CN106982435A - A kind of capacity adjustment method and device of F-band mixed networking - Google Patents
A kind of capacity adjustment method and device of F-band mixed networking Download PDFInfo
- Publication number
- CN106982435A CN106982435A CN201610033410.5A CN201610033410A CN106982435A CN 106982435 A CN106982435 A CN 106982435A CN 201610033410 A CN201610033410 A CN 201610033410A CN 106982435 A CN106982435 A CN 106982435A
- Authority
- CN
- China
- Prior art keywords
- dilatation
- carrier wave
- scene
- business
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/02—Resource partitioning among network components, e.g. reuse partitioning
- H04W16/04—Traffic adaptive resource partitioning
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/02—Resource partitioning among network components, e.g. reuse partitioning
- H04W16/10—Dynamic resource partitioning
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/16—Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
Abstract
The invention discloses a kind of capacity adjustment method and device of F-band mixed networking, including:According to traffic forecast result, the scene to base station is identified;When the traffic forecast result is prescribed a time limit more than or equal to traffic reference gate, it is first kind scene to identify the scene;When the traffic forecast result is prescribed a time limit less than traffic reference gate, it is Equations of The Second Kind scene to identify the scene;When identifying first kind scene, according to accessing user's quantity and/or portfolio, carrier wave dilatation or veneer dilatation are carried out;When identifying Equations of The Second Kind scene, model classifications are carried out to business according to every RAB flows;For the business of each model classification, according to accessing user's quantity and/or PRB utilization rates and/or cell flow, carrier wave dilatation is carried out.
Description
Technical field
The present invention relates to radio communication time-division Long Term Evolution (TDL, Time Division-Long Term
Evolution) technology, more particularly to a kind of TDL and TD SDMA (TDS, Time
Division-Synchronous Code Division Multiple Access) in the capacity of F-band mixed networking
Method of adjustment and device.
Background technology
The growth of data service is increasingly difficult to support with the soaring of resource utilization, the capacity of single carrier,
Need to carry out demand and experience that user is supported in carrier wave dilatation, it is ensured that network security.Currently, F+D dilatations mould
Formula turns into main flow, and when F-band carrier resource utilization rate is high and congestion occurs, deployment D frequency ranges carry out load
Share or traffic absorbs.
For forth generation (4G, 4Generation) dilatation, formulated dilatation standard, i.e., when cell without
Line channel utilization is more than or equal to 50%, and the effective wireless heterogeneous networks of cell (RRC, Radio Resource
Control) connection number is more than or equal to 30, and cell uplink handling capacity is more than or equal to 1G or downlink throughput capacity is big
When equal to 5G, dilatation is just considered, Main Basiss have at 3 points:1), can when network load is less than 50%
With meet edge Signal to Interference plus Noise Ratio (RS-SINR, Signal to Interference plus Noise Ratio) be more than etc.
In -3dB network quality requirement, therefore the corresponding dilatation threshold value of cell radio channel utilization is 50%;
2) the effective carrying number of users upper limit for descending cell to meet single user 1Mbps speed at full capacity is 30, therefore RRC
It is 30 to connect the corresponding dilatation threshold value of number;3) during 50% network load of the network planning, busy up-downgoing is small
Area's handling capacity is respectively 1GB and 5GB, therefore the corresponding dilatation threshold value of up-downgoing cell throughout is 1GB
And 5GB.
Current dilatation standard is excessively harsh, from Consumer's Experience angle, can not characterize all business
Scape, main cause may be summarized to be:1) it is the ceU edge rate 1Mbps with the case of 50% network load
Physical Resource Block (PRB, Physical Resource Block) utilization rate in planning, obtained dilatation standard
50% only meets network quality;2) be with cell at full capacity in the case of, single user 1Mbps guarantee speed
The maximum obtained under rate effectively RRC connection numbers of users;3) different cities are due to data service flow package structure
Into difference, user behavior is accustomed to difference, causes the guarantee speed and PRB utilization rates and cell stream of user
Relation curve between amount can not possibly be national consistent.
On the other hand, TDS data services are gradually decreased, and frequency resource will gradually discharge, particularly TDS
The release of network occupancy F-band resource is beneficial to the integration of 4G network resources.Pass through TDS networks
Clearing up and discharging for F-band, can play the advantage progress 20M+10M double frequency networkings that equipment is directly upgraded, reduce
Equipment investment.For the application study of 20M+10M in F-band, there is presently no the research of complete set
In terms of scheme, particularly displaying, any scene is more suitable for this combination of frequency and still belongs to blank.
The content of the invention
In order to solve the above technical problems, the embodiments of the invention provide a kind of capacity of F-band mixed networking tune
Adjusting method and device.
The capacity adjustment method of F-band mixed networking provided in an embodiment of the present invention, including:
According to traffic forecast result, the scene to base station is identified;When the traffic forecast result be more than etc.
Prescribed a time limit in traffic reference gate, it is first kind scene to identify the scene;When the traffic forecast result is less than
Traffic reference gate is prescribed a time limit, and it is Equations of The Second Kind scene to identify the scene;
When identifying first kind scene, according to accessing user's quantity and/or portfolio, carry out carrier wave dilatation or
Veneer dilatation;
When identifying Equations of The Second Kind scene, according to every RAB (RAB, Radio Access Bearer)
Flow carries out model classifications to business;For the business of each model classification, according to accessing user's quantity and/
Or Physical Resource Block (PRB, Physical Resource Block) utilization rate and/or cell flow, carried
Ripple dilatation.
It is described when identifying first kind scene in the embodiment of the present invention, according to accessing user's quantity and/or industry
Business amount, carries out carrier wave dilatation or veneer dilatation, including:
For first kind scene, when wireless heterogeneous networks (RRC, Radio Resource Control) are maximum
When connecting number more than or equal to first threshold, carrier wave dilatation is carried out;When base station, maximum activation number of users is more than simultaneously
During equal to Second Threshold, hardware dilatation is carried out.
It is described when identifying Equations of The Second Kind scene in the embodiment of the present invention, according to every RAB RAB
Flow carries out model classifications to business, including:
For Equations of The Second Kind scene, when every RAB flows are more than the first thresholding, business is classified as big bag model;
When every RAB flows are less than the second thresholding, business is classified as parcel model;When every RAB flows are in
When between first thresholding and second thresholding, business is classified as middle bag model.
In the embodiment of the present invention, the business for each model classification, according to accessing user's quantity and/
Or Physical Resource Block PRB utilization rates and/or cell flow, carrier wave dilatation is carried out, including:
For the big bag model, as RRC, averagely to connect number, PRB utilization rates and cell flow big
When threshold value corresponding equal to the big bag model, carrier wave dilatation is carried out;
For the middle bag model, as RRC, averagely to connect number, PRB utilization rates and cell flow big
When threshold value corresponding equal to the middle bag model, carrier wave dilatation is carried out;
For the parcel model, when RRC maximum numbers of connections are more than or equal to three threshold values, carrier wave expansion is carried out
Hold.
In the embodiment of the present invention, methods described also includes:
If the configuration of TD SDMA TDS cells secondary carrier is less than or equal to 8 pieces, and has carrier wave to be configured to
F-band, A frequency ranges are all replaced into by the F-band carrier wave of the TDS cells;
If the configuration of TDS cells secondary carrier is more than 8 pieces, frame point, business speed are taken with reference to the business model of cell
Rate downshifts and GTL interoperability is come F-band of clearing up and discharging, wherein, the F-band cleared up and discharged can carry out carrier wave expansion
Hold.
The capacity regulating device of F-band mixed networking provided in an embodiment of the present invention, including:
Recognition unit, for according to traffic forecast result, the scene to base station to be identified;When the traffic
Predict the outcome and prescribed a time limit more than or equal to traffic reference gate, it is first kind scene to identify the scene;When the words
Business predicts the outcome prescribes a time limit less than traffic reference gate, and it is Equations of The Second Kind scene to identify the scene;
First dilatation control unit, for when identifying first kind scene, according to accessing user's quantity and/
Or portfolio, carry out carrier wave dilatation or veneer dilatation;
Second dilatation control unit, for when identifying Equations of The Second Kind scene, according to every RAB flows to business
Carry out model classifications;For the business of each model classification, utilized according to accessing user's quantity and/or PRB
Rate and/or cell flow, carry out carrier wave dilatation.
In the embodiment of the present invention, the first dilatation control unit is further used for:
For first kind scene, when RRC maximum numbers of connections are more than or equal to first threshold, carrier wave dilatation is carried out;
When maximum activation number of users is more than or equal to Second Threshold simultaneously for base station, hardware dilatation is carried out.
In the embodiment of the present invention, the second dilatation control unit includes:
Model classifications subelement, for for Equations of The Second Kind scene, when every RAB flows are more than the first thresholding,
Business is classified as big bag model;When every RAB flows are less than the second thresholding, business is classified as parcel mould
Type;When every RAB flows are between first thresholding and second thresholding, during business is classified as
Bag model.
In the embodiment of the present invention, the second dilatation control unit also includes:
Dilatation controls subelement, for for the big bag model, when RRC averagely connects number, PRB profits
When being all higher than being equal to the corresponding threshold value of the big bag model with rate and cell flow, carrier wave dilatation is carried out;Pin
To the middle bag model, it is all higher than being equal to when RRC averagely connects number, PRB utilization rates and cell flow
During the corresponding threshold value of the middle bag model, carrier wave dilatation is carried out;For the parcel model, when RRC is maximum
When connecting number more than or equal to three threshold values, carrier wave dilatation is carried out.
In the embodiment of the present invention, described device also includes:
Volume reduction control unit, if being less than or equal to 8 pieces for the configuration of TDS cells secondary carrier, and has carrier wave configuration
For F-band, the F-band carrier wave of the TDS cells is all replaced into A frequency ranges;If TDS cells are auxiliary
Carrier wave configuration is more than 8 pieces, takes frame point, service rate downshift and GTL mutual with reference to the business model of cell
Operate come F-band of clearing up and discharging, wherein, the F-band cleared up and discharged can carry out carrier wave dilatation.
In the technical scheme of the embodiment of the present invention, according to traffic forecast result, the scene to base station is identified;
When identifying first kind scene, according to accessing user's quantity and/or portfolio, carrier wave dilatation or veneer are carried out
Dilatation;When identifying Equations of The Second Kind scene, model is carried out to business according to every RAB RAB flows
Sort out;For the business of each model classification, according to accessing user's quantity and/or Physical Resource Block PRB profits
With rate and/or cell flow, carrier wave dilatation is carried out.If the configuration of TDS cells secondary carrier is less than or equal to 8 pieces,
And there is carrier wave to be configured to F-band, the F-band carrier wave of the TDS cells is all replaced into A frequency ranges;
If the configuration of TDS cells secondary carrier is more than 8 pieces, frame point, service rate drop are taken with reference to the business model of cell
Shelves and GTL interoperate come F-band of clearing up and discharging, wherein, the F-band cleared up and discharged can carry out carrier wave dilatation.
The embodiment of the present invention compensate for carrying out the applicable scene research field of 20M+10M frequencies networking using F-band
Blank.The utilization of F-band 20M+10M frequency networkings, improve frequency range utilization rate, it is to avoid deployment D
The extensive investment that frequency range is brought, directly can reach that resource is maximally utilized by device upgrade, reduce
The input of cost, improves investment return ratio.In addition, the displaying for perceiving angle research from user is expanded
Appearance method, compensate for the deficiency of dilatation demand considered from single network quality dimensions, the standard of dilatation and calculation
Method more adapts to the demand of displaying.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of the capacity adjustment method of the F-band mixed networking of the embodiment of the present invention;
Fig. 2 is the 4G Single Frequency Network dilatation flow charts of the embodiment of the present invention;
Fig. 3 is the dilatation schematic diagram based on business model of the embodiment of the present invention;
Fig. 4 is the TDS network volume reduction flow charts of the embodiment of the present invention;
Fig. 5 divides schematic diagram for the TDS frequency ranges of the embodiment of the present invention;
Fig. 6 is the structure composition schematic diagram of the capacity regulating device of the F-band mixed networking of the embodiment of the present invention.
Embodiment
The characteristics of in order to more fully hereinafter understand the embodiment of the present invention and technology contents, below in conjunction with the accompanying drawings
Realization to the embodiment of the present invention is described in detail, appended accompanying drawing purposes of discussion only for reference, is not used for
Limit the embodiment of the present invention.
The embodiment of the present invention is intended to not influence TDS or with minimal network quality cost to TDS network F-bands
Implement volume reduction to support 4G networks to implement 20M+10M double frequency networkings in F-band.
Collaboration of the embodiment of the present invention is considered in traffic hotspots region, TDS and TDL network qualities and business hair
Exhibition demand, it is maximized in the case of substantially ensuring that TDS networks are available to improve TDL nets in F-band
The utilization rate of the bandwidth of network.Tune is evaluated and optimized to TDS the and TDL network capacities in traffic hotspots region
It is whole to propose specific solution.
Fig. 1 is the schematic flow sheet of the capacity adjustment method of the F-band mixed networking of the embodiment of the present invention, such as
Shown in Fig. 1, it the described method comprises the following steps:
Step 101:According to traffic forecast result, the scene to base station is identified.
In the embodiment of the present invention, the result that the scene to base station is identified is:First kind scene and Equations of The Second Kind
Scene.When the traffic forecast result is prescribed a time limit more than or equal to traffic reference gate, it is first to identify the scene
Class scene;When the traffic forecast result is prescribed a time limit less than traffic reference gate, it is Equations of The Second Kind to identify the scene
Scene;Wherein, first kind scene refers to big traffic scene, such as colleges and universities, stadium, Conference Room,
Such scene is mainly shown as that data business volume is high or number of users is more;Equations of The Second Kind scene refers to routinely dilatation
Scape, such scene service shows more stable, such as city hot spot region.
Step 102:When identifying first kind scene, according to accessing user's quantity and/or portfolio, carry out
Carrier wave dilatation or veneer dilatation.
In the embodiment of the present invention, for first kind scene, when RRC maximum numbers of connections are more than or equal to first threshold
When, carry out carrier wave dilatation;When maximum activation number of users is more than or equal to Second Threshold simultaneously for base station, carry out hard
Part dilatation.
Here, first threshold and Second Threshold can flexibly be set according to the concrete condition of first kind scene.
Step 103:When identifying Equations of The Second Kind scene, according to every RAB RAB flows to business
Carry out model classifications;For the business of each model classification, according to accessing user's quantity and/or Physical Resource Block
PRB utilization rates and/or cell flow, carry out carrier wave dilatation.
In the embodiment of the present invention, for Equations of The Second Kind scene, when every RAB flows are more than the first thresholding, by industry
Business is classified as big bag model;When every RAB flows are less than the second thresholding, business is classified as parcel model;
When every RAB flows are between first thresholding and second thresholding, business is classified as middle Bao Mo
Type.
Here, the first thresholding and the second thresholding can flexibly be set according to the concrete condition of Equations of The Second Kind scene.
In the embodiment of the present invention, for the big bag model, when RRC averagely connects number, PRB utilization rates
And cell flow is when being all higher than being equal to the corresponding threshold value of the big bag model, carrier wave dilatation is carried out;
For the middle bag model, as RRC, averagely to connect number, PRB utilization rates and cell flow big
When threshold value corresponding equal to the middle bag model, carrier wave dilatation is carried out;
For the parcel model, when RRC maximum numbers of connections are more than or equal to three threshold values, carrier wave expansion is carried out
Hold.
In the embodiment of the present invention, methods described also includes:Volume reduction flow, is specifically included:If TDS cells are auxiliary
Carrier wave configuration is less than or equal to 8 pieces, and has carrier wave to be configured to F-band, and the F-band of the TDS cells is carried
Ripple is all replaced into A frequency ranges;If the configuration of TDS cells secondary carrier is more than 8 pieces, with reference to the business mould of cell
Type takes frame point, service rate downshift and GTL interoperability come F-band of clearing up and discharging, wherein, the F cleared up and discharged
Frequency range can carry out carrier wave dilatation.
With reference to concrete scene the capacity adjustment method of the F-band mixed networking of the embodiment of the present invention is done into
One step is described in detail.
TDL networks are preferable dilatation selections using 20M+10M combination of frequency in F-band, in TDL
Under TDS networks and the present situation deposited, in order to be able to lift TDL network user's access rate to greatest extent,
According to the not high present situation of current TDS utilization rates, to usage scenario (i.e. the scene such as colleges and universities, shopping centre) and industry
It is engaged in after model (business model such as i.e. big bag, parcel and middle bag) identification, situation carries out TDS's according to demand
F frequencies are cleared up and discharged, and the bandwidth in this, as TDL networks is supplemented, and are felt with the user for being obviously improved TDL networks
Know.
The capacity adjustment method of the F-band mixed networking of the embodiment of the present invention includes:TDL network capacity extension flows
With two parts of TDS network volume reductions flow, wherein TDL network capacity extensions flow can trigger TDS after performing and subtract
Hold flow.
Reference picture 2, Fig. 2 is the 4G Single Frequency Network dilatation flow charts of the embodiment of the present invention, below to the present invention
4G dilatation flows in embodiment are described in detail.
As shown in Fig. 2 4G Single Frequency Network dilatation flows mainly include:Scene Recognition, business model identification and
Dilatation is adjudicated.By the implementation to key node in flow, the dilatation that can carry out current network is implemented.Tool
Body:
1) scene Recognition
Scene is broadly divided into two major classes:One class refers to big traffic scene, such as colleges and universities, stadium, Conference Room
It is mainly shown as that data business volume is high or number of users is more Deng, such scene;It is another kind of to refer to routinely dilatation scene,
Such scene service shows more stable, such as city hot spot region.
2) business model is recognized
For big traffic scene (bursts of traffic scene), consider whether that a large number of users is accessed first, accessing user
Number is more, then carries out carrier wave dilatation, access customer number is few but portfolio is big, then it is contemplated that carrying out veneer dilatation.
For routinely dilatation, busy is paid close attention to per RAB flows, busy can pass through 4G per RAB flows
Webmaster is obtained.By being made decisions to busy per RAB flows, business can be divided into big bag model, middle bag
Model (between parcel and big bag) and parcel model.
