CN106988681A - A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well - Google Patents

A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well Download PDF

Info

Publication number
CN106988681A
CN106988681A CN201710435276.6A CN201710435276A CN106988681A CN 106988681 A CN106988681 A CN 106988681A CN 201710435276 A CN201710435276 A CN 201710435276A CN 106988681 A CN106988681 A CN 106988681A
Authority
CN
China
Prior art keywords
well
horizontal
mixed phase
section
hot fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710435276.6A
Other languages
Chinese (zh)
Other versions
CN106988681B (en
Inventor
曹广胜
袁鹏飞
张晓丽
李新
张志群
宋鑫
白玉杰
高超
王培龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Kuangcai Technology Co.,Ltd.
Original Assignee
Daqing Dongyou Ruijia Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Dongyou Ruijia Petroleum Technology Co Ltd filed Critical Daqing Dongyou Ruijia Petroleum Technology Co Ltd
Priority to CN201710435276.6A priority Critical patent/CN106988681B/en
Publication of CN106988681A publication Critical patent/CN106988681A/en
Application granted granted Critical
Publication of CN106988681B publication Critical patent/CN106988681B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/18Drilling by liquid or gas jets, with or without entrained pellets

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well, is related to oil and gas production, and completion belongs to field of petroleum exploitation.The technique includes:In oilfield drilling; reaming bit formation bottom reaming section is changed during 50 300 meters away from target oil reservoir of drill bit; straight well section is drilled complete rear tripping in sleeve pipe and adds grout off layer; the plugged zone is cement and montmorillonite mixture; after after grout off layer solidification; continue to pierce net horizontal section and carry out perforation completion operation, take staged perforation, and add injection protective layer in straight well section and horizontal segment connecting place;The present invention can effectively prevent from noting the injury that high-temperature steam causes grout off layer and pit shaft when mixed phase hot fluid recovers the oil, extend the service life of pit shaft by arranging grout off layer in underground;Net horizontal section takes staged perforation, can be more uniformly distributed the mixed phase hot fluid branch in injection oil reservoir, reduces the probability for occurring has channeling.

