CN106975980A - Drill bit cooling system based on vortex tube refrigeration - Google Patents

Drill bit cooling system based on vortex tube refrigeration Download PDF

Info

Publication number
CN106975980A
CN106975980A CN201710376170.3A CN201710376170A CN106975980A CN 106975980 A CN106975980 A CN 106975980A CN 201710376170 A CN201710376170 A CN 201710376170A CN 106975980 A CN106975980 A CN 106975980A
Authority
CN
China
Prior art keywords
hot
processing unit
drill bit
refrigeration
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710376170.3A
Other languages
Chinese (zh)
Inventor
孙志利
王启帆
崔奇
李紫薇
谢志远
石康吉
王雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University of Commerce
Original Assignee
Tianjin University of Commerce
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University of Commerce filed Critical Tianjin University of Commerce
Priority to CN201710376170.3A priority Critical patent/CN106975980A/en
Publication of CN106975980A publication Critical patent/CN106975980A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q11/00Accessories fitted to machine tools for keeping tools or parts of the machine in good working condition or for cooling work; Safety devices specially combined with or arranged in, or specially adapted for use in connection with, machine tools
    • B23Q11/10Arrangements for cooling or lubricating tools or work
    • B23Q11/1092Arrangements for cooling or lubricating tools or work specially adapted for portable power-driven tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25FCOMBINATION OR MULTI-PURPOSE TOOLS NOT OTHERWISE PROVIDED FOR; DETAILS OR COMPONENTS OF PORTABLE POWER-DRIVEN TOOLS NOT PARTICULARLY RELATED TO THE OPERATIONS PERFORMED AND NOT OTHERWISE PROVIDED FOR
    • B25F5/00Details or components of portable power-driven tools not particularly related to the operations performed and not otherwise provided for
    • B25F5/008Cooling means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of drill bit cooling system based on vortex tube refrigeration.The present invention includes air compression plant, vortex tube refrigerating device, dust and refrigeration waste gas collection device, and hot gas utilizes processing unit and central integrated circuit control device.The present invention can carry out effectively cooling down and then reducing high temperature to bit life and its drill bit cooling system of performance impact to drill bit, can guarantee that again simultaneously does not influence the performance of the medium-and-large-sized equipment in construction site and highly sophisticated device, and does not cause a certain degree of change and influence to the severe rugged environment required by large scale equipment and highly sophisticated device.

Description

Drill bit cooling system based on vortex tube refrigeration
Technical field
The present invention is to be related to a kind of drill bit cooling system, specifically a kind of drill bit cooling system based on vortex tube refrigeration System.
Background technology
Under normal circumstances, concrete bearing wall newly opens the door hole in engineering, windowing.The various types such as air-conditioning, lampblack absorber, water heater Number reserved hole drilling.Ventilation shaft punches, and what the boring procedure such as fire protection pipeline drilling was used is water drilling, and water drilling scientific name is band Water source diamond drill machine, abbreviation diamond drill machine.Water drilling has following feature:Size is accurate, and construction precision is high;Shockproof, nothing Noise, meets environmental requirement;To surrounding structure not damaged, repairing is not required to;Equipment volume is small, using flexible, has a wide range of application.Water Bore during use, drill bit can produce substantial amounts of heat in a short time, rely primarily on water to be cooled down, in general construction In conjunction more adapt to and conveniently.
But in some special occasions, such as in highly sophisticated device production and workplace, war production place, high electrostatic area In the execution conditions such as domain extremely harsh environment, it is not possible to the pollution sources such as dust, sewage occur, change that can not be larger is special Ensure the equipment normally required environment of operation in occasion, otherwise may be to the precise instrument and big machinery in place Certain part of equipment causes immeasurable direct or indirect destruction, influences the overall performance of equipment, causes unnecessary huge Big economic loss.If the transformation of certain system upgrade or small-scale operation, tradition in the wall decorations, room to the indoor progress later stage Water drilling can not meet construction requirement, it is thus impossible to the construction operation for this occasion.Development, section with China's economic The raising of skill level and the reform and development that deepens continuously of the industrial structure, heavy mechanical equipment, highly sophisticated device, larger central processing The places such as device are set up in succession in each department, how to be constructed or entered on a small scale in the place to environmental requirement extremely harshness Other construction operations of row a, it has also become great difficult problem of the high-accuracy production of high-tech.
Therefore, the necessary meaning and value that truly have its presence of drill bit cooling system of this set based on vortex tube refrigeration.
The content of the invention
It is an object of the invention to provide one kind drill bit can be carried out effectively to cool down and then reduce high temperature to bit life and its Performance impact, while can guarantee that again does not influence the performance of the medium-and-large-sized equipment in construction site and highly sophisticated device, and not to large-scale Severe rugged environment required by equipment and highly sophisticated device causes the drill bit cooling system of a certain degree of change and influence.
To realize above-mentioned functions, technical scheme is as follows:
Drill bit cooling system based on vortex tube refrigeration, including controlled respectively by central integrated circuit control device 5 Air compression plant 1, vortex tube refrigerating device 2, dust and refrigeration waste gas collection device 3 and hot gas utilize processing unit 4,
The vortex pipe refrigeration system 2 includes air inlet 2a, cold side outlet 2b and hot junction outlet 2c, air inlet 2a and noise reduction Device 18 is connected, and muffler 18 is connected with air compression plant 1, and cold side outlet 2b is connected with electrical drilling machine 19, and electrical drilling machine 19 is with keeping out the wind Screen 12 is connected, and paravent 12 is connected with dust and refrigeration waste gas collection device 3, dust and refrigeration waste gas collection device 3 and filtering Device 9 is connected, and filter 9 is connected with hot gas using the air inlet 4a of processing unit 4, and hot junction outlet 2c is utilized with hot gas to be handled The air inlet 4a of device 4 is connected.
The hot gas using processing unit 4 include air inlet 4a, gas outlet 4b, air inlet 4a respectively with vortex tube refrigeration system The hot junction outlet 2c of system 2, filter 9 is connected, and gas outlet 4b is connected with dry filtrating equipment 10, and hot gas utilizes processing unit 4 It is connected with hot water control valve 8, hot water control valve 8 is connected with hot water tank 6, hot water tank 6 is connected with tap 17, hot gas It is connected using processing unit 4 with cold water control valve 15, cold water control valve 15 is connected with cold water reservoir 7, cold water reservoir 7 and heat Tank 16 is connected.
The outside of the cooling system installs detachable light instrument case 11, central controller 13 and charger 14, central controller 13 Connect central integrated circuit control device 5.
The present invention has the advantages that:
Drill bit cooling system of the present invention can carry out effectively cooling down and then reducing high temperature to bit life and its performance to drill bit Influence, while can guarantee that again does not influence the performance of the medium-and-large-sized equipment in construction site and highly sophisticated device, and not to large scale equipment A certain degree of change and influence are caused with the severe rugged environment required by highly sophisticated device.
Brief description of the drawings
Drill bit cooling systems of the Fig. 1 based on vortex tube refrigeration.
In figure:Air compression plant 1, vortex tube refrigerating device 2, dust and refrigeration waste gas collection device 3, hot gas is at Reason device 4, central integrated circuit control device 5, hot water tank 6, cold water reservoir 7, hot water control valve 8, filter 9, Dry filtrating equipment 10, detachable light instrument case 11, paravent 12, central controller 13, charger 14, cold water control valve 15, heat Tank 16, tap 17, muffler 18, electrical drilling machine 19.
Embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.
As shown in figure 1, the drill bit cooling system based on vortex tube refrigeration, including pass through central integrated circuit control dress respectively The air compression plant 1 of 5 controls is put, vortex tube refrigerating device 2, dust and refrigeration waste gas collection device 3 and hot gas utilize processing Device 4,
The vortex pipe refrigeration system 2 includes vortex pipe refrigeration system air inlet 2a, cold side outlet 2b and hot junction outlet 2c, Vortex pipe refrigeration system air inlet 2a is connected with muffler 18, and muffler 18 is connected with air compression plant 1, cold side outlet 2b with Electrical drilling machine 19 is connected, and electrical drilling machine 19 is connected with paravent 12, and paravent 12 is connected with dust and refrigeration waste gas collection device 3, powder Dirt and refrigeration waste gas collection device 3 are connected with filter 9, and filter 9 is connected with hot gas using processing unit air inlet 4a, Outlet 2c in hot junction is connected with hot gas using processing unit air inlet 4a.
The hot gas includes hot gas using processing unit air inlet 4a, gas outlet 4b, 4a points of air inlet using processing unit 4 2c is not exported with the hot junction of vortex pipe refrigeration system 2, filter 9 is connected, and gas outlet 4b is connected with dry filtrating equipment 10, heat Gas is connected using processing unit 4 with hot water control valve 8, and hot water control valve 8 is connected with hot water tank 6, hot water tank 6 and water Tap 17 is connected, and hot gas is connected using processing unit 4 with cold water control valve 15, and cold water control valve 15 is connected with cold water reservoir 7, Cold water reservoir 7 is connected with hot water storgae 16.
All devices inside the central integrated control system of circuit control device 5, by 13 pairs outside of central controller respectively Device is regulated and controled, and meets different construction demands.
The detachable light instrument case 11, central controller 13 and charger 14 are separately mounted to the outside of whole system.
Outside air compresses through air compression plant and is cooled to normal temperature high voltage gas during experiment, from whirlpool after muffler The air inlet of flow tube refrigeration system is flowed into, and produces cold airflow and thermal current in minor air cell, and cold airflow is from vortex tube refrigerating device Cold side outlet outflow, flow into the drill bit through hole of rig, drill bit cooled down, afterwards inflow paravent in, with dust chip Be inhaled into together dust and refrigeration waste gas collection device, waste gas after dry filtrating equipment filtration, purification with vortex tube refrigerating device The hot gas of hot junction outlet utilize processing unit into hot gas in the lump, exchanged heat with water, be cooled to the waste gas of normal temperature through drying Filter is drained into atmospheric environment.The hot water that hot gas is produced using processing system enters hot water tank through hot water control valve, Cold water utilizes processing system through cold water control valve in cold water reservoir into hot gas.Hot water can be flowed out by tap, for outer Boundary is used, and hot water storgae receives the hot water or waste water omitted.Each part and subsystem are controlled by central integrated circuit control device, Signal is delivered to central controller, is directly operated by extraneous, reasonably changes system operational parameters, and charger is that whole system supplies electricity Energy.

Claims (2)

1. a kind of drill bit cooling system based on vortex tube refrigeration, it is characterized in that, including controlled respectively by central integrated circuit The air compression plant (1) of device (5) control, vortex tube refrigerating device (2), dust and refrigeration waste gas collection device (3) and heat Gas utilizes processing unit (4),
The vortex pipe refrigeration system (2) includes vortex pipe refrigeration system air inlet (2a), cold side outlet (2b) and hot junction outlet (2c), vortex pipe refrigeration system air inlet (2a) is connected with muffler (18), muffler (18) and air compression plant (1) phase Even, cold side outlet (2b) is connected with electrical drilling machine (19), and electrical drilling machine (19) is connected with paravent (12), paravent (12) and dust and The waste gas collection device (3) that freezes is connected, and dust and refrigeration waste gas collection device (3) are connected with filter (9), filter (9) it is connected with hot gas using processing unit air inlet (4a), hot junction outlet (2c) utilizes processing unit air inlet (4a) with hot gas It is connected;
The hot gas includes hot gas using processing unit (4) and utilizes processing unit air inlet (4a), and gas outlet (4b), hot gas is utilized Processing unit air inlet (4a) exports (2c) with the hot junction of vortex pipe refrigeration system (2) respectively and filter (9) is connected, outlet Mouth (4b) is connected with dry filtrating equipment (10), and hot gas is connected using processing unit (4) with hot water control valve (8), hot water control Valve (8) is connected with hot water tank (6), and hot water tank (6) is connected with tap (17), hot gas using processing unit (4) with Cold water control valve (15) is connected, and cold water control valve (15) is connected with cold water reservoir (7), cold water reservoir (7) and hot water storgae (16) it is connected.
2. the drill bit cooling system according to claim 1 based on vortex tube refrigeration, it is characterized in that, the cooling system Detachable light instrument case (11), central controller (13) and charger (14) are installed in outside, and central controller (13) connects central integrated electricity Road control device (5).
CN201710376170.3A 2017-05-25 2017-05-25 Drill bit cooling system based on vortex tube refrigeration Pending CN106975980A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710376170.3A CN106975980A (en) 2017-05-25 2017-05-25 Drill bit cooling system based on vortex tube refrigeration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710376170.3A CN106975980A (en) 2017-05-25 2017-05-25 Drill bit cooling system based on vortex tube refrigeration

Publications (1)

Publication Number Publication Date
CN106975980A true CN106975980A (en) 2017-07-25

Family

ID=59342663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710376170.3A Pending CN106975980A (en) 2017-05-25 2017-05-25 Drill bit cooling system based on vortex tube refrigeration

Country Status (1)

Country Link
CN (1) CN106975980A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107263203A (en) * 2017-08-02 2017-10-20 上海金兆节能科技有限公司 A kind of cold air lubricating system with trace amount
CN108188431A (en) * 2017-12-21 2018-06-22 昆山万马五金有限公司 A kind of drilling machine for being used for five metalworkings
CN110319614A (en) * 2018-03-28 2019-10-11 上海微电子装备(集团)股份有限公司 A kind of temperature control system, lithographic equipment and temprature control method
CN112276668A (en) * 2020-10-17 2021-01-29 台州学院 Cooling device for machine tool cooling liquid

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1177665A (en) * 1997-09-12 1999-03-23 Ichiro Shimizu Vortex tube applied cooling type vacuum boring drill
JP2003077519A (en) * 2001-08-30 2003-03-14 Nippon Soken Inc Water collecting device for fuel cell system
CN101672545A (en) * 2008-09-09 2010-03-17 罗耀文 Cooling and heating device with vortex tube
CN101963432A (en) * 2010-11-01 2011-02-02 江苏天舒电器有限公司 Freezing and refrigerating device with hot water supply
US20110173994A1 (en) * 2010-01-15 2011-07-21 Advanced Semiconductor Engineering, Inc. Cooling system for semiconductor manufacturing and testing processes
CN205482476U (en) * 2016-02-19 2016-08-17 天津市冰科制冷设备有限公司 Refrigeration plant heat sink
CN205888724U (en) * 2016-08-11 2017-01-18 深圳市溢辉数控设备有限公司 Lathe cooling a tool equipment
CN206925643U (en) * 2017-05-25 2018-01-26 天津商业大学 Drill bit cooling system based on vortex tube refrigeration

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1177665A (en) * 1997-09-12 1999-03-23 Ichiro Shimizu Vortex tube applied cooling type vacuum boring drill
JP2003077519A (en) * 2001-08-30 2003-03-14 Nippon Soken Inc Water collecting device for fuel cell system
CN101672545A (en) * 2008-09-09 2010-03-17 罗耀文 Cooling and heating device with vortex tube
US20110173994A1 (en) * 2010-01-15 2011-07-21 Advanced Semiconductor Engineering, Inc. Cooling system for semiconductor manufacturing and testing processes
CN101963432A (en) * 2010-11-01 2011-02-02 江苏天舒电器有限公司 Freezing and refrigerating device with hot water supply
CN205482476U (en) * 2016-02-19 2016-08-17 天津市冰科制冷设备有限公司 Refrigeration plant heat sink
CN205888724U (en) * 2016-08-11 2017-01-18 深圳市溢辉数控设备有限公司 Lathe cooling a tool equipment
CN206925643U (en) * 2017-05-25 2018-01-26 天津商业大学 Drill bit cooling system based on vortex tube refrigeration

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107263203A (en) * 2017-08-02 2017-10-20 上海金兆节能科技有限公司 A kind of cold air lubricating system with trace amount
CN108188431A (en) * 2017-12-21 2018-06-22 昆山万马五金有限公司 A kind of drilling machine for being used for five metalworkings
CN110319614A (en) * 2018-03-28 2019-10-11 上海微电子装备(集团)股份有限公司 A kind of temperature control system, lithographic equipment and temprature control method
CN112276668A (en) * 2020-10-17 2021-01-29 台州学院 Cooling device for machine tool cooling liquid

Similar Documents

Publication Publication Date Title
CN106975980A (en) Drill bit cooling system based on vortex tube refrigeration
CN108087013B (en) Mine cooling and heat damage utilization system
CN204327155U (en) A kind of for mine ventilation Dust Removal Experiment device
CN102721117A (en) Special air conditioner and dehumidifier for variable-air supply dew-point temperature-controlled hydropower station, and control method
CN101520365A (en) Simulation experimental system for controlling mine tunnel dust environment
CN108150214B (en) Automatic mist-reducing, dust-removing and cooling system and method in tunnel construction process
CN101776943A (en) Energy-saving system and method for data center machine room
CN206925643U (en) Drill bit cooling system based on vortex tube refrigeration
CN206263704U (en) Lathe exhaust system
CN206266520U (en) A kind of skid mounted biogas purifier
CN210863680U (en) Modular air quality monitoring device
CN205030022U (en) Satellite ground testing cooling system
CN113833449A (en) Monitoring system and method while drilling for directional drilling of underground coal mine gas
CN207689453U (en) A kind of Self inhaling type enviromental monitoring equipment
CN205825502U (en) Earth-source hot-pump system
CN105373156A (en) Electrical control cabinet based on sensor technology applications
CN201059716Y (en) Hpid controlled precision air-conditioning
CN205878495U (en) Be used for air conditioner outer container cooling tube heat reclamation device
CN209371576U (en) A kind of condensation temperature automatic control device
CN103673142A (en) Air conditioner outdoor unit and outdoor unit case thereof
CN205558960U (en) Tunnel regional hypothermia device
Dumakor-Dupey et al. Numerical evaluation of a spot cooling technique for underground metal mines
CN205717774U (en) Center energy saving air conditioning system
CN205427654U (en) Electrical control cabinet based on sensor technology uses
CN205717750U (en) Center energy saving air-conditioning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170725