CN107009153A - A kind of double steel plate shear-wall element production method and production equipment - Google Patents

A kind of double steel plate shear-wall element production method and production equipment Download PDF

Info

Publication number
CN107009153A
CN107009153A CN201710410880.3A CN201710410880A CN107009153A CN 107009153 A CN107009153 A CN 107009153A CN 201710410880 A CN201710410880 A CN 201710410880A CN 107009153 A CN107009153 A CN 107009153A
Authority
CN
China
Prior art keywords
steel plate
connector
wall element
shear
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710410880.3A
Other languages
Chinese (zh)
Inventor
石柏林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN107009153A publication Critical patent/CN107009153A/en
Priority to CN201710884022.2A priority Critical patent/CN107914110B/en
Priority to PCT/CN2017/103613 priority patent/WO2018064942A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/04Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass for both machining and other metal-working operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K13/00Welding by high-frequency current heating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • B23K37/0443Jigs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/0026Arc welding or cutting specially adapted for particular articles or work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/32Accessories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Architecture (AREA)
  • Optics & Photonics (AREA)
  • Plasma & Fusion (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)
  • Winding, Rewinding, Material Storage Devices (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention provides a kind of production method and production equipment of double steel plate shear-wall element, it is characterised in that connector 2 of the double steel plate shear-wall element by the steel plate rolled up from two coils with being fixed in the middle of steel plate is welded by row.

Description

A kind of double steel plate shear-wall element production method and production equipment
Technical field
The present invention relates to a kind of production method and production equipment of double steel plate shear-wall element, belong to building structure and machine Tool apparatus field.
Background technology
At present in building structure field, the application of steel plate shear force wall is more and more, the structure type species of steel plate shear force wall Also it is more and more, but its production method is essentially limited to manual welding, or simple mechanization.It is unfavorable for steel plate shear force wall Popularization and large-scale application.
A kind of production method and production equipment that the present invention is proposed based on double steel plate shear-wall element, realize that double steel plate is cut Power wall unit automated production, realizes being switched fast between the double steel plate shear-wall element of various different sizes, is steel plate The wall member full-automation production ring of most critical one is sheared, can be set with double steel plate shear-wall element splicing equipment, node installation welding Standby, ball blast painting equipment docking, realizes full-automatic production of the steel construction from material to finished product.
Described double steel plate shear-wall element is made up of the connector of both sides steel plate and centre, length, width and section Connector quantity is determined as needed, is the basic component units in double steel plate shearing wall member.
The content of the invention
It is an object of the invention to provide a kind of production method and production equipment of double steel plate shear-wall element, the double steel of reduction Cost of labor, spillage of material, the weld seam quantity of plate shear wall in process of production, improve speed of production, realize that double steel plate is sheared Wall standardization, automated production.
The technical solution adopted by the present invention is:
A kind of double steel plate shear-wall element production method, it is characterised in that:Double steel plate shear-wall element from two coils by rolling up(3) Steel plate(1)With positioned at two steel plates(1)Middle connector(2)It is welded by row, two steel plates(1)Form similar in weld zone Horn shape, welds preceding two steel plate(1)The distance between be more than welding after the completion of two steel plates(1)The distance between, during welding, even Fitting(2)With steel plate(1)Between there is certain extruding force, make connector(2)With steel plate(1)Contact and complete welding;
Described double steel plate shear-wall element is by the steel plate by both sides(1)And middle connector(2)Composition.
Described double steel plate shear-wall element production method, steel plate(1)Continuous moving, connector(2)With steel plate(1)Welding When, connector(2)With steel plate(1)Synchronizing moving, speed is identical, connector in moving process(2)With steel plate(1)The distance between Progressively reduce, then contact forms extruding force, and each row's connector is completed in this moving process(2)Welding.
Described double steel plate shear-wall element production method, steel plate(1)Stop movement in welding, pass through device for exerting (6)To two steel plates up and down(1)Pressure, makes two steel plates(1)The distance between reduce, and then and connector(2)Contact and weld, weld Moving steel plate after the completion of connecing(1), carry out next row connector(2)Welding.
Described double steel plate shear-wall element production method, with following implementation process:
1)Rotate rolled steel plate feeding platform(7)Upper coil of strip(3), rolled steel plate is extended to welding position, be used as double steel plate shear wall The upper and lower steel plate of unit(1);
2)Connector(2)Load and be fixed to connector fixation welder(4)On;
3)It is fixed with connector(2)Connector fix welder(4)It is moved to upper and lower steel plate(1)Centre, upper and lower steel plate (1)With connector(2)There is gap;
4)Pass through device for exerting(6), make upper and lower steel plate(1)With connector(2)Contact and form squeezing action, while by even Fitting fixes welder(4)To steel plate(1)With connector(2)Welded;
5)After being moved a certain distance along double steel plate shear-wall element length direction, next row connector is carried out(2)Welding, so Repeatedly;
6)When double steel plate shear-wall element length reaches component length requirement, pass through double steel plate shear-wall element cutting device(8) Double steel plate shear-wall element is blocked;
Described rolled steel plate feeding platform(7)For placing coil of strip;
Described connector fixes welder(4)For fixedly connected part(2), and by the connector fixed(2)It is moved to Upper and lower steel plate(1)Welded centre;
Described device for exerting(6), for making steel plate(1)With connector(2)Contact and form squeezing action;
Described double steel plate shear-wall element cutting device(8)For blocking double steel plate shear-wall element.
Described double steel plate shear-wall element production method, connector fixes welder(4)Simultaneously fixed, welding company Fitting(2)Quantity is at least twice that double steel plate shear-wall element often arranges connector quantity, when connector fixes welder(4) Wherein side is located at upper and lower steel plate(1)When middle, opposite side is attached part(2)Filling fix, so circulation.
Described double steel plate shear-wall element production method, connector fixes welder(4)With making connector(2)With The synchronization-moving function of steel plate.
Described double steel plate shear-wall element production method, device for exerting(6)Position keeps constant, its be shaped as it is circular or Long Circle, can be rotated, and velocity of rotation is consistent with rolled steel plate translational speed.
Described double steel plate shear-wall element production method, rolled steel plate feeding platform(7)On at least place a pair of coil of strips (3), the volume per coil(3)One rolled steel plate cutting device of preceding setting(5), it is necessary to when switching coil of strip specification in production process, coil of strip Plate cutting device(5)Rolled steel plate is blocked, thereafter, mobile rolled steel plate feeding platform(7), it would be desirable to lower a kind of coil of strip for production Correct position is moved to, starts a kind of production of lower specification double steel plate shear-wall element;Described rolled steel plate cutting device(5)With In blocking rolled steel plate.
Described double steel plate shear-wall element production method, steel plate(1)With connector(2)Between welding use welding Mode is ratio-frequency welding, or arc welding.
Described double steel plate shear-wall element production method, production process is controlled to perform by computer.
A kind of production equipment for implementing double steel plate shear-wall element production method, it is characterised in that:The equipment includes coil of strip Plate feeding platform(7), connector fix welder(4), device for exerting(6), double steel plate shear-wall element cutting device(8), Rolled steel plate feeding platform(7)Welder is fixed positioned at connector(4)And device for exerting(6)Before, connector fixes welder (4)With device for exerting(6)Positioned at centre, device for exerting(6)Positioned at double steel plate shear-wall element steel plate(1)Outside, connector is solid Determine welder(4)Positioned at double steel plate shear-wall element steel plate(1)Centre, double steel plate shear-wall element cutting device(8)It is located at Connector fixes welder(4)With device for exerting(6)Afterwards;
Described rolled steel plate feeding platform(7)For placing coil of strip;
Described connector fixes welder(4)For fixedly connected part(2), and by the connector fixed(2)It is moved to Upper and lower steel plate(1)Welded centre;
Described device for exerting(6), for making steel plate(1)With connector(2)Contact and form squeezing action;
Described double steel plate shear-wall element cutting device(8)For blocking double steel plate shear-wall element.
Further, described rolled steel plate feeding platform(7)On can place multipair coil of strip(3), and can move, it is described Coil of strip(3)Before be provided with rolled steel plate cutting device(5);Described rolled steel plate cutting device(5)For blocking rolled steel plate.
Further, described connector fixes welder(4), can fix simultaneously, welded connections(2)Quantity extremely It is that double steel plate shear-wall element often arranges connector less(2)A kind of twice of quantity, described double steel plate shear-wall element production is set It is standby that there are following functions:Welder is fixed in connector(4)When side is welded, opposite side is attached part simultaneously(2) Filling fix.
Further, connector fixes welder(4)The welding manner of use is ratio-frequency welding, or arc welding.
Further, connector fixes welder(4)In each connector fixing device and welder can basis Double steel plate shear-wall element connector(2)Specification, spacing freely adjusts.
Double steel plate shear-wall element production equipment described above, whole production process is controlled by computer.
Compared with prior art, its advantage is:
1st, the mechanization production of double steel plate shear-wall element can be realized;
2nd, the speed of production of double steel plate shear-wall element is effectively improved;
3rd, effectively reduction production cost and loss;
4th, it can realize and be switched fast production between plurality of specifications double steel plate shear-wall element;
5th, the automated production of double steel plate shear wall steel member can further be realized;
6th, it can be docked with double steel plate shear-wall element splicing equipment, node installation welding equipment, ball blast painting equipment, it is real Existing full-automatic production.
Brief description of the drawings
Fig. 1 is double steel plate shear-wall element production equipment structural representation.
Fig. 2 is the top view of Fig. 1 welding regions.
Fig. 3 is double steel plate shear-wall element sectional schematic diagram.
In figure, 1 it is the both sides steel plate of double plate shear-wall elements, 2 is connector in the middle of double plate shear-wall elements, 3 be steel Coil of strip on roll bending feeding platform, 4 be connector fix welder, 5 be rolled steel plate cutting device, 6 be device for exerting, 7 be Rolled steel plate feeding platform, 8 are double steel plate shear-wall element cutting device.
Embodiment
Reference picture 1, Fig. 2, a kind of double steel plate shear-wall element production method, double steel plate shear-wall element is by from two coils Volume(3)Steel plate(1)With positioned at two steel plates(1)Middle connector(2)It is welded by row, two steel plates(1)In weld zone shape Into similar horn shape, preceding two steel plate is welded(1)The distance between be more than welding after the completion of two steel plates(1)The distance between, weldering When connecing, connector(2)With steel plate(1)Between there is certain extruding force, make connector(2)With steel plate(1)Contact and complete weldering Connect;
Described double steel plate shear-wall element is by the steel plate by both sides(1)And middle connector(2)Composition.
Described double steel plate shear-wall element production method, steel plate(1)Continuous moving, connector(2)With steel plate(1)Welding When, connector(2)With steel plate(1)Synchronizing moving, speed is identical, connector in moving process(2)With steel plate(1)The distance between Progressively reduce, then contact forms extruding force, and each row's connector is completed in this moving process(2)Welding.
Described double steel plate shear-wall element production method, steel plate(1)Stop movement in welding, pass through device for exerting (6)To two steel plates up and down(1)Pressure, makes two steel plates(1)The distance between reduce, and then and connector(2)Contact and weld, weld Moving steel plate after the completion of connecing(1), carry out next row connector(2)Welding.
Described double steel plate shear-wall element production method, with following implementation process:
1)Rotate rolled steel plate feeding platform(7)Upper coil of strip(3), rolled steel plate is extended to welding position, be used as double steel plate shear wall The upper and lower steel plate of unit(1);
2)Connector(2)Load and be fixed to connector fixation welder(4)On;
3)It is fixed with connector(2)Connector fix welder(4)It is moved to upper and lower steel plate(1)Centre, upper and lower steel plate (1)With connector(2)There is gap;
4)Pass through device for exerting(6), make upper and lower steel plate(1)With connector(2)Contact and form squeezing action, while by even Fitting fixes welder(4)To steel plate(1)With connector(2)Welded;
5)After being moved a certain distance along double steel plate shear-wall element length direction, next row connector is carried out(2)Welding, so Repeatedly;
6)When double steel plate shear-wall element length reaches component length requirement, pass through double steel plate shear-wall element cutting device(8) Double steel plate shear-wall element is blocked;
Described rolled steel plate feeding platform(7)For placing coil of strip;
Described connector fixes welder(4)For fixedly connected part(2), and by the connector fixed(2)It is moved to Upper and lower steel plate(1)Welded centre;
Described device for exerting(6), for making steel plate(1)With connector(2)Contact and form squeezing action;
Described double steel plate shear-wall element cutting device(8)For blocking double steel plate shear-wall element.
Described double steel plate shear-wall element production method, connector fixes welder(4)Simultaneously fixed, welding company Fitting(2)Quantity is at least twice that double steel plate shear-wall element often arranges connector quantity, when connector fixes welder(4) Wherein side is located at upper and lower steel plate(1)When middle, opposite side is attached part(2)Filling fix, so circulation.
Described double steel plate shear-wall element production method, connector fixes welder(4)With making connector(2)With The synchronization-moving function of steel plate.
Described double steel plate shear-wall element production method, device for exerting(6)Position keeps constant, its be shaped as it is circular or Long Circle, can be rotated, and velocity of rotation is consistent with rolled steel plate translational speed.
Described double steel plate shear-wall element production method, rolled steel plate feeding platform(7)On at least place a pair of coil of strips (3), the volume per coil(3)One rolled steel plate cutting device of preceding setting(5), it is necessary to when switching coil of strip specification in production process, coil of strip Plate cutting device(5)Rolled steel plate is blocked, thereafter, mobile rolled steel plate feeding platform(7), it would be desirable to lower a kind of coil of strip for production Correct position is moved to, starts a kind of production of lower specification double steel plate shear-wall element;Described rolled steel plate cutting device(5)With In blocking rolled steel plate.
Described double steel plate shear-wall element production method, steel plate(1)With connector(2)Between welding use welding Mode is ratio-frequency welding, or arc welding.
Described double steel plate shear-wall element production method, production process is controlled to perform by computer.
Reference picture 1, Fig. 2, a kind of production equipment of implementation double steel plate shear-wall element production method, equipment include coil of strip Plate feeding platform(7), connector fix welder(4), device for exerting(6), double steel plate shear-wall element cutting device(8), Rolled steel plate feeding platform(7)Welder is fixed positioned at connector(4)And device for exerting(6)Before, connector fixes welder (4)With device for exerting(6)Positioned at centre, device for exerting(6)Positioned at double steel plate shear-wall element steel plate(1)Outside, connector is solid Determine welder(4)Positioned at double steel plate shear-wall element steel plate(1)Centre, double steel plate shear-wall element cutting device(8)It is located at Connector fixes welder(4)With device for exerting(6)Afterwards;
Described rolled steel plate feeding platform(7)For placing coil of strip;
Described connector fixes welder(4)For fixedly connected part(2), and by the connector fixed(2)It is moved to Upper and lower steel plate(1)Welded centre;
Described device for exerting(6), for making steel plate(1)With connector(2)Contact and form squeezing action;
Described double steel plate shear-wall element cutting device(8)For blocking double steel plate shear-wall element.
Further, described rolled steel plate feeding platform(7)On can place multipair coil of strip(3), and can move, it is described Coil of strip(3)Before be provided with rolled steel plate cutting device(5);Described rolled steel plate cutting device(5)For blocking rolled steel plate.
Further, described connector fixes welder(4), can fix simultaneously, welded connections(2)Quantity extremely It is that double steel plate shear-wall element often arranges connector less(2)A kind of twice of quantity, described double steel plate shear-wall element production is set It is standby that there are following functions:Welder is fixed in connector(4)When side is welded, opposite side is attached part simultaneously(2) Filling fix.
Further, connector fixes welder(4)The welding manner of use is ratio-frequency welding, or arc welding.
Further, connector fixes welder(4)In each connector fixing device and welder can basis Double steel plate shear-wall element connector(2)Specification, spacing freely adjusts.
Double steel plate shear-wall element production equipment described above, whole production process is controlled by computer.
Content described in this specification embodiment is only the citing to inventive concept form of implementation, protection scope of the present invention It is not construed as being only limitted to the concrete mode described in embodiment, the equivalent technologies mean expected according to present inventive concept should be wrapped It is contained in protection scope of the present invention.

Claims (10)

1. a kind of double steel plate shear-wall element production method, it is characterised in that:Double steel plate shear-wall element from two coils by rolling up (3)Steel plate(1)With positioned at two steel plates(1)Middle connector(2)It is welded by row, two steel plates(1)Formed in weld zone Similar horn shape, welds preceding two steel plate(1)The distance between be more than welding after the completion of two steel plates(1)The distance between, welding When, connector(2)With steel plate(1)Between there is certain extruding force, make connector(2)With steel plate(1)Contact and complete welding;
Described double steel plate shear-wall element is by the steel plate by both sides(1)And middle connector(2)Composition.
2. a kind of double steel plate shear-wall element production method as claimed in claim 1, it is characterised in that:Steel plate(1)It is continuous to move It is dynamic, connector(2)With steel plate(1)During welding, connector(2)With steel plate(1)Synchronizing moving, speed is identical, connects in moving process Fitting(2)With steel plate(1)The distance between progressively reduce, then contact form extruding force, complete each in this moving process Arrange connector(2)Welding.
3. a kind of double steel plate shear-wall element production method as claimed in claim 1, it is characterised in that:Steel plate(1)In welding When stop movement, pass through device for exerting(6)To two steel plates up and down(1)Pressure, makes two steel plates(1)The distance between reduce, and then With connector(2)Contact and weld, moving steel plate after the completion of welding(1), carry out next row connector(2)Welding.
4. a kind of double steel plate shear-wall element production method as described in one of claim 1 ~ 3, it is characterised in that:With following Implementation process:
1)Rotate rolled steel plate feeding platform(7)Upper coil of strip(3), rolled steel plate is extended to welding position, be used as double steel plate shear wall The upper and lower steel plate of unit(1);
2)Connector(2)Load and be fixed to connector fixation welder(4)On;
3)It is fixed with connector(2)Connector fix welder(4)It is moved to upper and lower steel plate(1)Centre, upper and lower steel plate (1)With connector(2)There is gap;
4)Pass through device for exerting(6), make upper and lower steel plate(1)With connector(2)Contact and form squeezing action, while by even Fitting fixes welder(4)To steel plate(1)With connector(2)Welded;
5)After being moved a certain distance along double steel plate shear-wall element length direction, next row connector is carried out(2)Welding, so Repeatedly;
6)When double steel plate shear-wall element length reaches component length requirement, pass through double steel plate shear-wall element cutting device(8) Double steel plate shear-wall element is blocked;
Described rolled steel plate feeding platform(7)For placing coil of strip;
Described connector fixes welder(4)For fixedly connected part(2), and by the connector fixed(2)It is moved to Upper and lower steel plate(1)Welded centre;
Described device for exerting(6), for making steel plate(1)With connector(2)Contact and form squeezing action;
Described double steel plate shear-wall element cutting device(8)For blocking double steel plate shear-wall element.
5. a kind of double steel plate shear-wall element production method as described in one of claim 1 ~ 4, it is characterised in that:Connector is consolidated Determine welder(4)Simultaneously fixed, welding connector(2)Quantity is at least double steel plate shear-wall element and often arranges connector quantity Twice, when connector fix welder(4)Wherein side is located at upper and lower steel plate(1)When middle, opposite side is attached part (2)Filling fix, so circulation.
6. a kind of double steel plate shear-wall element production method as described in one of claim 1 ~ 5, it is characterised in that:Described steel Roll bending feeding platform(7)On at least place a pair of coil of strips(3), the volume per coil(3)One rolled steel plate cutting device of preceding setting(5), , it is necessary to when switching coil of strip specification in production process, rolled steel plate cutting device(5)Rolled steel plate is blocked, thereafter, mobile rolled steel plate feed Platform(7), it would be desirable to lower a kind of coil of strip for production is moved to correct position, starts a kind of lower specification double steel plate shear wall list The production of member;Described rolled steel plate cutting device(5)For blocking rolled steel plate.
7. a kind of double steel plate shear-wall element production method as described in one of claim 1 ~ 6, it is characterised in that:Steel plate(1) With connector(2)Between the welding manner that uses of welding for ratio-frequency welding, or arc welding.
8. implement a kind of production equipment of double steel plate shear-wall element production method described in claim 1, it is characterised in that:Should Equipment includes rolled steel plate feeding platform(7), connector fix welder(4), device for exerting(6), double steel plate shear-wall element Cutting device(8), rolled steel plate feeding platform(7)Welder is fixed positioned at connector(4)And device for exerting(6)Before, connector Fixed welder(4)With device for exerting(6)Positioned at centre, device for exerting(6)Positioned at double steel plate shear-wall element steel plate(1)Outside Side, connector fixes welder(4)Positioned at double steel plate shear-wall element steel plate(1)Centre, double steel plate shear-wall element is blocked Device(8)Welder is fixed positioned at connector(4)With device for exerting(6)Afterwards;
Described rolled steel plate feeding platform(7)For placing coil of strip;
Described connector fixes welder(4)For fixedly connected part(2), and by the connector fixed(2)It is moved to Upper and lower steel plate(1)Welded centre;
Described device for exerting(6), for making steel plate(1)With connector(2)Contact and form squeezing action;
Described double steel plate shear-wall element cutting device(8)For blocking double steel plate shear-wall element.
9. a kind of double steel plate shear-wall element production equipment as claimed in claim 8, it is characterised in that:Described rolled steel plate is supplied Expect platform(7)On can place multipair coil of strip(3), and can move, described coil of strip(3)Before be provided with rolled steel plate and block Device(5);Described rolled steel plate cutting device(5)For blocking rolled steel plate.
10. a kind of double steel plate shear-wall element production equipment as described in one of claim 8 ~ 9, it is characterised in that:Described Connector fixes welder(4), can fix simultaneously, welded connections(2)Quantity be at least double steel plate shear-wall element Often arrange connector(2)A kind of twice of quantity, described double steel plate shear-wall element production equipment has following functions:In connection Part fixes welder(4)When side is welded, opposite side is attached part simultaneously(2)Filling fix.
CN201710410880.3A 2016-10-08 2017-06-04 A kind of double steel plate shear-wall element production method and production equipment Pending CN107009153A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710884022.2A CN107914110B (en) 2016-10-08 2017-09-26 Production method and production equipment for double-steel-plate shear wall unit
PCT/CN2017/103613 WO2018064942A1 (en) 2016-10-08 2017-09-27 Double steel plate shear wall unit production method and production equipment

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016108705480 2016-10-08
CN201610870548.0A CN106425295A (en) 2016-10-08 2016-10-08 Double-steel plate shear wall unit production method and production equipment

Publications (1)

Publication Number Publication Date
CN107009153A true CN107009153A (en) 2017-08-04

Family

ID=58171357

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610870548.0A Pending CN106425295A (en) 2016-10-08 2016-10-08 Double-steel plate shear wall unit production method and production equipment
CN201710410880.3A Pending CN107009153A (en) 2016-10-08 2017-06-04 A kind of double steel plate shear-wall element production method and production equipment
CN201710884022.2A Active CN107914110B (en) 2016-10-08 2017-09-26 Production method and production equipment for double-steel-plate shear wall unit

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610870548.0A Pending CN106425295A (en) 2016-10-08 2016-10-08 Double-steel plate shear wall unit production method and production equipment

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710884022.2A Active CN107914110B (en) 2016-10-08 2017-09-26 Production method and production equipment for double-steel-plate shear wall unit

Country Status (1)

Country Link
CN (3) CN106425295A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107498163A (en) * 2017-09-20 2017-12-22 李慧 A kind of production technology and production equipment of steel plate wall member
WO2018064942A1 (en) * 2016-10-08 2018-04-12 石柏林 Double steel plate shear wall unit production method and production equipment

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108127352A (en) * 2018-01-13 2018-06-08 石柏林 A kind of double steel plate shearing wall member automatic production method and production equipment
CN111730182B (en) * 2020-06-11 2021-11-02 中国建筑第八工程局有限公司 Resistance welding equipment for internal stiffening ribs of double-steel-plate shear wall and welding method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3133868A1 (en) * 1981-08-27 1982-09-16 Dieter 3500 Kassel Altmann Wall element consisting of lightweight metal
JPH03119238A (en) * 1989-09-29 1991-05-21 Natl House Ind Co Ltd Panel frame body
CN102274871B (en) * 2011-08-02 2013-09-25 太原华科信冶金成套设备有限公司 Method and equipment for producing longitudinal submerged arc welded pipe
CN104499641A (en) * 2014-11-28 2015-04-08 谢英俊 Separated continuous roll forming process for processing continuous twin-beam light steel room-frame component
CN105756244A (en) * 2016-04-18 2016-07-13 石柏林 Double-steel-plate shear wall combined structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018064942A1 (en) * 2016-10-08 2018-04-12 石柏林 Double steel plate shear wall unit production method and production equipment
CN107498163A (en) * 2017-09-20 2017-12-22 李慧 A kind of production technology and production equipment of steel plate wall member
CN107498163B (en) * 2017-09-20 2023-01-10 李慧 Production process and production equipment of steel plate wall component

Also Published As

Publication number Publication date
CN107914110B (en) 2021-05-11
CN107914110A (en) 2018-04-17
CN106425295A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN107009153A (en) A kind of double steel plate shear-wall element production method and production equipment
CN104227182B (en) The moulding process of the main weld seam of joist steel unclear completepenetration I level component
CN203356277U (en) Bending device of steel ladder pattern tread
CN103231157A (en) Manufacturing process for welded H-shaped steel
CN104325231B (en) Steel pipe bundle combining structure component automatic assembling welder
CN104308447A (en) Automatic overturning device for linear steel tube bundle structural components
CN107524232A (en) A kind of integrated shaped steel and its live splicing construction
CN201376164Y (en) Vertical weld joint adjusting fixture used in no rolling plate construction of cylindrical tank
CN102601260B (en) Core column production method, special machining device for core column and forming die column for core column
CN204673172U (en) Steel pipe bundle group founds spot-welding equipment
CN206455323U (en) A kind of ladle body Straight seam welding machine
CN104400430B (en) The automatic production process of steel pipe bundle combinative structure component and equipment thereof
CN204111781U (en) Last furnace shell making and installation device
CN104827213A (en) Assembly spot welding equipment for steel tube bundle
CN203330694U (en) Spiral pipe production device
CN103586374B (en) A kind of serration type steel reinforcement cage processing moulding bed and construction method thereof
CN104942604A (en) Full-automatic apron board equipment all-in-one machine
WO2018064942A1 (en) Double steel plate shear wall unit production method and production equipment
CN107486724B (en) Logistics telescopic machine rack assembled formation system
CN214392903U (en) Reinforcing bar net piece manufacturing system
CN110315132A (en) It is a kind of to prevent strip is narrow from connecing the cutting method for being wider than and crossing junction extension side
CN214868656U (en) Automatic production device for heat transfer plates of plate heat exchanger
CN204321594U (en) The automated production equipment of steel pipe bundle combining structure component
CN204235053U (en) Yi word pattern steel pipe bundle structural elements automatic turning device
CN108127352A (en) A kind of double steel plate shearing wall member automatic production method and production equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170804

WD01 Invention patent application deemed withdrawn after publication