CN107012958A - A kind of containment type Circular Tubular Joints and preparation method - Google Patents

A kind of containment type Circular Tubular Joints and preparation method Download PDF

Info

Publication number
CN107012958A
CN107012958A CN201710428405.9A CN201710428405A CN107012958A CN 107012958 A CN107012958 A CN 107012958A CN 201710428405 A CN201710428405 A CN 201710428405A CN 107012958 A CN107012958 A CN 107012958A
Authority
CN
China
Prior art keywords
pipe
cutting
time
supervisor
mutually
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710428405.9A
Other languages
Chinese (zh)
Other versions
CN107012958B (en
Inventor
周观根
何挺
何伟
郭振华
姜楠
吕艳
周博
许素环
徐丽萍
徐燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Southeast Space Frame Co Ltd
Original Assignee
Zhejiang Southeast Space Frame Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Southeast Space Frame Co Ltd filed Critical Zhejiang Southeast Space Frame Co Ltd
Priority to CN201710428405.9A priority Critical patent/CN107012958B/en
Publication of CN107012958A publication Critical patent/CN107012958A/en
Application granted granted Critical
Publication of CN107012958B publication Critical patent/CN107012958B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B1/1903Connecting nodes specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section

Abstract

The present invention relates to a kind of tubular joint, more particularly to a kind of containment type Circular Tubular Joints and preparation method, belong to field of steel structure.Including supervisor and time pipe, supervisor and time pipe are respectively curved steel tube, and the outer wall of secondary pipe is provided with intersecting mouth, and supervisor's half built-in is into intersecting mouth.A kind of containment type Circular Tubular Joints and preparation method compact conformation, stress performance are outstanding, preparation method science.

Description

A kind of containment type Circular Tubular Joints and preparation method
Technical field
The present invention relates to a kind of tubular joint, more particularly to a kind of containment type Circular Tubular Joints and preparation method, belong to Field of steel structure.
Background technology
In recent years, with the raising and the development of process equipment of architectural design level, new large span spatial pipe truss The theory and technology research of structure has also obtained deep development.The geometric characteristics of round steel pipe are good, with good resistance to compression and Bending-twisting bearing capacity, closed frame tube is not perishable, and architectural appearance is attractive in appearance, therefore tube truss structure is with its unique advantage times Favored by designer.
Chinese patent 201010219122.1, discloses a kind of inserting plate type welding through node, including supervisor, branch pipe and ear Plate, the branch pipe is connected with the supervisor by angle welding, and the supervisor is provided with relative twice groove, and otic placode is inserted by groove Supervisor, is connected with supervisor using melt-through weld, and the otic placode is provided with pin shaft hole.
This structure interior joint is complicated, can influence overall performance.
The content of the invention
The present invention mainly solves the deficiencies in the prior art there is provided a kind of structure is compacter, solves building A kind of containment type Circular Tubular Joints and preparation method of contradiction between design and the manufacture of tubular truss tubular joint.
The above-mentioned technical problem of the present invention is mainly what is be addressed by following technical proposals:
A kind of containment type Circular Tubular Joints and preparation method, are carried out according to the following steps:
(1), structure is combined:
Including supervisor and time pipe, supervisor and time pipe are respectively curved steel tube, and the outer wall of secondary pipe is provided with intersecting mouth, and supervisor half is embedding Enter formula into intersecting mouth;
(2), manufacturing process:
(1) secondary pipe digitized simulation, is divided into two sections first, is divided into time pipe 1 and time pipe 2, an original can not be cut Distortion intersecting mouth is converted into the pipe end intersecting mouth of two digit control cuttings in the middle part of pipe, and provides the arc pipe number of time pipe 1 and time pipe 2 Control cutting data;
(2) and then using the cutting data of time pipe 1 and time pipe 2, pass through oral area in two pipe ends and orient cutting arcing point and right The orthogonal control point of pipe end answered;By the way that to the end arcing point in data and the positioning at control point, cutting gun is mutually passed through using numerical control The low current operation of head, sets some plain intersection control points in place in secondary pipe outer wall, had so both fixed whole piece containment type Intersection, in turn ensure that the integrality of time pipe, and pipe strength of parent can be made to meet medium frequency bending of pipe operation;
(3) medium frequency bending of pipe operation and then by the straight tube for having set intersection control point is carried out, afterwards using semi-automatic cutting Machine is carried out passing through mouth cutting by intersection control point, and is repaired out and mutually passed through groove;
(4) it is, last, the secondary pipe of curved arc and intersecting mouth cutting will be completed in workshop and be responsible for progress preassembling operation, Check primary and secondary pipe location dimension, mutually pass through the assembled data such as gap, improve node and mutually pass through accuracy, can be in car if any slight error Between repair in time.
Secondary pipe side wall intersecting mouth and supervisor's angle of intersection, primary and secondary pipe caliber, primary and secondary pipe bent arc radius and mutually containing are deep Degree etc. is relevant.Insertion and partial tolerance are responsible in secondary pipe, compared with conventional tubular joint, this node not only modern design, It is attractive in appearance naturally, also ensureing that structure stress is reasonable, power transmission is clear and definite simultaneously.
Two curved arc pipes of appearance formula Circular Tubular Joints must mutually be passed through in spatial intersecting, cause time intersecting mouth of pipe pipe side wall not Rule distortion.Cutting equipment is mutually passed through in numerical control can not cut such special-shaped intersecting mouth, even if pipe side wall is passed through after the completion of mouth cutting, also not Medium frequency bending of pipe operation can be completed, because strength of parent can not meet medium frequency bending of pipe requirement after cutting.
Secondary pipe is often by conventional manufacture method passing through one point of mouthful near middle in order to solve above processing and manufacturing problem Two, after mutually passing through and be connected with supervisor respectively, then the strong docking such as carry out.Such manufacture method, it is impossible to ensure the continuous of curved arc pipe Property with mutually pass through accuracy, also add field welding, be not preferable method.
Through manufacture method technical research and improvement, it can accomplish more to meet Architectural Design Requirements at present, it is ensured that node is strong The rational method of degree.Through engineering practice, the preparation method of this containment type Circular Tubular Joints is simple and reliable, meets abnormity and mutually passes through section The required precision of point, it is adaptable to the making processing of the containment type tubular joint of all kinds of conventional curved arc round steel pipes.
Irregular intersecting mouth in the middle part of pipe is successfully solved to be difficult to cut and mutually pass through the two of cutting and curved arc sequence of operation contradiction Class problem.
The present invention provides a kind of containment type Circular Tubular Joints and preparation method, and compact conformation, stress performance is outstanding, Preparation method science.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of the present invention;
Fig. 2 is the configuration schematic diagram of the present invention;
Fig. 3 is the structural representation of time pipe in the present invention;
Fig. 4 is the cross section structure diagram of 1-1 in Fig. 3.
Embodiment
Below by embodiment, and with reference to accompanying drawing, technical scheme is described in further detail.
Embodiment 1:As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of containment type Circular Tubular Joints and preparation method, by with Lower step is carried out:
(1), structure is combined:
Including supervisor 1 and time pipe 2, supervisor 1 and time pipe 2 are respectively curved steel tube, and the outer wall of secondary pipe 2 is provided with intersecting mouth 3, main The half built-in of pipe 1 is into intersecting mouth 3;
(2), manufacturing process:
(1) secondary pipe digitized simulation, is divided into two sections first, is divided into time pipe 1 and time pipe 2, an original can not be cut Distortion intersecting mouth is converted into the pipe end intersecting mouth of two digit control cuttings in the middle part of pipe, and provides the arc pipe number of time pipe 1 and time pipe 2 Control cutting data;
(2) and then using the cutting data of time pipe 1 and time pipe 2, pass through oral area in two pipe ends and orient cutting arcing point and right The orthogonal control point of pipe end answered;By the way that to the end arcing point in data and the positioning at control point, cutting gun is mutually passed through using numerical control The low current operation of head, sets some plain intersection control points in place in secondary pipe outer wall, had so both fixed whole piece containment type Intersection, in turn ensure that the integrality of time pipe, and pipe strength of parent can be made to meet medium frequency bending of pipe operation;
(3) medium frequency bending of pipe operation and then by the straight tube for having set intersection control point is carried out, afterwards using semi-automatic cutting Machine is carried out passing through mouth cutting by intersection control point, and is repaired out and mutually passed through groove;
(4) it is, last, the secondary pipe of curved arc and intersecting mouth cutting will be completed in workshop and be responsible for progress preassembling operation, Check primary and secondary pipe location dimension, mutually pass through the assembled data such as gap, improve node and mutually pass through accuracy, can be in car if any slight error Between repair in time.

Claims (1)

1. a kind of containment type Circular Tubular Joints and preparation method, it is characterised in that carry out according to the following steps:(1), structure group Close:
Including supervisor (1) and secondary pipe (2), supervisor (1) and time pipe (2) are respectively curved steel tube, and the outer wall of secondary pipe (2), which is provided with, mutually to be passed through Mouth (3), supervisor's (1) half built-in is into intersecting mouth (3);
(2), manufacturing process:
(1) secondary pipe digitized simulation, is divided into two sections first, is divided into time pipe 1 and time pipe 2, the pipe that an original can not be cut Portion's distortion intersecting mouth is converted into the pipe end intersecting mouth of two digit control cuttings, and provides the arc pipe numerical control cutting of time pipe 1 and time pipe 2 Cut data;
(2) and then using the cutting data of time pipe 1 and time pipe 2, pass through oral area in two pipe ends and orient cutting arcing point and corresponding The orthogonal control point of pipe end;By the way that to the end arcing point in data and the positioning at control point, cutting pipette tips are mutually passed through using numerical control Low current operation, sets some plain intersection control points in place in secondary pipe outer wall, had so both fixed whole piece containment type and mutually passed through Line, in turn ensure that the integrality of time pipe, and pipe strength of parent can be made to meet medium frequency bending of pipe operation;
(3) medium frequency bending of pipe operation and then by the straight tube for having set intersection control point is carried out, it is rear to be pressed using semi auto cutting machine Intersection control point carries out passing through mouth cutting, and repairs out and mutually pass through groove;
(4) it is, last, by the secondary pipe for having completed curved arc and intersecting mouth cutting in workshop and supervisor's progress preassembling operation, check Primary and secondary pipe location dimension, mutually pass through the assembled data such as gap, improve node and mutually pass through accuracy, if any slight error, can in workshop and When repair.
CN201710428405.9A 2017-06-08 2017-06-08 A kind of containment type Circular Tubular Joints and production method Active CN107012958B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710428405.9A CN107012958B (en) 2017-06-08 2017-06-08 A kind of containment type Circular Tubular Joints and production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710428405.9A CN107012958B (en) 2017-06-08 2017-06-08 A kind of containment type Circular Tubular Joints and production method

Publications (2)

Publication Number Publication Date
CN107012958A true CN107012958A (en) 2017-08-04
CN107012958B CN107012958B (en) 2019-04-23

Family

ID=59451130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710428405.9A Active CN107012958B (en) 2017-06-08 2017-06-08 A kind of containment type Circular Tubular Joints and production method

Country Status (1)

Country Link
CN (1) CN107012958B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112108841A (en) * 2020-09-11 2020-12-22 浙江精工钢结构集团有限公司 Method for manufacturing intersecting opening of hyperbolic oblique-crossing circular tube
CN112282080A (en) * 2020-11-06 2021-01-29 广东电网有限责任公司广州供电局 Novel tubular intersecting joint structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101767267A (en) * 2010-03-03 2010-07-07 潮峰钢构集团有限公司 Technology for processing curve of intersection pipeline
CN101851957A (en) * 2010-06-02 2010-10-06 中建钢构有限公司 Manufacturing method of multi-pipe tubular joint
CN106670584A (en) * 2016-12-10 2017-05-17 湖南金海钢结构股份有限公司 Novel machining method for intersecting opening of curved rod piece

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101767267A (en) * 2010-03-03 2010-07-07 潮峰钢构集团有限公司 Technology for processing curve of intersection pipeline
CN101851957A (en) * 2010-06-02 2010-10-06 中建钢构有限公司 Manufacturing method of multi-pipe tubular joint
CN106670584A (en) * 2016-12-10 2017-05-17 湖南金海钢结构股份有限公司 Novel machining method for intersecting opening of curved rod piece

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112108841A (en) * 2020-09-11 2020-12-22 浙江精工钢结构集团有限公司 Method for manufacturing intersecting opening of hyperbolic oblique-crossing circular tube
CN112282080A (en) * 2020-11-06 2021-01-29 广东电网有限责任公司广州供电局 Novel tubular intersecting joint structure

Also Published As

Publication number Publication date
CN107012958B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
CN107012958A (en) A kind of containment type Circular Tubular Joints and preparation method
CN211305265U (en) Brazing pipeline joint
CN103084427A (en) Manufacturing method of hardenability steel tube
CN109138450B (en) Method for positioning intersection line of space butt joint interface of reducer pipe
CN101332600A (en) Blanking method of multi-node knee
CN112883664B (en) Size optimization method for hydraulic integrated block right-angled bend flow channel
JPWO2006067881A1 (en) Piping connection method, air conditioner and piping connection parts
CN102825395A (en) Brazing structure for connecting pipe and valve seat
KR101878601B1 (en) Pipe joint, apparatus for producing the same and method for constructing piping system using the same
CN115262671A (en) Excavator boom and boom design method
CN115012520A (en) Reinforcing system and method for welding hollow sphere nodes
CN105817841B (en) Shape tube forming method
CN204771500U (en) Guarantee positioner of work piece assembly concentricity
CN109388870B (en) Method for calculating minimum backfilling length of oil and gas pipeline by using strong group
CN105014319A (en) Method for manufacturing complex intersecting line hot rolling steel tube joint
CN112108841B (en) Method for manufacturing intersecting opening of hyperbolic oblique-crossing circular tube
CN218694831U (en) Plasma cutting positioning device
CN105436812A (en) Restoring method for part nail passing hole leakage
CN204645275U (en) Connected node firm after a kind of first hinge
CN107679258B (en) Method and device for selecting and matching main material strength level difference forging flange of power transmission steel pipe tower
CN215807063U (en) Steel wire composite pipe hot melting socket mould and system
CN219336577U (en) Pressure steel pipe grouting hole flange assembly device
CN113857781B (en) Gas-collecting hood and forming method thereof
CN211888502U (en) Pipe orifice shaping tool for reducing pipe and straight pipe
CN211360129U (en) Claw-shaped tee machining structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant