CN106989410A - A kind of waste heat boiler water-cooling wall installs positioning apparatus and installation method - Google Patents
A kind of waste heat boiler water-cooling wall installs positioning apparatus and installation method Download PDFInfo
- Publication number
- CN106989410A CN106989410A CN201710166612.1A CN201710166612A CN106989410A CN 106989410 A CN106989410 A CN 106989410A CN 201710166612 A CN201710166612 A CN 201710166612A CN 106989410 A CN106989410 A CN 106989410A
- Authority
- CN
- China
- Prior art keywords
- cooling wall
- water
- waste heat
- heat boiler
- positioning apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23M—CASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
- F23M5/00—Casings; Linings; Walls
- F23M5/08—Cooling thereof; Tube walls
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/28—Other constructional details
- B66D1/30—Rope, cable, or chain drums or barrels
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- General Engineering & Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Positioning apparatus and installation method are installed the present invention relates to a kind of waste heat boiler water-cooling wall, including roller and base, wherein the base is rectangular frame structure, the base upper end is respectively arranged on the left side and the right side support, the roller is arranged on base by support, and method includes:(a) some waste heat boiler water-cooling walls are made and positioning apparatus is installed;(b) and then by the device of manufacture in step (a) it is fixed on the steel construction of water-cooling wall erection;(c) channel steel cross beam on the outside of water-cooling wall is placed on above roller;(d) after water-cooling wall reaches design attitude, positioning apparatus both sides are installed in waste heat boiler water-cooling wall jack is set respectively, then waste heat boiler water-cooling wall installation positioning apparatus is withdrawn to water-cooling wall jack-up from the two ends of water-cooling wall by jack.The present invention makes easy, simple to operate, installs in place compared to traditional many hook block dresses of utilization, improves efficiency of construction, while reducing the machine-team number of lifting machine, reduce Construction Cost.
Description
Technical field
The invention belongs to waste heat boiler water-cooling wall mounting technique field, more particularly to a kind of waste heat boiler water-cooling wall is installed just
Position device and installation method.
Background technology
In waste heat boiler water-cooling wall hoisting process, hoist lifting hook is influenceed by factory building top, steel construction etc., it is difficult to one
Hook is in place, and, it is necessary to adjust water-cooling wall position again, the method for adjustment directly drawn under normal circumstances easily causes device damage,
It is simultaneously also time-consuming, laborious, influence construction quality and progress.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of waste heat boiler water-cooling wall and install positioning apparatus and side in place
Method, when solving waste heat boiler water-cooling wall by the present apparatus and installing in place, is limited by mounting condition and is difficult to one and is hooked to position, and effectively
Inefficiency in water-cooling wall installation process is solved, the problem of wasting mechanical one-shift.
The technical solution adopted for the present invention to solve the technical problems is:A kind of waste heat boiler water-cooling wall is provided and installs in place
Device, including roller and base, wherein the base is rectangular frame structure, the base upper end is respectively arranged on the left side and the right side
Support, the roller is arranged on base by support.
The further technical characteristic of the present invention is that the base is the rectangular frame knot being welded to form by four angle steel
Structure.
The further technical characteristic of the present invention is that the support includes support diagonal brace and vertical support, the vertical branch
In the middle of in support setting chassis side, the support diagonal brace is arranged on vertical support both sides, two ends and supported and base with vertical respectively
Connection.
The further technical characteristic of the present invention is that the vertical support is with base by being welded to connect, and the support is oblique
Support is with vertical support and base respectively by being welded to connect.
The further technical characteristic of the present invention is that the roller is connected with support by bearing pin, and roller can be around pin
Axle is rotated.
