CN107017628A - Unit and control method and system thereof - Google Patents

Unit and control method and system thereof Download PDF

Info

Publication number
CN107017628A
CN107017628A CN201710338938.8A CN201710338938A CN107017628A CN 107017628 A CN107017628 A CN 107017628A CN 201710338938 A CN201710338938 A CN 201710338938A CN 107017628 A CN107017628 A CN 107017628A
Authority
CN
China
Prior art keywords
control
unit
control instruction
generator set
mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710338938.8A
Other languages
Chinese (zh)
Other versions
CN107017628B (en
Inventor
王喜成
王现林
潘保远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201710338938.8A priority Critical patent/CN107017628B/en
Publication of CN107017628A publication Critical patent/CN107017628A/en
Application granted granted Critical
Publication of CN107017628B publication Critical patent/CN107017628B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J13/0013
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a unit and a control method and a control system thereof. Wherein, the method comprises the following steps: the method comprises the steps that a unit controller receives a first control instruction sent by a control device, wherein the first control instruction is used for representing that a power grid is in a power utilization valley period; and the unit controller controls the unit to operate according to the working mode corresponding to the first control instruction. The invention solves the technical problem that the residual electric quantity in the low-ebb period of the power consumption can not be effectively utilized because the power consumption reduction control is carried out on the unit only in the peak period of the power consumption in the prior art.

Description

Unit and its control method and system
Technical field
The present invention relates to household appliance technical field, in particular to a kind of unit and its control method and system.
Background technology
Network load is changed greatly intraday, and the load of peak times of power consumption is several times of the load of low power consumption phase, The electricity of peak times of power consumption is insufficient, and the electricity residue of low power consumption phase is more.In the prior art, in order to high in electricity consumption The peak phase is that power network is lightened the burden, and is frequently in peak times of power consumption to unit progress reducing power consumption control, but can not effectively utilize use The dump energy of electric low ebb phase, causes the dump energy of low ebb phase to waste.
For only carrying out reducing power consumption control to unit in peak times of power consumption in the prior art, it is impossible to effectively utilize low power consumption The problem of dump energy of phase, effective solution is not yet proposed at present.
The content of the invention
The embodiments of the invention provide a kind of unit and its control method and system, at least to solve only to exist in the prior art Peak times of power consumption carry out reducing power consumption control to unit, it is impossible to effectively utilize the technical problem of the dump energy of low power consumption phase.
One side according to embodiments of the present invention there is provided a kind of control method of unit, including:Generator set controller connects The first control instruction that control device is sent is received, wherein, the first control instruction is used to characterize power network in the low power consumption phase;Unit Controller controls unit to be run according to the corresponding mode of operation of the first control instruction.
Another aspect according to embodiments of the present invention, additionally provides a kind of control system of unit, including:Control device, For sending the first control instruction, wherein, the first control instruction is used to characterize power network in the low power consumption phase;Generator set controller, It is connected with control device, for controlling unit to be run according to the corresponding mode of operation of the first control instruction.
Another aspect according to embodiments of the present invention, additionally provides a kind of unit, including:Storage medium, storage medium bag The program of storage is included, wherein, equipment where controlling storage medium when program is run performs the control of the unit in above-described embodiment Method processed;Processor, processor is used for operation program, wherein, program performs the control of the unit in above-described embodiment when running Method;Or the control system of the unit in above-described embodiment.
In embodiments of the present invention, in the case where power network is in the low power consumption phase, the control of control device generation first refers to Make and send to generator set controller, generator set controller is after the first control instruction is received, and control unit is according to the first control Instruct corresponding mode of operation to run, realize the thermal inertia principle in itself with reference to building, unit is controlled in the low power consumption phase Operation is opened in advance, accumulation of energy is carried out to building and internal environment, in peak times of power consumption, reducing power consumption control is carried out to unit, reached To the purpose of peak load shifting, reducing power consumption control only is carried out to unit in peak times of power consumption in the prior art so as to solve, it is impossible to Effectively utilize the technical problem of the dump energy of low power consumption phase.Therefore, the scheme provided by the above embodiment of the present invention, can To reduce the energy waste of low power consumption phase, and while being conducive to electric power peak clipping in peak times of power consumption, ensure that user's is normal Living environment, improves the likability of user.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of the control method of unit according to embodiments of the present invention;
Fig. 2 is a kind of schematic flow sheet of the control method of optional unit according to embodiments of the present invention;And
Fig. 3 is a kind of schematic diagram of the control system of unit according to embodiments of the present invention.
Embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, should all belong to the model that the present invention is protected Enclose.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, " Two " etc. be for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that cover Lid is non-exclusive to be included, for example, the process, method, system, product or the equipment that contain series of steps or unit are not necessarily limited to Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or the intrinsic other steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention there is provided a kind of embodiment of the control method of unit, it is necessary to illustrate, in accompanying drawing Flow can be performed in the computer system of such as one group computer executable instructions the step of illustrate, and, although Show logical order in flow charts, but in some cases, can with different from order herein perform it is shown or The step of description.
Fig. 1 is a kind of flow chart of the control method of unit according to embodiments of the present invention, as shown in figure 1, this method bag Include following steps:
Step S102, the first control instruction that generator set controller receiving control apparatus is sent, wherein, the first control instruction is used The low power consumption phase is in characterizing power network.
Specifically, above-mentioned generator set controller can be the controller set inside unit, and the start of unit can be opened Dynamic, operational mode and operational factor are adjusted, and unit can include air-conditioner set, the mechanical, electrical water heater of air source heat pump etc., this Invention is not specifically limited to this;Above-mentioned control device can be the equipment by network connection with generator set controller, can be with The current loads of power network are detected, determine whether power network is in peak times of power consumption, or low power consumption phase, and in different power networks In the case of load, different control instructions are generated, unit is controlled, the purpose of peak load shifting is reached;Above-mentioned first Control instruction can be that control generator set controller runs and improves the control instruction of unit power consumption, i.e., Fill valley is instructed.
Step S104, generator set controller controls unit to be run according to the corresponding mode of operation of the first control instruction.
Specifically, the above-mentioned corresponding mode of operation of the first control instruction can be Working mould of the unit in the low power consumption phase Formula, under the mode of operation of low power consumption phase, the power consumption under the mode of operation of the operation power ratio peak times of power consumption of unit is high, carries It is preceding to carry out accumulation of energy to building masonry wall and indoor environment, so that power consumption can be reduced in peak times of power consumption carries out peak clipping, and maintain The demand of indoor environment temperature, ensures the normal life environment of user, that is, realizes balance power network peak load, make network load soft Property regulation purpose.
In a kind of optional scheme, in order to make full use of the dump energy of low power consumption phase, control device is it is determined that electricity Net was in after the low power consumption phase, can generate the first control instruction, and be sent to generator set controller, unit allocation by network Device is receiving the first control instruction, that is, receives after Fill valley instruction, can control unit according to the first control instruction correspondence Mode of operation operation, that is, control unit to start shooting in advance operation, and improve the power consumption of unit, so that by the control of low power consumption phase Unit processed opens operation in advance, at utmost reduces energy waste.
According to the above embodiment of the present invention, in the case where power network is in the low power consumption phase, control device generation first is controlled System is instructed and sent to generator set controller, and generator set controller is after the first control instruction is received, and control unit is according to first The corresponding mode of operation operation of control instruction, realizes the thermal inertia principle in itself with reference to building, in the control of low power consumption phase Unit opens operation in advance, and accumulation of energy is carried out to building and internal environment, and in peak times of power consumption, reducing power consumption control is carried out to unit System, reaches the purpose of peak load shifting, so that solve prior art only carries out reducing power consumption control, nothing in peak times of power consumption to unit Method effectively utilizes the technical problem of the dump energy of low power consumption phase.Therefore, the scheme provided by the above embodiment of the present invention, The energy waste of low power consumption phase can be reduced, and while being conducive to electric power peak clipping in peak times of power consumption, is ensureing user just Normal living environment, improves the likability of user.
Alternatively, in the above embodiment of the present invention, step S104, generator set controller controls unit to refer to according to the first control Corresponding mode of operation is made to run, including:
Step S1042, generator set controller obtains the current state of unit, wherein, current state includes one of following:Start State and off-mode.
Step S1044, in the case where current state is open state, generator set controller is according to default control mode, control The operational factor of unit processed.
Wherein, operational factor includes:Design temperature, operation windscreen and running frequency.
Specifically, above-mentioned default control mode can be the operational factor of the control unit pre-set according to default frequency The control mode that rate and predetermined amplitude are raised and lowered, for example, the design temperature of control unit is raised or dropped per hour It is low 1 degree.
In a kind of optional scheme, generator set controller receive control device transmission the first control instruction after, Obtain the current state of unit first, judge whether unit starts shooting, if it is judged that unit is already powered on, then can directly according to Default control mode, controls the operational factor of unit, i.e., according to default control mode, adjusts design temperature, the operation wind of unit Gear and running frequency.
Step S1046, in the case where current state is off-mode, generator set controller controls unit according to default work Pattern start operation, and according to default control mode, control the operational factor of unit.
Specifically, above-mentioned default mode of operation can be the mode of operation that generator set controller is prestored, and can include: Functional mode (i.e. cold and hot pattern), wind speed, sweep wind pattern etc..
In a kind of optional scheme, if it is judged that unit is not keyed up, then control unit first is according to generator set controller In the default mode of operation start operation that prestores, then control unit according to default control mode, control the operation of unit Parameter, i.e., according to default control mode, adjust the design temperature, operation windscreen and running frequency of unit.
It should be noted that after generator set controller control unit is according to the start operation of default mode of operation, Ke Yizhi Connect the operational factor that unit is controlled according to advance control mode;After can also waiting for a period of time, according to advance controlling party Formula, controls the operational factor of unit;It may also wait for after a period of time, controlled if generator set controller is not received by other Instruction, then according to advance control mode, control the operational factor of unit.
Alternatively, in the above embodiment of the present invention, in step S1046, generator set controller controls unit according to default work Before operation mode start operation, this method also includes:
Step S106, generator set controller obtains the downtime of unit.
Specifically, above-mentioned downtime can be the time that unit is continuously shut down.
Step S108, generator set controller judges whether downtime exceedes preset time.
Specifically, above-mentioned preset time can be the most long downtime pre-set, for example, can be according to user's Actual use situation is set, if user is frequent using unit, preset time can set shorter;If user uses Infrequently, then preset time can set longer unit.
Step S110, if downtime, not less than preset time, generator set controller controls unit according to default work Pattern start operation.
In a kind of optional scheme, generator set controller receive control device transmission the first control instruction after, The current state of unit can be first determined whether, if the current state of unit is off-mode, unit can be determined whether Continuous downtime, if continuous downtime exceedes preset time, confirm in user family nobody, generator set controller is not held Row start-up command;If the continuous available machine time, not less than preset time, can control unit to be started shooting according to default mode of operation Operation, and according to default control mode, control the operational factor of unit, i.e., according to default control mode, adjust the setting of unit Temperature, operation windscreen and running frequency.
Alternatively, in the above embodiment of the present invention, if downtime exceedes preset time, this method also includes:
Step S112, the second control instruction that generator set controller receiving control apparatus is sent, wherein, the second control instruction is used In control unit start operation.
Specifically, enforced opening pattern can be reserved in control, control device can send the second control instruction, i.e., it is strong Open command processed.
Step S114, after the second control instruction is received, generator set controller controls unit according to default mode of operation Start operation, and according to default control mode, control the operational factor of unit.
In a kind of optional scheme, generator set controller judge unit continuous dwell time exceed preset time it Afterwards, generator set controller does not perform start-up command, and now control device can send the second control instruction, and generator set controller is being received After receiving unlatching control instruction to the second control instruction, i.e. pressure, control unit can be forced according to default mode of operation Start, and according to default control mode, control the operational factor of unit, i.e., according to default control mode, adjust the setting of unit Temperature, operation windscreen and running frequency.
Alternatively, in the above embodiment of the present invention, step S1044, or step S1046, generator set controller is according to default Control mode, controls the operational factor of unit, including:
Step S10442, generator set controller obtains the functional mode of unit, wherein, functional mode includes one of following:System Chill formula and heating mode.
Step S10444, in the case where functional mode is heating mode, generator set controller is according to default control mode, control Design temperature processed, operation windscreen and running frequency rise.
Step S10446, in the case where functional mode is refrigeration mode, generator set controller is according to default control mode, control Design temperature reduction processed, and control operation windscreen and running frequency rise.
In a kind of optional scheme, in order to improve the power consumption of unit, generator set controller can obtain the function mould of unit Formula, different functional mode control mode is different, for example, when the functional mode of unit is heating mode, in order to improve unit Power consumption, generator set controller can according to default control mode, control design temperature, operation windscreen and running frequency rise;When When the functional mode of unit is refrigeration mode, in order to improve the power consumption of unit, generator set controller can according to default control mode, Control design temperature reduces and controls operation windscreen and running frequency rise.
Alternatively, in the above embodiment of the present invention, in step S104, generator set controller controls unit according to the first control Instruct after corresponding mode of operation operation, this method also includes:
Step S116, the 3rd control instruction that generator set controller receiving control apparatus is sent, wherein, the 3rd control instruction is used The low power consumption phase is not in characterizing power network, and is not in peak times of power consumption.
Specifically, the 3rd above-mentioned control instruction can be that control unit maintains current operation mode, stop improving power consumption Control instruction, that is, maintain instruction.
Step S118, after the 3rd control instruction is received, generator set controller obtains the current operation mode of unit.
Step S120, generator set controller control unit is run according to current operation mode.
In a kind of optional scheme, control device is it is determined that power network, which is not in the low power consumption phase, is also not in peak of power consumption After phase, the 3rd control instruction can be generated, and generator set controller is sent to by network, generator set controller is receiving the 3rd Control instruction, that is, receive after maintenance instruction, unit can be controlled to be run according to current operation mode, not according still further to default control Mode processed, controls the operational factor of unit.
Alternatively, in the above embodiment of the present invention, in step S104, generator set controller controls unit according to the first control Instruct after corresponding mode of operation operation, method also includes:
Step S122, the 4th control instruction that generator set controller receiving control apparatus is sent, wherein, the 4th control instruction is used Peak times of power consumption are in characterizing power network.
Specifically, the 4th above-mentioned control instruction can control unit to reduce the control instruction of power consumption, that is, release Fill valley Instruction.
Step S124, generator set controller control unit is run according to initial operation mode, wherein, initial operation mode is machine Group is according to the mode of operation before the corresponding mode of operation operation of the first control instruction.
Specifically, above-mentioned initial operation mode can be that unit is run according to the corresponding mode of operation of the first control instruction Mode of operation before, that is, can be mode of operation of the unit before by generator set controller control, if for example, unit Off-mode is in before according to the corresponding mode of operation operation of the first control instruction, then initial operation mode is shutdown shape State;If unit is in open state before according to the corresponding mode of operation operation of the first control instruction, and in first Mode of operation, then initial operation mode is the first mode of operation.
In a kind of optional scheme, control device is it is determined that power network is after peak times of power consumption, in order to reduce unit Power consumption, so as to reduce network load, can generate the 4th control instruction, and be sent to generator set controller, unit control by network Device processed is receiving the 4th control instruction, that is, receives after maintenance instruction, unit can be controlled to be transported according to initial operation mode OK.
By such scheme, run, carried out to building and internal environment by controlling unit to open in the low power consumption phase Accumulation of energy, so as in peak times of power consumption, the power of the assembling unit can be controlled to reduce, while reaching peak load shifting, can maintain indoor ring The requirement that border temperature is met, ensures the normal life environment of user, also, if power network carries out paddy price subsidies patch, may also reach up Save the purpose of the electricity charge.
Alternatively, in the above embodiment of the present invention, control device at least includes:Electric control system, wherein, in step Before S102, the first control instruction that generator set controller receiving control apparatus is sent, this method also includes:
Step S126, electric control system detects the current loads of power network.
Current loads are compared by step S128, electric control system with the first load value and the second load value.
Specifically, the first above-mentioned load value can be that the power network pre-set is in the peak load of low power consumption phase Value, when the current loads of power network are less than or equal to the first load value, it may be determined that power network is in the low power consumption phase;Above-mentioned second Load value can be that the power network pre-set is in the minimal negative charge values of peak times of power consumption, when the current loads of power network are more than second During load value, it may be determined that power network is in peak times of power consumption.
Step S130, if current loads are less than or equal to the first load value, the control of electric control system generation first refers to Order.
Step S132, if current loads are more than the first load value, and is less than or equal to the second load value, then Electric control system System the 3rd control instruction of generation.
Step S134, if current loads are more than the second load value, electric control system generates the 4th control instruction.
In a kind of optional scheme, in order to make full use of the dump energy of low power consumption phase, and in peak times of power consumption drop Low-power consumption, electric control system can detect the current loads of power network in real time, and by the current loads detected and the first load Value and the second load value are compared, if current loads are less than or equal to the first load value, it is determined that power network is in low power consumption Phase, the first control instruction can be generated;If current loads are more than the first load value, and are less than or equal to the second load value, then really Determine power network and be in the normal electricity consumption phase, that is, being not in the low power consumption phase is also not in peak times of power consumption, can generate the 3rd control and refer to Order;If current loads are more than the second load value, it is determined that power network is in peak times of power consumption, can generate the 4th control instruction, Electric control system can be by the first control instruction of generation, and either the 3rd control instruction or the 4th control instruction pass through net Network is sent to generator set controller, is run by generator set controller control unit according to corresponding operational module.
Alternatively, in the above embodiment of the present invention, control device also includes:Centralized Controller and power line carrier module, Power line carrier module is arranged on generator set controller, and Centralized Controller is connected with power line carrier module by power line, wherein, Before step S102, the first control instruction that generator set controller receiving control apparatus is sent, this method also includes:
Step S136, Centralized Controller receive electric control system send the first control instruction, the 3rd control instruction or 4th control instruction.
Specifically, a power line carrier module can be set on each generator set controller, and power line carrier module is controlled with concentrating Device processed passes through internet communication by electric line carrier communication, Centralized Controller with electric control system.
Step S138, Centralized Controller is modulated to the first control instruction, the 3rd control instruction or the 4th control instruction, Generate carrier signal.
Step S140, Centralized Controller sends carrier signal to power line carrier module, wherein, power line carrier module is to carrying Ripple signal is demodulated, and obtains the first control instruction, the 3rd control instruction or the 4th control instruction, and by the first control instruction, 3rd control instruction or the 4th control instruction are sent to generator set controller.
In a kind of optional scheme, Centralized Controller can receive any of electric control system transmission by network One control instruction, because Centralized Controller is connected by power line with power line carrier module, Centralized Controller will can be received Any one control instruction arrived carries out carrier modulation, obtains carrier signal, carrier signal is sent into electric power by power line Carrier wave can be demodulated by carrier module, power line carrier module, and any one control for obtaining electric control system transmission refers to Order, and any one control instruction after modulation is sent to generator set controller, unit is controlled according to corresponding by generator set controller Mode of operation operation.
Alternatively, in the above embodiment of the present invention, step S140, power line carrier module is by the first control instruction, the 3rd Control instruction or the 4th control instruction are sent to generator set controller, including:
Step S1402, power line carrier module is controlled the first control instruction, the 3rd control instruction or the 4th by preset protocol System instruction is sent to generator set controller.
Specifically, communicated between generator set controller and power line carrier module by preset protocol, above-mentioned preset protocol can To be communications protocol that power line carrier module and generator set controller determined after agreement communication.
In a kind of optional scheme, power line carrier module can be by preset protocol, by any one control after modulation Instruction processed is packaged, and the information after encapsulation is sent into generator set controller, letter of the generator set controller after encapsulation is received It after breath, can be decapsulated, obtain any one control instruction, and according to any one control instruction, control unit is pressed According to the operation of corresponding mode of operation.
Alternatively, in the above embodiment of the present invention, in the case where power line carrier module is multiple, step S140, collection Middle controller sends carrier signal to power line carrier module, including:
Step S1404, Centralized Controller obtains the mark of at least one power line carrier module stored in Centralized Controller Information.
Specifically, a Centralized Controller can control the Centralized Controller of multiple units, i.e., one can be with multiple electric power Carrier module is connected, and the mark for having a unique MAC Address, i.e. power line carrier module on each carrier module is believed The MAC Address for each power line carrier module being connected with the Centralized Controller is stored on breath, the memory of Centralized Controller.
Step S1406, Centralized Controller sends carrier signal according to the identification information of at least one power line carrier module To at least one power line carrier module.
In a kind of optional scheme, Centralized Controller refers in any one control for receiving electric control system transmission After order, carrier modulation can be carried out to the control instruction, obtain carrier signal, and read and the centralized Control from memory The MAC Address of all power line carrier modules of device connection, and carrier signal is sent to the institute being connected with the Centralized Controller Some power line carrier modules.
Alternatively, in the above embodiment of the present invention, in the case where Centralized Controller is multiple, in step S138, collection Middle controller is received before the first control instruction, the 3rd control instruction or the 4th control instruction that electric control system is sent, should Method also includes:
Step S142, electric control system obtains the mark of at least one Centralized Controller stored in electric control system Information.
Specifically, can be using many Centralized Controllers, every centralized Control when Centralized Controller control area is larger Have on device be stored with unique ID addresses, the i.e. identification information of Centralized Controller, the memory of electric control system with The ID addresses of multiple Centralized Controllers of electric control system connection.
Step S144, electric control system according to the identification information of at least one Centralized Controller, by the first control instruction, 3rd control instruction or the 4th control instruction are sent at least one Centralized Controller.
In a kind of optional scheme, electric control system according to the current loads detected, is generating any one control After system instruction, the ID addresses for all Centralized Controllers being connected with the electric control system can be read from memory, And any one control instruction is sent to all Centralized Controllers being connected with the electric control system by network.
Alternatively, in the above embodiment of the present invention, in step S104, generator set controller controls unit according to the first control Instruct after corresponding mode of operation operation, this method also includes:
Step S146, generator set controller obtains the running status of unit.
The running status of unit is reported to control device by step S148, generator set controller.
In a kind of optional scheme, generator set controller can gather running status of unit etc. by the sensor carried Data, and the data collected are reported into control device, the data that will be collected are by power line carrier module and concentrate control Device processed is reported to electric control system, so that electric control system can determine the implementation status of unit.
Fig. 2 is a kind of schematic flow sheet of the control method of optional unit according to embodiments of the present invention, with reference to A kind of preferred embodiment of the invention is described in detail Fig. 2, as shown in Fig. 2 the control system of the unit can include:Electricity Force control system, Centralized Controller, power line carrier module and generator set controller, by mutual between electric control system and concentrator Combined network communication, by electric line carrier communication between concentrator and carrier module, between power line carrier module and generator set controller By protocol, generator set controller directly controls unit operation.On each carrier module with having a unique MAC Location, is stored in the mac address information of each carrier module on the holder of Centralized Controller, is easy to follow-up instruction to send, often Platform concentrator can control many set units., can be using many concentrators, every Centralized Controller when centralized Control area is larger On also have unique ID addresses.
This method may include steps of:
Step S21, electric power management system calculates network load, generates corresponding control instruction, and be sent to centralized Control Device.
Alternatively, electric control system pre-sets network load dividing value A, B, i.e., the second above-mentioned load value and first negative Charge values B, and current loads Q is detected in real time, as Q≤B, electric control system sends Fill valley signal, i.e., the first above-mentioned control Instruction;As B≤Q < A, electric control system sends maintenance signal, i.e., the 3rd above-mentioned control instruction;As Q >=A, electric power control System processed sends releasing Fill valley signal, i.e., the 4th above-mentioned control instruction, coherent signal can issue concentrator by internet.
The control instruction received is modulated into carrier signal by step S22, Centralized Controller, and is given by power line transmission Power line carrier module.
The carrier signal received is demodulated to control instruction by step S23, power line carrier module, and is sent to by agreement Generator set controller.
Step S24, generator set controller judges whether the current state of unit is off-mode.
Alternatively, generator set controller is after control instruction is received, and whether the current state for first determining whether unit is pass Machine state, that is, judge whether unit shuts down, if it is, into step S25;If it is not, then into step S29.
Step S25, generator set controller judges whether the continuous downtime of unit exceedes preset time.
Alternatively, judging that the current state of unit is off-mode, that is, after judging unit shutdown, unit allocation Device can determine whether whether the continuous downtime of unit exceedes preset time, that is, judge whether that someone lives, if not, Then enter step S26;If it is, into step S28.
Step S26, generator set controller does not perform control instruction.
Alternatively, judge unit continuous downtime exceed preset time, that is, judge it is unoccupied after, machine Group controller does not perform control instruction.
Step S27, when control instruction is that enforced opening is instructed, control unit is started shooting according to default mode of operation and run.
Alternatively, judge unit continuous downtime exceed preset time, that is, judge it is unoccupied after, such as Fruit control instruction instructs for enforced opening, i.e. enforced opening unit, then generator set controller can be according to the default work prestored Operation mode (comprising cold and hot pattern, wind speed, sweeping the information such as wind) start operation, and according to default control mode, control the fortune of unit Row parameter, i.e., improve operation wind shelves, raising design temperature, raising running frequency isotype to improve automatically according to default pattern Power consumption.
Step S28, generator set controller controls unit to be run according to the start of default mode of operation.
Alternatively, in the continuous downtime for judging unit not less than preset time, that is, judge it is occupied after, It can be opened with generator set controller according to the default mode of operation (comprising cold and hot pattern, wind speed, sweeping the information such as wind) prestored Machine is run, and according to default control mode, is controlled the operational factor of unit, i.e., improved operation wind automatically according to default pattern Shelves, improve design temperature, improve running frequency isotype to improve power consumption.
Step S29, generator set controller controls the operational factor of unit according to default control mode.
Alternatively, judging that the current state of unit is open state, that is, after judging unit start, unit allocation Device can control unit to enter Fill valley pattern, i.e., according to default control mode, control the operational factor of unit, current for unit In heating mode, generator set controller can automatically be improved according to default pattern the operation wind shelves of unit, improve design temperature, Running frequency isotype is improved to improve power consumption;Refrigeration mode is currently at for unit, generator set controller can be according to default Pattern improve the operation wind shelves of unit, reduction design temperature automatically, improve running frequency isotype to improve power consumption.
Step S210, when control instruction to release during Fill valley instruction, generator set controller control unit returns to initialization Pattern.
Alternatively, if the control instruction received is releases Fill valley instruction, generator set controller can control unit extensive Initial operation mode is arrived again, that is, returns to reset condition.
It should be noted that when control instruction is maintains instruction, generator set controller can control unit to maintain currently Run under mode of operation, Fill valley instruction is released until receiving.
Step S211, the running status of generator set controller active reporting unit to power line carrier module.
Running status is modulated into carrier signal by step S212, power line carrier module, and reports Centralized Controller.
Carrier signal is demodulated to running status by step S213, Centralized Controller, and reports to electric power management system.
Alternatively, generator set controller can pass through association by the running status from belt sensor harvester group, and by data View is transferred to power line carrier module, and running status is reported into Electric control system by power line carrier module and Centralized Controller System.
By above-mentioned steps, service condition of the user to unit can be combined, autonomous selection is started shooting on demand, not only can be with Using the unnecessary electricity of low power consumption phase, control unit opens operation in advance, is carried out in advance to building masonry wall and indoor environment Accumulation of heat, can also can control unit to reduce power consumption in peak times of power consumption and carry out peak clipping, and indoor temperature can be maintained to meet It is required that, the normal life environment of user is ensured, the purpose of peak load shifting is reached.If power network carries out paddy price subsidies patch, user may be used also To save the electricity charge, doulbe-sides' victory is realized.
Embodiment 2
There is provided a kind of embodiment of the control system of unit according to embodiments of the present invention.
Fig. 3 is a kind of schematic diagram of the control system of unit according to embodiments of the present invention, as shown in figure 3, the system bag Include:
Control device 31, for sending the first control instruction, wherein, the first control instruction is used to characterize power network in electricity consumption The low ebb phase.
Specifically, whether above-mentioned control device can be detected to the current loads of power network, determine power network in use Electric peak period, or low power consumption phase, and in the case of different network loads, different control instructions are generated, unit is carried out Control, reaches the purpose of peak load shifting, and unit can include air-conditioner set, the mechanical, electrical water heater of air source heat pump etc., and the present invention is right This is not specifically limited;The first above-mentioned control instruction can be that control generator set controller runs and improves the control of unit power consumption Instruction, i.e. Fill valley are instructed.
Generator set controller 33, is connected with control device, for controlling unit according to the corresponding Working mould of the first control instruction Formula is run.
Specifically, above-mentioned generator set controller can be the controller set inside unit, and the start of unit can be opened Dynamic, operational mode and operational factor are adjusted, and network connection is passed through with control device;The first above-mentioned control instruction is corresponding Mode of operation can be mode of operation of the unit in the low power consumption phase, under the mode of operation of low power consumption phase, the operation of unit Power consumption under the mode of operation of power ratio peak times of power consumption is high, carries out accumulation of energy to building masonry wall and indoor environment in advance, so that Power consumption can be reduced in peak times of power consumption and carries out peak clipping, and maintains the demand of indoor environment temperature, the normal life of user is ensured Environment, that is, realize balance power network peak load, make the purpose of network load soft readjustment.
In a kind of optional scheme, in order to make full use of the dump energy of low power consumption phase, control device is it is determined that electricity Net was in after the low power consumption phase, can generate the first control instruction, and be sent to generator set controller, unit allocation by network Device is receiving the first control instruction, that is, receives after Fill valley instruction, can control unit according to the first control instruction correspondence Mode of operation operation, that is, control unit to start shooting in advance operation, and improve the power consumption of unit, so that by the control of low power consumption phase Unit processed opens operation in advance, at utmost reduces energy waste.
According to the above embodiment of the present invention, in the case where power network is in the low power consumption phase, control device generation first is controlled System is instructed and sent to generator set controller, and generator set controller is after the first control instruction is received, and control unit is according to first The corresponding mode of operation operation of control instruction, realizes the thermal inertia principle in itself with reference to building, in the control of low power consumption phase Unit opens operation in advance, and accumulation of energy is carried out to building and internal environment, and in peak times of power consumption, reducing power consumption control is carried out to unit System, reaches the purpose of peak load shifting, so that solve prior art only carries out reducing power consumption control, nothing in peak times of power consumption to unit Method effectively utilizes the technical problem of the dump energy of low power consumption phase.Therefore, the scheme provided by the above embodiment of the present invention, The energy waste of low power consumption phase can be reduced, and while being conducive to electric power peak clipping in peak times of power consumption, is ensureing user just Normal living environment, improves the likability of user.
Alternatively, in the above embodiment of the present invention, generator set controller 33 includes:
Harvester, the current state for obtaining unit, wherein, current state includes one of following:Open state and Off-mode.
Controller, is connected with harvester, in the case of being open state in current state, according to default control side Formula, controls the operational factor of unit, in the case where current state is off-mode, and control unit is opened according to default mode of operation Machine is run, and according to default control mode, controls the operational factor of unit, wherein, operational factor includes:Design temperature, operation Windscreen and running frequency.
Specifically, above-mentioned default control mode can be the operational factor of the control unit pre-set according to default frequency The control mode that rate and predetermined amplitude are raised and lowered, for example, the design temperature of control unit is raised or dropped per hour It is low 1 degree;Above-mentioned default mode of operation can be the mode of operation that generator set controller is prestored, and can include:Functional mode (i.e. cold and hot pattern), wind speed, sweep wind pattern etc..
In a kind of optional scheme, generator set controller receive control device transmission the first control instruction after, Obtain the current state of unit first, judge whether unit starts shooting, if it is judged that unit is already powered on, then can directly according to Default control mode, controls the operational factor of unit, i.e., according to default control mode, adjusts design temperature, the operation wind of unit Gear and running frequency;If it is judged that unit is not keyed up, then control unit first is pre- according to what is prestored in generator set controller If mode of operation start operation, then control unit according to default control mode, control the operational factor of unit, i.e., according to default Control mode, adjusts the design temperature, operation windscreen and running frequency of unit.
It should be noted that after generator set controller control unit is according to the start operation of default mode of operation, Ke Yizhi Connect the operational factor that unit is controlled according to advance control mode;After can also waiting for a period of time, according to advance controlling party Formula, controls the operational factor of unit;It may also wait for after a period of time, controlled if generator set controller is not received by other Instruction, then according to advance control mode, control the operational factor of unit.
Alternatively, in the above embodiment of the present invention,
Harvester is additionally operable to obtain the downtime of unit.
Specifically, above-mentioned downtime can be the time that unit is continuously shut down.
Generator set controller 33 also includes:Processor, is connected with harvester, for judging it is default whether downtime exceedes Time.
Specifically, above-mentioned preset time can be the most long downtime pre-set, for example, can be according to user's Actual use situation is set, if user is frequent using unit, preset time can set shorter;If user uses Infrequently, then preset time can set longer unit.
Controller, is connected with processor, if being additionally operable to downtime not less than preset time, control unit is according to pre- If mode of operation start operation.
In a kind of optional scheme, generator set controller receive control device transmission the first control instruction after, The current state of unit can be first determined whether, if the current state of unit is off-mode, unit can be determined whether Continuous downtime, if continuous downtime exceedes preset time, confirm in user family nobody, generator set controller is not held Row start-up command;If the continuous available machine time, not less than preset time, can control unit to be started shooting according to default mode of operation Operation, and according to default control mode, control the operational factor of unit, i.e., according to default control mode, adjust the setting of unit Temperature, operation windscreen and running frequency.
Alternatively, in the above embodiment of the present invention, if downtime exceedes preset time, control device 31 is additionally operable to The second control instruction is sent, wherein, the second control instruction is used to control unit start operation.
Specifically, enforced opening pattern can be reserved in control, control device can send the second control instruction, i.e., it is strong Open command processed.
Generator set controller 33 is additionally operable to after the second control instruction is received, and control unit is opened according to default mode of operation Machine is run, and according to default control mode, controls the operational factor of unit.
In a kind of optional scheme, generator set controller judge unit continuous dwell time exceed preset time it Afterwards, generator set controller does not perform start-up command, and now control device can send the second control instruction, and generator set controller is being received After receiving unlatching control instruction to the second control instruction, i.e. pressure, control unit can be forced according to default mode of operation Start, and according to default control mode, control the operational factor of unit, i.e., according to default control mode, adjust the setting of unit Temperature, operation windscreen and running frequency.
Alternatively, in the above embodiment of the present invention, harvester is additionally operable to obtain the functional mode of unit, wherein, work( Energy pattern includes one of following:Refrigeration mode and heating mode.
Controller is additionally operable in the case where functional mode is heating mode, according to default control mode, control setting temperature Degree, operation windscreen and running frequency rise, according to default control mode, control design temperature reduction, and control operation windscreen and Running frequency is raised.
In a kind of optional scheme, in order to improve the power consumption of unit, generator set controller can obtain the function mould of unit Formula, different functional mode control mode is different, for example, when the functional mode of unit is heating mode, in order to improve unit Power consumption, generator set controller can according to default control mode, control design temperature, operation windscreen and running frequency rise;When When the functional mode of unit is refrigeration mode, in order to improve the power consumption of unit, generator set controller can according to default control mode, Control design temperature reduces and controls operation windscreen and running frequency rise.
Alternatively, in the above embodiment of the present invention,
Control device 31 is additionally operable to send the 3rd control instruction, wherein, the 3rd control instruction is not in for characterizing power network The low power consumption phase, and it is not in peak times of power consumption.
Specifically, the 3rd above-mentioned control instruction can be that control unit maintains current operation mode, stop improving power consumption Control instruction, that is, maintain instruction.
Generator set controller 33 is additionally operable to after the 3rd control instruction is received, and obtains the current operation mode of unit, control Unit processed is run according to current operation mode.
In a kind of optional scheme, control device is it is determined that power network, which is not in the low power consumption phase, is also not in peak of power consumption After phase, the 3rd control instruction can be generated, and generator set controller is sent to by network, generator set controller is receiving the 3rd Control instruction, that is, receive after maintenance instruction, unit can be controlled to be run according to current operation mode, not according still further to default control Mode processed, controls the operational factor of unit.
Alternatively, in the above embodiment of the present invention,
Control device 31 is additionally operable to send the 4th control instruction, wherein, the 4th control instruction is used to characterize power network in use Electric peak period.
Specifically, the 4th above-mentioned control instruction can control unit to reduce the control instruction of power consumption, that is, release Fill valley Instruction.
Generator set controller 33 is additionally operable to control unit and run according to initial operation mode, wherein, initial operation mode is machine Group is according to the mode of operation before the corresponding mode of operation operation of the first control instruction.
Specifically, above-mentioned initial operation mode can be that unit is run according to the corresponding mode of operation of the first control instruction Mode of operation before, that is, can be mode of operation of the unit before by generator set controller control, if for example, unit Off-mode is in before according to the corresponding mode of operation operation of the first control instruction, then initial operation mode is shutdown shape State;If unit is in open state before according to the corresponding mode of operation operation of the first control instruction, and in first Mode of operation, then initial operation mode is the first mode of operation.
In a kind of optional scheme, in a kind of optional scheme, control device is it is determined that power network is in peak of power consumption After phase, in order to reduce unit power consumption, so as to reduce network load, the 4th control instruction can be generated, and send by network To generator set controller, generator set controller is receiving the 4th control instruction, that is, receives after maintenance instruction, can control unit Run according to initial operation mode.
By such scheme, run, carried out to building and internal environment by controlling unit to open in the low power consumption phase Accumulation of energy, so as in peak times of power consumption, the power of the assembling unit can be controlled to reduce, while reaching peak load shifting, can maintain indoor ring The requirement that border temperature is met, ensures the normal life environment of user, also, if power network carries out paddy price subsidies patch, may also reach up Save the purpose of the electricity charge.
Alternatively, in the above embodiment of the present invention, control device 31 at least includes:
Electric control system, the current loads for detecting power network, by current loads and the first load value and the second load Value is compared, if current loads are less than or equal to the first load value, the first control instruction is generated, if current loads are more than First load value, and less than or equal to the second load value, then the 3rd control instruction is generated, if current loads are more than the second load Value, then generate the 4th control instruction.
Specifically, the first above-mentioned load value can be that the power network pre-set is in the peak load of low power consumption phase Value, when the current loads of power network are less than or equal to the first load value, it may be determined that power network is in the low power consumption phase;Above-mentioned second Load value can be that the power network pre-set is in the minimal negative charge values of peak times of power consumption, when the current loads of power network are more than second During load value, it may be determined that power network is in peak times of power consumption.
In a kind of optional scheme, in order to make full use of the dump energy of low power consumption phase, and in peak times of power consumption drop Low-power consumption, electric control system can detect the current loads of power network in real time, and by the current loads detected and the first load Value and the second load value are compared, if current loads are less than or equal to the first load value, it is determined that power network is in low power consumption Phase, the first control instruction can be generated;If current loads are more than the first load value, and are less than or equal to the second load value, then really Determine power network and be in the normal electricity consumption phase, that is, being not in the low power consumption phase is also not in peak times of power consumption, can generate the 3rd control and refer to Order;If current loads are more than the second load value, it is determined that power network is in peak times of power consumption, can generate the 4th control instruction, Electric control system can be by the first control instruction of generation, and either the 3rd control instruction or the 4th control instruction pass through net Network is sent to generator set controller, is run by generator set controller control unit according to corresponding operational module.
Alternatively, in the above embodiment of the present invention, control device 31 also includes:
Centralized Controller, has correspondence with electric control system, for the first control instruction, the 3rd control instruction Or the 4th control instruction be modulated, generate carrier signal.
Power line carrier module, is arranged on generator set controller, is connected with Centralized Controller by power line, with unit allocation Utensil has correspondence, for being demodulated to carrier signal, obtains the first control instruction, the 3rd control instruction or the 4th control Instruction, and the first control instruction, the 3rd control instruction or the 4th control instruction are sent to generator set controller.
Specifically, a power line carrier module can be set on each generator set controller, and power line carrier module is controlled with concentrating Device processed passes through internet communication by electric line carrier communication, Centralized Controller with electric control system.
In a kind of optional scheme, Centralized Controller can receive any of electric control system transmission by network One control instruction, because Centralized Controller is connected by power line with power line carrier module, Centralized Controller will can be received Any one control instruction arrived carries out carrier modulation, obtains carrier signal, carrier signal is sent into electric power by power line Carrier wave can be demodulated by carrier module, power line carrier module, and any one control for obtaining electric control system transmission refers to Order, and any one control instruction after modulation is sent to generator set controller, unit is controlled according to corresponding by generator set controller Mode of operation operation.
Alternatively, in the above embodiment of the present invention, power line carrier module and generator set controller are carried out by preset protocol Communication.
Specifically, above-mentioned preset protocol can be that power line carrier module and generator set controller determined after agreement communication Communications protocol.
In a kind of optional scheme, power line carrier module can be by preset protocol, by any one control after modulation Instruction processed is packaged, and the information after encapsulation is sent into generator set controller, letter of the generator set controller after encapsulation is received It after breath, can be decapsulated, obtain any one control instruction, and according to any one control instruction, control unit is pressed According to the operation of corresponding mode of operation.
Alternatively, in the above embodiment of the present invention, in the case where power line carrier module is multiple, Centralized Controller bag Include:
First memory, the identification information for storing at least one power line carrier module.
Specifically, a Centralized Controller can control the Centralized Controller of multiple units, i.e., one can be with multiple electric power Carrier module is connected, and the mark for having a unique MAC Address, i.e. power line carrier module on each carrier module is believed The MAC Address for each power line carrier module being connected with the Centralized Controller is stored on breath, the memory of Centralized Controller.
First communication module, is connected with first memory, for the identification information according at least one power line carrier module, Carrier signal is sent at least one power line carrier module.
In a kind of optional scheme, Centralized Controller refers in any one control for receiving electric control system transmission After order, carrier modulation can be carried out to the control instruction, obtain carrier signal, and read and the centralized Control from memory The MAC Address of all power line carrier modules of device connection, and carrier signal is sent to the institute being connected with the Centralized Controller Some power line carrier modules.
Alternatively, in the above embodiment of the present invention, in the case where Centralized Controller is multiple, electric control system bag Include:
Second memory, the identification information at least one Centralized Controller of storage.
Specifically, can be using many Centralized Controllers, every centralized Control when Centralized Controller control area is larger Have on device be stored with unique ID addresses, the i.e. identification information of Centralized Controller, the memory of electric control system with The ID addresses of multiple Centralized Controllers of electric control system connection.
Second communication module, is connected with second memory, for the identification information according at least one Centralized Controller, will First control instruction, the 3rd control instruction or the 4th control instruction are sent at least one Centralized Controller.
In a kind of optional scheme, electric control system according to the current loads detected, is generating any one control After system instruction, the ID addresses for all Centralized Controllers being connected with the electric control system can be read from memory, And any one control instruction is sent to all Centralized Controllers being connected with the electric control system by network.
Alternatively, in the above embodiment of the present invention, generator set controller 33 includes:
Harvester, the running status for obtaining unit.
Specifically, above-mentioned harvester can be the sensor carried on generator set controller.
Reporting device, is connected with harvester, for the running status of unit to be reported into control device.
In a kind of optional scheme, generator set controller can gather running status of unit etc. by the sensor carried Data, and the data collected are reported into control device, the data that will be collected are by power line carrier module and concentrate control Device processed is reported to electric control system, so that electric control system can determine the implementation status of unit.
Embodiment 3
According to embodiments of the present invention there is provided a kind of embodiment of unit, including:Storage medium, storage medium includes depositing The program of storage, wherein, equipment where controlling storage medium when program is run performs the controlling party of the unit in above-described embodiment 1 Method;Processor, processor is used for operation program, wherein, program performs the controlling party of the unit in above-described embodiment 1 when running Method;Or the control system of the unit in above-described embodiment 2.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in some embodiment The part of detailed description, may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, others can be passed through Mode is realized.Wherein, device embodiment described above is only schematical, such as division of described unit, Ke Yiwei A kind of division of logic function, can there is other dividing mode when actually realizing, such as multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be the INDIRECT COUPLING or communication link of unit or module by some interfaces Connect, can be electrical or other forms.
The unit illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be selected to realize the purpose of this embodiment scheme according to the actual needs.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is realized using in the form of SFU software functional unit and as independent production marketing or used When, it can be stored in a computer read/write memory medium.Understood based on such, technical scheme is substantially The part contributed in other words to prior art or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are to cause a computer Equipment (can for personal computer, server or network equipment etc.) perform each embodiment methods described of the invention whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (13)

1. a kind of control method of unit, it is characterised in that including:
The first control instruction that generator set controller receiving control apparatus is sent, wherein, first control instruction is used to characterize electricity Net is in the low power consumption phase;
The generator set controller control unit is run according to the corresponding mode of operation of first control instruction.
2. according to the method described in claim 1, it is characterised in that the generator set controller controls the unit according to described the The corresponding mode of operation operation of one control instruction, including:
The generator set controller obtains the current state of the unit, wherein, the current state includes one of following:Start shape State and off-mode;
In the case where the current state is the open state, the generator set controller is according to default control mode, control The operational factor of the unit;
In the case where the current state is the off-mode, the generator set controller controls the unit according to default work Operation mode start operation, and according to default control mode, control the operational factor of the unit.
3. method according to claim 2, it is characterised in that control the unit according to default in the generator set controller Before mode of operation start operation, methods described also includes:
The generator set controller obtains the downtime of the unit;
The generator set controller judges whether the downtime exceedes preset time;
If the downtime, not less than the preset time, the generator set controller controls the unit according to default work Operation mode start operation.
4. method according to claim 3, it is characterised in that if the downtime exceedes the preset time, institute Stating method also includes:
The generator set controller receives the second control instruction that the control device is sent, wherein, second control instruction is used Run in controlling the unit start;
After second control instruction is received, the generator set controller controls the unit according to the default Working mould Formula start operation, and according to the default control mode, control the operational factor of the unit.
5. method according to claim 2, it is characterised in that the operational factor includes:Design temperature, operation windscreen and Running frequency, wherein, the generator set controller controls the operational factor of the unit according to default control mode, including:
The generator set controller obtains the functional mode of the unit, wherein, the functional mode includes one of following:Freeze mould Formula and heating mode;
The functional mode be the heating mode in the case of, the generator set controller according to the default control mode, Control the design temperature, the operation windscreen and running frequency rise;
The functional mode be the refrigeration mode in the case of, the generator set controller according to the default control mode, Control the design temperature to reduce, and control the operation windscreen and running frequency rise.
6. according to the method described in claim 1, it is characterised in that control the unit according to described in the generator set controller After the corresponding mode of operation operation of first control instruction, methods described also includes:
The generator set controller receives the 3rd control instruction that the control device is sent, wherein, the 3rd control instruction is used The low power consumption phase is not in characterizing the power network, and is not in peak times of power consumption;
After the 3rd control instruction is received, the generator set controller obtains the current operation mode of the unit;
The generator set controller controls the unit to be run according to the current operation mode.
7. according to the method described in claim 1, it is characterised in that control the unit according to described in the generator set controller After the corresponding mode of operation operation of first control instruction, methods described also includes:
The generator set controller receives the 4th control instruction that the control device is sent, wherein, the 4th control instruction is used Peak times of power consumption are in characterizing the power network;
The generator set controller controls the unit to be run according to initial operation mode, wherein, the initial operation mode is institute Unit is stated according to the mode of operation before the corresponding mode of operation operation of first control instruction.
8. according to the method described in claim 1, it is characterised in that the control device at least includes:Electric control system, its In, before the first control instruction that generator set controller receiving control apparatus is sent, methods described also includes:
The electric control system detects the current loads of the power network;
The current loads are compared by the electric control system with the first load value and the second load value;
If the current loads are less than or equal to first load value, electric control system generation first control Instruction;
If the current loads are more than first load value, and less than or equal to second load value, then the electric power control System processed generates the 3rd control instruction;
If the current loads are more than second load value, the electric control system generates the 4th control instruction.
9. method according to claim 8, it is characterised in that the control device also includes:Centralized Controller and electric power Carrier module, the power line carrier module is arranged on the generator set controller, the Centralized Controller and the power carrier Module is connected by power line, wherein, before the first control instruction that generator set controller receiving control apparatus is sent, the side Method also includes:
The Centralized Controller receives first control instruction, the 3rd control instruction that the electric control system is sent Or the 4th control instruction;
The Centralized Controller is adjusted to first control instruction, the 3rd control instruction or the 4th control instruction System, generates carrier signal;
The Centralized Controller sends the carrier signal to the power line carrier module, wherein, the power line carrier module The carrier signal is demodulated, first control instruction, the 3rd control instruction or the 4th control is obtained and refers to Order, and first control instruction, the 3rd control instruction or the 4th control instruction are sent to the unit allocation Device.
10. method according to claim 9, it is characterised in that the power line carrier module by first control instruction, 3rd control instruction or the 4th control instruction are sent to the generator set controller, including:
The power line carrier module is by preset protocol by first control instruction, the 3rd control instruction or the described 4th Control instruction is sent to the generator set controller.
11. method according to claim 9, it is characterised in that be multiple in the power line carrier module, described concentrate is controlled In the case that device processed is multiple,
The Centralized Controller sends the carrier signal to the power line carrier module, including:The Centralized Controller is obtained Take the identification information of at least one power line carrier module stored in the Centralized Controller;The Centralized Controller is according to described The identification information of at least one power line carrier module, the carrier signal is sent at least one described power line carrier module;
First control instruction of the electric control system transmission, the 3rd control are received in the Centralized Controller to refer to Before order or the 4th control instruction, methods described also includes:The electric control system obtains the electric control system The identification information of at least one Centralized Controller of middle storage;The electric control system is according at least one described centralized Control The identification information of device, first control instruction, the 3rd control instruction or the 4th control instruction are sent to described At least one Centralized Controller.
12. a kind of control system of unit, it is characterised in that including:
Control device, for sending the first control instruction, wherein, first control instruction is low in electricity consumption for characterizing power network Gu Qi;
Generator set controller, is connected with the control device, for controlling unit according to the corresponding work of first control instruction Mode operation.
13. a kind of unit, it is characterised in that including:
Storage medium, the storage medium includes the program of storage, wherein, the storage medium is controlled when described program is run The control method of unit in place equipment perform claim requirement 1 to 11 described in any one;
Processor, the processor is used for operation program, wherein, it is any in perform claim requirement 1 to 11 when described program is run The control method of unit described in one;Or
The control system of unit described in claim 12.
CN201710338938.8A 2017-05-15 2017-05-15 Unit and control method and system thereof Active CN107017628B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710338938.8A CN107017628B (en) 2017-05-15 2017-05-15 Unit and control method and system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710338938.8A CN107017628B (en) 2017-05-15 2017-05-15 Unit and control method and system thereof

Publications (2)

Publication Number Publication Date
CN107017628A true CN107017628A (en) 2017-08-04
CN107017628B CN107017628B (en) 2023-08-25

Family

ID=59449628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710338938.8A Active CN107017628B (en) 2017-05-15 2017-05-15 Unit and control method and system thereof

Country Status (1)

Country Link
CN (1) CN107017628B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108711864A (en) * 2018-06-19 2018-10-26 广东美的制冷设备有限公司 Electricity consumption amount control method, device, server and electric appliance
CN111781880A (en) * 2020-07-16 2020-10-16 青岛海信日立空调系统有限公司 Centralized control system for household appliances

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100691229B1 (en) * 2005-09-16 2007-03-12 삼성전자주식회사 Power-saving operation apparatus of system air conditioner and method thereof
CN101818435A (en) * 2010-05-10 2010-09-01 海尔集团公司 Washing machine control method and system for regulating washing procedure according to network load
CN101876824A (en) * 2010-05-21 2010-11-03 刘树伟 Computer control system for urban electric power central heating and control method thereof
CN103940049A (en) * 2014-05-12 2014-07-23 珠海格力电器股份有限公司 air conditioning unit control method, device and system
CN104374042A (en) * 2014-07-28 2015-02-25 广东电网公司电力科学研究院 Air conditioner load control method and system
CN104534621A (en) * 2014-12-18 2015-04-22 珠海格力电器股份有限公司 Air conditioner and control method and device thereof
CN104990208A (en) * 2015-06-04 2015-10-21 国家电网公司 Method for controlling and reducing peak load of power grid by using air conditioning load
CN105202839A (en) * 2015-10-21 2015-12-30 广东美的制冷设备有限公司 Method and device for starting compressor in air conditioner, compressor system and air conditioner
CN106247527A (en) * 2016-07-27 2016-12-21 珠海格力电器股份有限公司 Method and device for controlling air conditioner at night by using night control mode
CN206775128U (en) * 2017-05-15 2017-12-19 珠海格力电器股份有限公司 Unit and control system thereof

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100691229B1 (en) * 2005-09-16 2007-03-12 삼성전자주식회사 Power-saving operation apparatus of system air conditioner and method thereof
CN101818435A (en) * 2010-05-10 2010-09-01 海尔集团公司 Washing machine control method and system for regulating washing procedure according to network load
CN101876824A (en) * 2010-05-21 2010-11-03 刘树伟 Computer control system for urban electric power central heating and control method thereof
CN103940049A (en) * 2014-05-12 2014-07-23 珠海格力电器股份有限公司 air conditioning unit control method, device and system
CN104374042A (en) * 2014-07-28 2015-02-25 广东电网公司电力科学研究院 Air conditioner load control method and system
CN104534621A (en) * 2014-12-18 2015-04-22 珠海格力电器股份有限公司 Air conditioner and control method and device thereof
CN104990208A (en) * 2015-06-04 2015-10-21 国家电网公司 Method for controlling and reducing peak load of power grid by using air conditioning load
CN105202839A (en) * 2015-10-21 2015-12-30 广东美的制冷设备有限公司 Method and device for starting compressor in air conditioner, compressor system and air conditioner
CN106247527A (en) * 2016-07-27 2016-12-21 珠海格力电器股份有限公司 Method and device for controlling air conditioner at night by using night control mode
CN206775128U (en) * 2017-05-15 2017-12-19 珠海格力电器股份有限公司 Unit and control system thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈楚等: "基于日前调度的大规模中央空调调峰方法", vol. 11, no. 1, pages 74 - 79 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108711864A (en) * 2018-06-19 2018-10-26 广东美的制冷设备有限公司 Electricity consumption amount control method, device, server and electric appliance
CN108711864B (en) * 2018-06-19 2022-04-15 广东美的制冷设备有限公司 Power consumption control method and device, server and electric appliance
CN111781880A (en) * 2020-07-16 2020-10-16 青岛海信日立空调系统有限公司 Centralized control system for household appliances
CN111781880B (en) * 2020-07-16 2021-10-01 青岛海信日立空调系统有限公司 Centralized control system for household appliances

Also Published As

Publication number Publication date
CN107017628B (en) 2023-08-25

Similar Documents

Publication Publication Date Title
CN111139620A (en) Control method for household appliances based on Internet of things
US10612810B2 (en) Method and system for controlling air conditioner outdoor unit
EP2721778B1 (en) System and method of operating household appliances
CN107024883B (en) Fired power generating unit load adjusting method and device and storage medium, processor
CN107017628A (en) Unit and control method and system thereof
CN103443835A (en) Device for monitoring and/or controlling the operation of at least one household appliance by means of at least one portable communication terminal
CN107991891A (en) Method and system for adjusting environmental parameters and user equipment
CN103004054B (en) Be the method that household electrical appliance are powered and the household electrical appliance being suitable for performing described method by low-voltage power network
CN106152249B (en) The control method of electric heating equipment, device and system
CN206775128U (en) Unit and control system thereof
CN108278729A (en) Air conditioner control method and device and air conditioner
CN105444355B (en) Method and device for inputting current of air conditioning unit
CN108242551A (en) Heating means, apparatus and system
CN105698396B (en) Water heater, control method and device thereof and mobile communication terminal
CN108227782A (en) A kind of energy storage container temperature control system and temperature control method
CN109768756A (en) Motor control method and device, motor and computer readable storage medium
CN115875713A (en) Control system and control method of range hood
CN107606688A (en) The control method of heating equipment, apparatus and system
CN102480898A (en) Container data center and cooling device and cooling method thereof
CN212618511U (en) Intelligent control system of kitchen electricity integrated product
CN108571802A (en) Multi-split air conditioner and heat dissipation method thereof
CN107655069A (en) The control method of heating equipment, apparatus and system
CN108847689A (en) Photovoltaic system, and control method and device of photovoltaic system
CN206505727U (en) A kind of cold fusion power-generating control system
CN107612705A (en) A kind of method and trunking of the equipment power saving of bulk management internet-of-things terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant