CN106970291A - A kind of method of automatic test high voltage device of transformer station current loop secondary load - Google Patents

A kind of method of automatic test high voltage device of transformer station current loop secondary load Download PDF

Info

Publication number
CN106970291A
CN106970291A CN201710182736.9A CN201710182736A CN106970291A CN 106970291 A CN106970291 A CN 106970291A CN 201710182736 A CN201710182736 A CN 201710182736A CN 106970291 A CN106970291 A CN 106970291A
Authority
CN
China
Prior art keywords
test
secondary load
current loop
intelligent mobile
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710182736.9A
Other languages
Chinese (zh)
Other versions
CN106970291B (en
Inventor
杨晞明
李祥筠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Ximing Engineering Laboratories Co., Ltd.
Original Assignee
Shanghai Red Eggs Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Red Eggs Mdt Infotech Ltd filed Critical Shanghai Red Eggs Mdt Infotech Ltd
Priority to CN201710182736.9A priority Critical patent/CN106970291B/en
Publication of CN106970291A publication Critical patent/CN106970291A/en
Application granted granted Critical
Publication of CN106970291B publication Critical patent/CN106970291B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/20Measuring earth resistance; Measuring contact resistance, e.g. of earth connections, e.g. plates
    • G01R27/205Measuring contact resistance of connections, e.g. of earth connections
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/66Testing of connections, e.g. of plugs or non-disconnectable joints
    • G01R31/67Testing the correctness of wire connections in electric apparatus or circuits

Abstract

A kind of method of automatic test high voltage device of transformer station current loop secondary load, belongs to fields of measurement.It is with signal source of the constant-current source as test device, one APP software of installation settings in Intelligent mobile equipment, the CPU for manipulating test device performs corresponding test instruction, one server is set, for record test device, the device identifying information of Intelligent mobile equipment, record and store test data or test result;Server, test device and Intelligent mobile equipment are located in same WLAN WiFi.The measurement of exchange continuity, secondary load measurement and secondary circuit are carried out by the secondary circuit to multiple high-tension apparatus current loops successively correctness detection is installed, realize comprehensive a variety of detections to high-tension apparatus current loop;For Party A construction unit or third-party intendance unit inspection personnel in time, at large grasp first-hand test data or test result provides safe and reliable acquisition of information channel.Suitable for the testing field of secondary loop in power system.

Description

A kind of method of automatic test high voltage device of transformer station current loop secondary load
Technical field
The invention belongs to fields of measurement, more particularly to a kind of survey for high voltage device of transformer station current loop secondary load Method for testing.
Background technology
High-tension apparatus in transformer station, is divided according to rated operational voltage, rated operational voltage in 1000V and More than for high voltage electric equipment (abbreviation high-tension apparatus), rated operational voltage grade is set in below 1000V persons for low-voltage electrical Standby (abbreviation low-voltage equipment), this is in State Grid Corporation of China《Safety code》In have clear stipulaties.
Installed in high voltage device of transformer station, debug or annual regular maintenance after, it is necessary to be returned to high-tension apparatus electric current The secondary load on road is tested, and to ensure that the wiring in secondary load loop is correct, contact is good.
Existing secondary load test job pattern, it usually needs one group of staff carries out test equipment in device context Connect, work of taking out stitches, another group of staff before the switch board in centralized control room, monitoring and record test data, Generally contacted between two groups of staff using the wireless telecommunications system such as intercom, transmit test result, coordinate to test into Degree etc..
In the implementation process of above-mentioned this mode of operation, there is problems with:
1st, tester needs to carry out the work before switch board in the erecting bed of high-tension apparatus and centralized control room simultaneously, Therefore actual test personnel will at least be divided into two groups, one group at the scene, and one group, in central station of floating dock, is linked up and coordinated by intercom Testing procedure, bothersome laborious, test job efficiency is low;
2nd, need many people to be worked simultaneously in test site and centralized control room (at least two group of 4 people), involve personnel's number Amount is more, is not suitable with the working system and mode of operation of existing power system increasing efficiency by downsizing staff;
3rd, with the continuous popularization of various high-power electromagnetic equipments, the various electromagnetism in transformer station and its surrounding enviroment are done Disturb and greatly increase, the information communication between severe jamming wireless intercom equipment, original wireless communication mode can not ensure Noiseless reliable links between substation field and remote control room;
4th, test process and test result are manually recorded, and easily produce error, it is impossible to test process, test is completely secured As a result true, effective, test content, the accuracy of record place one's entire reliance upon the working sense of responsibility of on-the-spot test personnel, to survey Authenticity, the reliability of test result record bring certain hidden danger, are unfavorable for Party A's unit or management side and grasp the in time, at large Proficiency test data or test result.
How the artifical influence factor during on-the-spot test is minimized, realize substation field and central station of floating dock Between glitch-free reliable links, it is ensured that test process and test result record authenticity, reliability, be easy to Party A's unit or Management side is timely, at large grasp first-hand test data or test result, is urgent problem in actual field work.
The content of the invention
It is secondary that the technical problems to be solved by the invention are to provide a kind of automatic test high voltage device of transformer station current loop The method of load.It uses constant-current source as testing source, it is ensured that the stability of test result, reproducibility is good;On the one hand Carried out data transmission using the WLAN of intelligent substation, it is ensured that accurate in data transfer procedure, it is another Whole test process and data are sent to server and preserved by aspect in real time, by the human factor in test process reduce to It is minimum, it is ensured that it is true, reliable that test process and test result are recorded, and is also easy to Party A's unit or management side timely, detailed Grasp first-hand test data or test result in ground.
The technical scheme is that:A kind of side of automatic test high voltage device of transformer station current loop secondary load is provided Method, including use secondary load of the test device to high-tension apparatus current loop to be tested and record test result, its feature It is:
1) using signal source of the constant-current source as test device, described test device is arranged on high-tension apparatus current loop Device context, described test device carries CPU and wireless network communication module;
2) in the Intelligent mobile equipment with wireless network communication module, one APP software of installation settings is described The CPU that APP softwares are used to manipulate the test device performs corresponding test instruction, control correspondence test switch or middle relay " on/off " action of device, carries out corresponding test event;
3) server is set, for record test device, the device identifying information of Intelligent mobile equipment, records and deposits Store up test data or test result;Described server, test device and Intelligent mobile equipment is located at same WLAN In WiFi;
4) by the multiple signals output end of test device and the terminals of multiple high-tension apparatus current loop secondary load sides Or test lead carries out correspondence connection respectively;
5) APP is started in Intelligent mobile equipment;
6) Intelligent mobile equipment is first by the wireless network communication module carried, scanning wireless local in the environment WiFi name and password are netted, and scanning result is uploaded onto the server;Then the string code or equipment of Intelligent mobile equipment are compiled Code uploads onto the server;
7) CPU of test device is first by the wireless network communication module carried, scanning wireless office in the environment WiFi is netted in domain, and scanning result is uploaded onto the server;
8) name of server intelligent mobile device and the test device CPU WLAN WiFi uploaded, if It is identical, then judge that Intelligent mobile equipment is located in same WLAN WiFi with test device;
9) server sends the password of the WLAN WiFi to the CPU of test device;
10) CPU of test device is accessed wireless where Intelligent mobile equipment by the wireless network communication module that carries LAN WiFi, the string code or device coding that test device is carried into wireless network communication module uploads onto the server;
11) by server and WLAN WiFi, built between described Intelligent mobile equipment and the CPU of test device The contact method of vertical " point-to-point ", " shaking hands " success;
12) tester is by operating APP, and Intelligent mobile equipment exports a test instruction, and described test instruction is logical Cross the CPU that server downloads to test device;
13) CPU of test device is connected to described test instruction, corresponding CPU pins output signal, by being arranged on survey Auxiliary reclay during trial assembly is put carries out contact extension;
14) the CPU controls test device of test device switches on power, and then by controlling the contact of auxiliary reclay, controls The electric current output of corresponding current grade processed;
15) test electric current is sent to the secondary load side of the high-tension apparatus current loop of the test instruction nominative testing; The magnitude of voltage tested simultaneously between tested high-tension apparatus current loop secondary load side signal input part;
16) CPU of test numbers the loop of the magnitude of voltage tested and tested current loop secondary load, transmission To server, the loop numbering of the magnitude of voltage tested and tested current loop secondary load is returned to intelligence by server Mobile device;
17) Intelligent mobile equipment shows loop numbering, code name or the relay of tested current loop secondary load in APP Device is numbered, and shows the corresponding magnitude of voltage result tested simultaneously;
18) the magnitude of voltage result tested by recording and comparing, judgement is devices under whether meeting detection requirement;
19) server storage test result, and test result is sent to Intelligent mobile equipment, examine and survey for tester Test result;
20) tester is by operating APP, and Intelligent mobile equipment exports a new test instruction, to another high pressure The secondary load in device current loop repeats above-mentioned 12nd to 19 step;
21) inspection personnel of Party A construction unit or third-party intendance unit, can browse mould by login service device Formula, checks, has access to the test data or test result for having completed perhaps test event in test;
The method of the automatic test high voltage device of transformer station current loop secondary load, by WLAN WiFi, The data transmission of test instruction, test data and test result is carried out, to realize real-time, rapid, free from error information transmission Process, realizes glitch-free reliable links between substation field and central station of floating dock, it is ensured that what test process and test result were recorded Authenticity, reliability, and the error that the human factor during on-the-spot test is caused minimizes;
The method of the automatic test high voltage device of transformer station current loop secondary load, is carrying out multipath testing equipment Signal output part is carried out after corresponding connection respectively with the terminals or test lead of multiple high-tension apparatus current loop secondary loads, is adopted With the APP installed on operation Intelligent mobile equipment pattern, far distance controlled test device carries out corresponding a variety of protections or meter Examination is measured, so as to reduce required on-the-spot test personnel amount to greatest extent, the work for mitigating on-the-spot test personnel is strong Degree, improves work on the spot efficiency;
The method of the automatic test high voltage device of transformer station current loop secondary load, can not turn off high-tension apparatus In the case of current loop, by the secondary circuit to multiple high-tension apparatus current loops carry out successively exchange continuity measure, Secondary load measurement and secondary circuit install correctness detection, realize comprehensive a variety of detections to high-tension apparatus current loop;
The method of the automatic test high voltage device of transformer station current loop secondary load, passes through browsing for login service device Pattern, be Party A construction unit or third-party intendance unit inspection personnel grasp in time, at large first-hand test data or Test result provides safe and reliable acquisition of information channel.
Specifically, described Intelligent mobile equipment includes smart mobile phone, tablet personal computer or the pen with wireless network module Remember this computer.
Specifically, described multiple high-tension apparatus current loops, in the same equipment installation interval of transformer station, or position In in adjacent equipment installation interval.
Specifically, described server, test device and Intelligent mobile equipment are located at the wireless local of same transformer station In net.
Specifically, the name of the WLAN includes the identification code or ID of wireless network.
Further, the electric current output of described corresponding current grade at step 14, refers to that output is returned with tested electric current The current class of road secondary load is to corresponding electric current.
Further, described current class is 1A, 2A or 5A.
Further, the magnitude of voltage result tested in step 18 by recording and comparing, judgement be devices under be It is no to meet detection requirement, refer to utilize formula U=IR, pass through the magnitude of voltage result tested, judge that tested high pressure is set Whether standby current loop is normal, and whether the line footpath of connecting wire meets the requirements, and whether the contact resistance of binding post meets the requirements And whether the secondary load of tested current loop meets the requirements.
Further, described test device at least includes the control unit with a current source and test device;It is described Control unit at least include CPU, wireless wireless network communication module, one group of centre current-collector, multichannel and prolong Stretch version;
Wherein, described current source is constant-current source, and " on/off " of the current source power input is by CPU controls;It is described The output end of current source carries out corresponding connection respectively with the terminals or test lead of high-tension apparatus current loop secondary load side;
The connection corresponding with CPU I/O ports of described wireless wireless network communication module, one group of centre current-collector I/O ports corresponding with CPU are connected respectively control coil respectively;The output contact of current-collector and extension in the middle of described one group Multiple inputs of expansion board are connected respectively;The electricity of each output end of the extension expansion board respectively with a current source Source control end correspondence is connected.
Further, between two binding posts of every high-tension apparatus current loop secondary load tested all the way, or Person, in extension expansion board per between two binding posts of output end all the way, is provided with a voltmeter.
Compared with the prior art, it is an advantage of the invention that:
1. by WLAN WiFi in the technical program, carry out test instruction, test data and test result Data are transmitted, to realize real-time, rapid, free from error information exchanging process, are realized between substation field and central station of floating dock without dry The reliable links disturbed, it is ensured that authenticity, the reliability of test process and test result record, and by the people during on-the-spot test The error caused for factor is minimized;
2. using the APP installed on operation Intelligent mobile equipment pattern in the technical program, far distance controlled test dress The corresponding a variety of protections of progress or metrology and measurement are put, so as to reduce required on-the-spot test personnel amount to greatest extent, Mitigate the working strength of on-the-spot test personnel, improve work on the spot efficiency;
3. the technical program can be in the case where not turning off high-tension apparatus current loop, by multiple high-tension apparatuses electricity The secondary circuit for flowing back to road carries out the measurement of exchange continuity, secondary load measurement and secondary circuit installation correctness detection successively, Realize comprehensive a variety of detections to high-tension apparatus current loop;
4. it is Party A construction unit or third-party intendance unit by the browse mode of login service device in the technical program Inspection personnel grasp first-hand test data or test result in time, at large and provide safe and reliable acquisition of information canal Road.
Brief description of the drawings
Fig. 1 is the module composition schematic diagram of test device of the present invention;
Fig. 2 is the working range schematic diagram of test jobs of the present invention.
In figure, 1 is the control unit of test device.
Embodiment
The present invention will be further described below in conjunction with the accompanying drawings.
In Fig. 1, it is secondary negative that technical scheme provides a kind of automatic test high voltage device of transformer station current loop The method of load, including use secondary load of the test device to high-tension apparatus current loop to be tested and record test result, Its inventive point is that described method at least comprises the following steps:
1) using signal source of the constant-current source as test device, described test device is arranged on high-tension apparatus current loop Device context, described test device carries CPU and wireless network communication module;
2) in the Intelligent mobile equipment with wireless network communication module, one APP software of installation settings is described The CPU that APP softwares are used to manipulate the test device performs corresponding test instruction, control correspondence test switch or middle relay " on/off " action of device, carries out corresponding test event;
3) server is set, for record test device, the device identifying information of Intelligent mobile equipment, records and deposits Store up test data or test result;Described server, test device and Intelligent mobile equipment is located at same WLAN In WiFi;
4) by the multiple signals output end of test device and the terminals of multiple high-tension apparatus current loop secondary load sides Or test lead carries out correspondence connection respectively;
5) APP is started in Intelligent mobile equipment;
6) Intelligent mobile equipment is first by the wireless network communication module carried, scanning wireless local in the environment WiFi name and password are netted, and scanning result is uploaded onto the server;Then the string code or equipment of Intelligent mobile equipment are compiled Code uploads onto the server;
7) CPU of test device is first by the wireless network communication module carried, scanning wireless office in the environment WiFi is netted in domain, and scanning result is uploaded onto the server;
8) name of server intelligent mobile device and the test device CPU WLAN WiFi uploaded, if It is identical, then judge that Intelligent mobile equipment is located in same WLAN WiFi with test device;
9) server sends the password of the WLAN WiFi to the CPU of test device;
10) CPU of test device is accessed wireless where Intelligent mobile equipment by the wireless network communication module that carries LAN WiFi, the string code or device coding that test device is carried into wireless network communication module uploads onto the server;
11) by server and WLAN WiFi, built between described Intelligent mobile equipment and the CPU of test device The contact method of vertical " point-to-point ", " shaking hands " success;
12) tester is by operating APP, and Intelligent mobile equipment exports a test instruction, and described test instruction is logical Cross the CPU that server downloads to test device;
13) CPU of test device is connected to described test instruction, corresponding CPU pins output signal, by being arranged on survey Auxiliary reclay during trial assembly is put carries out contact extension;
14) the CPU controls test device of test device switches on power, and then by controlling the contact of auxiliary reclay, controls The electric current output of corresponding current grade processed;
15) test electric current is sent to the secondary load side of the high-tension apparatus current loop of the test instruction nominative testing; The magnitude of voltage tested simultaneously between tested high-tension apparatus current loop secondary load side signal input part;
16) CPU of test numbers the loop of the magnitude of voltage tested and tested current loop secondary load, transmission To server, the loop numbering of the magnitude of voltage tested and tested current loop secondary load is returned to intelligence by server Mobile device;
17) Intelligent mobile equipment shows loop numbering, code name or the relay of tested current loop secondary load in APP Device is numbered, and shows the corresponding magnitude of voltage result tested simultaneously;
18) the magnitude of voltage result tested by recording and comparing, judgement is devices under whether meeting detection requirement;
19) server storage test result, and test result is sent to Intelligent mobile equipment, examine and survey for tester Test result;
20) tester is by operating APP, and Intelligent mobile equipment exports a new test instruction, to another high pressure The secondary load in device current loop repeats above-mentioned 12nd to 19 step;
21) inspection personnel of Party A construction unit or third-party intendance unit, can browse mould by login service device Formula, checks, has access to the test data or test result for having completed perhaps test event in test;
The method of the automatic test high voltage device of transformer station current loop secondary load, by WLAN WiFi, The data transmission of test instruction, test data and test result is carried out, to realize real-time, rapid, free from error information transmission Process, realizes glitch-free reliable links between substation field and central station of floating dock, it is ensured that what test process and test result were recorded Authenticity, reliability, and the error that the human factor during on-the-spot test is caused minimizes;
The method of the automatic test high voltage device of transformer station current loop secondary load, is carrying out multipath testing equipment Signal output part is carried out after corresponding connection respectively with the terminals or test lead of multiple high-tension apparatus current loop secondary loads, is adopted With the APP installed on operation Intelligent mobile equipment pattern, far distance controlled test device carries out corresponding a variety of protections or meter Examination is measured, so as to reduce required on-the-spot test personnel amount to greatest extent, the work for mitigating on-the-spot test personnel is strong Degree, improves work on the spot efficiency;
The method of the automatic test high voltage device of transformer station current loop secondary load, can not turn off high-tension apparatus In the case of current loop, by the secondary circuit to multiple high-tension apparatus current loops carry out successively exchange continuity measure, Secondary load measurement and secondary circuit install correctness detection, realize comprehensive a variety of detections to high-tension apparatus current loop;
The method of the automatic test high voltage device of transformer station current loop secondary load, passes through browsing for login service device Pattern, be Party A construction unit or third-party intendance unit inspection personnel grasp in time, at large first-hand test data or Test result provides safe and reliable acquisition of information channel.
Specifically, described Intelligent mobile equipment includes smart mobile phone, tablet personal computer or the pen with wireless network module Remember this computer.
Specifically, described multiple high-tension apparatus current loops, in the same equipment installation interval of transformer station, or position In in adjacent equipment installation interval.
Specifically, described server, test device and Intelligent mobile equipment are located at the wireless local of same transformer station In net.
Specifically, the name of the WLAN includes the identification code or ID of wireless network.
Further, the electric current output of described corresponding current grade at step 14, refers to that output is returned with tested electric current The current class of road secondary load is to corresponding electric current.
Further, described current class is 1A, 2A or 5A.
Further, the magnitude of voltage result tested in step 18 by recording and comparing, judgement be devices under be It is no to meet detection requirement, refer to utilize formula U=IR, because using constant-current source, then electric current I is constant, then passes through and tested The magnitude of voltage result arrived, you can judge whether tested high-tension apparatus current loop is normal, and whether the line footpath of connecting wire accords with Close and require, whether whether meet the requirements and the be tested secondary load of current loop of the contact resistance of binding post conforms to Ask.
Further, described test device at least includes the control unit with a current source and test device;It is described Control unit at least include CPU, wireless wireless network communication module, one group of centre current-collector, multichannel and prolong Stretch version;
Wherein, described current source is constant-current source, and " on/off " of the current source power input is by CPU controls;It is described The output end of current source carries out corresponding connection respectively with the terminals or test lead of high-tension apparatus current loop secondary load side;
The connection corresponding with CPU I/O ports of described wireless wireless network communication module, one group of centre current-collector I/O ports corresponding with CPU are connected respectively control coil respectively;The output contact of current-collector and extension in the middle of described one group Multiple inputs of expansion board are connected respectively;The electricity of each output end of the extension expansion board respectively with a current source Source control end correspondence is connected.
Further, between two binding posts of every high-tension apparatus current loop secondary load tested all the way, or Person, in extension expansion board per between two binding posts of output end all the way, is provided with a voltmeter.
In Fig. 2, by taking a transformer station as an example, high-tension apparatus current loop and its secondary load are tested at 1 building, metering cabinet exists 2 buildings, protection switch board is at 4 buildings.
Under existing means of testing, on-the-spot test personnel are needed for 1 building, it is on the scene that 2 buildings and 4 buildings pages need tester, Therefore the synchronization of the contact between each group personnel, data record and test event, coordination are an extremely difficult things, arduously Bothersome and time-consuming, inefficiency, test period is long, and labor intensity is big.
After the technical program, one group of tester of order carefully connects the wire at 1 building, to 2 buildings by Intelligent mobile equipment The APP of installation carries out corresponding operating, completes corresponding test event, test result is automatically recorded in server, then upper To 4 buildings, progress completes corresponding test event, and test result is equally automatically recorded in server.
So, tester is from 1 upstairs to 4 buildings, and all test events pass through with regard to being all over like clockwork The data in server are transferred, test report also conveniently, can be completed inerrably, and operating efficiency is greatly improved, and labor intensity is obvious Decline.
Tied because technical scheme carries out test instruction, test data and test by WLAN WiFi The data transmission of fruit, it is ensured that authenticity, the reliability of test process and test result record, and by during on-the-spot test The error that human factor is caused is minimized;It uses the APP installed on operation Intelligent mobile equipment pattern, far distance controlled Test device carries out corresponding a variety of protections or metrology and measurement, so as to reduce required on-the-spot test personnel to greatest extent Quantity, mitigates the working strength of on-the-spot test personnel, improves work on the spot efficiency;The technical scheme can be set not turning off high pressure In the case of standby current loop, exchange continuity is carried out by the secondary circuit to multiple high-tension apparatus current loops successively and surveyed Amount, secondary load measurement and secondary circuit install correctness detection, realize comprehensive a variety of detections to high-tension apparatus current loop; In addition, being the inspection of Party A construction unit or third-party intendance unit by the browse mode of login service device in the technical program Look into personnel and grasp first-hand test data or test result in time, at large there is provided safe and reliable acquisition of information channel.
It the method can be widely used in the testing field of secondary loop in power system.

Claims (10)

1. a kind of method of automatic test high voltage device of transformer station current loop secondary load, including using test device to high pressure The secondary load in device current loop is tested and records test result, it is characterized in that:
1) using signal source of the constant-current source as test device, described test device is arranged on setting for high-tension apparatus current loop Standby scene, described test device carries CPU and wireless network communication module;
2) in the Intelligent mobile equipment with wireless network communication module, one APP software of installation settings, described APP is soft The CPU that part is used to manipulating the test device performs corresponding test instruction, control correspondence test switch or auxiliary reclay " on/off " is acted, and carries out corresponding test event;
3) server is set, for record test device, the device identifying information of Intelligent mobile equipment, records and stores survey Try data or test result;Described server, test device and Intelligent mobile equipment is located at same WLAN WiFi In;
4) by the terminals or survey of the multiple signals output end of test device and multiple high-tension apparatus current loop secondary load sides Examination end carries out correspondence connection respectively;
5) APP is started in Intelligent mobile equipment;
6) Intelligent mobile equipment is first by the wireless network communication module carried, scanning WLAN in the environment WiFi name and password, and scanning result is uploaded onto the server;Then by the string code or device coding of Intelligent mobile equipment Upload onto the server;
7) CPU of test device is first by the wireless network communication module carried, scanning WLAN in the environment WiFi, and scanning result is uploaded onto the server;
8) name of server intelligent mobile device and the test device CPU WLAN WiFi uploaded, if identical, Then judge that Intelligent mobile equipment is located in same WLAN WiFi with test device;
9) server sends the password of the WLAN WiFi to the CPU of test device;
10) wireless local that the CPU of test device is accessed by the wireless network communication module carried where Intelligent mobile equipment WiFi is netted, the string code or device coding that test device is carried into wireless network communication module upload onto the server;
11) by server and WLAN WiFi, set up between described Intelligent mobile equipment and the CPU of test device The contact method of " point-to-point ", " shaking hands " success;
12) tester is by operating APP, and Intelligent mobile equipment exports a test instruction, and described test instruction passes through clothes Business device downloads to the CPU of test device;
13) CPU of test device is connected to described test instruction, corresponding CPU pins output signal, by being arranged on test dress Auxiliary reclay in putting carries out contact extension;
14) the CPU controls test device of test device switches on power, then by controlling the contact of auxiliary reclay, control pair The electric current output of induced current grade;
15) test electric current is sent to the secondary load side of the high-tension apparatus current loop of the test instruction nominative testing;Simultaneously Magnitude of voltage between the tested high-tension apparatus current loop secondary load side signal input part of test;
16) CPU of test numbers the loop of the magnitude of voltage tested and tested current loop secondary load, is sent to clothes The loop numbering of the magnitude of voltage tested and tested current loop secondary load is returned to intelligent mobile by business device, server Equipment;
17) Intelligent mobile equipment shows that loop numbering, code name or the relay of tested current loop secondary load are compiled in APP Number, and the corresponding magnitude of voltage result tested is shown simultaneously;
18) the magnitude of voltage result tested by recording and comparing, judgement is devices under whether meeting detection requirement;
19) server storage test result, and test result is sent to Intelligent mobile equipment, for tester's verification test knot Really;
20) tester is by operating APP, and Intelligent mobile equipment exports a new test instruction, to another high-tension apparatus The secondary load of current loop repeats above-mentioned 12nd to 19 step;
21) inspection personnel of Party A construction unit or third-party intendance unit, can be looked into by the browse mode of login service device See, have access to the test data or test result for having completed perhaps test event in test;
The method of the automatic test high voltage device of transformer station current loop secondary load, by WLAN WiFi, is carried out The data transmission of test instruction, test data and test result, to realize real-time, rapid, free from error information exchanging process, Realize glitch-free reliable links between substation field and central station of floating dock, it is ensured that it is true that test process and test result are recorded Property, reliability, and the error that the human factor during on-the-spot test is caused minimizes;
The method of the automatic test high voltage device of transformer station current loop secondary load, is carrying out multipath testing equipment signal Output end is carried out after corresponding connection respectively with the terminals or test lead of multiple high-tension apparatus current loop secondary loads, using behaviour Make the APP pattern installed on Intelligent mobile equipment, far distance controlled test device carries out corresponding a variety of protections or metering and surveyed Examination, so as to reduce required on-the-spot test personnel amount to greatest extent, mitigates the working strength of on-the-spot test personnel, carries High work on the spot efficiency;
The method of the automatic test high voltage device of transformer station current loop secondary load, can not turn off high-tension apparatus electric current In the case of loop, by the secondary circuit to multiple high-tension apparatus current loops carry out successively exchange continuity measure, it is secondary Load measure and secondary circuit install correctness detection, realize comprehensive a variety of detections to high-tension apparatus current loop;
The method of the automatic test high voltage device of transformer station current loop secondary load, mould is browsed by login service device Formula, be Party A construction unit or third-party intendance unit inspection personnel in time, at large grasp first-hand test data or survey Test result provides safe and reliable acquisition of information channel.
2. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 1, its feature It is that described Intelligent mobile equipment includes smart mobile phone, tablet personal computer or the notebook computer with wireless network module.
3. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 1, its feature It is described multiple high-tension apparatus current loops, in the same equipment installation interval of transformer station, or positioned at adjacent equipment In installation interval.
4. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 1, its feature It is that described server, test device and Intelligent mobile equipment are located in the WLAN of same transformer station.
5. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 1, its feature It is that the name of the WLAN includes the identification code or ID of wireless network.
6. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 1, its feature It is the electric current output of corresponding current grade described at step 14, refers to the electric current of output and tested current loop secondary load Grade is to corresponding electric current.
7. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 6, its feature It is that described current class is 1A, 2A or 5A.
8. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 1, its feature It is the magnitude of voltage result tested in step 18 by recording and comparing, judgement is devices under whether meeting detection requirement, Refer to utilize formula U=IR, pass through the magnitude of voltage result tested, whether just to judge tested high-tension apparatus current loop Often, whether the line footpath of connecting wire is met the requirements, and the contact resistance of the binding post electric current that whether meets the requirements and be tested is returned Whether the secondary load on road meets the requirements.
9. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 1, its feature It is
Described test device at least includes the control unit with a current source and test device;
Described control unit at least includes a CPU, wireless wireless network communication module, one group of centre current-collector, one Individual multichannel extends version;
Wherein, described current source is constant-current source, and " on/off " of the current source power input is by CPU controls;The electric current The output end in source carries out corresponding connection respectively with the terminals or test lead of high-tension apparatus current loop secondary load side;
The connection corresponding with CPU I/O ports of described wireless wireless network communication module, the control of one group of centre current-collector I/O ports corresponding with CPU are connected respectively coil respectively;The output contact of current-collector extends with extension in the middle of described one group Multiple inputs of plate are connected respectively;The power supply control of each output end of the extension expansion board respectively with a current source End correspondence processed is connected.
10. according to the method for the automatic test high voltage device of transformer station current loop secondary load described in claim 9, its feature Be per being tested all the way between two binding posts of high-tension apparatus current loop secondary load, or, in extension expansion board Per between two binding posts of output end all the way, a voltmeter is provided with.
CN201710182736.9A 2017-03-24 2017-03-24 A kind of method of automatic test high voltage device of transformer station current loop secondary load Expired - Fee Related CN106970291B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710182736.9A CN106970291B (en) 2017-03-24 2017-03-24 A kind of method of automatic test high voltage device of transformer station current loop secondary load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710182736.9A CN106970291B (en) 2017-03-24 2017-03-24 A kind of method of automatic test high voltage device of transformer station current loop secondary load

Publications (2)

Publication Number Publication Date
CN106970291A true CN106970291A (en) 2017-07-21
CN106970291B CN106970291B (en) 2019-05-10

Family

ID=59328960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710182736.9A Expired - Fee Related CN106970291B (en) 2017-03-24 2017-03-24 A kind of method of automatic test high voltage device of transformer station current loop secondary load

Country Status (1)

Country Link
CN (1) CN106970291B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108776303A (en) * 2018-06-08 2018-11-09 上海金艺检测技术有限公司 Asynchronous motor supplied with variable frequency signal dynamics time-sharing acquisition device in groups
CN108845225A (en) * 2018-06-28 2018-11-20 云南电网有限责任公司昆明供电局 Power capacitor, reactor secondary current circuit connection Correctness Analysis method based on fault component detection
CN109061313A (en) * 2018-10-10 2018-12-21 潍坊市九易通电器有限公司 A kind of detection earth resistance system
CN109557446A (en) * 2017-09-27 2019-04-02 国网内蒙古东部电力有限公司电力科学研究院 Extra-high voltage debugging electrical quantity converting system and adjustment method based on APP
CN111257678A (en) * 2020-03-02 2020-06-09 山东电力设备有限公司 Transformer running state monitoring terminal and monitoring method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102749549A (en) * 2012-06-21 2012-10-24 云南电力试验研究院(集团)有限公司电力研究院 Intelligent checking system for substation alternating current voltage secondary circuit
CN104122522A (en) * 2014-07-28 2014-10-29 国家电网公司 Intelligent on-board substation equipment condition monitoring device checking and testing system and method
CN105261185A (en) * 2015-11-04 2016-01-20 国网山东省电力公司济宁供电公司 Data transmission system for transformer substation based on WiFi communication
CN205195437U (en) * 2015-12-16 2016-04-27 肖凯 Automatic information recorded appearance of transformer substation
CN105868927A (en) * 2016-04-28 2016-08-17 国网上海市电力公司 Intelligent inspection system for electrical devices

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102749549A (en) * 2012-06-21 2012-10-24 云南电力试验研究院(集团)有限公司电力研究院 Intelligent checking system for substation alternating current voltage secondary circuit
CN104122522A (en) * 2014-07-28 2014-10-29 国家电网公司 Intelligent on-board substation equipment condition monitoring device checking and testing system and method
CN105261185A (en) * 2015-11-04 2016-01-20 国网山东省电力公司济宁供电公司 Data transmission system for transformer substation based on WiFi communication
CN205195437U (en) * 2015-12-16 2016-04-27 肖凯 Automatic information recorded appearance of transformer substation
CN105868927A (en) * 2016-04-28 2016-08-17 国网上海市电力公司 Intelligent inspection system for electrical devices

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109557446A (en) * 2017-09-27 2019-04-02 国网内蒙古东部电力有限公司电力科学研究院 Extra-high voltage debugging electrical quantity converting system and adjustment method based on APP
CN108776303A (en) * 2018-06-08 2018-11-09 上海金艺检测技术有限公司 Asynchronous motor supplied with variable frequency signal dynamics time-sharing acquisition device in groups
CN108845225A (en) * 2018-06-28 2018-11-20 云南电网有限责任公司昆明供电局 Power capacitor, reactor secondary current circuit connection Correctness Analysis method based on fault component detection
CN108845225B (en) * 2018-06-28 2020-11-06 云南电网有限责任公司昆明供电局 Method for analyzing wiring correctness of secondary current loop of power capacitor and reactor
CN109061313A (en) * 2018-10-10 2018-12-21 潍坊市九易通电器有限公司 A kind of detection earth resistance system
CN111257678A (en) * 2020-03-02 2020-06-09 山东电力设备有限公司 Transformer running state monitoring terminal and monitoring method
CN111257678B (en) * 2020-03-02 2022-03-08 山东电力设备有限公司 Transformer running state monitoring terminal and monitoring method

Also Published As

Publication number Publication date
CN106970291B (en) 2019-05-10

Similar Documents

Publication Publication Date Title
CN106970291B (en) A kind of method of automatic test high voltage device of transformer station current loop secondary load
CN106327979A (en) Analog and simulation training system for collecting power information
CN109697912B (en) Power distribution network operation and maintenance training system
CN105390053B (en) Intelligent electric energy meter and power information collection site simulation training platform
CN202975216U (en) Automatic collector test tool system
CN206804744U (en) A kind of distribution power automation terminal automatic detection platform
CN206193123U (en) Distribution automation integration testing arrangement
CN106935089A (en) Power information acquisition terminal installation training system and method
CN105610245A (en) Integrated test system for simulated master station for intelligent substation
CN107678960A (en) Intelligent electric energy meter software Black-box Testing system and method
CN208637023U (en) Wiring check actual training device before high-voltage metering cubicle power transmission
CN109919451B (en) Digital power grid system and method based on real power grid topology analysis and safety knowledge base
CN108597291B (en) Distribution network line loss simulation training system
CN205751223U (en) Power information acquisition system failure diagnosis apparatus
CN216646789U (en) Power transformer multi-path automatic on-site detection system based on Internet of things
CN106530653B (en) Power information acquisition method
CN104820201A (en) Acquisition terminal performance index evaluation method
CN105489080A (en) Metering system simulation platform
CN205507056U (en) Insulating detector and collection module's off -line tester
CN102508052B (en) Test method for field band channel operation of automatic bus transfer system of area network
CN112396906A (en) Comprehensive simulation system for professional post skills and examination of electricity inspection for actual operation
CN208271415U (en) Almightiness type power supply station Training in Comprehensive Skills device
CN207149078U (en) A kind of low-voltage collecting meter reading system fault locator
CN105785149A (en) Network tester for undercurrent grounding line selection apparatus of smart substation and network testing method therefor
CN209417585U (en) A kind of energy management system for current consuming apparatus

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180305

Address after: Room 1507, room 5, No. 1628, Jinsha River Road, Putuo District, Shanghai

Applicant after: Shanghai Ximing Engineering Laboratories Co., Ltd.

Address before: 200063 North 15 building 1528 room, No. 500, Cao Yang Road, Putuo District, Shanghai

Applicant before: Shanghai red eggs Mdt InfoTech Ltd

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190510

Termination date: 20200324