Description

A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well
Technical field
Oil and gas is produced, completion, belongs to field of petroleum exploitation.
Background technology
The exploitation of current heavy crude reservoir is basic based on thermal recovery, mainly has steam soak, steam to drive, combustion in situ skill Art, the spontaneous mixed phase hot fluid oil recovery technique of downhole electric heating technology and underground.
The spontaneous mixed phase hot fluid oil recovery technique cardinal principle in underground is:Bottom, oil reservoir top arrangement well are injected in oil field Lower mixed phase heated fluid generator, its supporting feed system in ground configuration;Occur by feed system to underground mixed phase hot fluid Device provides oxidant, fuel and water, mixed phase burning generation high-temperature steam and carbon dioxide is formed in underground, and inject oil reservoir therewith Carbon dioxide and high-temperature steam in the middle carry out displacement of reservoir oil, mixed phase hot fluid can be modified to crude oil, reduce crude oil in heavy, Colloid, the content of asphalitine, play a part of reduction viscosity of crude, increase its mobility, make it easier for being plucked out of.
Flue gas and high-temperature steam mixture that mixed phase hot fluid generates for burning, in oil displacement process high temperature mixed phase hot-fluid Know from experience the grout off layer between contact sleeve pipe and oil reservoir, Long Term Contact can cause irreversible damage to grout off layer, make Has channeling occurs between packaged tube and stratum, serious can seeing from ground emits vapour, therefore to being drilled well and cementing technology It is required that higher.
During horizontal well gas-injection, due to the anisotropism on stratum, has channeling easily occurs for gas injection process, forms invalid gas circulation, Cost for oil production has been significantly greatly increased;When horizontal well injects high temperature fluid, easy aging, burn into perforation, cause well workover at horizontal well heel Number of times increase, injection fluid sweep area are uneven, significantly increase cost for oil production.
In view of the above-mentioned problems, the present invention provides a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well, keep away Exempt from occur has channeling between sleeve pipe and stratum during mixed phase hot fluid displacement, increase the service life of pit shaft;By adding injection protection Layer can reduce aging at horizontal well heel, the probability of burn into perforation;Horizontal segment gas injection is more uniformly distributed by staged perforation, Reduce horizontal segment has channeling probability.
The content of the invention
The embodiment of the present invention provides a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well, the technique bag Include:In oilfield drilling, reaming bit is changed during 50-300 meters away from target oil reservoir of drill bit, continues to pierce by reaming bit Form oil reservoir reaming section top 50-300 meter high, tripping in sleeve pipe and in sleeve pipe and stratum in the wellbore after straight well section drilling well is finished Between reaming section add grout off layer, after grout off layer solidification after, continue to pierce net horizontal section, net horizontal section drilling well is complete Perforation completion operation is carried out after finishing, perforating modes take staged perforation, and in the straight well section and horizontal segment connecting place of horizontal well Add injection protective layer.
The reaming section mineshaft diameter increases 20-80 centimetres with respect to the non-reaming mineshaft diameter in its top, so that cement is sealed Blocking layer diameter increase, to reach enhancing seal-off effect, stability action.
The plugged zone is cement and montmorillonite mixture, and montmorillonite mass ratio is that 5-10% remaining composition is cement, institute E, F grades are stated in cement selection API classifications.
The montmorillonite particle size range is 0.01-0.1 millimeters, and 0.01-0.1 millimeters of particle diameter montmorillonites effectively can uniformly divide In portion and cement, and montmorillonite has the characteristic of water swelling, when injecting mixed phase hot fluid, if the steaming in mixed phase hot fluid Vapour enters inside plugged zone through cement, and montmorillonite can effectively absorb steam and expand, to block follow-up steam to permeate, and After the montmorillonite of 0.01-0.1 millimeters of particle diameters, plugged zone will not be caused harm.
The staged perforation is specially horizontal segment perforation completion, and it is isometric four that horizontal segment is punished from tiptoe to heel Section, and the ratio between four sections of shot densities are 4:3:2:1, shot density is 10-60 holes/rice, by staged perforating modes, can make note Horizontal segment air-breathing is more uniformly distributed during gas, it is to avoid cause has channeling, and specific shot density can be fitted according to stratum actual conditions Work as adjustment.
The injection protective layer is that the smooth high temperature resistant stainless steel body in surface is constituted, and 5-10 millimeters of thickness, 5-30 meters of length rises Sleeve pipe is not by mixed phase hot fluid corrosiveness to level of protection well heel.
The beneficial effect of the embodiment of the present invention is:1) present invention process by reaming section is formed in underground and in sleeve pipe and Add grout off layer in the middle of stratum, it is more firm that reaming section grout off layer compares traditional well completion cement plugged zone, closure effect Fruit is more notable;2) high-temperature steam is to water when can effectively prevent that note mixed phase hot fluid from recovering the oil using the characteristic of montmorillonite The injury that mudding blocking layer and pit shaft are caused, extends the service life of pit shaft;3) by adding injection protective layer in artificial bottom of a well, subtract Corrosion during note mixed phase hot fluid to shaft bottom, extends pit shaft service life less;4) net horizontal section takes staged perforation, can be effective Has channeling is avoided, the mixed phase hot fluid branch in injection oil reservoir is more uniformly distributed.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those skilled in the art, it can also be obtained on the premise of not paying creative work according to these accompanying drawings other attached Figure.