3) dilatation is adjudicated
The object of dilatation judgement mainly includes three major types, i.e. number of users, busy PRB utilization rates and busy list
Cell flow, when three standards reach decision threshold simultaneously, performs carrier wave dilatation or optimization.
4G Single Frequency Network dilatation flows are described below:
Dilatation is the dilatation perceived based on user, by large-scale websites such as Sina, Sohu, Netease and Tengxuns
Move broadband services (MBB, Mobile Broadband) web page browsing test and analysis is drawn, page
Face browses time delay and is inversely proportional with number of users, and webpage is opened speed and is inversely proportional with number of users, extracts 9 points to 10
The business datum of point shows that business experience is higher than experience baseline after 9: 20;Passed by MBB test files
Defeated agreement (FTP, File Transfer Protocol) downloads descending throughput and user in display, cell in real time
It is inversely proportional.
For 2G, 3G network dilatation, it need to only consider that single " resource utilization " carries out dilatation, for
For the data service dilatation of 4G networks, single " resource utilization " can not characterize the demand of capacity completely, need
Business is classified, the angle perceived from user is analyzed, it is considered to which PRB utilization rates, RRC connect
Connect number of users, up-downgoing flow, the factor of influence such as maximum number of user in cell.
From business angle analysis, business can be divided into parcel model, middle bag model and big bag model, it is different
Business scenario dilatation thresholding is different, it is necessary to which the dimension considered is also different, such as big bag model needs to consider
PRB utilization rates, effective RRC connection numbers of users and flow, and parcel model lays particular emphasis on the effective RRC of consideration
Number of users is connected, with reference to table 1, table 1 gives condition and the suggestion of all kinds of business dilatations.
Table 1
For big bag business (business correspondence big bag model), such as video, user focus more on buffer time and
Play interim card number of times;For packet services (business correspondence parcel model), for example WEB is browsed, Yong Hugeng
Pay attention in page load time.Research shows that more than 95% experimenter keeps good notice within 2 seconds,
Notice starts to disperse after 3 seconds, i.e., period of reservation of number, which is less than, means outstanding network in 3 seconds.
Big bag (video) business takes a large amount of physical resources due to single user, and 30 feelings are not up in number of users
Just occurring that utilization rate surges under condition brings user rate to decline to influence service-aware, it is therefore desirable to comprehensive
Consider the influence that number of users PRB utilization rates and Zone are perceived to user.Research shows, big bag business
Dilatation thresholding is:Descending PRB utilization rates are more than or equal to 40% and cell flow is more than 2.8GB and RRC has
Effect connection number of users is more than 12.
Middle bag business (bag model in business correspondence) is that big bag and packet services mixing proportion of composing are not known,
Therefore in dilatation assessment, in scape cell capacity-enlarging standard of making a block booking have two kinds:
1) dilatation based on Consumer's Experience:Middle bag scene perception dilatation thresholding:User rate 3.2M, PRB
Utilization rate 42%, flow 3GB, effective RRC connections number of users 17;
2) dilatation based on network carrying ability:When cell maximum number of user is more than 150, in make a block booking scape
Lower customer service is perceived and network carrying ability has deteriorated, it is proposed that dilatation.
Number of users is excessive but the not high region of portfolio, because network insertion carrying (signaling side) is limited,
User's access is difficult, it is more to go offline, and the perception to user causes more ill effect, therefore, parcel industry
Business dilatation emphasis considers access customer number.Under parcel scene, when user (including number is passed and non-number passes number of users)
During more than 160, user's web traffic time delay perceives thresholding significantly more than 3s and fluctuation increases, it is proposed that
Carrier wave dilatation is considered when community user number is more than 160.Therefore, the dilatation algorithm of 4G Single Frequency Network can be with
Summarize as shown in Figure 3.
It can be seen that, the dilatation flow of the embodiment of the present invention includes:It is identified according to the affiliated scene in specific base station
Classification;For common application scene, analyzed according to every RAB flows, if being more than per RAB flows
Whether big 0.2MB, then averagely connect number, PRB utilization rates and flow according to big its RRC of bag model analysis
In threshold value, if then carrying out dilatation, if being less than 0.2MB per RAB flows, according to parcel model analysis
Whether its RAB maximum number of connections is more than threshold value, if then carrying out dilatation;For campus, stadium and meeting
The big traffic scene such as room, then to base station, maximum activation number of users reaches the carry out hardware dilatation of threshold value simultaneously, right
RRC connections maximum number of user reaches the carry out carrier wave dilatation of threshold value;So far the volume reduction flow to TDS is triggered,
To confirm the majority of the frequency available for TDL.
Reference picture 4, Fig. 4 is the TDS network volume reduction flow charts of the embodiment of the present invention, below to of the invention real
The TDS network volume reduction flows applied in example are described in detail.
After TDL dilatation demand statistics is completed, the volume reduction for proceeding by TDS is calculated.
Mobile regulation A frequency range 15M bandwidth (2010MHz~2025MHz) is distributed to TDS and used, and presses
According to every carrier bandwidths 1.6MHz requirements, A frequency ranges maximum configured is 9 carrier waves.Part hot spot region is due to connecing
Access customer is more, and business scale is big, and the carrier wave of A frequency ranges 9 can not meet demand, thus enable F-band
1905MHz~1915MHz supplements frequency range as TDS, and 10MHz bandwidth brings 6 carrier capacities.TDS
Frequency range divides as shown in Figure 5.
With deployment of LTE network, TDS business is gradually decreased, and carrier frequency resource utilization rate is begun to decline, F frequencies
The TDS carrier waves of section, which can clear up and discharge, supports LTE business development demands, effectively lifting frequency range utilization rate.
As shown in figure 4, TDS network volume reductions flow is main from F-band carrier wave configuring condition and TDS network industries
From the aspect of quality two of being engaged in, by the research to key node in flow, the F to current TDS networks is realized
The implementation that frequency range carrier wave is cleared up and discharged.
1) carrier wave is configured
A frequency ranges support maximum 9 carrier wave configuration, it is generally the case that main carrier is configured to A frequency ranges.Therefore,
Can 8 pieces of A frequency range secondary carriers of maximum configured.When the secondary carrier configuration of TDS cells is less than or equal to 8 pieces, A
Frequency range can meet configuration needs with 100%, only the F-band carrier wave of occupancy need to be configured into A frequency ranges;
When the secondary carrier configuration of TDS cells is more than 8 pieces, TDS cell carriers must can use F-band, therefore,
When clearing up and discharging F-band carrier wave, it is necessary to consider the operational indicator and Consumer's Experience of TDS cells.
2) GTL interoperates
GTL interoperability is the interoperability between LTE, TDS and GSM.
The overlay area of current LTE network has been over the covering of TDS networks, it may be considered that close LTE
Network retains TDS to LTE gravity treatment and redirection function to the redirection function of TDS networks, so that
Reduction business is resident the ratio of TDS networks, and support TDS volume reductions are implemented.
Based on the interoperability strategy of existing network, carry out LTE to TDS interoperability and simplify;
LTE is not redirected to TDS not gravity treatments;TDS remains into LTE gravity treatment and redirects strategy;
LTE to GSM opens gravity treatment and blind redirection;GSM is opened into LTE gravity treatment, no longer passes through
TDS is bridged;
3) frame point
Frame point mainly includes descending 2 times of frames point, descending 4 times of frames and divided and up 2 times of frames point.Descending 2 times of frames
Point multiplexing is the adjoint DPCH codes resource for 2 SF=16 that every 2 users are multiplexed on TS6 jointly under
Row is with channel;Open descending 4 times of signaling frame division multiplexings and open up 2 times of traffic frame timesharing, and configure
DCCC parameters, can now allow up reduction of speed to 8k, and take 2 simultaneously with another up 8K user
Individual SF16 code channels, are carried on TS1 or TS2;2 SF=16 of occupancy that each upstream rate is 16k
Code resource, each upstream rate for 32k 4 SF=16 of occupancy code resource, upstream rate is 64
8 SF=16 of Shi Zhanyong code resource, it is 64k that maximum uplink rate is set at present.
4) service rate downshifts
The characteristics of service rate downshift is directed to business, turns down class, reduction connects by service access guarantee speed
Enter the resource occupation of business.The current minimum access rate of such as video traffic is 64K, when by access rate
When being reduced to 16K, unnecessary resource is supplied to other users to access.
5) carrier bandwidths compress technique
Current carrier bandwidths are 1.6MHz, can be compressed to carrier bandwidths by carrier wave compress technique
1.4MHz, its advantage is to add 1 piece of carrier wave on the premise of A frequency range 15MHz bandwidth, totally 10 pieces of loads
Ripple, its shortcoming is the increase in the interference potential of intercarrier, has an impact to quality of service.
It can be seen that, the volume reduction flow of the embodiment of the present invention includes:If the configuration of TDS cells secondary carrier is less than or equal to 8
Block, and there is carrier wave to be configured to F-band, then, the F-band carrier wave of the cell can be all replaced into A
Frequency range;If the configuration of TDS cells secondary carrier is more than 8 pieces, when clearing up and discharging F-band carrier wave, it is necessary to consider user
Experience and service impact, with reference to skills such as GTL interoperability, frame point, access rate downshift, carrier bandwidths compressions
Art and means are waited to implement;Therefore, for TDS cells, the F-band within 8 pieces of carrier waves of clearing up and discharging first is carried
Ripple (is replaced into A frequency ranges), for configuring the cell more than 8 pieces of carrier waves, it is necessary to reference to the business mould of cell
Type takes frame point, service rate downshift and GTL interoperability to coordinate F-band to clear up and discharge.
Fig. 6 is the structure composition schematic diagram of the capacity regulating device of the F-band mixed networking of the embodiment of the present invention,
As shown in fig. 6, the capacity regulating device of the F-band mixed networking includes:
Recognition unit 61, for according to traffic forecast result, the scene to base station to be identified;When the words
Business predicts the outcome prescribes a time limit more than or equal to traffic reference gate, and it is first kind scene to identify the scene;When described
Traffic forecast result is prescribed a time limit less than traffic reference gate, and it is Equations of The Second Kind scene to identify the scene;
First dilatation control unit 62, for when identifying first kind scene, according to accessing user's quantity and
/ or portfolio, carry out carrier wave dilatation or veneer dilatation;
Second dilatation control unit 63, for when identifying Equations of The Second Kind scene, according to every RAB flows pair
Business carries out model classifications;For the business of each model classification, according to accessing user's quantity and/or PRB
Utilization rate and/or cell flow, carry out carrier wave dilatation.
In the embodiment of the present invention, the first dilatation control unit 62 is further used for:
For first kind scene, when RRC maximum numbers of connections are more than or equal to first threshold, carrier wave dilatation is carried out;
When maximum activation number of users is more than or equal to Second Threshold simultaneously for base station, hardware dilatation is carried out.
In the embodiment of the present invention, the second dilatation control unit 63 includes:
Model classifications subelement 631, for for Equations of The Second Kind scene, when every RAB flows are more than the first thresholding
When, business is classified as big bag model;When every RAB flows are less than the second thresholding, business is classified as small
Bag model;When every RAB flows are between first thresholding and second thresholding, business is sorted out
For middle bag model.
In the embodiment of the present invention, the second dilatation control unit 63 also includes:
Dilatation controls subelement 632, for for the big bag model, when RRC averagely connects number, PRB
When utilization rate and cell flow are all higher than being equal to the big bag model corresponding threshold value, carrier wave dilatation is carried out;
For the middle bag model, it is all higher than when RRC averagely connects number, PRB utilization rates and cell flow
When the middle bag model corresponding threshold value, carrier wave dilatation is carried out;For the parcel model, when RRC most
When big connection number is more than or equal to three threshold values, carrier wave dilatation is carried out.
In the embodiment of the present invention, described device also includes:
Volume reduction control unit 64, if being less than or equal to 8 pieces for the configuration of TDS cells secondary carrier, and has carrier wave
F-band is configured to, the F-band carrier wave of the TDS cells is all replaced into A frequency ranges;If TDS is small
Area's secondary carrier configuration is more than 8 pieces, and frame point, service rate downshift and GTL are taken with reference to the business model of cell
Interoperate come F-band of clearing up and discharging, wherein, the F-band cleared up and discharged can carry out carrier wave dilatation.
