CN107016463A - Method of Product Cost Prediction method and system - Google Patents

Method of Product Cost Prediction method and system Download PDF

Info

Publication number
CN107016463A
CN107016463A CN201710224967.1A CN201710224967A CN107016463A CN 107016463 A CN107016463 A CN 107016463A CN 201710224967 A CN201710224967 A CN 201710224967A CN 107016463 A CN107016463 A CN 107016463A
Authority
CN
China
Prior art keywords
cost
finished product
list
product
forecasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710224967.1A
Other languages
Chinese (zh)
Inventor
邝宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Renwoxing Software Ltd By Share Ltd
Original Assignee
Chengdu Renwoxing Software Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Renwoxing Software Ltd By Share Ltd filed Critical Chengdu Renwoxing Software Ltd By Share Ltd
Priority to CN201710224967.1A priority Critical patent/CN107016463A/en
Publication of CN107016463A publication Critical patent/CN107016463A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Economics (AREA)
  • Accounting & Taxation (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Finance (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to forecasting of cost field, a kind of Method of Product Cost Prediction method and system are provided, the system includes parameter setting module, finished product selecting module, material sequence computing module, material cost computing module, totle drilling cost computing module and forecasting of cost list generation module.Technical scheme proposed by the present invention can quickly help user to calculate the actual cost of finished product, judge whether sales order can guarantee that reasonable profit, and quickly generate sales quotation list, and provide the detailed data of quotation.

Description

Method of Product Cost Prediction method and system
Technical field
The invention belongs to forecasting of cost field, more particularly to a kind of Method of Product Cost Prediction method and system.
Background technology
Enterprise for product when formulating sales quotation, it is necessary to which the material for being apparent from product is constituted and current reality Cost, just can ensure that reasonable profit.This, which is accomplished by user, can easily inquire about the material composition and various materials of finished product Actual cost, and the various expenses of finished product in process of production can be counted on.However, in traditional business administration and information In change system, the cost of product can only be but actual regularly by adjusting the reference of material into the cost of original record product In production, the change of the material of product is very common, and material purchases price fluctuation is larger, by reference into it is original adjust finished product into This mode can not accurately reflect the actual cost of current production, it is impossible to provide accurate when formulating sales quotation for user Data reference.
The content of the invention
It is an object of the invention to provide a kind of Method of Product Cost Prediction method and system, produced with helping user to adjust in real time The actual cost of finished product, data reference is provided when formulating sales quotation for user.
The present invention is achieved by the following technical solutions.
Present invention firstly relates to a kind of Method of Product Cost Prediction method, it includes:
User specifies the material cost acquisition mode and material expansion relation of finished product;
Select the finished product of cost to be predicted;
The material expansion relation for the finished product specified according to user, calculates the material sequence of selected finished product;
The material cost acquisition mode for the finished product specified according to user captures corresponding material cost, collects each material Cost obtains material cost aggregate value;
User specifies other fees value at cost, the other fees value at cost specified according to material cost aggregate value and user The totle drilling cost predicted value of product is obtained, manufacturing cost prediction is single, and the forecasting of cost list at least includes finished product title, finished product The totle drilling cost predicted value of quantity and finished product.
As a preferred embodiment, the method for the finished product of the selection cost to be predicted is:Selective selling is ordered List or production schedule list, read finished product title and finished product quantity from sales order or production schedule list.
As another preferred embodiment, the method for the finished product of the selection cost to be predicted is manual typing production Finished product title and finished product quantity.
As another preferred embodiment, the material cost acquisition mode of the finished product is included according to nearest buying Unit price obtains, obtains and obtained according to quota cost according to material surplus last month cost.
Price list is generated as another preferred embodiment, in addition to according to forecasting of cost list:By forecasting of cost list In finished product title, the corresponding field in the totle drilling cost predicted value of finished product quantity and finished product write-in price list to be to generate report Valency list.
The invention further relates to a kind of Method of Product Cost Prediction system, it includes parameter setting module, finished product selecting module, material Expect sequence computing module, material cost computing module, totle drilling cost computing module and forecasting of cost list generation module,
The parameter setting module is configured to:Specify the material cost acquisition mode and material expansion relation of finished product;
The finished product selecting module is configured to:Select the finished product of cost to be predicted;
The material sequence computing module is configured to:The material expansion relation for the finished product specified according to user, is calculated The material sequence of selected finished product;
The material cost computing module is configured to:The material cost acquisition mode for the finished product specified according to user is grabbed Corresponding material cost is taken, collects each material cost and obtains material cost aggregate value;
The totle drilling cost computing module is configured to:The other fees specified according to material cost aggregate value and user into Originally it is worth to the totle drilling cost predicted value of product;
The forecasting of cost list generation module is used for manufacturing cost and predicts list, and the forecasting of cost list at least includes finished product The totle drilling cost predicted value of title, finished product quantity and finished product.
As a preferred embodiment, the finished product selecting module is specifically configured to:Selective selling order or Production schedule list, reads finished product title and finished product quantity from sales order or production schedule list.
As another preferred embodiment, the finished product selecting module is specifically configured to:Manual typing is produced into The name of an article claims and finished product quantity.
As another preferred embodiment, the material cost acquisition mode of the finished product is included according to nearest buying Unit price obtains, obtains and obtained according to quota cost according to material surplus last month cost.
As another preferred embodiment, in addition to the single generation module of prediction, the prediction list generation module by with It is set to:By in the totle drilling cost predicted value write-in price list of the finished product title in forecasting of cost list, finished product quantity and finished product Corresponding field to generate price list.
Technical scheme proposed by the present invention has the advantages that:
The present invention can quickly help user to calculate the actual cost of finished product, judge whether sales order can guarantee that Reasonable profit, and sales quotation list is quickly generated, and the detailed data of quotation is provided.
Brief description of the drawings
Fig. 1 is the theory diagram for the Method of Product Cost Prediction system that embodiments of the invention one are provided.
Fig. 2 is the theory diagram for the Method of Product Cost Prediction system that embodiments of the invention two are provided.
Fig. 3 is the flow chart for the Method of Product Cost Prediction method that embodiments of the invention three are provided.
Fig. 4 is the flow chart for the Method of Product Cost Prediction method that embodiments of the invention four are provided.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below by the embodiment of the present invention Carry out clear, complete description.
Fig. 1 is the theory diagram for the Method of Product Cost Prediction system that embodiments of the invention one are provided.As shown in figure 1, this is System includes parameter setting module, finished product selecting module, material sequence computing module, material cost computing module, totle drilling cost meter Calculate module and forecasting of cost list generation module.
