safety.
Described tubular inspection shaft covers and also is provided with two and lifts the hole, thereby brings great convenience for installing, safeguarding.
Described carrier base is logical up and down truncated cone-shaped structure of pushing up, and carrier base bottom correspondence is provided with two pinholes, and the steel dowel inserts pinhole carrier base is fixed on the ground, covers one deck concrete mortar on the described dowel.
Also hang a protective screening on around the inwall of described carrier base by several hooks; By the effect that protective screening further plays dual fail-safe is set.
The beneficial effects of the utility model are: by bottom lower floor's lid and the decorative cover that iron plate constitutes are set, not only reduced cost of production at the inspection shaft lid, and in light weight, and crushing resistance is good, is not easy fragmentation, distortion; And the cover plate of upper layer of inspection shaft lid adopts concrete casting to form, and can prevent the generation of noise effectively.The steel member skeleton that the inspection shaft lid is built-in has satisfied the designing requirement of intensity of load on the one hand, makes that inspection shaft lid supporting capacity is strong, and resistance to compression, tension, bending resistance, excellent in cushion effect promptly have robust characteristics.Simultaneously, also hang a protective screening on around the carrier base inwall, thereby further avoided the casualties that causes because of inspection shaft losing of cover or damage.
Description of drawings
Fig. 1 is the utility model stereogram;
Fig. 2 is the vertical view of inspection shaft lid among Fig. 1;
Fig. 3 is the structural representation of steel member skeleton in the utility model;
Fig. 4 is a user mode schematic diagram of the present utility model.
The specific embodiment
Below by specific embodiment the technical solution of the utility model is described further.
As shown in Figure 1, present embodiment comprises carrier base 10 and the cylindric inspection shaft lid 1 that is covered on the carrier base, inspection shaft lid is formed by upper strata lid 2, lower floor's lid 4 with around being arranged between the upper and lower layer lid decorative cover 3, and described lower floor lid and decorative cover are the integral piece that 3~8 centimetres iron plate constitutes by a thickness.Be provided with and the iron plate of one all around by bottom, thereby make that inspection shaft lid supporting capacity is strong, the characteristics of resistance to compression, tension, bending resistance, excellent in cushion effect, long service life at inspection shaft lid; Replace being arranged on the cast iron that inspection shaft covers the surface originally by iron plate simultaneously, it is low, in light weight to have a cost of production, and crushing resistance is good, is not easy fragmentation, distortion.
Be provided with one in the described inspection shaft lid through the steel member skeleton 5 between the upper and lower layer lid, steel member skeleton is the integral piece that is welded into by integral plate 6 and crisscross the channel-section steel 7 that is distributed in this surface of steel plate.8 in the space of described steel member skeleton also is filled with cement or sandstone, thereby has further strengthened the weight capacity of inspection shaft lid.
Go back correspondence in the described inspection shaft lid two latch grooves 15,16 are set, correspondingly be arranged to right pinhole on the decorative cover of inspection shaft lid with on the carrier base sidewall, one steel dowel 17 respectively is set in the latch groove, and steel dowel 17 is put into and is inserted pinhole inspection shaft lid 1 is fixedlyed connected with carrier base 10; Described steel dowel can be " L " or "T"-shaped structure, and described latch groove is arranged to the shape that is complementary with the steel dowel.
Described upper strata lid is formed by concreting, has not only reduced cost of production, and prevents the generation of noise effectively.As further improvement of the utility model, described upper strata lid can also select for use compound resin, spheroidal graphite, steel fibre or cement to replace concrete.
The external surface of lid upper strata, described upper strata lid is provided with anti-skidding, wear-resisting Argyle bar 2-1, thereby increases the frictional force of upper strata lid, to reach current purpose of safety; This tubular inspection shaft covers and also is provided with two and lifts hole 9, thereby brings great convenience for installing, safeguarding.
Described carrier base 10 is logical up and down truncated cone-shaped structure of pushing up, and carrier base bottom correspondence is provided with two pinholes 11, and steel dowel 12 inserts pinholes carrier base is fixed on the ground, covers one deck concrete mortar on the described dowel.Make carrier base locate securely on the ground, prevent the lawless people pilferage.
Also hang a protective screening 14 on around the inwall of described carrier base 10, thereby further avoided the casualties that causes because of inspection shaft losing of cover or damage by 4 hooks 13.
Specific embodiment described herein only is that the utility model spirit is illustrated.The utility model person of ordinary skill in the field can make various modifications or replenishes or adopt similar mode to substitute described specific embodiment, and steel member skeleton as described can also be made by screw-thread steel, reinforcing bar except channel-section steel; Only otherwise can depart from spirit of the present utility model or surmount the defined scope of appended claims.

Claims (9)

1. a high-strength steel fibre inspection shaft covers, the tubular inspection shaft that comprises carrier base (10) and be covered on the carrier base covers (1), it is characterized in that: described inspection shaft lid is formed by upper strata lid (2), lower floor's lid (4) with around being arranged between the upper and lower layer lid decorative cover (3), and described lower floor lid and decorative cover are the integral piece of an iron plate moulding.
2. high-strength steel fibre inspection shaft lid according to claim 1 is characterized in that: described inspection shaft lid is for columnar structured, and the lower floor's lid of inspection shaft lid and the thickness of decorative cover are 3~8 centimetres.
3. high-strength steel fibre inspection shaft lid according to claim 1 and 2, it is characterized in that: be provided with one in the described inspection shaft lid through the steel member skeleton (5) between the upper and lower layer lid, steel member skeleton is the integral piece that is welded into by integral plate (6) and crisscross the channel-section steel (7) that is distributed in this surface of steel plate.
4. high-strength steel fibre inspection shaft lid according to claim 3 is characterized in that: also be filled with cement or sandstone between the space (8) of described steel member skeleton.
5. high-strength steel fibre inspection shaft lid according to claim 3, it is characterized in that: go back correspondence in the described inspection shaft lid two latch grooves (15,16) are set, correspondingly be arranged to right pinhole on the decorative cover of inspection shaft lid with on the carrier base sidewall, steel dowel (17) inserts pinhole and inspection shaft is covered (1) fixedlys connected with carrier base (10).
6. high-strength steel fibre inspection shaft lid according to claim 3, it is characterized in that: described upper strata lid is formed by concreting, and the external surface of upper strata lid is provided with anti-skidding, wear-resisting Argyle bar (2-1).
7. high-strength steel fibre inspection shaft lid according to claim 6 is characterized in that: also be provided with two on the described tubular inspection shaft lid (1) and lift hole (9).
8. high-strength steel fibre inspection shaft lid according to claim 7, it is characterized in that: described carrier base (10) is for leading to the truncated cone-shaped structure on top up and down, carrier base bottom correspondence is provided with two pinholes (11), steel dowel (12) inserts pinhole carrier base is fixed on the ground, covers one deck concrete mortar on the described dowel.
9. high-strength steel fibre inspection shaft lid according to claim 8 is characterized in that: also hang a protective screening (14) by several hooks (13) on around the inwall of described carrier base (10).
CN2009201902750U 2009-08-06 2009-08-06 High-strength steel fiber inspection well cover Expired - Fee Related CN201485876U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201902750U CN201485876U (en) 2009-08-06 2009-08-06 High-strength steel fiber inspection well cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201902750U CN201485876U (en) 2009-08-06 2009-08-06 High-strength steel fiber inspection well cover

Publications (1)

Publication Number Publication Date
CN201485876U true CN201485876U (en) 2010-05-26

Family

ID=42424762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201902750U Expired - Fee Related CN201485876U (en) 2009-08-06 2009-08-06 High-strength steel fiber inspection well cover

Country Status (1)

Country Link
CN (1) CN201485876U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102367683A (en) * 2011-10-25 2012-03-07 江苏通全球工程管业有限公司 Straight wall plastic inspection well
CN103469822A (en) * 2013-09-05 2013-12-25 常熟市勤丰铸件厂 Round slab casting
CN105801034A (en) * 2016-06-02 2016-07-27 南京工程学院 Steel-fiber light-emitting-concrete maintenance well lid and production method thereof
CN106400845A (en) * 2016-09-19 2017-02-15 安徽鹰龙工业设计有限公司 Sewage backflow preventing type inspection well cover device for urban road

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102367683A (en) * 2011-10-25 2012-03-07 江苏通全球工程管业有限公司 Straight wall plastic inspection well
CN103469822A (en) * 2013-09-05 2013-12-25 常熟市勤丰铸件厂 Round slab casting
CN105801034A (en) * 2016-06-02 2016-07-27 南京工程学院 Steel-fiber light-emitting-concrete maintenance well lid and production method thereof
CN105801034B (en) * 2016-06-02 2018-02-23 南京工程学院 A kind of preparation method of the luminous concrete maintenance well lid of steel fibre
CN106400845A (en) * 2016-09-19 2017-02-15 安徽鹰龙工业设计有限公司 Sewage backflow preventing type inspection well cover device for urban road
CN106400845B (en) * 2016-09-19 2018-04-24 广西建工集团联合建设有限公司 A kind of urban road catch basin cover for preventing backing up of sewage

Similar Documents

Publication Publication Date Title
CN201485876U (en) High-strength steel fiber inspection well cover
CN202012091U (en) Plunger type manhole cover
CN201610533U (en) Guardrail base
CN203905060U (en) Waterproof and shakeproof manhole cover
CN201395800Y (en) Glass fiber reinforced plastic anti-theft shock absorption manhole cover
CN201202123Y (en) Resin-based high polymer composite well lid
CN2782777Y (en) Moulded compound material manhole cover
CN2663522Y (en) Reinforce composite well cover
CN203160278U (en) Ductile iron and steel fiber well lid
CN205171561U (en) Composite construction's waterproof theftproof well lid
CN201284487Y (en) Spheroidal graphite cast iron combined manhole cover
CN202787320U (en) High-strength composite manhole cover
CN201722710U (en) Inspection well cover
CN201756703U (en) Steel fiber reinforced concrete manhole cover with organic compound surface layer
CN206873500U (en) A kind of NEW TYPE OF COMPOSITE well lid
CN206512753U (en) A kind of Safety well cover of anti-settling
CN2761695Y (en) Load boaring well cover of mud slip well, manhole
CN205205872U (en) Novel concrete well lid
CN201835290U (en) Combined well cover
CN211816441U (en) Steel fiber nodular manhole cover
CN204418227U (en) A kind of ultra-large type manhole maintenance well well lid
CN208501738U (en) A kind of high-strength cast iron well lid
CN204590085U (en) A kind of electronic anti-theft well lid
CN201362856Y (en) Connection type invisible inspection well
CN201424656Y (en) Combined type well curb well lid

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100526

Termination date: 20120806