A kind of waste heat boiler water-cooling wall installs installation method, including following steps:
(a) some above-mentioned waste heat boiler water-cooling walls are made positioning apparatus is installed;
(b) and then by the device of manufacture in step (a) it is fixed on the steel construction of water-cooling wall erection;
(c) water-cooling wall is sling by Lifting implementses, the channel steel cross beam on the outside of water-cooling wall is placed on above roller, in water cooling
The adjustment direction of wall and the back side hang chain block, pull water-cooling wall is mobile on roller to be set until reaching by chain block
Count position;
(d) after water-cooling wall reaches design attitude, positioning apparatus both sides is installed in waste heat boiler water-cooling wall and set thousand respectively
Then jin top, removed waste heat boiler water-cooling wall installation positioning apparatus water-cooling wall jack-up from the two ends of water-cooling wall by jack
Go out;
(e) roller under the channel-section steel on the outside of water-cooling wall is installed in place, finally jack is slowly put down, water-cooling wall is put
On roller;
(f) after water-cooling wall is in place, water-cooling wall is fixed.
The further technical characteristic of the present invention is that in the step (b), waste heat boiler water is determined according to the width of water-cooling wall
Cold wall installs the number of positioning apparatus.
Beneficial effect
The present invention has the following advantages that and good effect:
1st, the present invention makes easy, easy for installation, with strong points, simple to operate, compared to traditional many hook block dress peaces of utilization
Dress is in place, improves efficiency of construction, while reducing the machine-team number of lifting machine, reduces Construction Cost;
2nd, compared to directly pulling, equipment safety is effectively protected, the labor intensity of workman is also reduced;
3rd, the present apparatus and method can be reduced engineering cost, improve efficiency of construction, it is ensured that construction quality, be easy to push away
Extensively.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
Fig. 2 is the present invention and chain block water-cooling wall schematic diagram in place.
Fig. 3 is water-cooling wall side view in place.
Fig. 4 is to remove schematic diagram of the present invention using jack.
Embodiment
With reference to specific embodiment, the present invention is expanded on further.It should be understood that these embodiments are merely to illustrate the present invention
Rather than limitation the scope of the present invention.In addition, it is to be understood that after the content of the invention lectured has been read, people in the art
Member can make various changes or modifications to the present invention, and these equivalent form of values equally fall within the application appended claims and limited
Scope.
Embodiment 1
As shown in figure 1, a kind of waste heat boiler water-cooling wall installs positioning apparatus, including roller 1 and base 4, wherein the bottom
Seat 4 is rectangular frame structure, and the upper end of base 4 is respectively arranged on the left side and the right side support 5, and the roller 1 is installed by support 5
On base 4.
The base 4 is the rectangular frame structure being welded to form by four angle steel.
The support 5 includes support diagonal brace 2 and vertical support 3, and the vertical support 3 is set in the middle of in the side of base 4, institute
State support diagonal brace 2 and be arranged on 3 both sides of vertical support, two ends and be connected respectively with vertical support 3 and base 4, the vertical support 3 with
Base 4 is by being welded to connect, and the support diagonal brace 2 is with vertical support 3 and base 4 respectively by being welded to connect.
The roller 1 is connected with support 5 by bearing pin, and roller 1 can be rotated around bearing pin.
As shown in Figure 1 to Figure 3, a kind of waste heat boiler water-cooling wall installs installation method, including following steps:
1st, some above-mentioned waste heat boiler water-cooling walls are made positioning apparatus is installed;
2 and then the device of manufacture in step (a) is fixed on the steel construction 6 of water-cooling wall erection, according to the width of water-cooling wall
Degree determines that waste heat boiler water-cooling wall installs the number of positioning apparatus;
3rd, water-cooling wall 10 is sling by Lifting implementses, the crossbeam of channel-section steel 7 in the outside of water-cooling wall 10 is placed on above roller,
The adjustment direction of water-cooling wall and the back side hang chain block 8, by chain block 8 pull water-cooling wall on roller it is mobile until
Reach design attitude;
4th, after water-cooling wall reaches design attitude, positioning apparatus both sides is installed in waste heat boiler water-cooling wall and set very heavy respectively
Then top 9, dress in place is installed by jack 9 by the jack-up of water-cooling wall 10 from the two ends of water-cooling wall 10 by waste heat boiler water-cooling wall
Put and withdraw from;
5th, the roller under the channel-section steel 7 in the outside of water-cooling wall 10 is installed in place, finally slowly put down jack, by water-cooling wall
10 are placed on above roller;
6th, after water-cooling wall 10 is in place, water-cooling wall 10 is fixed.
Auxiliary roller devices in place and method in the present invention can make water-cooling wall smoothly in place, first be fixed on device
On corresponding steel construction, then the channel steel cross beam of water-cooling wall is placed on above roller, adjusts in place by chain block, so as to solve
Certainly under restricted clearance, the problem of water-cooling wall lifting one hook difficulty in place is big.
Claims (7)
1. a kind of waste heat boiler water-cooling wall installs positioning apparatus, including roller (1) and base (4), it is characterised in that:The base
(4) it is rectangular frame structure, base (4) upper end is respectively arranged on the left side and the right side support (5), the roller (1) passes through branch
Frame (5) is arranged on base (4).
2. a kind of waste heat boiler water-cooling wall according to claim 1 installs positioning apparatus, it is characterised in that:The base
(4) the rectangular frame structure to be welded to form by four angle steel.
3. a kind of waste heat boiler water-cooling wall according to claim 1 installs positioning apparatus, it is characterised in that:The support
(5) support diagonal brace (2) and vertical support (3) are included, the vertical support (3) is set in the middle of in base (4) side, the support
Diagonal brace (2) is arranged on vertical support (3) both sides, two ends and is connected respectively with vertical support (3) and base (4).
4. a kind of waste heat boiler water-cooling wall according to claim 3 installs positioning apparatus, it is characterised in that:The vertical branch
(3) are supportted with base (4) by being welded to connect, the support diagonal brace (2) passes through welding respectively with vertical support (3) and base (4)
Connection.
5. a kind of waste heat boiler water-cooling wall according to claim 1 installs positioning apparatus, it is characterised in that:The roller
(1) it is connected with support (5) by bearing pin, and roller (1) can be rotated around bearing pin.
6. a kind of waste heat boiler water-cooling wall installs installation method, it is characterised in that:Comprise the following steps:
1st, some above-mentioned waste heat boiler water-cooling walls are made positioning apparatus is installed;
2 and then the device of manufacture in step (a) is fixed on the steel construction (6) of water-cooling wall erection;
3rd, water-cooling wall (10) is sling by Lifting implementses, channel-section steel (7) crossbeam on the outside of water-cooling wall (10) is placed on above roller,
Chain block (8) is hung at the adjustment direction of water-cooling wall and the back side, pulls water-cooling wall to be moved up in roller by chain block (8)
Move until reaching design attitude;
4th, after water-cooling wall reaches design attitude, positioning apparatus both sides are installed in waste heat boiler water-cooling wall jack is set respectively
(9), by jack (9) from the two ends of water-cooling wall (10) by water-cooling wall (10) jack-up, then waste heat boiler water-cooling wall is installed
Positioning apparatus is withdrawn from;
5th, the roller under the channel-section steel (7) on the outside of water-cooling wall (10) is installed in place, finally slowly put down jack, by water-cooling wall
(10) it is placed on above roller;
6th, it is after water-cooling wall (10) is in place, water-cooling wall (10) is fixed.
7. a kind of waste heat boiler water-cooling wall according to claim 6 installs installation method, it is characterised in that:The step
(b) in, determine that waste heat boiler water-cooling wall installs the number of positioning apparatus according to the width of water-cooling wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710166612.1A CN106989410B (en) | 2017-03-20 | 2017-03-20 | A kind of waste heat boiler water-cooling wall installation positioning apparatus and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710166612.1A CN106989410B (en) | 2017-03-20 | 2017-03-20 | A kind of waste heat boiler water-cooling wall installation positioning apparatus and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106989410A true CN106989410A (en) | 2017-07-28 |
CN106989410B CN106989410B (en) | 2019-03-19 |
Family
ID=59412086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710166612.1A Active CN106989410B (en) | 2017-03-20 | 2017-03-20 | A kind of waste heat boiler water-cooling wall installation positioning apparatus and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106989410B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2317939C1 (en) * | 2006-09-06 | 2008-02-27 | Закрытое акционерное общество "Научно-исследовательский и конструкторский институт центробежных и роторных компрессоров им. В.Б. Шнеппа" | Device for equipment positioning |
CN103383104A (en) * | 2013-07-03 | 2013-11-06 | 天津二十冶建设有限公司 | Hoisting installation method for quickly mounting economizer and super heater |
CN203336186U (en) * | 2013-04-03 | 2013-12-11 | 中国一冶集团有限公司 | Sliding supporting device |
CN203638529U (en) * | 2014-01-03 | 2014-06-11 | 山东齐鲁石化建设有限公司 | Overall replacing and using tool for horizontal coolers |
CN203845782U (en) * | 2014-05-26 | 2014-09-24 | 中海石油深海开发有限公司 | Device for dragging marine oil module in place |
CN106322347A (en) * | 2016-08-22 | 2017-01-11 | 上海二十冶建设有限公司 | Construction method for enabling water-cooling walls of refuse incineration power generation waste heat boiler to integrally penetrate from top |
-
2017
- 2017-03-20 CN CN201710166612.1A patent/CN106989410B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2317939C1 (en) * | 2006-09-06 | 2008-02-27 | Закрытое акционерное общество "Научно-исследовательский и конструкторский институт центробежных и роторных компрессоров им. В.Б. Шнеппа" | Device for equipment positioning |
CN203336186U (en) * | 2013-04-03 | 2013-12-11 | 中国一冶集团有限公司 | Sliding supporting device |
CN103383104A (en) * | 2013-07-03 | 2013-11-06 | 天津二十冶建设有限公司 | Hoisting installation method for quickly mounting economizer and super heater |
CN203638529U (en) * | 2014-01-03 | 2014-06-11 | 山东齐鲁石化建设有限公司 | Overall replacing and using tool for horizontal coolers |
CN203845782U (en) * | 2014-05-26 | 2014-09-24 | 中海石油深海开发有限公司 | Device for dragging marine oil module in place |
CN106322347A (en) * | 2016-08-22 | 2017-01-11 | 上海二十冶建设有限公司 | Construction method for enabling water-cooling walls of refuse incineration power generation waste heat boiler to integrally penetrate from top |
Also Published As
Publication number | Publication date |
---|---|
CN106989410B (en) | 2019-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480930B (en) | A kind of filling pile cage of reinforcement hangs fixing construction method | |
CN209179535U (en) | Basement reinforces support construction | |
CN105569242A (en) | Assembling method for composite floor slabs | |
CN109081247A (en) | A kind of hanging method of vestibule large-span steel girder | |
CN105019664A (en) | High-altitude slipping installation method for compartment-type electric room | |
CN203359755U (en) | Assembly and lifting integrated device for anode plate | |
CN212599995U (en) | Welding installation equipment for hot-melt welded pipe | |
CN106989410A (en) | A kind of waste heat boiler water-cooling wall installs positioning apparatus and installation method | |
CN101450766A (en) | Lifting installation method for ultralong workpiece and used fixture cross beam | |
CN209906232U (en) | Building template lifting device and cross-floor transportation system comprising same | |
CN209906186U (en) | Building template cross-floor transportation equipment | |
CN210289075U (en) | Adjustable elevator shaft operating platform system that can have enough to meet need | |
CN202689494U (en) | Elevator shaft template support | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube | |
CN106013819A (en) | Hoisting system and method for hoisting prefabricated exterior wall cladding based on overhead hooking exchange | |
CN112908624A (en) | Transformer replacing method and device | |
CN217458427U (en) | Cooler head combination hoist | |
JP2000255990A (en) | Supporting apparatus for heavy object | |
CN216430870U (en) | Comprehensive support and hanger system | |
CN211775617U (en) | Elevator shaft construction operation platform | |
CN104444810A (en) | Large plate turning construction method | |
CN220186028U (en) | Pipeline lifting and temporary supporting device | |
CN205077876U (en) | Machine and stressing jack linkage are worn to restraint by prestress wire | |
CN216662224U (en) | Lifting appliance manhole matching device convenient for automatic unhooking | |
CN110127537B (en) | Building template lifting device, cross-floor conveying system comprising building template lifting device and conveying method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |