CN107008097A - A kind of combustible gas wet purification equipment of new energy field - Google Patents

A kind of combustible gas wet purification equipment of new energy field Download PDF

Info

Publication number
CN107008097A
CN107008097A CN201710374099.5A CN201710374099A CN107008097A CN 107008097 A CN107008097 A CN 107008097A CN 201710374099 A CN201710374099 A CN 201710374099A CN 107008097 A CN107008097 A CN 107008097A
Authority
CN
China
Prior art keywords
fixedly connected
housing
screen pack
baffle
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710374099.5A
Other languages
Chinese (zh)
Inventor
蒙泽喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Beiyoutong New Energy Technology Development Co Ltd
Original Assignee
Shenzhen Beiyoutong New Energy Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Beiyoutong New Energy Technology Development Co Ltd filed Critical Shenzhen Beiyoutong New Energy Technology Development Co Ltd
Priority to CN201710374099.5A priority Critical patent/CN107008097A/en
Publication of CN107008097A publication Critical patent/CN107008097A/en
Pending legal-status Critical Current

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

A kind of combustible gas wet purification equipment of new energy field, including the first casing device, the first filter being contained in first casing device, the frame device above first casing device, the press device being arranged on the frame device, the cistern device on the right side of the frame device, the second casing device below first casing device, the desiccation apparatus being arranged on second casing device, the second filter being contained in second casing device.The present invention can effectively remove the impurity such as the dust in biological mass combustable gas, elimination effect is notable, and the steam in combustible gas can be removed, the influence for preventing steam from being caused to combustible gas burning, ensure the effect of combustible gas purifying, the entrance of purified water can be automatically controlled simultaneously, fully contacting for purified water and combustible gas is realized.

Description

A kind of combustible gas wet purification equipment of new energy field
Technical field
The present invention relates to field of new energy technologies, set more particularly, to a kind of combustible gas wet purification of new energy field It is standby.
Background technology
Contain the impurity such as dust in biological mass combustable gas, it is impossible to directly using, it is necessary to carry out purified treatment to it.It is existing Purifier can not effectively remove dust therein, and dust removing effects are poor, and when using wet purification mode, in combustible gas Steam can be carried, and then influences the burning of combustible gas, it is impossible to the need for meeting to combustible gas purifying.
Therefore, it is necessary to provide a kind of new technical scheme to overcome drawbacks described above.
The content of the invention
It is an object of the invention to provide a kind of flammable air humidity for the new energy field that can effectively solve above-mentioned technical problem Formula cleaning equipment.
To reach the purpose of the present invention, adopt the following technical scheme that:
A kind of combustible gas wet purification equipment of new energy field, including the first casing device, it is contained in the first shell The first filter in body device, the frame device above first casing device, it is arranged at the frame device On press device, the cistern device on the right side of the frame device, the second shell below first casing device Body device, the desiccation apparatus being arranged on second casing device, second be contained in second casing device are filtered Device, first casing device includes the first housing, the air inlet pipe on the left of first housing, is arranged at the air inlet The first valve on pipe, the drainpipe below first housing, the second valve being arranged on the drainpipe, it is described First filter includes the first screen pack, the first spring below first screen pack, positioned at the described first filtering The first support of online side, the first roller being arranged in the first support, the second roller, on the left of the first support The first fix bar, the first baffle on the right side of first screen pack, the frame device include framework, be contained in it is described The second screen pack in framework, the first sponge block above second screen pack, the press device include electric cylinders, position Catch bar below the electric cylinders, the push pedal below the catch bar, the positioned at the catch bar left and right sides the 3rd Baffle plate, the 3rd support on the left of the electric cylinders, the first bracing wire being arranged in the push pedal, the cistern device include water Case, the second support below the water tank, the first pipeline on the left of the water tank, above first pipeline The second fix bar, the cover plate above the water tank, the gripper rings above the cover plate, second casing device Second pipe, the 3rd valve being arranged on the second pipe including the second housing, above second housing, position The 3rd fix bar on the left of the second pipe, the discharge pipe on the left of second housing, it is arranged at the discharge pipe On blower fan, the 4th valve, the 3rd pipeline on the right side of second housing, the 5th valve being arranged on the 3rd pipeline Door, the desiccation apparatus includes second baffle, the movable plate on the right side of the second baffle, below the movable plate Second spring, the second sponge block above the movable plate, the second bracing wire, the above second housing the 4th consolidate Fixed pole, the 3rd roller for being arranged at the 4th fix bar upper end, the motor on the left of the 4th fix bar, it is arranged at institute The output shaft on motor is stated, second filter includes dividing plate, the montant on the right side of the dividing plate, is arranged at described erect The contiguous block of bar upper end, the 3rd screen pack above the contiguous block, the 3rd spring on the left of the montant, it is located at Transverse slat on the left of the dividing plate, the 4th screen pack above the transverse slat, the collection center below the transverse slat.
Compared with prior art, the present invention has the advantages that:The combustible gas wet type of new energy field of the present invention is net The impurity such as the dust in biological mass combustable gas can effectively be removed by changing equipment, and elimination effect significantly, and can be removed flammable Steam in gas, prevents steam from being impacted to combustible gas burning, it is ensured that the effect of combustible gas purifying, while can automatically control The entrance of purified water processed, realizes fully contacting for purified water and combustible gas.
Brief description of the drawings
Fig. 1 is the structural representation of the combustible gas wet purification equipment of new energy field of the present invention.
Embodiment
Clearly complete say is made to the combustible gas wet purification equipment of new energy field of the present invention below in conjunction with accompanying drawing It is bright.
As shown in figure 1, the combustible gas wet purification equipment of new energy field of the present invention includes the first casing device 1, housed In the first filter 2 in first casing device 1, the frame device 3 positioned at the top of the first casing device 1, set The press device 4 that is placed on the frame device 3, the cistern device 6 positioned at the right side of frame device 3, positioned at described first Second casing device 7 of the lower section of casing device 1, the desiccation apparatus 8 being arranged on second casing device 7, be contained in it is described The second filter 9 in second casing device 7.
As shown in figure 1, first casing device 1 includes the first housing 11, entering positioned at the left side of the first housing 11 Tracheae 12, the first valve 13 being arranged in the air inlet pipe 12, the drainpipe 14 positioned at the lower section of the first housing 11, setting In the second valve 15 on the drainpipe 14.First housing 11 is in hollow cuboid and horizontal positioned, described first Housing 11 is provided with the first through hole 111 positioned at its lower surface, the second through hole 112 positioned at its left surface, surface disposed thereon Third through-hole 113, the fourth hole 114 positioned at its lower surface, the first through hole 111, the second through hole 112, fourth hole 114 is rounded and communicated with the inside of first housing 11, the third through-hole 113 be square and with first housing 11 Inside communicate.The right-hand member of the air inlet pipe 12 is directed at second through hole 112 and consolidated with the left surface of first housing 11 Fixed connection so that the inside of the air inlet pipe 12 is communicated with the inside of first housing 11.First valve 13 is used to control Make the flow of gas in the air inlet pipe 12.The upper end of the drainpipe 14 is directed at the fourth hole 114 and with described first The lower surface of housing 11 is fixedly connected so that the inside of the drainpipe 14 is communicated with the inside of first housing 11.It is described Second valve 15 is used for the flow for controlling water in the drainpipe 14.
As shown in figure 1, first filter 2 includes the first screen pack 21, positioned at the lower section of the first screen pack 21 The first spring 22, the first support 23 positioned at the top of first screen pack 21, be arranged in the first support 23 the One roller 24, the second roller 25, the first fix bar 26 positioned at the left side of the first support 23, positioned at first screen pack 21 The first baffle 27 on right side.First screen pack 21 is in cuboid and horizontal positioned, and first screen pack 21 is contained in institute State in the first housing 11, the inner surface sliding contact of first screen pack 21 and first housing 11, first filtering The right surface of net 21 act against on the left surface of the first baffle 27 and with its sliding contact so that first screen pack 21 Smoothly it can move up and down vertically.First spring 22 is provided with two, the lower end of first spring 22 and described first The inner surface of housing 11 is fixedly connected, and the upper end of first spring 22 is fixedly connected with first screen pack 21.Described One support 23 is L-shaped, and the upper end of the first support 23 is fixedly connected with the inner surface of first housing 11, described first The lower end of frame 23 is horizontal, and the lower end of the first support 23 is provided with the first groove 231, and first groove 231 is square. First roller 24 is in cylinder, first roller 24 be contained in first groove 231 and with the first support 23 is pivotally connected so that first roller 24 can rotate in first groove 231.Second roller 25 is in cylinder Body, second roller 25 is contained in first groove 231 and pivotally connected with the first support 23 so that described the Second wheel 25 can be rotated in first groove 231, and first roller 24 is relative with second roller 25 or so to be set Put.The left end of first fix bar 26 is fixedly connected with the inner surface of first housing 11, first fix bar 26 Right-hand member is fixedly connected with the first support 23.The first baffle 27 is in cuboid and vertical placement, the first baffle 27 It is fixedly connected with the inner surface of first housing 11, the first baffle 27 is located at the fourth hole 114, third through-hole 113 right side, and positioned at the left side of the first through hole 111, the first baffle 27 can be by the space in the first housing 11 Obstruct into left and right two parts, the upper end of the first baffle 27 is provided with the second groove 271, second groove 271 be square and Through the left and right surface of the first baffle 27.
As shown in figure 1, the frame device 3 includes framework 31, the second screen pack 32 being contained in the framework 31, position The first sponge block 33 in the top of the second screen pack 32.The framework 31 is in hollow cuboid, under the framework 31 End causes the longitudinal section of the framework 31 to be in inverted concave shape, threeway described in the lower end aligned of the framework 31 provided with opening Hole 113 and it is fixedly connected with the upper surface of first housing 11 so that the inside of the framework 31 and first housing 11 Inside communicate, the framework 31 covers the third through-hole 113, and the right surface of the framework 31 is provided with fifth hole 311, institute State fifth hole 311 rounded and communicated with the inside of the framework 31.Second screen pack 32 is put in cuboid and level Put, the side of second screen pack 32 is fixedly connected with the inner surface of the framework 31.First sponge block 33 is in rectangular Body and horizontal positioned, the lower surface of first sponge block 33 are fixedly connected with the upper surface of second screen pack 32, described The side of first sponge block 33 and the inner surface of the framework 31 fix sliding contact.
As shown in figure 1, the press device 4 includes electric cylinders 41, the catch bar 42 positioned at the lower section of electric cylinders 41, positioned at institute State the push pedal 43 below catch bar 42, the third baffle 44 positioned at the left and right sides of catch bar 42, positioned at the left side of electric cylinders 41 3rd support 45 of side, the first bracing wire being arranged in the push pedal 43.The electric cylinders 41 and power supply electric connection (not shown), There is provided electric energy for the electric cylinders 41, the electric cylinders 41 provided with switch (not shown), the convenient control electric cylinders 41 open or Close.The catch bar 42 is connected in cylinder and vertical placement, the upper end of the catch bar 42 with the electric cylinders 41 so that institute Stating electric cylinders 41 can drive the catch bar 42 to move up and down, the catch bar 42 through the framework 31 surfaces externally and internally and with Its sliding contact so that the catch bar 42 can be moved up and down vertically, the lower end of the catch bar 42 and the push pedal 43 Upper surface is fixedly connected.The push pedal 43 be in cuboid and horizontal positioned, the side of the push pedal 43 with the framework 31 Slidably contact the surfaces so that the push pedal 43 can be moved up and down in the framework 31.The third baffle 44 is provided with two And it is located at the left and right sides of the catch bar 42 respectively, the third baffle 44 is in cuboid and vertical placement, the third gear The lower end of plate 44 is fixedly connected with the upper surface of the push pedal 43, the side of the third baffle 44 and the interior table of the framework 31 Face sliding contact, the push pedal 43 is located at the top of the fifth hole 311.The lower end of 3rd support 45 and the framework 31 are fixedly connected, and the upper end of the 3rd support 45 is fixedly connected with the electric cylinders 41.The upper end of first bracing wire with it is described Push pedal 43 is fixedly connected, first bracing wire through the screen pack 32 of the first sponge block 33 and second upper and lower surface and and its Sliding contact, the lower end of first bracing wire is fixedly connected with first screen pack 21, and described first is drawstring through described One groove 231 and the lower section of second roller 25 and the top of the first roller 24 are acted against, so as to be risen to first bracing wire To supporting role.
As shown in figure 1, the cistern device 6 includes water tank 61, the second support 62 positioned at the lower section of water tank 61, is located at First pipeline 63 in the left side of the water tank 61, the second fix bar 64 positioned at the top of the first pipeline 63, positioned at the water tank The cover plate 65 of 61 tops, the gripper rings 66 positioned at the top of cover plate 65.The water tank 61 is in hollow cuboid, the water tank 61 upper end causes the longitudinal section of the water tank 61 to be in concave shape provided with opening, and the water tank 61 is provided with positioned at its left surface 6th through hole 611, the 6th through hole 611 is rounded and is communicated with the inside of the water tank 61.Under the second support 62 End is fixedly connected with first housing 11, and the upper end of the second support 62 is fixedly connected with the water tank 61.Described first The right-hand member of pipeline 63 is directed at the 6th through hole 611 and is fixedly connected with the left surface of the water tank 61 so that first pipe The inside in road 63 is communicated with the inside of the water tank 61, the left end of first pipeline 63 be aligned the fifth hole 311 and with The right surface of the framework 31 is fixedly connected so that the inside of first pipeline 63 is communicated with the inside of the framework 31.Institute The right-hand member for stating the second fix bar 64 is fixedly connected with the water tank 61, and the left end of second fix bar 64 is consolidated with the framework 31 Fixed connection.The cover plate 65 is in cuboid, and the cover plate 65 is acted against on the upper surface of the water tank 61, so as to cover State the upper end of water tank 61.The gripper rings 66 are in bending, and the two ends of the gripper rings 66 and the upper surface of the cover plate 65 are consolidated Fixed connection, convenient use person holds.
As shown in figure 1, second casing device 7 includes the second housing 71, the positioned at the top of second housing 71 Two pipelines 72, the 3rd valve 73 being arranged on the second pipe 72, the 3rd fixation positioned at the left side of second pipe 72 Bar 74, discharge pipe 75, the blower fan 76 being arranged on the discharge pipe 75, the 4th valve positioned at the left side of the second housing 71 77th, positioned at the right side of second housing 71 the 3rd pipeline 78, the 5th valve 79 being arranged on the 3rd pipeline 78.It is described Second housing 71 is in hollow cuboid, and the horizontal positioned of the second housing 71, second housing 71 is provided with left positioned at its First circular hole 711 on surface, the second circular hole 712 positioned at its right surface, the 3rd circular hole 713 on surface disposed thereon, described One circular hole 711, the second circular hole 712 and the 3rd circular hole 713 are rounded and communicated with the inside of second housing 71.Described second 3rd circular hole 713 described in the lower end aligned of pipeline 72 and it is fixedly connected with the upper surface of second housing 71 so that described The inside of two pipelines 72 is communicated with the inside of second housing 71, and the upper end of the second pipe 72 is directed at the first through hole 111 and it is fixedly connected with the lower surface of first housing 11 so that the inside of the second pipe 72 and first housing 11 inside is communicated.3rd valve 73 is used for the flow for controlling gas in the second pipe 72.3rd fix bar 74 upper end is fixedly connected with first housing 11, and the lower end of the 3rd fix bar 74 is fixed with second housing 71 to be connected Connect, the 3rd fix bar 74 is provided with the 4th circular hole 741 through its left and right surface.The right-hand member alignment institute of the discharge pipe 75 State the first circular hole 711 and be fixedly connected with the left surface of second housing 71 so that the inside of the discharge pipe 75 with it is described The inside of second housing 71 is communicated.The blower fan 76 and power supply electric connection (not shown), are that the blower fan 76 provides electric energy, institute Blower fan 76 is stated provided with switch (not shown), the convenient control blower fan 76 is opened or closed.4th valve 77 is used for Control the flow of gas in the discharge pipe 75.The left end of 3rd pipeline 78 be aligned second circular hole 712 and with it is described The right surface of second housing 71 is fixedly connected so that the inside of the 3rd pipeline 78 and the inside phase of second housing 71 It is logical.5th valve 79 is used for the flow for controlling water in the 3rd pipeline 78.
As shown in figure 1, the desiccation apparatus 8 includes second baffle 81, the movable plate positioned at the right side of second baffle 81 82nd, positioned at the lower section of movable plate 82 second spring 83, the second sponge block 83, second positioned at the top of movable plate 82 are drawn Line 84, the 4th fix bar 85 positioned at the top of the second housing 71, the 3rd rolling for being arranged at the upper end of the 4th fix bar 85 Wheel 86, the motor 87 positioned at the left side of the 4th fix bar 85, the output shaft 88 being arranged on the motor 87.The second gear Plate 81 in cuboid and it is vertical place, the second baffle 81 is fixedly connected with the inner surface of second housing 71, described the Two baffle plates 81 are located at the left side of the 3rd circular hole 713, and the lower end of the second baffle 81 is provided with the 3rd groove 811, and described the Three grooves 811 are square.The movable plate 82 is in cuboid and horizontal positioned, and the left end of the movable plate 82 acts against described the On the right surface of two baffle plates 81 and with its sliding contact, the right-hand member of the movable plate 82 acted against on the inner surface of the second housing 71 And with its sliding contact so that the movable plate 82 can be moved up and down vertically.The second spring 83 is provided with two, described the The lower end of two springs 83 is fixedly connected with the inner surface of second housing 71, upper end and the movement of the second spring 83 Plate 82 is fixedly connected.Second sponge block 83 is in cuboid, the lower surface of second sponge block 83 and the movable plate 82 Upper surface be fixedly connected, the left surface of second sponge block 83 and the right side of the second baffle 81 are slidably contacted the surfaces, institute State the second sponge block 83 right surface act against on the inner surface of second housing 71 and with its sliding contact, second sea The upper surface of continuous block 83 is acted against on the inner surface of second housing 71.4th fix bar 85 is in cuboid, described the The lower end of four fix bars 85 is fixedly connected with the upper surface of second housing 71, and the upper end of the 4th fix bar 85 is provided with the Four grooves.3rd roller 86 is in cylinder, and the 3rd roller 86 is contained in the 4th groove and with the described 4th Fix bar 85 is pivotally connected so that the 3rd roller 86 can rotate in the 4th groove.The motor 87 and power supply It is (not shown) to be electrically connected with, it is that the motor 87 provides electric energy, the motor 87 is provided with switch (not shown), convenient control institute State motor 87 to open or close, the lower surface of the motor 87 is fixedly connected with the upper surface of second housing 71.It is described Output shaft 88 is in cylinder, and one end of the output shaft 88 is connected with the motor 87 so that the motor 87 can drive institute Output shaft 88 is stated to rotate.The lower end of second bracing wire 84 is fixedly connected with the movable plate 82, and second bracing wire 84 runs through The upper and lower surface of second sponge block 83 and with its sliding contact, second bracing wire 84 is interior through second housing 71 Outer surface and with its sliding contact, second bracing wire 84 acted against on the 3rd roller 86, and second bracing wire 84 is passed through The fourth hole 741 and it is fixedly connected with the output shaft 88.
As shown in figure 1, second filter 9 includes dividing plate 91, the montant 93 positioned at the right side of dividing plate 91, set Contiguous block 94 in the upper end of montant 93, the 3rd screen pack 92 positioned at the top of contiguous block 94, positioned at the montant 93 3rd spring 95 in left side, the transverse slat 96 positioned at the left side of the dividing plate 91, the 4th screen pack 97 positioned at the top of transverse slat 96, Collection center 98 positioned at the lower section of transverse slat 96.The dividing plate 91 is in cuboid, the dividing plate 91 and second housing 71 Inner surface is fixedly connected, and the upper end of the dividing plate 91 is provided with the 5th groove 911, and the 5th groove 911 is square and through institute State the left and right surface of dividing plate 91.The montant 93 is in cuboid and vertical placement, lower end and the second shell of the montant 93 The inner surface of body 71 is fixedly connected, and the upper end of the montant 93 is provided with the 6th groove.The contiguous block 94 is contained in the described 6th It is in groove and pivotally connected with the montant 93 so that the contiguous block 94 can rotate in the 6th groove, the company The upper end for connecing block 94 is fixedly connected with the 3rd screen pack 92.3rd screen pack 92 is oblique, the 3rd filtering The left end of net 92 is acted against on the right surface of the dividing plate 91, and the right-hand member of the 3rd screen pack 92 acts against the second baffle On 81 left surface, the 3rd screen pack 92 can prevent drier.The lower end of 3rd spring 95 and the second shell The inner surface of body 71 is fixedly connected, and the upper end of the 3rd spring 95 is fixedly connected with the 3rd screen pack 92, so as to institute The 3rd screen pack 92 is stated to play a supporting role.The transverse slat 96 is in cuboid and horizontal positioned, the left end of the transverse slat 96 and institute The inner surface for stating the second housing 71 is fixedly connected, and the right-hand member of the transverse slat 96 is fixedly connected with the left surface of the dividing plate 91, institute The lower section that transverse slat 96 is located at the 5th groove 911 is stated, the transverse slat 96 is provided with the 5th circular hole through its upper and lower surface 961, the 5th circular hole 961 is rounded.4th screen pack 97 is in cuboid and vertical placement, the 4th screen pack 97 Lower end be fixedly connected with the transverse slat 96, the upper end of the 4th screen pack 97 and the inner surface of second housing 71 are fixed Connection, the 4th screen pack 97 is located at the right side of the 5th circular hole 961.The collection center 98 is in hollow cuboid, institute The upper and lower surface for stating collection center 98 is communicated, the upper end of the collection center 98 be aligned the 5th circular hole 961 and with the transverse slat 96 Lower surface be fixedly connected, the 5th circular hole 961 with it is described collection center 98 inside communicate, it is described collection center 98 lower surface It is fixedly connected with the inner surface of second housing 71, the left surface of the collection center 98 is provided with some 6th circular holes 981, described 6th circular hole 981 is rounded and is communicated with the inside of the collection center 98.
As shown in figure 1, the combustible gas wet purification equipment of the new energy field of the present invention is in use, be first turned on electric cylinders 41 switch so that the catch bar 42 is constantly moved up and down, the push pedal 43 therewith in the framework 31 constantly on Lower movement, when the push pedal 43 is moved down, the first third baffle 44 positioned at right side blocks the 5th circular hole 311, and institute State push pedal 43 and press down on first sponge block 33, first bracing wire is loosened, and first screen pack 21 is moved down, institute When stating push pedal 43 and moving up, the push pedal 43 is moved to the top of the fifth hole 311, and first bracing wire is tightened up, First screen pack 21 is moved up, and is constantly moved up and down by the push pedal 43, the first third baffle positioned at right side 44 can periodically block the fifth hole 311, and the push pedal 43 periodically presses first sponge block 33, described First screen pack 21 is constantly moved up and down.Then gripper rings 66 are held to move up, and then cover plate 65 is removed, then toward institute State water tank 61 and pour into appropriate purified water, then cover cover plate 65 on the water tank 61 again.Water in water tank 61 is entered In first pipeline 63, when first third baffle 44 blocks the fifth hole 311, water in first pipeline 63 Rest in first pipeline 63, when first third baffle 44 does not block the fifth hole 311, first pipe Water in road 63 is entered in the framework 31 by fifth hole 311, and soaks first sponge block 33, so that push pedal 43 When pressing down on first sponge block 33, the water in first sponge block 33 is extruded, and the water of extrusion passes through third through-hole 113 and the first screen pack 21 is soaked, because push pedal 43 is constantly moved up and down, the water in water tank 61 periodically enters into framework In 31, and then water in the first sponge block 33 is periodically extruded, and soaks the first screen pack 21, when entering described first When water in housing 11 is more, the water now opened in the second valve 15, first housing 11 enters the drainpipe 14 It is interior, and then discharge, the waste of water resource can effectively be reduced by periodically soaking the first screen pack 21, saving water resource, and And automaticity is high.Then the first valve 13 is opened, while the 3rd valve 13, the 4th valve 77 are opened, by air inlet pipe 12 The outlet connection of left end and combustible gas, while the import of the left end of discharge pipe 75 and combustible gas is connected, then opens blower fan 76 Switch so that combustible gas is entered in the air inlet pipe 12, then into first housing 11, then by soaking The first screen pack 21 filtering after enter the top of first screen pack 21, the first screen pack 21 soaked can be effective The dust impurities removed in combustible gas, and dust impurities are concentrated on the lower surface of first screen pack 21, are then passed through Second groove 271 enters the right side of the first baffle 27, and not blocking the described 5th due to the first third baffle 44 leads to During hole 311, purified water is filled up in first pipeline 63, the air of the top of the first screen pack 211 cannot be introduced into water tank In 61, when the first third baffle 44 blocks the fifth hole 311, the air of the top of the first screen pack 21 cannot be introduced into In the water tank 61, the air of the top of the first screen pack 21 can only enter the right side of the first baffle 27 in summary, on First screen pack 21 of lower movement can fall viscous dust shake on the lower surface thereof.Enter the right side of first baffle 27 Air enter in the second pipe 72, then enter in second housing 71 by the 3rd circular hole 713, enter Air in second housing 71 is contacted with the second sponge block 83, and then movable plate 82 is moved down, the second spring 83 Compressed, until the movable plate 82 is moved to the right side of the 3rd groove 811, the air of the top of movable plate 82 passes through second The left side of second baffle 81, second sponge block are entered after the filtering of sponge block 83 and through the 3rd groove 811 83 can effectively absorb the steam in combustible gas, and the second sponge block 83 is gradually wetted, then by the described 3rd The top of the 3rd screen pack 92 is entered after the filtering of screen pack 92, and by the drier of the top of the 3rd screen pack 92 Desiccation remove combustible gas in steam, so as to thoroughly remove combustible gas in steam, when under the 3rd screen pack 92 When the air pressure of side is larger, the 3rd screen pack 92 surrounds the upper end rotate counterclockwise of the montant 93, the 3rd screen pack Gap between 92 and the second baffle 81 and dividing plate 91, and then the air of the lower section of the 3rd screen pack 92 can be caused to pass through the 3rd Gap between screen pack 92 and second baffle 91 and dividing plate 91 enters the top of the 3rd screen pack 92, improves efficiency, And the effect of being effectively protected is played to the 3rd screen pack 91, prevents air pressure excessive and 3rd screen pack 91 is caused to damage.Then Air enters the left side of the dividing plate 91 by the 5th groove 911, and then the filtering by the 4th screen pack 97 is laggard Enter to the left side of the 4th screen pack 97, the 4th screen pack 97 can filter out the drier in combustible gas, Ran Houjing Cross the 5th circular hole 961 to enter in the collection center 98, then enter the collection center by the 6th through hole 981 98 left side, then into the discharge pipe 75, is finally discharged to combustible gas and enters intraoral, and the combustible gas of discharge does not contain miscellaneous Matter, and drying do not moisten.When the moisture that the second sponge block 83 absorbs is more, the switch of motor 87 is now opened so that described Output shaft 88 is rotated, and second bracing wire 84 is tightened up, and second bracing wire 84 pulls up the movable plate 82 so that described Movable plate 82 is moved up, and second sponge block 83 is compressed, so as to be extruded, the water of extrusion enters the 3rd pipeline In 78, open the 5th valve 79 so that the water of extrusion is discharged from the 3rd pipeline 78, it is to be discharged finish after, close motor 87 and open Close, because the air in second pipe 72 is constantly entered in the second housing 71, the movable plate 82 continues to move down, directly To the right side for being moved to the 3rd groove 811, so that the purification to combustible gas is smoothed out again.So far, originally The combustible gas wet purification equipment of invention new energy field is finished using process description.

Claims (9)

1. a kind of combustible gas wet purification equipment of new energy field, including the first casing device, it is contained in first housing The first filter in device, the frame device above first casing device, it is arranged on the frame device Press device, the cistern device on the right side of the frame device, the second housing below first casing device Device, the desiccation apparatus being arranged on second casing device, second be contained in second casing device filtering dress Put, it is characterised in that:First casing device includes the first housing, the air inlet pipe on the left of first housing, set In the first valve in the air inlet pipe, the drainpipe below first housing, be arranged on the drainpipe Two valves, first filter includes the first screen pack, the first spring below first screen pack, positioned at institute The first roller for state the first support above the first screen pack, being arranged in the first support, the second roller, positioned at described The first fix bar on the left of one support, the first baffle on the right side of first screen pack, the frame device include framework, It is contained in the second screen pack in the framework, the first sponge block above second screen pack, the press device Catch bar including electric cylinders, below the electric cylinders, the push pedal below the catch bar, positioned at described catch bar or so The third baffle of both sides, the 3rd support on the left of the electric cylinders, the first bracing wire being arranged in the push pedal, the water tank Device include water tank, the second support below the water tank, the first pipeline on the left of the water tank, positioned at described the The second fix bar above one pipeline, the cover plate above the water tank, the gripper rings above the cover plate, described Two casing devices include the second housing, the second pipe above second housing, are arranged on the second pipe 3rd valve, the 3rd fix bar on the left of the second pipe, the discharge pipe on the left of second housing, it is arranged at Blower fan, the 4th valve on the discharge pipe, the 3rd pipeline on the right side of second housing, it is arranged at the 3rd pipeline On the 5th valve, the desiccation apparatus include second baffle, the movable plate on the right side of the second baffle, positioned at it is described move Second spring below dynamic plate, the second sponge block above the movable plate, the second bracing wire, on second housing 4th fix bar of side, the 3rd roller, the electricity on the left of the 4th fix bar for being arranged at the 4th fix bar upper end Machine, the output shaft being arranged on the motor, second filter include dividing plate, the montant on the right side of the dividing plate, It is arranged at the contiguous block of the montant upper end, the 3rd screen pack above the contiguous block, on the left of the montant 3rd spring, the transverse slat on the left of the dividing plate, the 4th screen pack above the transverse slat, below the transverse slat Collection center.
2. the combustible gas wet purification equipment of new energy field as claimed in claim 1, it is characterised in that:First housing It is provided with the first through hole positioned at its lower surface, the second through hole, the third through-hole on surface disposed thereon, position positioned at its left surface In the fourth hole of its lower surface, the right-hand member of the air inlet pipe be aligned second through hole and with the left surface of first housing It is fixedly connected, the upper end of the drainpipe is directed at the fourth hole and is fixedly connected with the lower surface of first housing.
3. the combustible gas wet purification equipment of new energy field as claimed in claim 2, it is characterised in that:First filtering Net is contained in the first shell body, the inner surface sliding contact of first screen pack and first housing, described first The right surface of screen pack act against on the left surface of the first baffle and with its sliding contact, the lower end of first spring with The inner surface of first housing is fixedly connected, and the upper end of first spring is fixedly connected with first screen pack, described First support is L-shaped, and the upper end of the first support is fixedly connected with the inner surface of first housing, the first support Lower end is provided with the first groove, and first roller is contained in first groove and, institute pivotally connected with the first support The second roller is stated to be contained in first groove and, the first baffle and described first pivotally connected with the first support The inner surface of housing is fixedly connected, and the upper end of the first baffle is provided with the second groove.
4. the combustible gas wet purification equipment of new energy field as claimed in claim 3, it is characterised in that:Under the framework End is directed at the third through-hole and is fixedly connected with the upper surface of first housing, and the framework covers the third through-hole, The right surface of the framework is provided with fifth hole, and the side of second screen pack is fixedly connected with the inner surface of the framework, The lower surface of first sponge block is fixedly connected with the upper surface of second screen pack, the side of first sponge block with The inner surface of the framework fixes sliding contact.
5. the combustible gas wet purification equipment of new energy field as claimed in claim 4, it is characterised in that:The catch bar Upper end is connected with the electric cylinders, the catch bar through the framework surfaces externally and internally and with its sliding contact, the catch bar Lower end be fixedly connected with the upper surface of the push pedal, the side of the push pedal and the inner surface sliding contact of the framework, institute The lower end for stating third baffle is fixedly connected with the upper surface of the push pedal, the side of the third baffle and the interior table of the framework Face sliding contact, the lower end of the 3rd support is fixedly connected with the framework, upper end and the electric cylinders of the 3rd support It is fixedly connected, the upper end of first bracing wire is fixedly connected with the push pedal, first bracing wire runs through first sponge block And second screen pack upper and lower surface and with its sliding contact, the lower end of first bracing wire and first screen pack, which are fixed, to be connected Connect, described first is drawstring through first groove and acts against the lower section of second roller and the top of the first roller.
6. the combustible gas wet purification equipment of new energy field as claimed in claim 5, it is characterised in that:Set on the water tank Have the 6th through hole positioned at its left surface, the right-hand member of first pipeline be aligned the 6th through hole and with the left-handed watch of the water tank Face is fixedly connected, and the left end of first pipeline is directed at the fifth hole and is fixedly connected with the right surface of the framework.
7. the combustible gas wet purification equipment of new energy field as claimed in claim 6, it is characterised in that:Second housing It is provided with the first circular hole, the second circular hole positioned at its right surface, the 3rd circular hole on surface disposed thereon, institute positioned at its left surface State the 3rd circular hole described in the lower end aligned of second pipe and be fixedly connected with the upper surface of second housing, the second pipe Upper end be directed at the first through hole and be fixedly connected with the lower surface of first housing, the right-hand member alignment institute of the discharge pipe State the first circular hole and be fixedly connected with the left surface of second housing, the left end of the 3rd pipeline is directed at second circular hole And be fixedly connected with the right surface of second housing.
8. the combustible gas wet purification equipment of new energy field as claimed in claim 7, it is characterised in that:The second baffle It is fixedly connected with the inner surface of second housing, the lower end of the second baffle is provided with the 3rd groove, a left side for the movable plate End act against on the right surface of the second baffle and with its sliding contact, the right-hand member of the movable plate acts against the second housing On inner surface and with its sliding contact, the lower end of the second spring is fixedly connected with the inner surface of second housing, described The upper end of second spring is fixedly connected with the movable plate, the lower surface of second sponge block and the upper surface of the movable plate It is fixedly connected, the left surface and the right side of the second baffle of second sponge block are slidably contacted the surfaces, second sponge block Right surface act against on the inner surface of second housing and with its sliding contact, the lower end of the 4th fix bar with it is described The upper surface of second housing is fixedly connected, and the upper end of the 4th fix bar is provided with the 4th groove, and the 3rd roller is contained in It is in 4th groove and pivotally connected with the 4th fix bar, the upper table of the lower surface of the motor and second housing Face is fixedly connected, and the output shaft is in cylinder, one end of the output shaft and the motor connection, under second bracing wire End is fixedly connected with the movable plate, and second bracing wire, which runs through the upper and lower surface of second sponge block and slided with it, to be connect Touch, second bracing wire through second housing surfaces externally and internally and with its sliding contact, second bracing wire acts against institute State on the 3rd roller, second bracing wire is fixedly connected with the output shaft.
9. the combustible gas wet purification equipment of new energy field as claimed in claim 8, it is characterised in that:The dividing plate and institute The inner surface for stating the second housing is fixedly connected, and the upper end of the dividing plate is provided with the 5th groove, the lower end of the montant and described the The inner surface of two housings is fixedly connected, and the upper end of the montant is provided with the 6th groove, and it is recessed that the contiguous block is contained in the described 6th In groove and pivotally connected with the montant, the upper end of the contiguous block is fixedly connected with the 3rd screen pack, the 3rd mistake The left end of filter screen is acted against on the right surface of the dividing plate, and the right-hand member of the 3rd screen pack acts against a left side for the second baffle On surface, the lower end of the 3rd spring is fixedly connected with the inner surface of second housing, the upper end of the 3rd spring with 3rd screen pack is fixedly connected, and the left end of the transverse slat is fixedly connected with the inner surface of second housing, the transverse slat Right-hand member be fixedly connected with the left surface of the dividing plate, the transverse slat is located at the lower section of the 5th groove, sets on the transverse slat There is the 5th circular hole through its upper and lower surface, the lower end of the 4th screen pack is fixedly connected with the transverse slat, the 4th mistake The upper end of filter screen is fixedly connected with the inner surface of second housing, and the 4th screen pack is located at the right side of the 5th circular hole Side, the upper end of the collection center is directed at the 5th circular hole and is fixedly connected with the lower surface of the transverse slat, the collection center Lower surface is fixedly connected with the inner surface of second housing, and the left surface of the collection center is provided with some 6th circular holes.
CN201710374099.5A 2017-05-24 2017-05-24 A kind of combustible gas wet purification equipment of new energy field Pending CN107008097A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710374099.5A CN107008097A (en) 2017-05-24 2017-05-24 A kind of combustible gas wet purification equipment of new energy field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710374099.5A CN107008097A (en) 2017-05-24 2017-05-24 A kind of combustible gas wet purification equipment of new energy field

Publications (1)

Publication Number Publication Date
CN107008097A true CN107008097A (en) 2017-08-04

Family

ID=59452587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710374099.5A Pending CN107008097A (en) 2017-05-24 2017-05-24 A kind of combustible gas wet purification equipment of new energy field

Country Status (1)

Country Link
CN (1) CN107008097A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109107370A (en) * 2018-09-06 2019-01-01 马骏 A kind of new and effective fume treatment desulphurization plant of environmental protection
CN109925848A (en) * 2019-04-10 2019-06-25 青岛明珠钢结构有限公司 A kind of steel member spraying pernicious gas collection and processing equipment
CN111821815A (en) * 2020-06-28 2020-10-27 杭州新安江工业泵有限公司 Waste gas treatment system
CN113877416A (en) * 2021-10-28 2022-01-04 浙江天翔环保设备有限公司 Boiler flue gas desulfurization and denitrification device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2577967Y (en) * 2002-09-25 2003-10-08 高国纯 Wet gas electric dust remover
KR200459674Y1 (en) * 2010-05-13 2012-04-06 한국원자력연구원 A purifying ventilator of air being contaminated by tritiated water vapor
RU138469U1 (en) * 2012-09-03 2014-03-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Юго-Западный государственный университет" (ЮЗГУ) FILTER FOR CLEANING THE AIR
CN104841232A (en) * 2015-05-23 2015-08-19 王杨 Air purifier with cleaning function
CN105674440A (en) * 2016-01-21 2016-06-15 金思思 Indoor air purification system
CN205360947U (en) * 2016-01-25 2016-07-06 苏州普绿法环保科技有限公司 Water dust scrubber
CN106178797A (en) * 2016-09-06 2016-12-07 成都秉德科技有限公司 A kind of boiler waste gas purification filtration system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2577967Y (en) * 2002-09-25 2003-10-08 高国纯 Wet gas electric dust remover
KR200459674Y1 (en) * 2010-05-13 2012-04-06 한국원자력연구원 A purifying ventilator of air being contaminated by tritiated water vapor
RU138469U1 (en) * 2012-09-03 2014-03-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Юго-Западный государственный университет" (ЮЗГУ) FILTER FOR CLEANING THE AIR
CN104841232A (en) * 2015-05-23 2015-08-19 王杨 Air purifier with cleaning function
CN105674440A (en) * 2016-01-21 2016-06-15 金思思 Indoor air purification system
CN205360947U (en) * 2016-01-25 2016-07-06 苏州普绿法环保科技有限公司 Water dust scrubber
CN106178797A (en) * 2016-09-06 2016-12-07 成都秉德科技有限公司 A kind of boiler waste gas purification filtration system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109107370A (en) * 2018-09-06 2019-01-01 马骏 A kind of new and effective fume treatment desulphurization plant of environmental protection
CN109925848A (en) * 2019-04-10 2019-06-25 青岛明珠钢结构有限公司 A kind of steel member spraying pernicious gas collection and processing equipment
CN111821815A (en) * 2020-06-28 2020-10-27 杭州新安江工业泵有限公司 Waste gas treatment system
CN113877416A (en) * 2021-10-28 2022-01-04 浙江天翔环保设备有限公司 Boiler flue gas desulfurization and denitrification device

Similar Documents

Publication Publication Date Title
CN107008097A (en) A kind of combustible gas wet purification equipment of new energy field
CN105771444B (en) A kind of efficient flue gas dust collecting system
CN209754770U (en) Burr clearing device for square tube machining
CN107398126A (en) A kind of dedusting dust-collecting equipment of bitumen flue gas processing
CN107019984A (en) A kind of shoemaking workshop multi-staged air cleaning system of high-efficiency environment friendly
CN106902606B (en) A kind of environment-friendly type haze purification system to economize on resources
CN106975313A (en) A kind of haze fine particle cleaning equipment
CN106746454B (en) Efficient municipal sludge dewatering treatment facility
CN206935003U (en) A kind of environmentally friendly chemical workshop air cleaner
CN107854913A (en) A kind of environmentally friendly waste gas purification impurity removing equipment
CN106621676A (en) Environment-friendly dust removing equipment for mechanical automation processing workshop
CN106606913A (en) Dust purification equipment for furniture and building material production
CN212881754U (en) Take waste gas speed control's industrial waste gas treatment device
CN111871090B (en) Environment-friendly smoke and dust purification treatment auxiliary assembly
CN106969606A (en) A kind of environmentally friendly energy-saving dehumidification equipment
CN206454444U (en) A kind of environmentally friendly flue-gas purification treatment device
CN207957951U (en) A kind of efficient sewage-treatment plant
CN207786291U (en) A kind of efficient low-temperature plasma emission-control equipment
CN206867887U (en) A kind of environmentally friendly building engineering construction air cleaning facility
CN207171753U (en) A kind of substrate pretreatment system for aluminium base production
CN206980383U (en) A kind of haze fine particle cleaning equipment
CN207012713U (en) A kind of air dust falling device of saving water resource
CN208082167U (en) A kind of plasma exhaust gas removing other fungus and purifying device
CN107008078A (en) A kind of environmentally friendly building engineering construction air cleaning facility
CN107096328A (en) A kind of environmentally friendly industrial dust processing equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804

RJ01 Rejection of invention patent application after publication