It will be appreciated by those skilled in the art that in the capacity regulating device of F-band mixed networking shown in Fig. 6
Each unit realize function can refer to the associated description of the capacity adjustment method of foregoing F-band mixed networking and
Understand.
, can be in any combination in the case where not conflicting between technical scheme described in the embodiment of the present invention.
In several embodiments provided by the present invention, it should be understood that disclosed method and smart machine,
It can realize by another way.Apparatus embodiments described above are only schematical, for example,
The division of the unit, only a kind of division of logic function, can there is other division side when actually realizing
Formula, such as:Multiple units or component can be combined, or be desirably integrated into another system, or some features can
To ignore, or do not perform.In addition, the coupling or straight of shown or discussed each part each other
Connect coupling or communication connection can be by some interfaces, the INDIRECT COUPLING or communication connection of equipment or unit,
Can be electrical, machinery or other forms.
The above-mentioned unit illustrated as separating component can be or may not be it is physically separate, as
The part that unit is shown can be or may not be physical location, you can positioned at a place, also may be used
To be distributed on multiple NEs;Part or all of unit therein can be selected according to the actual needs
Realize the purpose of this embodiment scheme.
In addition, each functional unit in various embodiments of the present invention can be fully integrated into a second processing list
, can also two or more unit collection in member or each unit is individually as a unit
Into in a unit;Above-mentioned integrated unit can both be realized in the form of hardware, it would however also be possible to employ hard
Part adds the form of SFU software functional unit to realize.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited to
This, any one skilled in the art the invention discloses technical scope in, can readily occur in
Change or replacement, should all be included within the scope of the present invention.
Claims (10)
1. a kind of capacity adjustment method of F-band mixed networking, it is characterised in that methods described includes:
According to traffic forecast result, the scene to base station is identified;When the traffic forecast result be more than etc.
Prescribed a time limit in traffic reference gate, it is first kind scene to identify the scene;When the traffic forecast result is less than
Traffic reference gate is prescribed a time limit, and it is Equations of The Second Kind scene to identify the scene;
When identifying first kind scene, according to accessing user's quantity and/or portfolio, carry out carrier wave dilatation or
Veneer dilatation;
When identifying Equations of The Second Kind scene, model is carried out to business according to every RAB RAB flows and returned
Class;For the business of each model classification, utilized according to accessing user's quantity and/or Physical Resource Block PRB
Rate and/or cell flow, carry out carrier wave dilatation.
2. the capacity adjustment method of F-band mixed networking according to claim 1, it is characterised in that
It is described when identifying first kind scene, according to accessing user's quantity and/or portfolio, carry out carrier wave dilatation or
Veneer dilatation, including:
For first kind scene, when radio resource control RRC maximum number of connections is more than or equal to first threshold,
Carry out carrier wave dilatation;When maximum activation number of users is more than or equal to Second Threshold simultaneously for base station, hardware expansion is carried out
Hold.
3. the capacity adjustment method of F-band mixed networking according to claim 1, it is characterised in that
It is described when identifying Equations of The Second Kind scene, according to every RAB RAB flows to business carry out model return
Class, including:
For Equations of The Second Kind scene, when every RAB flows are more than the first thresholding, business is classified as big bag model;
When every RAB flows are less than the second thresholding, business is classified as parcel model;When every RAB flows are in
When between first thresholding and second thresholding, business is classified as middle bag model.
4. the capacity adjustment method of F-band mixed networking according to claim 3, it is characterised in that
The business for each model classification, is utilized according to accessing user's quantity and/or Physical Resource Block PRB
Rate and/or cell flow, carry out carrier wave dilatation, including:
For the big bag model, as RRC, averagely to connect number, PRB utilization rates and cell flow big
When threshold value corresponding equal to the big bag model, carrier wave dilatation is carried out;
For the middle bag model, as RRC, averagely to connect number, PRB utilization rates and cell flow big
When threshold value corresponding equal to the middle bag model, carrier wave dilatation is carried out;
For the parcel model, when RRC maximum numbers of connections are more than or equal to three threshold values, carrier wave expansion is carried out
Hold.
5. the capacity adjustment method of the F-band mixed networking according to any one of Claims 1-4, its
It is characterised by, methods described also includes:
If the configuration of TD SDMA TDS cells secondary carrier is less than or equal to 8 pieces, and has carrier wave to be configured to
F-band, A frequency ranges are all replaced into by the F-band carrier wave of the TDS cells;
If the configuration of TDS cells secondary carrier is more than 8 pieces, frame point, business speed are taken with reference to the business model of cell
Rate downshifts and GTL interoperability is come F-band of clearing up and discharging, wherein, the F-band cleared up and discharged can carry out carrier wave expansion
Hold.
6. a kind of capacity regulating device of F-band mixed networking, it is characterised in that described device includes:
Recognition unit, for according to traffic forecast result, the scene to base station to be identified;When the traffic
Predict the outcome and prescribed a time limit more than or equal to traffic reference gate, it is first kind scene to identify the scene;When the words
Business predicts the outcome prescribes a time limit less than traffic reference gate, and it is Equations of The Second Kind scene to identify the scene;
First dilatation control unit, for when identifying first kind scene, according to accessing user's quantity and/
Or portfolio, carry out carrier wave dilatation or veneer dilatation;
Second dilatation control unit, for when identifying Equations of The Second Kind scene, according to every RAB flows to business
Carry out model classifications;For the business of each model classification, utilized according to accessing user's quantity and/or PRB
Rate and/or cell flow, carry out carrier wave dilatation.
7. the capacity regulating device of F-band mixed networking according to claim 6, it is characterised in that
The first dilatation control unit, is further used for:
For first kind scene, when RRC maximum numbers of connections are more than or equal to first threshold, carrier wave dilatation is carried out;
When maximum activation number of users is more than or equal to Second Threshold simultaneously for base station, hardware dilatation is carried out.
8. the capacity regulating device of F-band mixed networking according to claim 6, it is characterised in that
The second dilatation control unit includes:
Model classifications subelement, for for Equations of The Second Kind scene, when every RAB flows are more than the first thresholding,
Business is classified as big bag model;When every RAB flows are less than the second thresholding, business is classified as parcel mould
Type;When every RAB flows are between first thresholding and second thresholding, during business is classified as
Bag model.
9. the capacity regulating device of F-band mixed networking according to claim 8, it is characterised in that
The second dilatation control unit also includes:
Dilatation controls subelement, for for the big bag model, when RRC averagely connects number, PRB profits
When being all higher than being equal to the corresponding threshold value of the big bag model with rate and cell flow, carrier wave dilatation is carried out;Pin
To the middle bag model, it is all higher than being equal to when RRC averagely connects number, PRB utilization rates and cell flow
During the corresponding threshold value of the middle bag model, carrier wave dilatation is carried out;For the parcel model, when RRC is maximum
When connecting number more than or equal to three threshold values, carrier wave dilatation is carried out.
10. the capacity regulating device of the F-band mixed networking according to any one of claim 6 to 9,
Characterized in that, described device also includes:
Volume reduction control unit, if being less than or equal to 8 pieces for the configuration of TDS cells secondary carrier, and has carrier wave configuration
For F-band, the F-band carrier wave of the TDS cells is all replaced into A frequency ranges;If TDS cells are auxiliary
Carrier wave configuration is more than 8 pieces, takes frame point, service rate downshift and GTL mutual with reference to the business model of cell
Operate come F-band of clearing up and discharging, wherein, the F-band cleared up and discharged can carry out carrier wave dilatation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610033410.5A CN106982435B (en) | 2016-01-19 | 2016-01-19 | Capacity adjustment method and device for F-band hybrid networking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610033410.5A CN106982435B (en) | 2016-01-19 | 2016-01-19 | Capacity adjustment method and device for F-band hybrid networking |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106982435A true CN106982435A (en) | 2017-07-25 |
CN106982435B CN106982435B (en) | 2020-11-13 |
Family
ID=59340893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610033410.5A Active CN106982435B (en) | 2016-01-19 | 2016-01-19 | Capacity adjustment method and device for F-band hybrid networking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106982435B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108260131A (en) * | 2018-01-12 | 2018-07-06 | 北京天元创新科技有限公司 | A kind of cell hardware expansion method and device |
CN110098966A (en) * | 2019-05-13 | 2019-08-06 | 中国联合网络通信集团有限公司 | Wireless network capacitance analysis method and equipment |
CN110166964A (en) * | 2019-04-02 | 2019-08-23 | 中国联合网络通信集团有限公司 | A kind of determination method and device of base station to be expanded |
CN110191473A (en) * | 2018-02-23 | 2019-08-30 | 中国移动通信有限公司研究院 | A kind of network expansion method, device and computer readable storage medium |
CN110493794A (en) * | 2018-05-15 | 2019-11-22 | 中国移动通信集团湖北有限公司 | Base station expansion method, device, equipment and storage medium |
CN110677854A (en) * | 2018-07-03 | 2020-01-10 | 中国移动通信集团重庆有限公司 | Method, apparatus, device and medium for carrier frequency capacity adjustment |
CN111132349A (en) * | 2019-12-31 | 2020-05-08 | 中国移动通信集团江苏有限公司 | Method, apparatus, device and medium for adjusting spectrum bandwidth |
CN111385848A (en) * | 2018-12-27 | 2020-07-07 | 成都鼎桥通信技术有限公司 | Carrier reservation control method and device |
CN111818580A (en) * | 2020-07-30 | 2020-10-23 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN111818584A (en) * | 2020-07-30 | 2020-10-23 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN111818583A (en) * | 2020-07-30 | 2020-10-23 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN112203287A (en) * | 2019-07-08 | 2021-01-08 | 中国移动通信集团浙江有限公司 | Cell capacity adjusting method, device, equipment and storage medium |
CN112584391A (en) * | 2020-12-04 | 2021-03-30 | 中国联合网络通信集团有限公司 | Cell two-carrier expansion method and device |
WO2021057402A1 (en) * | 2019-09-27 | 2021-04-01 | 中兴通讯股份有限公司 | Multi-carrier capacity expansion method and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101426217A (en) * | 2008-10-24 | 2009-05-06 | 中国移动通信集团山东有限公司 | Method and apparatus for cell capacity-enlarging information confirming |
CN102752790A (en) * | 2011-04-21 | 2012-10-24 | 中国移动通信集团湖南有限公司 | Method and device for determining wireless network coverage rate |
CN102984735A (en) * | 2012-12-03 | 2013-03-20 | 中兴通讯股份有限公司 | Expansion analysis method and device for base station single plates |
CN103037375A (en) * | 2011-09-29 | 2013-04-10 | 中国移动通信集团河南有限公司 | Method and device for dividing community telephone traffic scenes |
EP2477346B1 (en) * | 2003-02-11 | 2013-12-11 | Sony Corporation | Communications systems |
US20140341170A1 (en) * | 2005-04-01 | 2014-11-20 | Adaptix, Inc. | Systems and methods for coordinating the coverage and capacity of a wireless base station |
-
2016
- 2016-01-19 CN CN201610033410.5A patent/CN106982435B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2477346B1 (en) * | 2003-02-11 | 2013-12-11 | Sony Corporation | Communications systems |
US20140341170A1 (en) * | 2005-04-01 | 2014-11-20 | Adaptix, Inc. | Systems and methods for coordinating the coverage and capacity of a wireless base station |
CN101426217A (en) * | 2008-10-24 | 2009-05-06 | 中国移动通信集团山东有限公司 | Method and apparatus for cell capacity-enlarging information confirming |
CN102752790A (en) * | 2011-04-21 | 2012-10-24 | 中国移动通信集团湖南有限公司 | Method and device for determining wireless network coverage rate |
CN103037375A (en) * | 2011-09-29 | 2013-04-10 | 中国移动通信集团河南有限公司 | Method and device for dividing community telephone traffic scenes |
CN102984735A (en) * | 2012-12-03 | 2013-03-20 | 中兴通讯股份有限公司 | Expansion analysis method and device for base station single plates |
Non-Patent Citations (6)
Title |
---|
周京胜: "基于用户感知的TD_LTE网络场景化扩容", 《电信快报》 * |
道客巴巴: "华为TDD-LTE大话务场景解决方案v3-20140913", 《华为TDD-LTE大话务场景解决方案V3-20140913》 * |
道客巴巴: "华为TD-LTE演唱会场景保障总结", 《华为TD-LTE演唱会场景保障总结》 * |
金勇等: "FDD LTE高话务场景保障方案浅析", 《电信网技术》 * |
马宁等: "大型场馆TD—LTE室内业务预测研究", 《2015LTE网络创新研讨会论文集》 * |
马颖: "TD-LTE高话务量场景网络优化配置方案", 《中国移动通信集团设计院第20届新技术论坛》 * |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108260131B (en) * | 2018-01-12 | 2022-01-07 | 北京天元创新科技有限公司 | Cell hardware capacity expansion method and device |
CN108260131A (en) * | 2018-01-12 | 2018-07-06 | 北京天元创新科技有限公司 | A kind of cell hardware expansion method and device |
CN110191473B (en) * | 2018-02-23 | 2022-04-15 | 中国移动通信有限公司研究院 | Network capacity expansion method and device and computer readable storage medium |
CN110191473A (en) * | 2018-02-23 | 2019-08-30 | 中国移动通信有限公司研究院 | A kind of network expansion method, device and computer readable storage medium |
CN110493794A (en) * | 2018-05-15 | 2019-11-22 | 中国移动通信集团湖北有限公司 | Base station expansion method, device, equipment and storage medium |
CN110493794B (en) * | 2018-05-15 | 2022-04-01 | 中国移动通信集团湖北有限公司 | Base station capacity expansion method, device, equipment and storage medium |
CN110677854A (en) * | 2018-07-03 | 2020-01-10 | 中国移动通信集团重庆有限公司 | Method, apparatus, device and medium for carrier frequency capacity adjustment |
CN111385848A (en) * | 2018-12-27 | 2020-07-07 | 成都鼎桥通信技术有限公司 | Carrier reservation control method and device |
CN110166964A (en) * | 2019-04-02 | 2019-08-23 | 中国联合网络通信集团有限公司 | A kind of determination method and device of base station to be expanded |
CN110098966B (en) * | 2019-05-13 | 2022-02-22 | 中国联合网络通信集团有限公司 | Wireless network capacity analysis method and equipment |
CN110098966A (en) * | 2019-05-13 | 2019-08-06 | 中国联合网络通信集团有限公司 | Wireless network capacitance analysis method and equipment |
CN112203287A (en) * | 2019-07-08 | 2021-01-08 | 中国移动通信集团浙江有限公司 | Cell capacity adjusting method, device, equipment and storage medium |
CN112203287B (en) * | 2019-07-08 | 2022-11-22 | 中国移动通信集团浙江有限公司 | Cell capacity adjusting method, device, equipment and storage medium |
WO2021057402A1 (en) * | 2019-09-27 | 2021-04-01 | 中兴通讯股份有限公司 | Multi-carrier capacity expansion method and storage medium |
CN111132349A (en) * | 2019-12-31 | 2020-05-08 | 中国移动通信集团江苏有限公司 | Method, apparatus, device and medium for adjusting spectrum bandwidth |
CN111818580A (en) * | 2020-07-30 | 2020-10-23 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN111818583A (en) * | 2020-07-30 | 2020-10-23 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN111818584A (en) * | 2020-07-30 | 2020-10-23 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN111818584B (en) * | 2020-07-30 | 2022-07-08 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN111818583B (en) * | 2020-07-30 | 2022-07-08 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN111818580B (en) * | 2020-07-30 | 2023-02-17 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
CN112584391A (en) * | 2020-12-04 | 2021-03-30 | 中国联合网络通信集团有限公司 | Cell two-carrier expansion method and device |
CN112584391B (en) * | 2020-12-04 | 2023-01-24 | 中国联合网络通信集团有限公司 | Cell two-carrier expansion method and device |
Also Published As
Publication number | Publication date |
---|---|
CN106982435B (en) | 2020-11-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106982435A (en) | A kind of capacity adjustment method and device of F-band mixed networking | |
CN105992228B (en) | A kind of expansion method of wireless network, device and electronic equipment | |
Lin et al. | QoE-driven spectrum assignment for 5G wireless networks using SDR | |
CN109600262A (en) | Resource self-configuring and self-organization method and device in URLLC transmission network slice | |
CN103249007B (en) | D2D multi-casting communication in IMT-A system is set up and its wireless resource allocation methods | |
CN103067985B (en) | The binding of ultrahigh speed wireless lan channel and distribution method based on channel quality | |
CN106604343B (en) | Cell virtualization method and device | |
CN107172682A (en) | Super-intensive network radio resources distribution method based on dynamic clustering | |
CN102711179B (en) | Multi-service dynamic bandwidth distribution method under heterogeneous wireless network environment | |
CN102655681A (en) | Scheduling method | |
CN110225553A (en) | Data distribution method, device and system | |
CN104219769A (en) | LTE-based high-speed rail wireless communication system and resource distribution method thereof | |
CN105744592B (en) | A kind of business access method based on heterogeneous wireless network, apparatus and system | |
CN104244331B (en) | Data distribution processing method and processing device | |
CN102595499B (en) | A kind of UE sets up the method for mixing carrying in multiple community | |
CN108076531A (en) | A kind of wireless network section resource dynamic distributing method of multi-service oriented business | |
CN109673054A (en) | Frequency allocation method and system | |
CN102625369B (en) | Load balancing optimization method for guaranteeing quality of service requirements of users of different levels in classified manner | |
CN104469849B (en) | A kind of dynamic traffic distribution method based on smart antenna in small base station network | |
CN100499864C (en) | Method for eliminating common-frequency interference in time-division multiple-address honeycomb communication system | |
CN105323783B (en) | The dilatation appraisal procedure and device of wireless communication system | |
CN106411764A (en) | Dynamic bandwidth configuration adjustment method and base station equipment | |
CN107846702A (en) | Strengthen the resource allocation method of Physical Downlink Control Channel | |
CN107947890B (en) | A kind of inter-cell interference coordination method and the network equipment | |
CN102118752B (en) | Method and device for interference control and coordination |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |