CN107012888A - A kind of tunneling device - Google Patents
A kind of tunneling device Download PDFInfo
- Publication number
- CN107012888A CN107012888A CN201710343476.9A CN201710343476A CN107012888A CN 107012888 A CN107012888 A CN 107012888A CN 201710343476 A CN201710343476 A CN 201710343476A CN 107012888 A CN107012888 A CN 107012888A
- Authority
- CN
- China
- Prior art keywords
- module
- construction
- precast
- tunneling device
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention discloses a kind of tunneling device, including:Underground construction portion, for excavating fitting recess under a subterranean formation, builds tunnel agent structure and slip casting;Ground control unit, for controlling the underground construction portion to be constructed;The ground control unit includes switchboards of job guide rail, Working gantry and mobile control main frame, the Working gantry is arranged on above the switchboards of job guide rail, the underground construction portion is arranged on below the switchboards of job guide rail, the Working gantry and the underground construction portion can together with moved horizontally along the switchboards of job guide rail.Tunnel can be built using the device, it is possible to reduce the use with supporting construction is excavated on stratum, save engineering construction cost, improve efficiency of construction, ensure construction safety.
Description
Technical field
The present invention relates to tunneling apparatus field, and in particular to a kind of tunneling device.
Background technology
Under the fast-developing situation of current cityization, to alleviate traffic pressure and rationally utilizing Underground Space Resource, city
The rapid transformation of city's road and city integrated piping lane construction are all received much concern, and following this kind of Tunnel Engineering can be continuously increased.
Tunnel construction early stage can select most rational construction method according to actual conditions, for the tunnel construction in shallow embedding soft soil layer,
Conventional method has cut and cover method, shield method, push bench process, shallow burial hidden digging etc. at present.
Cut and cover method is to excavate the soil body downwards from earth's surface, then performs agent structure and backfills.This method needs to perform to go along with sb. to guard him
System, and retaining design cost is high, sometimes even over the 50% of engineering totle drilling cost, the building enclosure goed deep into stratum can also
The exploitation of the follow-up underground space is hindered, another aspect open cut engineering, which first excavates the construction procedure backfilled afterwards, influences the duration to increase again
Cost.Shield method is a kind of relatively advanced method for tunnel construction using shield machine construction, but the equipment such as shield machine is expensive,
Need to excavate larger starting well and received well, vertical transport is expensive, while working environment needs divulge information illumination, construction cost
It is very high.Push bench process is that the tube coupling that will be preset is pushed into the engineering method that stratum forms tunnel one by one, and the engineering method is limited by length is pushed away surely
Larger, route is longer, and thrust loss is bigger, therefore is not suitable for long distance construction.And shallow mining method tunnel is slow, tedious process, peace
Full blast is nearly big, and cost is high.
The problem of tunnel excavation method more than as can be seen here has different, is badly in need of a kind of new tunnel construction of exploitation and sets
It is standby, to save engineering construction cost, efficiency of construction is improved, construction safety is ensured.
In view of drawbacks described above, creator of the present invention obtains a kind of tunnel of the invention finally by prolonged research and practice
Device is built in road.
The content of the invention
To solve above-mentioned technological deficiency, the technical solution adopted by the present invention is that there is provided a kind of tunneling device, bag
Include:
Underground construction portion, for excavating fitting recess under a subterranean formation, builds tunnel agent structure and slip casting;
Ground control unit, for controlling the underground construction portion to be constructed;
The ground control unit includes switchboards of job guide rail, Working gantry and mobile control main frame, and the Working gantry is arranged on
Above the switchboards of job guide rail, the underground construction portion is arranged on below the switchboards of job guide rail, the Working gantry and the underground
Construction portion can be moved horizontally along the switchboards of job guide rail together.
Preferably, the underground construction portion is connected with the Working gantry by rotating shaft, the underground construction portion being capable of edge
The rotating shaft is vertically rotated.
Preferably, the underground construction portion it is overall intoShape.
Preferably, the underground construction portion includes soil compaction module, hydraulic pushing module and precast construction locating module, it is described
Soil compaction module is located at the front end in the underground construction portion, and the precast construction locating module is located at behind the underground construction portion
End, the hydraulic pushing module is arranged between the soil compaction module and the precast construction locating module.
Preferably, the soil compaction module includes profile control just set and rotary digging excavation device, the rotary digging excavation device peace
In profile control just set.
Preferably, the rotary digging excavation device being arranged in the firm set straight flange of profile control is vertically-mounted, it is arranged on
The rotary digging excavation device that the profile control has just been covered in horizontal edge is horizontally mounted.
Preferably, the precast construction locating module includes inner side steel plate and outside steel, the inner side steel plate and outside steel
Tunnel agent structure installing space is formed between plate.
Preferably, the precast construction locating module rear end is provided with Grouting Pipe.
Preferably, the hydraulic pushing module includes a plurality of hydraulic jacks, the hydraulic jack front end connects institute
The firm set of profile control is stated, rear end is connected with the precast construction locating module.
Preferably, being provided with hydraulic control module and precast construction transport module, the workbench on the Working gantry
Erection has cross slide way, and the precast construction is transported module and is arranged on the cross slide way, the hydraulic control module and institute
The connection of hydraulic pushing module is stated, for controlling the hydraulic jack, the precast construction transports module and the precast construction
Locating module is connected.
Include conveying arm preferably, the precast construction transports module and equipment is installed, the conveying arm can be vertical
Side is moved up, and the installation equipment is used to fasten precast concrete.
Compared with the prior art the beneficial effects of the present invention are:A kind of new tunnel construction equipment is developed, the dress is used
Agent structure can first have been performed in the earth formation by putting, rear to excavate internal soil body formation tunnel, so can largely reduce stratum excavation
With the use of supporting construction, engineering construction cost is saved, efficiency of construction is improved, construction safety is ensured.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme in various embodiments of the present invention, required in being described below to embodiment
The accompanying drawing used is briefly described.
Fig. 1 is the structure chart of tunneling device;
Fig. 2 is the structure chart of tunneling device ground control unit;
Fig. 3 is the structure chart in tunneling device underground construction portion;
Fig. 4 is the structural perspective of the connecting elements of precast concrete first;
Fig. 5 is the structural perspective of the connecting elements of precast concrete second;
Fig. 6 is the structural perspective of the connecting elements of precast concrete the 3rd;
Fig. 7 is the structural perspective of precast concrete intermediate member;
Fig. 8 is the structural perspective that precast concrete is built into tunnel soil body structure;
Fig. 9 is the construction process concept map of shallow tunnel construction method.
Numeral is represented in figure:
1. the switchboards of job guide rail 13. of 2. underground construction portion of ground control unit, 11. Working gantry 12. moves control main frame 14.
The precast construction of hydraulic control module 15. transports the hydraulic pushing module of 21. soil compaction module of module, 22. rotary digging excavation device 23.
24. the connecting elements 33. the 3rd of 3. tunnel main body mechanism of precast construction locating module, 31. first connecting elements 32. second is connected
The lining structure of 5. tunnel of the connecting groove 36. of 34. intermediate member of component 35. connection boss 37. bolt hole, 4. fitting recess 6. 2
Embodiment
Below in conjunction with accompanying drawing, the forgoing and additional technical features and advantages are described in more detail.
<Shallow tunnel builds system>
A kind of shallow tunnel builds system, including:
Tunneling device, tunnel is built for excavating;
And precast concrete, for building tunnel agent structure.
The tunneling device includes:
Underground construction portion, for excavating fitting recess under a subterranean formation, builds tunnel agent structure and slip casting;
With ground control unit, for controlling the underground construction portion to be constructed.
The shallow tunnel system of building can realize a kind of new shallow tunnel construction method, and tunnel is first passed through using the system
Road builds device and digs out fitting recess in the earth formation, has performed tunnel agent structure with precast concrete in fitting recess, after
The soil body inside tunneling agent structure, forms tunnel.
<Tunneling device>
With reference to shown in Fig. 1, a kind of tunneling device, including ground control unit 1 and underground construction portion 2, the underground is applied
The Ministry of worker 2 is used to excavate fitting recess under a subterranean formation, builds tunnel agent structure and slip casting;The ground control unit 1 is used to control institute
Underground construction portion is stated to be constructed.
With reference to shown in Fig. 2, the ground control unit 1 includes Working gantry 11, switchboards of job guide rail 12 and mobile control main frame 13,
The Working gantry 11 is arranged on the top of switchboards of job guide rail 12.The underground construction portion 2 is arranged on the lower section of switchboards of job guide rail 12, Neng Gouyu
Working gantry 11 is moved horizontally along switchboards of job guide rail 12 together, can control construction location according to project situation.
Hydraulic control module 14 is installed on the Working gantry 11 and precast construction transports module 15.The Working gantry
11 are provided with cross slide way, and the precast construction is transported module 15 and is arranged on the cross slide way, can left and right moving control it is prefabricated
The transporting position of concrete component.The precast construction, which transports module 15, to be included conveying arm and installs equipment, the conveying arm energy
Moved under enough in the vertical directions, installing equipment is used to precast concrete is positioned and fastened.Precast construction is transported
Module 15 is pre-installed to precast concrete on the ground by installing equipment, and precast concrete will be transported by conveying arm
In component to ground end fitting recess, and fastened by installation equipment, precast construction transports the convenient control of module 15, and spelling is effectively ensured
Connect quality.
With reference to shown in Fig. 3, the underground construction portion 2 it is overall intoShape, tunnel body junction is built at lower frame position
Structure, the shape in underground construction portion 2 can reduce stratum excavation, save engineering construction cost, improve efficiency of construction.Underground construction portion
2 include soil compaction module 21, hydraulic pushing module 23 and precast construction locating module 24.The construction located underground of soil compaction module 21
The front end in portion 2, it includes profile control just set and rotary digging excavation device 22, and the rotary digging excavation device 22 is arranged on the profile
Control is just in set.Rotary digging excavation device 22 is installed according to shoveling direction, the rotary digging being arranged in the firm set straight flange of profile control is unearthed
Device 22 is vertically-mounted, and the rotary digging excavation device being arranged in the firm set horizontal edge of profile control is horizontally mounted, and rotary digging, which is unearthed, to be filled
Put 22 and the soil dug out is transported to ground, realize that stratum is excavated, by profile control just set control channel dredging shape.The prefabricated knot
The rear end in the construction portion 2 located underground of structure locating module 24, including inner side steel plate and outside plate, the inner side steel plate and outside steel
Plate shape is into tunnel agent structure installing space, for positioning precast concrete, completes tunnel agent structure and builds.It is described pre-
The rear end of structure positioning module 24 processed is provided with Grouting Pipe, for grouting construction.The hydraulic pushing module 23 is arranged on the soil compaction
It is that soil compaction module 21 is moved forward and precast construction locating module 24 is fixed and carried between module 21 and precast construction locating module 24
For power.The hydraulic pushing module 24 includes a plurality of hydraulic jacks, the hydraulic jack front end connection profile control
Just cover, rear end is connected with precast construction locating module.The hydraulic pushing module of the hydraulic control module 14 and ground control unit 1
23 connections, hydraulic pushing module 23 can control the hydraulic jack to work.The precast construction transport module 15 with it is described
Precast construction locating module 24 is connected, and transport module 15 by precast construction is transported to prefabricated knot by advance assembled concrete component
Structure locating module 24.
The tunneling device is arranged on selected stratum and excavates position, the mobile control main frame 13 of operation makes workbench
Frame 11 and underground construction portion 2 are moved to correct position on switchboards of job guide rail 12.Dig out and originate respectively before and after tunneling position
Well and received well, the thrust of the control hydraulic pushing of hydraulic control module 14 module 23, promote soil compaction module 21 to move forward to construction
Position.The pushing tow of rotary digging excavation device 22 excavates stratum, outward transport of being unearthed, and digs out in the earth formationShape fitting recess.Hydraulic control mould
Block 14 is acted on precast construction locating module 24, is positioned in fitting recess.It is horizontal in Working gantry 11 that precast construction transports module 15
Correct position is moved on direction guiding rail, precast concrete is pre-installed, the component being pre-installed is transported to pre- by conveying arm
Structure positioning module 24 processed, installs equipment and precast concrete is positioned and fastened, frame is built into fitting recess bottom
Shape tunnel agent structure.Precast construction locating module 24 moves forward, and departs from tunnel agent structure, is filled by Grouting Pipe grout fillingSpace in shape groove, grouting pressure and grouting amount are controlled by technological requirement.After slip casting between the framework of agent structure
Tunnel is dug out, underground construction portion, which is moved forward to, removes bottom on received well.
Using the tunneling device can largely reduce stratum excavate and supporting construction use, save engineering construction into
This, improves efficiency of construction, ensures construction safety.
<Precast concrete>
A kind of precast concrete, for building tunnel agent structure.With reference to shown in Fig. 4-7, the component is rectangular
Body structure, including front, the back side and four sides.Component two sides therein are joint face, and front and back is square,
Component can adjust closure as needed, make joint face is relative to be attached.Provided with connection boss in the middle part of the joint face
36 or connecting groove 35, the connection boss 36 is truncated cone-shaped, and the connecting groove 35 is reverse frustoconic, when connection boss 36 is inserted
Connection is formed when entering connecting groove 35 between component.The outside for connecting boss 36 is provided with rubber ring, connection can be made firm, connects
Precision is improved.
The component is divided into intermediate member 34 and connecting elements, and intermediate member 34 is used for horizontal or vertical connection and installed, structure
Into four sides of tunnel agent structure, connecting elements is arranged on the corner of the tunnel agent structure, for connecting vertically and horizontally
Intermediate member 34, four corners of the joint face of the component are provided with the bolt connecting hole 37 of insertion, the bolt connection
The direction of hole 37 is vertical with corresponding joint face, for being fastened by connecting bolt to splicing component, makes connection firm, the company of raising
Connect intensity.
The joint face of the connecting elements is altogether provided with eight bolt connecting holes on two adjacent sides, connecting elements
37.According to connection boss 36 and/or connecting groove 35 is provided that on joint face, the connecting elements is divided into the first connecting elements
31st, the second connecting elements 32 and the 3rd connecting elements 33.As shown in figure 4, being all provided with two joint faces of the first connecting elements 31
There is the connecting groove 35.As shown in figure 5, being respectively equipped with the connection boss 36 on two joint faces of the second connecting elements 32
With connecting groove 35.As shown in fig. 6, being equipped with the connection boss 36 on two joint faces of the 3rd connecting elements 33.
As shown in fig. 7, the joint face of the intermediate member 34 is two relative sides, four are provided with intermediate member 34 altogether
The connection boss 36 and connecting groove 35 are respectively equipped with individual bolt connecting hole 37, two joint faces of intermediate member 34.
As shown in figure 8, it is the frame shape tunnel agent structure being built into the precast concrete, wherein left side bottom
Angle is the first connecting elements 31, and left side drift angle and right side base angle are the second connecting elements 32, and right side drift angle is the 3rd connecting elements
33, up and down horizontal edge be made up of the intermediate member 34 being horizontally mounted, left and right vertical edge is made up of vertically-mounted intermediate member 34.It connects
The form of connecing is that the joint face of each component is contacted with the joint face of adjacent members, and the connection insertion of boss 36 connecting groove 35 is formed
Bolt connecting hole 37 between connection, adjacent members is connected, and connection fastening is realized by connecting bolt.
The precast concrete is simple in construction, easy to make, and replaceability is strong, and component is readily transported installation, component
Between connected by connecting boss and connecting groove, connection error can be avoided, difficulty of construction can be effectively reduced, construction is improved
Efficiency.
<Shallow tunnel construction method>
As shown in figure 9, a kind of shallow tunnel construction method, it is characterised in that comprise the following steps:
The first step:As shown in A in figure, determine that position is excavated on stratum, tunneling device is installed.
Second step:As shown in B in figure, incremental launching method is excavated, outward transport of being unearthed, and is dug out on stratumShape fitting recess 4,
Stratum is reduced to excavate.
3rd step:As shown in C in figure, component is transported to the bottom of fitting recess 4, component pair by precast concrete assembling
Fastening is connect, frame shape tunnel agent structure 3 is spliced into.
4th step:As shown by d in the figure, backfill slip casting, the space between grout filling fitting recess 4 and tunnel agent structure 3,
Raising, stratum or impervious and globality, improve foundation condition.
5th step:As shown in E in figure, the tunneling space soil body digs out tunnel 5 between the tunnel agent structure 3,
The use of supporting construction is reduced, engineering construction cost can be saved, efficiency of construction is improved.
6th step:As shown in F in figure, two lining structures 6 are performed in tunnel 5, bearing capacity is improved, plays waterproof action,
And accessory structure is built, electromechanical equipment is installed.
The shallow tunnel construction method has first performed tunnel agent structure 3 in the earth formation, rear to excavate internal soil body formation tunnel
Road 5, using this method carry out tunneling can largely reduce stratum excavate and supporting construction use, save engineering construction into
This, improves efficiency of construction, ensures construction safety.
<The deformation of above-mentioned embodiment>
The present embodiment part different from the embodiment described above is, the underground construction portion 2 of the tunneling device and work
Make stand 11 to connect by rotating shaft, can vertically be rotated along rotating shaft, realize that the oblique entrance stratum in underground construction portion 2 is constructed.
During using the present apparatus, the beveling of underground construction portion 2 enters ground, and the thrust of the control hydraulic pushing of hydraulic control module 14 module 23 is pushed away
Dynamic soil compaction module 21 is swung down to vertical construction position.Underground construction portion 2 is moved forward after certain distance after the completion of construction, to
It is upper to rotate, stratum is left, equipment is completed and reclaims.
Presently preferred embodiments of the present invention is the foregoing is only, is merely illustrative for the purpose of the present invention, and it is non-limiting
's.Those skilled in the art understands, many changes can be carried out to it in the spirit and scope that the claims in the present invention are limited,
Modification, in addition it is equivalent, but fall within protection scope of the present invention.
Claims (10)
1. a kind of tunneling device, it is characterised in that including:
Underground construction portion, for excavating fitting recess under a subterranean formation, builds tunnel agent structure and slip casting;
Ground control unit, for controlling the underground construction portion to be constructed;
The ground control unit includes switchboards of job guide rail, Working gantry and mobile control main frame, and the Working gantry is arranged on described
Above switchboards of job guide rail, the underground construction portion is arranged on below the switchboards of job guide rail, the Working gantry and the underground construction
Portion can be moved horizontally along the switchboards of job guide rail together.
2. tunneling device as claimed in claim 1, it is characterised in that the underground construction portion leads to the Working gantry
Rotating shaft connection is crossed, the underground construction portion can vertically be rotated along the rotating shaft.
3. tunneling device as claimed in claim 1 or 2, it is characterised in that the underground construction portion it is overall into
Shape.
4. tunneling device as claimed in claim 3, it is characterised in that the underground construction portion includes soil compaction module, liquid
Pushing module and precast construction locating module are pressed, the soil compaction module is located at the front end in the underground construction portion, the prefabricated knot
Structure locating module is located at the rear end in the underground construction portion, and the hydraulic pushing module is arranged on the soil compaction module and described pre-
Between structure positioning module processed.
5. tunneling device as claimed in claim 4, it is characterised in that the soil compaction module include profile control just set and
Rotary digging excavation device, the rotary digging excavation device is arranged on profile control, and just set is interior.
6. tunneling device as claimed in claim 4, it is characterised in that the precast construction locating module includes inner side steel
Plate and outside steel, form tunnel agent structure installing space between the inner side steel plate and outside plate.
7. tunneling device as claimed in claim 6, it is characterised in that the precast construction locating module rear end is provided with note
Slurry pipe.
8. tunneling device as claimed in claim 4, it is characterised in that the hydraulic pushing module includes a plurality of hydraulic pressure
Jack, the hydraulic jack front end connects the firm set of profile control, and rear end is connected with the precast construction locating module.
9. tunneling device as claimed in claim 8, it is characterised in that hydraulic control mould is provided with the Working gantry
Block and precast construction transport module, and the Working gantry is provided with cross slide way, and the precast construction transports module and is arranged on described
On cross slide way, the hydraulic control module is connected with the hydraulic pushing module, described for controlling the hydraulic jack
Precast construction is transported module and is connected with the precast construction locating module.
10. tunneling device as claimed in claim 9, it is characterised in that the precast construction, which transports module, includes conveying
Arm and install equipment, the conveying arm can in the vertical direction movement, it is described installation equipment be used for fasten precast concrete structure
Part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710343476.9A CN107012888B (en) | 2017-05-16 | 2017-05-16 | A kind of tunneling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710343476.9A CN107012888B (en) | 2017-05-16 | 2017-05-16 | A kind of tunneling device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107012888A true CN107012888A (en) | 2017-08-04 |
CN107012888B CN107012888B (en) | 2019-04-16 |
Family
ID=59450602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710343476.9A Active CN107012888B (en) | 2017-05-16 | 2017-05-16 | A kind of tunneling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107012888B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000008330A (en) * | 1998-07-13 | 2000-02-07 | 김중희 | Digging apparatus for underground tunnel excavation |
CN201539260U (en) * | 2009-11-23 | 2010-08-04 | 郭壮 | Grille-type trenchless pipe-jacking excavating device |
CN102518440A (en) * | 2011-12-27 | 2012-06-27 | 洛阳聚科特种工程机械有限公司 | Tunnel digging equipment |
CN103147462A (en) * | 2013-03-22 | 2013-06-12 | 王余富 | Slotting incremental launching construction method |
CN106567416A (en) * | 2016-10-19 | 2017-04-19 | 重庆大学 | Model test device of excavating tunnel in transparent soil foundation and test method |
-
2017
- 2017-05-16 CN CN201710343476.9A patent/CN107012888B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000008330A (en) * | 1998-07-13 | 2000-02-07 | 김중희 | Digging apparatus for underground tunnel excavation |
CN201539260U (en) * | 2009-11-23 | 2010-08-04 | 郭壮 | Grille-type trenchless pipe-jacking excavating device |
CN102518440A (en) * | 2011-12-27 | 2012-06-27 | 洛阳聚科特种工程机械有限公司 | Tunnel digging equipment |
CN103147462A (en) * | 2013-03-22 | 2013-06-12 | 王余富 | Slotting incremental launching construction method |
CN106567416A (en) * | 2016-10-19 | 2017-04-19 | 重庆大学 | Model test device of excavating tunnel in transparent soil foundation and test method |
Also Published As
Publication number | Publication date |
---|---|
CN107012888B (en) | 2019-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105298507B (en) | A kind of underground pipe gallery construction method of top open cut bottom tunneler construction | |
CN106049532B (en) | A kind of pipe gallery open-cut branch blocking means and its construction method | |
CN109723443B (en) | Tunnel construction method | |
CN107023300A (en) | A kind of use canopy, which is defended the doctrine, builds the construction method of subway station | |
JP4132442B2 (en) | Tunnel construction method | |
CN113513322A (en) | Soil pressure balance jacking construction method for water-rich shallow-buried large-section rectangular jacking pipe | |
CN107676098A (en) | A kind of construction method for exempting from button arch flat-top post hole method construction subway station | |
CN106958448B (en) | A kind of shallow tunnel construction method and system | |
JP2764149B2 (en) | Construction method of concrete box culvert | |
CN107012888B (en) | A kind of tunneling device | |
KR101289392B1 (en) | The tunnel pressing method | |
JP7357517B2 (en) | Pipe construction method using propulsion method | |
CN114607833A (en) | Vertical curve downward-penetrating construction method for rectangular jacking pipe meeting obstacle | |
CN107724425A (en) | The mechanized construction equipment and construction method of a kind of prefabricated pipe gallery | |
CN207513607U (en) | A kind of tunnel precast concrete | |
CN114382498A (en) | Large-caliber pipe jacking construction process for limited space | |
JP2000291398A (en) | Underground structure and construction method therefor | |
CN207554050U (en) | Box culvert relaying pushing tow system with box culvert bridging arrangement | |
CN207554048U (en) | Box culvert relaying pushing tow system with box culvert pushing block structure | |
CN207554058U (en) | Box culvert with thrustor and box culvert pushing block connection structure relays pushing tow system | |
CN207554049U (en) | Box culvert relays pushing tow system | |
CN107762526B (en) | Box culvert with thrustor and box culvert pushing block connection structure relays pushing tow system | |
CN207554064U (en) | Box culvert relaying pushing tow system with mobile mechanism | |
CN113882429B (en) | Construction method and construction structure of underground structure | |
CN110409497A (en) | Construction method suitable for water-bed shallow embedding prefabrication and assembly construction tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |