CN107009097A - The preparation method of large-scale bending steel stair - Google Patents

The preparation method of large-scale bending steel stair Download PDF

Info

Publication number
CN107009097A
CN107009097A CN201710291383.6A CN201710291383A CN107009097A CN 107009097 A CN107009097 A CN 107009097A CN 201710291383 A CN201710291383 A CN 201710291383A CN 107009097 A CN107009097 A CN 107009097A
Authority
CN
China
Prior art keywords
wallboard
assembling
bending
jig frame
terraced beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710291383.6A
Other languages
Chinese (zh)
Inventor
钱雷
刘明路
何月峰
王军
宋海通
高永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710291383.6A priority Critical patent/CN107009097A/en
Publication of CN107009097A publication Critical patent/CN107009097A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The present invention relates to steel structure stairway field, specifically a kind of preparation method of large-scale bending steel stair;It is characterized in that:Expansion setting-out and blanking including distorting box-shaped wallboard, the processing of cambered wallboard;The shaping detection of cambered wallboard;Set up assembling jig frame;Wallboard is positioned;Box ladder beam assembling positioning;Terraced beam assembling is carried out on assembling jig frame;Terraced beam is carried out to mark time assembling;Remove assembling jig frame.This preparation method is controlled in the blanking stage by the shape to arc fold bending plate, pass through the application to profiling moulding bed, ensure that the precision of bending component meets building requirements, it ensure that the precision controlling for the irregular steel member installed for high-altitude, during component preassembling, the three-dimensional localization that passes through and verification process repeatedly, it is ensured that the precision controlling of irregular element bending in space, it is ensured that the accuracy of steel member.Simultaneously by preassembling, the conjugation that bending component splices node is verified, construction quality can be effectively ensured.

Description

The preparation method of large-scale bending steel stair
Technical field
The present invention relates to steel structure support seat field, specifically a kind of preparation method of large-scale bending steel stair.
Background technology
Making for bending steel stair needs to meet to require:1st, the irregular positioning in space is met;2nd, terraced beam The deformation in welding process and the factor such as contraction are considered before number material;3rd, mark time needs to set up building according to location data before welding Terraced moulding bed, finds out being accurately positioned for stair step in space;4th, when bending steel stair is installed, it need to be carried out before dispatching from the factory pre-splicing Dress, checks that the data after the conjugation of assembled overall dimensions and interface, compound splicing meet building requirements.As can be seen here, bending No matter there is the problem of needing to be accurately positioned during manufacture or even assembly in steel stair.
The content of the invention
It is an object of the present invention to provide a kind of preparation method of large-scale bending steel stair, it has can be quick and precisely The advantage of positioning.
In order to achieve the above object, the present invention is realized in:
A kind of preparation method of large-scale bending steel stair, including
Step 1, the expansion setting-out for distorting box-shaped wallboard and blanking,
The processing of step 2, cambered wallboard;
The shaping detection of step 3, cambered wallboard;
Wherein, the shape of the arc fold bending plate after blanking, bending point coordinates are proofreaded;
Step 4, set up assembling jig frame;
Step 5, wallboard positioning;
The terraced beam assembling positioning of step 6, box;
Wherein, the terraced beam of wallboard and box is placed on assembling jig frame, by moulding bed to the plate that is irregularly distorted in space Every location data is checked;
Step 7, the terraced beam assembling of progress on assembling jig frame;
Step 8, carry out terraced beam and mark time assembling;
Step 9, dismounting assembling jig frame.
The preparation method of the terraced beam of described large-scale bending steel stair, assembling jig frame calculates terraced beam by computer software design Space coordinate, marks projection line, tongue and groove line, spacer lines etc. and sets up moulding bed positioning, and be made with section bar.
The preparation method of described large-scale bending steel stair, assembling jig frame calculates bending stair by computer software design Space coordinate and crucial control projection, it is determined that terraced beam and space orientation of marking time are assembled.
This preparation method is controlled in the blanking stage by the shape to arc fold bending plate, to ensure the structure of multi-angle box beam Part size it is accurate.In the production phase, by the application to profiling moulding bed, effectively solve for irregularly being distorted in space Every location data problem of component, it is ensured that the precision of bending component meets building requirements, it is ensured that installed not for high-altitude The precision controlling of regular steel member.Finally, during component preassembling, the three-dimensional localization that passes through and verification process repeatedly, Ensure the precision controlling of irregular element bending in space, it is ensured that the accuracy of steel member.Simultaneously by preassembling, verify Bending component splices the conjugation of node, can effectively ensure construction quality.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of preparation method of large-scale bending steel stair, including
Step 1, the expansion setting-out for distorting box-shaped wallboard and blanking;
Box-shaped ladder four pieces of wallboards of beam are space bending shape, and bending curvature is larger, for control setting-out blanking accuracy, wallboard Expansion is even more important.According to the air coordinates of steel twisted box-section element, four crest lines of bending box component are made, so as to Any air coordinates on to wallboard, carries out the automatic expansion to wallboard, and can generate simultaneously in casing according to software program Then the ribbed stiffener installation site line in portion, thus can input numerical control cutting according to the line style data of expansion by wallboard cutting data Cutting mill carries out the blanking cutting of wallboard.
The processing of step 2, cambered wallboard;
(1)Before wallboard segmental machining, it is necessary to marked on wallboard shape compacting line and casing assembling normal direction control line, into Detection datum line after shape processing, processing compacting line is set according to the linear angle of wallboard end face parallel to end face is linear every 100mm Put, processing compacting line be must assure that correctly, and be inspected for acceptance through experienced inspector, and shaping will be produced when otherwise processing Raw counter productive, and the detection datum line after forming is a camber line, should be refuted according to setting out data to wallboard, wallboard processing This detection datum line should turn into a straight line naturally after shaping.
(2)Wallboard forming carries out cold presswork shaping using three rolls plate bending machine and hydraulic press, as much as possible subtracts Few destruction of the heat processing and forming to steel plate, when wallboard is processed, the fillet that pressing mold should be selected appropriate, in case panel surfaces occur substantially Impression, then carry out suppressing the shaping of wallboard by the compressing processing line on wallboard, should be from one end to another during compacting End is progressively carried out, and is measured with angular templet, in order to avoid compacting is excessive, repeats the compacting to wallboard in this approach, directly Required to reaching to form
The shaping detection of step 3, cambered wallboard;
In order to ensure that bending box component can preferably ensure assembly precision in assembling, wallboard must be carried out once after processing Detailed detection, detection carries out complete detection using special sample case, and sample case is according to the linear carry out 1 of actual distortion of wallboard:1 system Make, the warp surface of wallboard is truly showed in three dimensions, as long as sample case put during detection on wallboard after processing,
The profile sideline of positioning distortion wallboard is checked that the gap of sample case surface each point and wallboard should be controlled within 2mm, no It should then be processed again, wallboard surplus carries out mowing according to sample case appearance and size.
Wherein, the shape of the arc fold bending plate after blanking, bending point coordinates are proofreaded;
Step 4, set up assembling jig frame;
Wallboard projection line, spacer lines, end face tongue and groove line, the moulding bed position line are first marked in assembled region;Then moulding bed template is set up, Coordinate measurement is carried out to moulding bed template.
Step 5, wallboard positioning;
After moulding bed is provided with, cambered wallboard is hung on into moulding bed, according to wallboard projection line, spacer lines, end face tongue and groove line, moulding bed position Line is put to position wallboard.
The terraced beam assembling positioning of step 6, box;
The good edge of a wing flat section of two pieces of assembly weldings is hung on into progress assembling positioning, positioning is must be noted that flange plate relative Position and the relative position of dividing plate, and flange plate perpendicularity, it is fixed while to ensure the groove gap between flange plate and wallboard The docking of diaphragm plate and the angle articulation of side plate are carried out behind position, local correction is carried out after welding, and inside is cleared up.
Wherein, the terraced beam of wallboard and box is placed on assembling jig frame, by moulding bed to the plate that is irregularly distorted in space Every location data of part is checked;
Step 7, the terraced beam assembling of progress on assembling jig frame;
It is first that bottom plate is levelling using spirit level, according to nine grids datagram 1:1 puts ground sample, finds out curved stairs CCP Subpoint(No less than 5 points), shaped steel fulcrum is erect using the Z-direction coordinate value of subpoint, then by the bottom plate spot welding of the terraced beam of box It is welded on vertical moulding bed, then by the web of the terraced beam of box according to box beam bottom plate arc tendency point on bottom plate.
Step 8, carry out terraced beam and mark time assembling;
Overall dimensions are first checked, finally by stair step under using instruments such as plumb bobs according to projection line of marking time in assembled region Supreme progressively point is welded between terraced beam.
Step 9, dismounting assembling jig frame.
The preparation method of the terraced beam of described large-scale bending steel stair, assembling jig frame calculates terraced beam by computer software design Space coordinate, marks projection line, tongue and groove line, spacer lines etc. and sets up moulding bed positioning, and be made with section bar.
The preparation method of described large-scale bending steel stair, assembling jig frame calculates bending stair by computer software design Space coordinate and crucial control projection, it is determined that terraced beam and space orientation of marking time are assembled.
This preparation method is controlled in the blanking stage by the shape to arc fold bending plate, to ensure the structure of multi-angle box beam Part size it is accurate.In the production phase, by the application to moulding bed, effectively solve for irregular twisted component in space Every location data problem, it is ensured that the precision of bending component meets building requirements, it is ensured that for high-altitude install it is irregular The precision controlling of steel member.Finally, during component preassembling, the three-dimensional localization that passes through and verification process repeatedly, it is ensured that The precision controlling of irregular element bending in space, it is ensured that the accuracy of steel member.Simultaneously by preassembling, bending is verified Component splices the conjugation of node, can effectively ensure construction quality.

Claims (3)

1. a kind of preparation method of large-scale bending steel stair, it is characterized in that:Including
Step 1, the expansion setting-out for distorting box-shaped wallboard and blanking,
The processing of step 2, cambered wallboard;
The shaping detection of step 3, cambered wallboard;
Wherein, the shape of the arc fold bending plate after blanking, bending point coordinates are proofreaded;
Step 4, set up assembling jig frame;
Step 5, wallboard positioning;
The terraced beam assembling positioning of step 6, box;
Wherein, the terraced beam of wallboard and box is placed on assembling jig frame, by moulding bed to the plate that is irregularly distorted in space Every location data is checked;
Step 7, the terraced beam assembling of progress on assembling jig frame;
Step 8, carry out terraced beam and mark time assembling;
Step 9, dismounting assembling jig frame.
2. the preparation method of large-scale bending steel stair according to claim 1, it is characterized in that:Assembling jig frame passes through computer Software for Design calculates terraced beam space coordinate, marks projection line, tongue and groove line, spacer lines etc. and sets up moulding bed positioning, and is made of section bar Form.
3. the preparation method of large-scale bending steel stair according to claim 2, it is characterized in that:Assembling jig frame passes through computer Software for Design calculates bending stair space coordinate and crucial control projection, it is determined that terraced beam and space orientation of marking time are assembled.
CN201710291383.6A 2017-04-28 2017-04-28 The preparation method of large-scale bending steel stair Pending CN107009097A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710291383.6A CN107009097A (en) 2017-04-28 2017-04-28 The preparation method of large-scale bending steel stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710291383.6A CN107009097A (en) 2017-04-28 2017-04-28 The preparation method of large-scale bending steel stair

Publications (1)

Publication Number Publication Date
CN107009097A true CN107009097A (en) 2017-08-04

Family

ID=59447306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710291383.6A Pending CN107009097A (en) 2017-04-28 2017-04-28 The preparation method of large-scale bending steel stair

Country Status (1)

Country Link
CN (1) CN107009097A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057366A (en) * 2018-08-31 2018-12-21 中冶建工集团有限公司 A kind of steel construction spiral stairs segmented assembly method
CN109184225A (en) * 2018-10-23 2019-01-11 中建三局安装工程有限公司 Four string prismatic bending circular tube truss structural systems of one kind and assembling method
CN109403563A (en) * 2018-11-19 2019-03-01 北京市机械施工有限公司 A kind of interior super large list ladder girder cantilever formula rotation steel stair and preparation method thereof
CN110936104A (en) * 2019-06-26 2020-03-31 浙江精工钢结构集团有限公司 Manufacturing method of space torsion box type node
CN112144419A (en) * 2020-10-20 2020-12-29 江苏沪宁钢机股份有限公司 Giant space bent-torsion bridge arch foot and manufacturing method thereof
CN113536427A (en) * 2021-07-15 2021-10-22 中国二十二冶集团有限公司 Large-caliber bending steel pipe column splicing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101435248A (en) * 2008-12-19 2009-05-20 中国建筑设计研究院 Self-adapting variable cross-section rectangular steel tube bending component
CN102268909A (en) * 2011-06-15 2011-12-07 王军 Stair unit and multi-box assembled arc spiral stair composed thereof
CN103659182A (en) * 2013-12-03 2014-03-26 中建钢构江苏有限公司 Production method of 360-degree spiral stair with cambered box beams
US20150101273A1 (en) * 2010-05-10 2015-04-16 Larry James Hopper Spiral box stair

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101435248A (en) * 2008-12-19 2009-05-20 中国建筑设计研究院 Self-adapting variable cross-section rectangular steel tube bending component
US20150101273A1 (en) * 2010-05-10 2015-04-16 Larry James Hopper Spiral box stair
CN102268909A (en) * 2011-06-15 2011-12-07 王军 Stair unit and multi-box assembled arc spiral stair composed thereof
CN103659182A (en) * 2013-12-03 2014-03-26 中建钢构江苏有限公司 Production method of 360-degree spiral stair with cambered box beams

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国二十二冶集团北京天润建设有限公司: "空间弯扭钢结构施工技术", 《百度文库》 *
张发荣 等: "360°旋转楼梯制作工艺及精度控制技术", 《"2015中国钢结构行业大会论文集》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057366A (en) * 2018-08-31 2018-12-21 中冶建工集团有限公司 A kind of steel construction spiral stairs segmented assembly method
CN109184225A (en) * 2018-10-23 2019-01-11 中建三局安装工程有限公司 Four string prismatic bending circular tube truss structural systems of one kind and assembling method
CN109403563A (en) * 2018-11-19 2019-03-01 北京市机械施工有限公司 A kind of interior super large list ladder girder cantilever formula rotation steel stair and preparation method thereof
CN110936104A (en) * 2019-06-26 2020-03-31 浙江精工钢结构集团有限公司 Manufacturing method of space torsion box type node
CN112144419A (en) * 2020-10-20 2020-12-29 江苏沪宁钢机股份有限公司 Giant space bent-torsion bridge arch foot and manufacturing method thereof
CN113536427A (en) * 2021-07-15 2021-10-22 中国二十二冶集团有限公司 Large-caliber bending steel pipe column splicing method

Similar Documents

Publication Publication Date Title
CN107009097A (en) The preparation method of large-scale bending steel stair
CN110886186A (en) BIM technology-based manufacturing and installation construction method for complex space curved surface special-shaped steel box girder
CN109531062B (en) Method for manufacturing uneven bending box beam rotary ladder
CN102011455A (en) Complex annular shed bending and twisting component and manufacturing method thereof
CN109441034A (en) A kind of construction technology of BIM auxiliary hyperboloid Special-Shaped Column set square installation
CN114434105B (en) Manufacturing method of bridge bolt welded steel truss girder hyperbolic chord member
CN108723630A (en) The production method of helically twisted box
CN110524190B (en) Manufacturing method of bent square and rectangular tube
CN114332402A (en) Ground-based and handheld laser scanning-fused steel bridge simulation pre-assembly method
KR20170117735A (en) Method for constructing Atypical Architecture of a Curved Exterior Panel using Metal Plate having post and lintel constructione
CN111931266B (en) Digital processing method for irregular end section keel based on complex space modeling
CN208945472U (en) A kind of Steel Bridge curve drum rod piece production assembling device
CN113718631A (en) Steel bridge hyperbolic paraboloid thin plate dense rib plate unit and manufacturing method thereof
CN105499927A (en) Manufacturing method of space curve profile steel component
JPH1077609A (en) Steel member manufacturing method
CN103321324A (en) Truss nodal region super-thick steel plate wall and building method thereof
CN110565856A (en) quick installation method for double-curved-surface metal plate curtain wall
CN110952692A (en) S-shaped curtain wall steel keel and manufacturing method and mounting method thereof
CN110055901A (en) Control method for realizing closure precision of pushing steel pipe arch rib based on BIM technology
CN116927503A (en) Construction method of large-span overhanging special-shaped member of steel structure roof
CN114043170B (en) Manufacturing method of hexagonal steel box arch
CN211361610U (en) Tool setting tool
CN111894223B (en) Method for separating, externally processing and installing large-area multi-curved-surface artistic ribbon
CN108544190B (en) Manufacturing method of bent box-shaped steel tower segment
CN111889962B (en) Assembly construction method for large-area multi-curve complex artistic facing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804

RJ01 Rejection of invention patent application after publication