In the embodiment, parameter setting module is configured to:Specify material cost acquisition mode and the material exhibition of finished product Open relation.Further, as a kind of more specifically embodiment, the material cost acquisition mode of finished product is included according to adopting recently Buying order valency obtains, obtains and obtained according to quota cost according to material surplus last month cost.If selection is according to nearest buying order Valency is obtained, then in the forecasting of cost of finished product, and what the material cost of finished product can capture that the material stocks up in the last time adopts Buying order valency, is compared by transfer items date that logs in of date and active user of the document of receiving tally, day is logged in closest to user The unit price of procurement of the material tail row is defined as nearest unit price of procurement on the receiving tally document of phase, when selecting nearest unit price of procurement, Also need to user and specify whether procurement price contains tax, if user specifies " purchasing price contain tax ", capture material cost when Corresponding valency containing duty receipt in crawl receiving tally is waited, if user specifies " purchasing price is free of tax ", what is captured is that material is being stocked up Corresponding non-duty receipt valency in list.If selection is obtained according to material surplus last month cost, the cost of material can capture the material and exist Unit cost during last accounting month surplus.If selection is obtained according to quota cost, it is pre- that the cost of material can capture the material If quota cost, the quota cost of predeterminable material in stock archives basic data.In addition, the material of finished product also can be set Expect expansion mode (can also claim BOM expansion modes), may be selected to be expanded to N grades and be expanded to final stage, the numeral that N is represented can be 1 ~20, selection is expanded to after N grades, in the material list body of forecasting of cost list, only N grades of the BOM of finished product can be shown to, more than N The material of level will not be shown.
In the embodiment, finished product selecting module is configured to:Select the finished product of cost to be predicted.Further, as A kind of more specifically embodiment, finished product selecting module is specifically configured to:Selective selling order or production schedule list, from pin Sell and finished product title and finished product quantity are read in order or production schedule list, specifically, if selection is sales order, read What is taken is customer name in sales order, finished product title, finished product quantity and source odd numbers, consumption sum;If selection It is production schedule list, then what is read is to plan finished product title, finished product quantity and the source odd numbers in list.As it is another more Specific embodiment, finished product selecting module is specifically configured to:Manual typing finished product title and finished product quantity.To sum up Understand, present embodiments provide the mode of the finished product of two kinds of selection costs to be predicted.
In the embodiment, material sequence computing module is configured to:The material expansion for the finished product specified according to user is closed System, calculates the material sequence of selected finished product.Specifically, during calculating, first by the BOM expansion modes of parameter setting The expansion series of setting, it is mono- with reference to the current BOM of finished product, following table body material pages show finished product material constitute and Standardized amount, loss quantity and actual use quantity, standardized amount formula is:BOM consumption * upper table body quantity;Quantity is lost public Formula is:BOM waste * quantity;Actual use quantity gives tacit consent to computational methods:Standardized amount+loss quantity.
In the embodiment, material cost computing module is configured to:The material cost for the finished product specified according to user takes The mode of obtaining captures corresponding material cost, collects each material cost and obtains material cost aggregate value.Specifically, material sequence meter Module is calculated to obtain after the material sequence of finished product, according to the material cost acquisition mode set in parameter setting, crawl material Unit cost, calculates material cost, and computational methods are:Actual use quantity * unit costs, round up two-decimal.Meter Calculate after material cost, be filled into the material cost field of correspondence finished product in upper table body., can if necessary to statistics expense The expense item of this secondary typing is selected, then typing unit costs cost, system can calculate Fee Amount, computational methods For:Quantity * unit costs costs, what amount field was brought into automatically is the quantity of upper table body.Upper table body achieve material cost and After Fee Amount, system will calculate total cost automatically, and the computational methods of total cost are:Material cost+Fee Amount+profit Profit volume.Further, can also be according to actual conditions, manual typing profit margin or profit margin, during typing profit margin, system will be certainly Dynamic to calculate profit margin, during typing profit margin, system will also calculate profit margin automatically, the conversion between profit margin and profit margin Formula is:(material cost+Fee Amount) * profit margins=profit margin.In addition, user can also typing discount, if user's typing Discount, the price list that discount will influence forecasting of cost list to generate.
In the embodiment, totle drilling cost computing module is configured to:Specified according to material cost aggregate value and user its His expense cost is worth to the totle drilling cost predicted value of finished product.Specifically, according to material cost aggregate value, add up expense cost, Obtain the totle drilling cost predicted value of finished product.
In the embodiment, forecasting of cost list generation module is used for manufacturing cost and predicts list, and forecasting of cost list includes finished product The totle drilling cost predicted value of title, finished product quantity and finished product, further, if user passes through material cost computing module typing Discount, then forecasting of cost list can also include rebate value.
By increasing price list generation module in the forecasting of cost system in above-described embodiment one, embodiment can be obtained Two, Fig. 2 are the theory diagram for the Method of Product Cost Prediction system that embodiments of the invention two are provided, as shown in Fig. 2 the product cost Forecasting system also includes price list generation module, and the price list generation module is specifically configured to:By the production in forecasting of cost list Corresponding field in the totle drilling cost predicted value write-in price list of finished product title, finished product quantity and finished product is to generate price list. Embodiment two can obtain price list by increasing the single generation module of prediction, in addition, in the embodiment, if forecasting of cost list bag Rebate value is included, then price list generation module can also write rebate value the corresponding field of price list.
Specifically, carrying out the method for Method of Product Cost Prediction using system provided in an embodiment of the present invention, it may be referred to following Corresponding embodiment of the method.
Fig. 3 is the flow chart for the Method of Product Cost Prediction method that embodiments of the invention three are provided, as shown in figure 3, this method Comprise the following steps:
Step S1:User specifies the material cost acquisition mode and material expansion relation of finished product.
In the step, as a kind of more specifically embodiment, the material cost acquisition mode of finished product is included according to most Nearly unit price of procurement obtains, obtains and obtained according to quota cost according to material surplus last month cost.If selection according to adopting recently Buying order valency is obtained, then in the forecasting of cost of finished product, the material cost of finished product can capture the material and be stocked up in the last time Unit price of procurement, be compared, stepped on closest to user by transfer items date that logs in of date and active user of the document of receiving tally The unit price of procurement of the material tail row is defined as nearest unit price of procurement on the receiving tally document on land date, selects nearest unit price of procurement When, in addition it is also necessary to user specifies whether procurement price contains tax, if user specifies " purchasing price contains tax ", in crawl material cost When crawl receiving tally in corresponding valency containing duty receipt, if user specifies " purchasing price without tax ", what is captured is that material is entering Corresponding non-duty receipt valency in manifest.If selection is obtained according to material surplus last month cost, the cost of material can capture the material Unit cost in last accounting month surplus.If selection is obtained according to quota cost, the cost of material can capture the material Default quota cost, the quota cost of predeterminable material in stock archives basic data.In addition, finished product also can be set BOM expansion modes, may be selected to be expanded to N grades and are expanded to final stage, and the numeral that N is represented can be 1~20, and selection is expanded to N grades Afterwards, in the material list body of forecasting of cost list, N grades of the BOM of finished product only can be shown to, the material more than N grades will not be shown.
Step S2:Select the finished product of cost to be predicted.
Specifically, the present embodiment provides the mode of the finished product of two kinds of selection costs to be predicted, and a kind of mode is:Selection pin Order or production schedule list are sold, finished product title and finished product quantity are read from sales order or production schedule list, specifically, If selection is sales order, what is read is customer name, finished product title, finished product quantity and the source in sales order Odd numbers, consumption sum;If selection is production schedule list, what is read is to plan finished product title, the finished product quantity in list And source odd numbers.Another way is:Manual typing finished product title and finished product quantity.
Step S3:Calculate the material sequence of selected finished product.
In the step, the material expansion relation for the finished product specified according to user calculates the material of selected finished product Sequence.Specifically, during calculating, first by the expansion series set in the BOM expansion modes of parameter setting, work as with reference to finished product Preceding BOM is mono-, shows that the material of finished product is constituted and standardized amount, loss quantity and actual use in following table body material pages Quantity, standardized amount formula is:BOM consumption * upper table body quantity;Quantity formula, which is lost, is:BOM waste * quantity;Actual use Quantity gives tacit consent to computational methods:Standardized amount+loss quantity.
Step S4:Corresponding material cost is captured, collects each material cost and obtains material cost aggregate value.
Specifically, after the material sequence for obtaining finished product, according to the material cost acquisition mode set in parameter setting, grab The unit cost drawn materials, calculates material cost, and computational methods are:Actual use quantity * unit costs, round up two Decimal.Calculate after material cost, be filled into the material cost field of correspondence finished product in upper table body.If necessary to count Expense, may be selected the expense item of this secondary typing, then typing unit costs cost, and system can calculate Fee Amount, Computational methods are:Quantity * unit costs costs, what amount field was brought into automatically is the quantity of upper table body.Upper table body achieves material Expect after cost and Fee Amount, system will calculate total cost automatically, the computational methods of total cost are:Material cost+take With the amount of money+profit margin.Further, can also be according to actual conditions, manual typing profit margin or profit margin, typing profit margin When, system will calculate profit margin automatically, during typing profit margin, and system will also calculate profit margin, profit margin and profit automatically Reduction formula between volume is:(material cost+Fee Amount) * profit margins=profit margin.In addition, user can also typing discount, If user's typing discount, the price list that discount will influence forecasting of cost list to generate.
Step S5:Calculate the totle drilling cost predicted value of finished product.
In the step, the other fees cost specified according to material cost aggregate value and user is worth to the total of finished product Forecasting of cost value.Specifically, according to material cost aggregate value, add up expense cost, obtains the totle drilling cost predicted value of finished product.
Step S6:Manufacturing cost prediction is single.
Specifically, forecasting of cost list includes the totle drilling cost predicted value of finished product title, finished product quantity and finished product, enters one Step, if user's typing discount in step s 4, forecasting of cost list can also include rebate value.
By increasing step S7 in the forecasting of cost method in above-described embodiment three, example IV can be obtained, Fig. 4 is The flow chart for the Method of Product Cost Prediction method that embodiments of the invention four are provided, as shown in figure 4, this method also includes:
Step S7:Generate price list.
The totle drilling cost predicted value of finished product title in forecasting of cost list, finished product quantity and finished product is write into price list In corresponding field to generate price list.Example IV can obtain price list by increasing the single generation module of prediction, in addition, should In embodiment, if forecasting of cost list includes rebate value, price list generation module can also write rebate value pair of price list Answer field.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above-mentioned each method embodiment can lead to The related hardware of programmed instruction is crossed to complete.Foregoing program can be stored in computer read/write memory medium.The program Upon execution, the step of including above-mentioned each method embodiment is performed;And foregoing storage medium includes:ROM, RAM, magnetic disc or CD etc. is various can be with the medium of store program codes.
As can be seen from the above embodiments, the embodiment of the present invention can quickly help user to calculate the reality of finished product Cost, judges whether sales order can guarantee that reasonable profit, and quickly generates sales quotation list, and provides the detailed number of quotation According to.
In addition, it is necessary to illustrate, the embodiment of foregoing description is a part of embodiment of the present invention, rather than is all implemented Example, nor limitation of the present invention.Based on embodiments of the invention, those of ordinary skill in the art are not paying creative labor The every other embodiment obtained under the premise of dynamic, belongs to protection scope of the present invention.

Claims (10)

1. a kind of Method of Product Cost Prediction method, it is characterised in that including:
User specifies the material cost acquisition mode and material expansion relation of finished product;
Select the finished product of cost to be predicted;
The material expansion relation for the finished product specified according to user, calculates the material sequence of selected finished product;
The material cost acquisition mode for the finished product specified according to user captures corresponding material cost, collects each material cost Obtain material cost aggregate value;
User specifies other fees value at cost, and the other fees cost specified according to material cost aggregate value and user is worth to The totle drilling cost predicted value of finished product, manufacturing cost prediction is single, and the forecasting of cost list at least includes finished product title, finished product number The totle drilling cost predicted value of amount and finished product.
2. Method of Product Cost Prediction method according to claim 1, it is characterised in that the production of the selection cost to be predicted into The method of product is:Selective selling order or production schedule list, from sales order or production schedule list read finished product title and Finished product quantity.
3. Method of Product Cost Prediction method according to claim 1, it is characterised in that the production of the selection cost to be predicted into The method of product is manual typing finished product title and finished product quantity.
4. Method of Product Cost Prediction method according to claim 1, it is characterised in that the material cost of the finished product is obtained Mode includes obtaining according to nearest unit price of procurement, obtains and obtained according to quota cost according to material surplus last month cost.
5. Method of Product Cost Prediction method according to claim 1, it is characterised in that also including being generated according to forecasting of cost list Price list:The totle drilling cost predicted value of finished product title in forecasting of cost list, finished product quantity and finished product is write into price list In corresponding field to generate price list.
6. a kind of Method of Product Cost Prediction system, it is characterised in that including parameter setting module, finished product selecting module, material sequence Computing module, material cost computing module, totle drilling cost computing module and forecasting of cost list generation module,
The parameter setting module is configured to:Specify the material cost acquisition mode and material expansion relation of finished product;
The finished product selecting module is configured to:Select the finished product of cost to be predicted;
The material sequence computing module is configured to:The material expansion relation for the finished product specified according to user, calculates selected The material sequence for the finished product selected;
The material cost computing module is configured to:The material cost acquisition mode crawl pair for the finished product specified according to user The material cost answered, collects each material cost and obtains material cost aggregate value;
The totle drilling cost computing module is configured to:The other fees value at cost specified according to material cost aggregate value and user Obtain the totle drilling cost predicted value of finished product;
The forecasting of cost list generation module is used for manufacturing cost and predicts list, and the forecasting of cost list at least includes finished product name The totle drilling cost predicted value of title, finished product quantity and finished product.
7. Method of Product Cost Prediction system according to claim 6, it is characterised in that the specific quilt of the finished product selecting module It is configured to:Selective selling order or production schedule list, finished product title is read from sales order or production schedule list and is produced into Product quantity.
8. Method of Product Cost Prediction system according to claim 6, it is characterised in that the specific quilt of the finished product selecting module It is configured to:Manual typing finished product title and finished product quantity.
9. Method of Product Cost Prediction system according to claim 6, it is characterised in that the material cost of the finished product is obtained Mode includes obtaining according to nearest unit price of procurement, obtains and obtained according to quota cost according to material surplus last month cost.
10. Method of Product Cost Prediction system according to claim 6, it is characterised in that also including the single generation module of prediction, institute The single generation module of prediction is stated to be configured to:By the assembly of the finished product title in forecasting of cost list, finished product quantity and finished product Corresponding field in this predicted value write-in price list is to generate price list.
CN201710224967.1A 2017-04-07 2017-04-07 Method of Product Cost Prediction method and system Pending CN107016463A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710224967.1A CN107016463A (en) 2017-04-07 2017-04-07 Method of Product Cost Prediction method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710224967.1A CN107016463A (en) 2017-04-07 2017-04-07 Method of Product Cost Prediction method and system

Publications (1)

Publication Number Publication Date
CN107016463A true CN107016463A (en) 2017-08-04

Family

ID=59445613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710224967.1A Pending CN107016463A (en) 2017-04-07 2017-04-07 Method of Product Cost Prediction method and system

Country Status (1)

Country Link
CN (1) CN107016463A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107506951A (en) * 2017-10-11 2017-12-22 金蝶软件(中国)有限公司 The computational methods and relevant apparatus of a kind of Material Cost
WO2019237573A1 (en) * 2018-06-11 2019-12-19 平安科技(深圳)有限公司 Price data determining method, electronic device, and medium
CN111199409A (en) * 2018-11-16 2020-05-26 浙江舜宇智能光学技术有限公司 Cost control method and system for specific product and electronic device
CN113837685A (en) * 2021-08-19 2021-12-24 深圳市亿源通供应链管理有限公司 Warehouse-out interception method, warehouse logistics system, order system and readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103927609A (en) * 2013-01-16 2014-07-16 上海云点信息科技有限公司 Cost accounting mechanism based on BOM
CN104866939A (en) * 2014-02-24 2015-08-26 上海宝钢国际经济贸易有限公司 Specific valuation cost accounting method orienting to steel producing and progressing enterprise
CN106022567A (en) * 2016-05-09 2016-10-12 上海恒企教育培训有限公司 Industrial cost accounting system
CN106228257A (en) * 2016-07-08 2016-12-14 中冶赛迪工程技术股份有限公司 A kind of cost analysis towards iron and steel enterprise's production process and assessment system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103927609A (en) * 2013-01-16 2014-07-16 上海云点信息科技有限公司 Cost accounting mechanism based on BOM
CN104866939A (en) * 2014-02-24 2015-08-26 上海宝钢国际经济贸易有限公司 Specific valuation cost accounting method orienting to steel producing and progressing enterprise
CN106022567A (en) * 2016-05-09 2016-10-12 上海恒企教育培训有限公司 Industrial cost accounting system
CN106228257A (en) * 2016-07-08 2016-12-14 中冶赛迪工程技术股份有限公司 A kind of cost analysis towards iron and steel enterprise's production process and assessment system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107506951A (en) * 2017-10-11 2017-12-22 金蝶软件(中国)有限公司 The computational methods and relevant apparatus of a kind of Material Cost
WO2019237573A1 (en) * 2018-06-11 2019-12-19 平安科技(深圳)有限公司 Price data determining method, electronic device, and medium
CN111199409A (en) * 2018-11-16 2020-05-26 浙江舜宇智能光学技术有限公司 Cost control method and system for specific product and electronic device
CN113837685A (en) * 2021-08-19 2021-12-24 深圳市亿源通供应链管理有限公司 Warehouse-out interception method, warehouse logistics system, order system and readable storage medium

Similar Documents

Publication Publication Date Title
Difrancesco et al. Optimizing the return window for online fashion retailers with closed-loop refurbishment
Mostard et al. The distribution-free newsboy problem with resalable returns
Chakraborty et al. Coordination and competition in a common retailer channel: Wholesale price versus revenue-sharing mechanisms
Padmanabhan et al. Manufacturer's return policies and retail competition
Jaggi et al. Inventory and credit decisions for deteriorating items with displayed stock dependent demand in two-echelon supply chain using Stackelberg and Nash equilibrium solution
Baier et al. Gravity models and empirical trade
John Mathis et al. Financing the global supply chain: growing need for management action
CN107016463A (en) Method of Product Cost Prediction method and system
Reinstein et al. Efficient consumer altruism and fair trade products
Khara et al. Sustainable recycling in an imperfect production system with acceptance quality level dependent development cost and demand
Amornpetchkul et al. Mechanisms to induce buyer forecasting: Do suppliers always benefit from better forecasting?
Khouja et al. A retailer’s decision to join a promotional event of an e-commerce platform
JP4134508B2 (en) Supply chain simulation system
Iyer et al. Contract design for the stockist in Indian distribution networks
Li et al. Coordinating the retail supply chain with item‐level RFID and excess inventory under a revenue‐cost‐sharing contract
CN109615492A (en) A kind of bookkeeping voucher generation method and system
Gökbayrak et al. Single item periodic review inventory control with sales dependent stochastic return flows
Mahdavisharif et al. Pricing and inventory policy for non-instantaneous deteriorating items in vendor-managed inventory systems: a Stackelberg game theory approach
Vasilyev et al. Assortment optimization using an attraction model in an omnichannel environment
Jiang et al. Partial backordering inventory model with limited storage capacity under order-size dependent trade credit
Ghosh et al. Determination of optimal price and quantity in a two-echelon supply chain model with promotional effort and feedback effect in stochastic scenario
Poddar et al. Improving trade promotions through virtual forward buying
JP2008052413A (en) Evaluation support system for sales plan
Meier et al. A formal model of the introduction of a vertical EDI system
CN115660708A (en) Commodity data processing method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804