Fig. 1 is a kind of well-completing process underground schematic diagram of the spontaneous mixed phase hot fluid oil production method of horizontal well.
Fig. 2 is horizontal segment staged perforation schematic diagram.
Fig. 3-5 is horizontal-well network arrangement schematic diagram.
Drawing reference numeral:1st, sleeve pipe 2, horizontal well straight well section 3, oil reservoir 4, horizontal well horizontal segment 5, reaming section 6, cement Plugged zone 7, injection protective layer 8, first level section the 9, second horizontal segment 10, the 3rd horizontal segment, 11 the 4th horizontal segments 12, Horizontal segment perforation 13, horizontal injection well 14, horizontal production well.
Embodiment
The embodiment of the present invention provides a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well, the technique bag Include:In drillng operation, reaming bit is changed during 50-300 meters away from target oil reservoir of drill bit, continues to pierce by reaming bit to be formed Oil reservoir top reaming section 50-300 meters high, tripping in sleeve pipe and between sleeve pipe and stratum in the wellbore after straight well section drilling well is finished Reaming section add grout off layer, after grout off layer solidification after, continue to pierce net horizontal section, after net horizontal section drilling well is finished Perforation completion operation is carried out, perforating modes take staged perforation, and are added in the straight well section and horizontal segment connecting place of horizontal well Spray protective layer.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on this Embodiment in invention, the every other reality that those of ordinary skill in the art are obtained under the premise of creative work is not made Example is applied, the scope of protection of the invention is belonged to.
The embodiments of the invention provide a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well, the technique Comprise the following steps:
Step one:As shown in figure 1, during drillng operation, reaming bit is changed during 50-300 meters away from target oil reservoir of drill bit, is passed through Reaming bit continues to pierce to form the reaming section 5 top 50-300 meters high of oil reservoir 3, the non-reaming pit shaft in its relative top of reaming section 5 Diameter amplification adds 20-80 centimetres.
Step 2:Tripping in sleeve pipe 1 and the reaming section 5 between sleeve pipe 1 and stratum in the wellbore after straight well 2 drilling wells of section are finished Add grout off layer 6, grout off layer 6 is cement and montmorillonite mixture, montmorillonite mass ratio be 5-10% remaining Composition is cement, and E, F grades in the cement selection API classifications, the montmorillonite particle diameter is 0.01-0.1 millimeters.
Step 3:After after grout off layer solidification, continue to pierce net horizontal section 4, the drilling well of net horizontal section 4 is penetrated after finishing Hole completion practice, perforating modes take staged perforation, as shown in Fig. 2 staged perforation be specially by horizontal segment from tiptoe It is isometric four sections to heel punishment, and the ratio between four sections of shot densities are 4:3:2:1, shot density is 10-60 holes/rice.
Step 4:Injection protective layer 7 is added in the straight well section and horizontal segment connecting place of horizontal well, injection protective layer 7 is table The smooth high temperature resistant stainless steel body in face is constituted, 5-10 millimeters of thickness, 5-30 meters of length, play at level of protection well heel sleeve pipe not by Mixed phase hot fluid corrosiveness.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Embodiment 1:
One, certain oil field block, 2250 meters of reservoir depth, 10 meters of core intersection, the mpas of viscosity of crude 20000, well spacing side Formula horizontal-well network, as shown in figure 3, horizontal injection well is distributed in the same direction with horizontal production well, horizontal injection well horizontal segment is given birth to level Produce well horizontal segment to be distributed in transversion malposition, and be located at 300 meters of rear, level at horizontal production well heel at horizontal injection well heel Segment length is 1000 meters, 400-500 meters away from producing well of injection well, the present embodiment injection well away from 420 meters nearer of producing well, away from compared with 470 meters of remote producing well, the ton day of design injection mixed phase hot fluid 100, mixed phase hot fluid temperature is 300 degree.
Step one:During drillng operation, reaming bit is changed during 220 meters away from target oil reservoir of drill bit, is continued by reaming bit Pierce to form oil reservoir top reaming section 220 meters high, reaming section mineshaft diameter is with respect to the non-reaming mineshaft diameter increase by 50 in its top Centimetre.
Step 2:Tripping in sleeve pipe in the wellbore after straight well section drilling well is finished, sleeve pipe and reaming section arranged concentric, and in sleeve pipe It is that 7% remaining composition is cement that reaming section between stratum, which adds montmorillonite mass ratio in grout off layer, the plugged zone, F grades in cement selection API classifications, the montmorillonite particle diameter is 0.05 millimeter.
Step 3:After after grout off layer solidification, continue to pierce net horizontal section, net horizontal section drilling well carries out perforation after finishing Completion practice, perforating modes take staged perforation, and staged perforation is specially to punish horizontal segment for 4 to heel from tiptoe Section, as shown in Fig. 2 first level section shot density is 10 holes/rice, the second horizontal segment shot density is 20 holes/rice, the 3rd level Section shot density is 30 holes/rice, and the 4th horizontal segment shot density is 40 holes/rice.
Step 4:Injection protective layer is added in the straight well section and horizontal segment connecting place of horizontal well, injection protective layer material is High temperature resistant stainless steel, length is 5 meters, and thickness is 5 millimeters.
After the completion of completion practice, mixed phase heated fluid generator and flooding operation can be started under lower going-into-well into pit shaft.
Embodiment 2:
One, certain oil field block, 900 meters of reservoir depth, 12 meters of core intersection, the mpas of viscosity of crude 5600, hole pattern Horizontal-well network, as shown in figure 4, horizontal injection well is reversely distributed with horizontal production well, horizontal injection well horizontal segment is produced with level Well horizontal segment to it in being laterally distributed, and horizontal section length is 1100 meters, 500-600 meters away from producing well of injection well, the present embodiment note Enter 530 meters nearer of producing well of well spacing, away from 580 meters of producing well farther out.The ton day of design injection mixed phase hot fluid 140, mixed phase heat Fluid temperature (F.T.) is 140 degree.
Step one:During drillng operation, reaming bit is changed during 50 meters away from target oil reservoir of drill bit, passes through reaming bit and continues to bore Enter to be formed oil reservoir top reaming section 50 meters high, reaming section mineshaft diameter increases by 20 lis with respect to the non-reaming mineshaft diameter in its top Rice.
Step 2:Tripping in sleeve pipe in the wellbore after straight well section drilling well is finished, sleeve pipe and reaming section arranged concentric, and in sleeve pipe It is that 5% remaining composition is cement that reaming section between stratum, which adds montmorillonite mass ratio in grout off layer, the plugged zone, E grades in cement selection API classifications, the montmorillonite particle diameter is 0.1 millimeter.
Step 3:After after grout off layer solidification, continue to pierce net horizontal section, net horizontal section drilling well carries out perforation after finishing Completion practice, perforating modes take staged perforation, and staged perforation is specially to punish horizontal segment for 4 to heel from tiptoe Section, as shown in Fig. 2 first level section shot density is 15 holes/rice, the second horizontal segment shot density is 30 holes/rice, the 3rd level Section shot density is 45 holes/rice, and the 4th horizontal segment shot density is 60 holes/rice.
Step 4:Injection protective layer is added in the straight well section and horizontal segment connecting place of horizontal well, injection protective layer material is High temperature resistant stainless steel, length is 30 meters, and thickness is 7 millimeters.
After the completion of completion practice, mixed phase heated fluid generator and flooding operation can be started under lower going-into-well into pit shaft.
Embodiment 3:
One, certain oil field block, 3100 meters of reservoir depth, 30 meters of core intersection, the mpas of viscosity of crude 14500, well spacing side Formula horizontal-well network, as shown in figure 5, horizontal injection well is reversely distributed with horizontal production well, horizontal injection well horizontal segment is given birth to level Produce well horizontal segment in transversion malposition be distributed, and at horizontal injection well heel with horizontal production well tiptoe in front of 400 meters, horizontal segment Length is 1300 meters, 700-800 meters away from producing well of injection well, and the present embodiment injection well is away from 720 meters nearer of producing well, away from farther out 800 meters of producing well.The ton day of design injection mixed phase hot fluid 300, mixed phase hot fluid temperature is 240 degree.
The first step:During drillng operation, reaming bit is changed during 300 meters away from target oil reservoir of drill bit, is continued by reaming bit Pierce to form oil reservoir top reaming section 300 meters high, reaming section mineshaft diameter is with respect to the non-reaming mineshaft diameter increase by 80 in its top Centimetre.
Step 2:Tripping in sleeve pipe in the wellbore after straight well section drilling well is finished, sleeve pipe and reaming section arranged concentric, and in sleeve pipe It is that 10% remaining composition is water that reaming section between stratum, which adds montmorillonite mass ratio in grout off layer, the plugged zone, Mud, F grades in cement selection API classifications, the montmorillonite particle diameter is 0.01 millimeter.
Step 3:After after grout off layer solidification, continue to pierce net horizontal section, net horizontal section drilling well carries out perforation after finishing Completion practice, perforating modes take staged perforation, and staged perforation is specially to punish horizontal segment for 4 to heel from tiptoe Section, as shown in Fig. 2 first level section shot density is 12 holes/rice, the second horizontal segment shot density is 24 holes/rice, the 3rd level Section shot density is 36 holes/rice, and the 4th horizontal segment shot density is 48 holes/rice.
Step 4:Injection protective layer is added in the straight well section and horizontal segment connecting place of horizontal well, injection protective layer material is High temperature resistant stainless steel, length is 5 meters, and thickness is 10 millimeters.
After the completion of completion practice, mixed phase heated fluid generator and flooding operation can be started under lower going-into-well into pit shaft.

Claims (6)

1. a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well, it is characterised in that the technique includes:
In oilfield drilling, reaming bit is changed during 50-300 meters away from target oil reservoir of drill bit, passes through reaming bit and continues to bore Enter to be formed oil reservoir top reaming section 50-300 meters high, and;
Straight well section drilling well finish after in the wellbore tripping in sleeve pipe and between sleeve pipe and stratum reaming section add grout off layer, And;
After after grout off layer solidification, continue to pierce net horizontal section, and;
Net horizontal section drilling well carries out perforation completion operation after finishing, and perforating modes take staged perforation, and in the straight of horizontal well Well section and horizontal segment connecting place add injection protective layer.
2. a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well as claimed in claim 1, it is characterised in that institute State reaming section mineshaft diameter increases 20-80 centimetres with respect to the non-reaming mineshaft diameter in its top.
3. a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well as claimed in claim 1, it is characterised in that institute Plugged zone is stated for cement and montmorillonite mixture, montmorillonite mass ratio is that 5-10% remaining composition is cement, the cement selection E, F grades in API classifications.
4. a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well as claimed in claim 3, it is characterised in that institute Montmorillonite particle diameter is stated for 0.01-0.1 millimeters.
5. a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well as claimed in claim 1, it is characterised in that institute It by horizontal segment from tiptoe is isometric four sections to heel punishment to state staged perforation to be specially, and the ratio between four sections of shot densities are 4: 3:2:1, shot density is 10-60 holes/rice.
6. a kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well as claimed in claim 1, it is characterised in that institute It is that the smooth high temperature resistant stainless steel body in surface is constituted to state injection protective layer, and 5-10 millimeters of thickness, 5-30 meters of length plays level of protection Sleeve pipe is not by mixed phase hot fluid corrosiveness at well heel.
CN201710435276.6A 2017-06-10 2017-06-10 A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well Active CN106988681B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710435276.6A CN106988681B (en) 2017-06-10 2017-06-10 A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710435276.6A CN106988681B (en) 2017-06-10 2017-06-10 A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well

Publications (2)

Publication Number Publication Date
CN106988681A true CN106988681A (en) 2017-07-28
CN106988681B CN106988681B (en) 2019-01-08

Family

ID=59421917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710435276.6A Active CN106988681B (en) 2017-06-10 2017-06-10 A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well

Country Status (1)

Country Link
CN (1) CN106988681B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442906A (en) * 2018-04-26 2018-08-24 中国石油天然气股份有限公司 Steam soak Heavy Oil Reservoir perforating methods and perforation structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130032336A1 (en) * 2011-08-05 2013-02-07 Abbate Jason P Establishing communication between well pairs in oil sands by dilation with steam or water circulation at elevated pressures
CN203239240U (en) * 2013-04-10 2013-10-16 中国石油天然气股份有限公司 Variable-permeability horizontal well segregated completion string
CN104832140A (en) * 2014-02-07 2015-08-12 中国石油化工股份有限公司 Method of improving production capacity of super-deep low-permeability heavy oil single well by radial drilling and auxiliary thermal recovery
CN105370259A (en) * 2014-08-29 2016-03-02 中国石油化工股份有限公司 Staged fracturing method of horizontal well
CN105422068A (en) * 2015-11-12 2016-03-23 中国石油天然气股份有限公司 Method for developing heavy oil reservoir of horizontal well by combining staged volume fracturing and fracturing filling
US20160298435A1 (en) * 2015-04-09 2016-10-13 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130032336A1 (en) * 2011-08-05 2013-02-07 Abbate Jason P Establishing communication between well pairs in oil sands by dilation with steam or water circulation at elevated pressures
CN203239240U (en) * 2013-04-10 2013-10-16 中国石油天然气股份有限公司 Variable-permeability horizontal well segregated completion string
CN104832140A (en) * 2014-02-07 2015-08-12 中国石油化工股份有限公司 Method of improving production capacity of super-deep low-permeability heavy oil single well by radial drilling and auxiliary thermal recovery
CN105370259A (en) * 2014-08-29 2016-03-02 中国石油化工股份有限公司 Staged fracturing method of horizontal well
US20160298435A1 (en) * 2015-04-09 2016-10-13 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
CN105422068A (en) * 2015-11-12 2016-03-23 中国石油天然气股份有限公司 Method for developing heavy oil reservoir of horizontal well by combining staged volume fracturing and fracturing filling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442906A (en) * 2018-04-26 2018-08-24 中国石油天然气股份有限公司 Steam soak Heavy Oil Reservoir perforating methods and perforation structure

Also Published As

Publication number Publication date
CN106988681B (en) 2019-01-08

Similar Documents

Publication Publication Date Title
US8286698B2 (en) Method for producing viscous hydrocarbon using steam and carbon dioxide
US8899327B2 (en) Method for recovering hydrocarbons using cold heavy oil production with sand (CHOPS) and downhole steam generation
CA1070611A (en) Recovery of hydrocarbons by in situ thermal extraction
US4718489A (en) Pressure-up/blowdown combustion - a channelled reservoir recovery process
US20060162923A1 (en) Method for producing viscous hydrocarbon using incremental fracturing
CN103225497B (en) Exploitation method of vaporizing formation water and displacing heavy oil by microwaves in situ
US20130098607A1 (en) Steam Flooding with Oxygen Injection, and Cyclic Steam Stimulation with Oxygen Injection
CN106948843A (en) A kind of double-deck multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
US10208578B2 (en) Moving injection gravity drainage for heavy oil recovery
US20130074470A1 (en) In-situ combustion recovery process using single horizontal well to produce oil and combustion gases to surface
CN106437669A (en) Thermal cracking fracture forming method and system for deep hot dry rock stratum mining
CN107035354A (en) A kind of oil production method for encrypting spontaneous mixed phase hot fluid under horizontal well surge well
CN107816340A (en) Utilize the process of high-power ultrasonics conjugate branch horizontal well thermal production shale gas
CN102587878B (en) Multi-element thermal fluid auxiliary gravitational displacement process
CN106996283A (en) The oil production method of spontaneous mixed phase hot fluid under a kind of hydrothermal cracking surge well
CN105221131A (en) The oil production method that SAGD and fireflood are used in conjunction
Sahin et al. Design, implementation and early operating results of steam injection pilot in already CO2 flooded deep-heavy oil fractured carbonate reservoir of Bati Raman Field, Turkey
CN105178931A (en) Method for increasing initial production speed of SAGD (Steam Assisted Gravity Drainage)
CN106988681B (en) A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of horizontal well
CN105178932A (en) Producing well using SAGD (steam assisted gravity drainage) and fireflood together
CN104265257A (en) Oil in-situ combustion huff and puff oil production method for assisting catalytic ignition by filling fracturing propping agent
CN106988716A (en) A kind of row's formula horizontal-well network combines spontaneous underground mixed phase hot fluid oil production method
CN107091055A (en) A kind of well-completing process of the spontaneous mixed phase hot fluid oil production method of straight well
CN114790879B (en) Underground exploitation method and system for steam assisted gravity drainage of fractured reservoir
US20140166279A1 (en) Extended reach steam assisted gravity drainage with oxygen ("ersagdox")

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210927

Address after: Room B512, e-commerce main building, 2345 Chuangxin 1st Road, Songbei District, Harbin, Heilongjiang, 150028

Patentee after: Heilongjiang Kuangcai Technology Co.,Ltd.

Address before: 163000 Room 301, emerging industry incubator (Park), No.36, torch new street, high tech Zone, Daqing City, Heilongjiang Province

Patentee before: DAQING DONGYOU RUIJIA PETROLEUM TECHNOLOGY Co.,Ltd.