CN106968400A - One kind removes unbonded prestressed concrete structure moveable anchor and its application method - Google Patents
One kind removes unbonded prestressed concrete structure moveable anchor and its application method Download PDFInfo
- Publication number
- CN106968400A CN106968400A CN201710368948.6A CN201710368948A CN106968400A CN 106968400 A CN106968400 A CN 106968400A CN 201710368948 A CN201710368948 A CN 201710368948A CN 106968400 A CN106968400 A CN 106968400A
- Authority
- CN
- China
- Prior art keywords
- anchor
- special
- prestressed concrete
- cup
- unbonded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
- E04C5/12—Anchoring devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
- E04C5/12—Anchoring devices
- E04C5/122—Anchoring devices the tensile members are anchored by wedge-action
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种拆除无粘结预应力混凝土结构用工具锚及其使用方法,属于土木工程领域,用于拆除无粘结预应力混凝土结构,解决对无粘结预应力混凝土结构实施拆除时安全性差的问题。拆除无粘结预应力混凝土结构用工具锚由具有异形缺口的锚杯、异形塞块、配套夹片三部分组成。方法:拆除无粘结预应力混凝土结构之初,剔除与一侧锚固端的工作锚具净距约1.0m以外不少于120mm范围内无粘结筋周围混凝土;剥掉无粘结筋护套,用具有异形缺口的锚杯环抱预应力筋,在预应力筋和锚杯内壁间插入配套夹片,将异形塞块推入杯壁缺口,用小锤敲打配套夹片使其在预应力筋和锚杯内壁之间处于塞紧状态;剔除另一侧工作锚具,继而进行后继拆除工作。
The invention discloses a tool anchor for dismantling unbonded prestressed concrete structures and a method for using the same, belonging to the field of civil engineering, used for dismantling unbonded prestressed concrete structures, and solving the problem of dismantling unbonded prestressed concrete structures The problem of poor security. The tool anchor for dismantling unbonded prestressed concrete structures consists of three parts: an anchor cup with a special-shaped notch, a special-shaped block, and a matching clip. Method: At the beginning of dismantling the unbonded prestressed concrete structure, remove the concrete surrounding the unbonded reinforcement within a range of no less than 120mm away from the working anchor at the anchorage end on one side with a net distance of about 1.0m; peel off the unbonded reinforcement sheath, Surround the prestressed tendon with an anchor cup with a special-shaped notch, insert a supporting clip between the prestressed tendon and the inner wall of the anchor cup, push the special-shaped plug into the notch of the cup wall, and tap the supporting clip with a small hammer to make it fit between the prestressed tendon and the inner wall of the anchor cup. The inner walls of the anchor cups are in a plugged state; remove the working anchor on the other side, and then carry out subsequent dismantling work.
Description
技术领域technical field
本发明属于土木工程领域,具体涉及一种拆除无粘结预应力混凝土结构用工具锚及其使用方法。The invention belongs to the field of civil engineering, and in particular relates to a tool anchor for removing unbonded prestressed concrete structures and a method for using the same.
背景技术Background technique
无粘结预应力混凝土结构是指在结构构件中合理布置并张锚无粘结预应力筋的混凝土结构。无粘结筋的预应力是靠其两端锚具的可靠锚固来维持的。The unbonded prestressed concrete structure refers to the concrete structure in which the unbonded prestressed tendons are reasonably arranged and anchored in the structural members. The prestress of the unbonded tendons is maintained by the reliable anchorage of the anchors at both ends.
由于城市规划调整、工程质量达不到要求等原因,有时需对无粘结预应力混凝土结构实施拆除。无粘结预应力筋积累了很大的拉伸应变能,一旦剔除一侧锚具,无粘结筋就会像箭一样飞出,造成人员伤亡和财产损失。为保障无粘结预应力混凝土结构拆除安全,研发拆除无粘结预应力混凝土结构用工具锚。Due to the adjustment of urban planning and the failure of project quality to meet the requirements, it is sometimes necessary to demolish the unbonded prestressed concrete structure. The unbonded prestressed tendons have accumulated a large amount of tensile strain energy. Once one side of the anchorage is removed, the unbonded tendons will fly out like arrows, causing casualties and property losses. In order to ensure the safety of the demolition of unbonded prestressed concrete structures, tool anchors for demolition of unbonded prestressed concrete structures were developed.
发明内容Contents of the invention
本发明是一种拆除无粘结预应力混凝土结构用工具锚,旨在解决对无粘结预应力混凝土结构实施拆除时,剔除一侧锚具,无粘结筋可能飞出造成人员伤亡和财产损失的问题。The invention is a tool anchor for dismantling unbonded prestressed concrete structures, which aims to solve the problem of removing one side of the anchor when unbonded prestressed concrete structures are removed, and unbonded tendons may fly out causing casualties and property The problem of loss.
一种拆除无粘结预应力混凝土结构用工具锚,由具有异形缺口的锚杯、异形塞块、配套夹片三部分组成。锚杯设有与常规锚具相同的中心锥孔,杯壁留有内宽外窄、近宽远窄的异形缺口,缺口最小宽度不小于无粘结筋公称直径。异形塞块与锚杯缺口的形状和大小正好吻合,即为避免在无粘结筋内缩时塞块不被夹片挤出,同时不沿纵向滑出,将塞块设计成内宽外窄、近宽远窄。A tool anchor for dismantling unbonded prestressed concrete structures is composed of three parts: an anchor cup with a special-shaped notch, a special-shaped block, and a matching clip. The anchor cup is equipped with the same central taper hole as the conventional anchor, and the cup wall has a special-shaped gap with a wide inside and a narrow outside, a near wide and far narrow, and the minimum width of the gap is not less than the nominal diameter of the unbonded rib. The shape and size of the special-shaped plug coincide with the notch of the anchor cup, that is, to prevent the plug from being squeezed out by the clip when the non-adhesive ribs shrink inward, and not to slide out along the longitudinal direction, the plug is designed to be wide inside and narrow outside , Near wide and far narrow.
拆除无粘结预应力混凝土结构之初,剔除与一侧锚固端的工作锚具净距约1.0m以外不少于120mm范围内无粘结筋周围混凝土,剥掉无粘结筋护套,用具有异形缺口的锚杯环抱预应力筋,在预应力筋和锚杯内壁间插入配套夹片,将塞块推入杯壁缺口,最后用小锤敲打夹片使其在预应力筋和锚杯内壁之间处于塞紧状态。在完成上述工作之后,剔除另一侧工作锚具,继而进行后继拆除工作。这里需要指出,拆除用工具锚与锚固端工作锚具约1.0m的净距要求,是为满足两个条件:一是剔除另一侧锚固端工作锚具时预应力筋所具有的拉伸应变能不会摧毁工具锚和工作锚间的混凝土;二是切断工具锚和工作锚间的预应力筋,二者间预应力筋所具有的拉伸应变能不足以使无粘结筋飞出。At the beginning of dismantling the unbonded prestressed concrete structure, remove the concrete surrounding the unbonded reinforcement within a range of not less than 120mm away from the working anchor at the anchorage end on one side with a net distance of about 1.0m, peel off the unbonded reinforcement sheath, and use The anchor cup with special-shaped notch surrounds the prestressed tendon, insert the supporting clip between the prestressed tendon and the inner wall of the anchor cup, push the plug into the gap of the cup wall, and finally hit the clip with a small hammer to make it fit between the prestressed tendon and the inner wall of the anchor cup. between is in a tight state. After the above work is completed, remove the working anchor on the other side, and then carry out subsequent demolition work. It needs to be pointed out here that the requirement of a clear distance of about 1.0m between the tool anchor used for dismantling and the working anchor at the anchoring end is to meet two conditions: one is to remove the tensile strain of the prestressed tendon when the working anchor at the anchoring end on the other side is removed The concrete between the tool anchor and the working anchor can not be destroyed; the second is to cut off the prestressed tendon between the tool anchor and the working anchor, and the tensile strain energy of the prestressed tendon between the two is not enough to make the unbonded tendon fly out.
本发明的有益效果:Beneficial effects of the present invention:
使用本发明对无粘结预应力混凝土结构实施拆除时,剔除一侧工作锚具后,失去预应力的无粘结筋将被新安装的工具锚重新锚固,不会飞出。When the present invention is used to dismantle the unbonded prestressed concrete structure, after one side of the working anchor is removed, the unbonded tendons that have lost the prestress will be re-anchored by the newly installed tool anchors and will not fly out.
附图说明Description of drawings
图1为拆除无粘结预应力混凝土结构用工具锚的结构示意图;Fig. 1 is the structural schematic diagram of tool anchor for removing unbonded prestressed concrete structure;
图2为所述具有异形缺口的锚杯的结构示意图;Fig. 2 is the schematic structural view of the anchor cup with a special-shaped notch;
图3为所述具有异形缺口的锚杯的主视图;Fig. 3 is the front view of the anchor cup with a special-shaped notch;
图4为所述具有异形缺口的锚杯的俯视图;Fig. 4 is the top view of the anchor cup with a special-shaped notch;
图5为所述异形塞块的结构示意图;Fig. 5 is the structural representation of described special-shaped block;
图6为所述异形塞块的主视图;Fig. 6 is the front view of described special-shaped block;
图7为所述异形塞块的俯视图。Fig. 7 is a top view of the special-shaped block.
图中:1、具有异形缺口的锚杯;2、异形塞块;3、配套夹片。In the figure: 1. An anchor cup with a special-shaped notch; 2. A special-shaped plug; 3. A supporting clip.
具体实施方式detailed description
具体实施方式一:结合图1~7具体说明本实施方式,本实施方式一种拆除无粘结预应力混凝土结构用工具锚由具有异形缺口的锚杯1、异形塞块2、配套夹片3三部分组成。Specific embodiment 1: This embodiment will be described in detail with reference to Figures 1 to 7. In this embodiment, a tool anchor for dismantling unbonded prestressed concrete structures consists of an anchor cup 1 with a special-shaped notch, a special-shaped plug 2, and a matching clip 3 It consists of three parts.
具体实施方式二:本实施方式与具体实施方式一不同的是:具有异形缺口的锚杯1设有与常规模锚具相同的中心锥孔,杯壁留有内宽外窄、近宽远窄的异形缺口,缺口最小宽度不小于无粘结筋公称直径。其他与具体实施方式一相同。Embodiment 2: This embodiment differs from Embodiment 1 in that the anchor cup 1 with a special-shaped notch is provided with the same central taper hole as the conventional scale anchorage, and the cup wall is wide inside and narrow outside, near wide and far narrow The minimum width of the notch is not less than the nominal diameter of the non-adhesive rib. Others are the same as the first embodiment.
所述内宽外窄、近宽远窄是指异形缺口上端内侧的宽度大于异形缺口上端外侧的宽度;异形缺口下端内侧的宽度大于异形缺口下端外侧的宽度;异形缺口上端内侧的宽度大于异形缺口下端内侧的宽度;异形缺口上端外侧的宽度大于异形缺口下端外侧的宽度。The inner width and outer narrowness, near width and far narrowness mean that the width inside the upper end of the special-shaped notch is greater than the width outside the upper end of the special-shaped notch; the width inside the lower end of the special-shaped notch is greater than the width outside the lower end of the special-shaped notch; The width of the inner side of the lower end; the width of the outer side of the upper end of the special-shaped notch is greater than the width of the lower end of the special-shaped notch.
具体实施方式三:本实施方式与具体实施方式一或二不同的是:异形塞块2与具有异形缺口的锚杯1缺口的形状和大小正好吻合,呈内宽外窄、近宽远窄。其他与具体实施方式一或二相同。Embodiment 3: The difference between this embodiment and Embodiment 1 or 2 is that the shape and size of the special-shaped plug 2 coincides with the shape and size of the anchor cup 1 with a special-shaped notch, which is wide inside and narrow outside, and narrow near and far. Others are the same as those in Embodiment 1 or 2.
具体实施方式四:本实施方式一种拆除无粘结预应力混凝土结构用工具锚的使用方法具体是按以下步骤进行的:Specific implementation mode four: a method of using a tool anchor for dismantling an unbonded prestressed concrete structure in this embodiment is specifically carried out in the following steps:
步骤一、拆除无粘结预应力混凝土结构之初,剔除与一侧锚固端工作锚具净距约1.0m以外不少于120mm范围内无粘结筋周围的混凝土;Step 1. At the beginning of dismantling the unbonded prestressed concrete structure, remove the concrete around the unbonded reinforcement within the range of not less than 120mm beyond the net distance of about 1.0m from the working anchor at the anchorage end on one side;
步骤二、剥掉如上所述不少于120mm区段内无粘结筋的护套,用具有异形缺口的锚杯1环抱预应力筋;Step 2. Peel off the sheath without bonding ribs in the section of no less than 120mm as described above, and surround the prestressed tendons with the anchor cup 1 with a special-shaped notch;
步骤三、在预应力筋和具有异形缺口的锚杯1内壁间插入配套夹片3,将异形塞块2推入杯壁缺口,用小锤敲打配套夹片3使其在预应力筋和锚杯内壁之间处于塞紧状态;步骤四、剔除另一侧锚固端的工作锚具,继而进行后继的拆除工作。Step 3: Insert the supporting clip 3 between the prestressed tendon and the inner wall of the anchor cup 1 with the special-shaped gap, push the special-shaped plug 2 into the gap of the cup wall, and tap the supporting clip 3 with a small hammer to make it fit between the prestressed tendon and the anchor cup 1. The inner walls of the cups are in a plugged state; step 4, remove the working anchor at the anchor end on the other side, and then carry out subsequent dismantling work.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710368948.6A CN106968400B (en) | 2017-05-23 | 2017-05-23 | A tool anchor for dismantling unbonded prestressed concrete structure and using method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710368948.6A CN106968400B (en) | 2017-05-23 | 2017-05-23 | A tool anchor for dismantling unbonded prestressed concrete structure and using method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106968400A true CN106968400A (en) | 2017-07-21 |
| CN106968400B CN106968400B (en) | 2019-05-14 |
Family
ID=59325783
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710368948.6A Active CN106968400B (en) | 2017-05-23 | 2017-05-23 | A tool anchor for dismantling unbonded prestressed concrete structure and using method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106968400B (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109057163A (en) * | 2018-09-29 | 2018-12-21 | 朱建玉 | Ready-package prestressing force Special ground tackle |
| CN109797910A (en) * | 2019-03-04 | 2019-05-24 | 东南大学 | A kind of clip for anchoring FRP bar, processing method and anchoring method |
| CN110778139A (en) * | 2019-10-21 | 2020-02-11 | 上海市政工程设计研究总院(集团)有限公司 | Local hole-opening construction method for unbonded prestressed tendon concrete slab |
| CN111441239A (en) * | 2020-04-15 | 2020-07-24 | 上海建工材料工程有限公司 | Prefabricated cover beam prestress deep-buried anchor sleeve and installation process thereof |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB804530A (en) * | 1955-09-22 | 1958-11-19 | Stressteel Corp | Improvements in wedge anchors |
| CN101004097A (en) * | 2007-01-23 | 2007-07-25 | 建研科技股份有限公司 | Intermeshing type opening anchorage in use for tendon of steel strand |
| KR20120119639A (en) * | 2011-04-22 | 2012-10-31 | 박병구 | Straight removable anchor head that can be refitted by hitting |
| CN103485486A (en) * | 2013-09-13 | 2014-01-01 | 中南林业科技大学 | Novel open type steel strand anchor |
| CN105672578A (en) * | 2016-04-05 | 2016-06-15 | 中国京冶工程技术有限公司 | Tool anchorage for shearing bars of constructed unbounded prestressed concrete structure |
-
2017
- 2017-05-23 CN CN201710368948.6A patent/CN106968400B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB804530A (en) * | 1955-09-22 | 1958-11-19 | Stressteel Corp | Improvements in wedge anchors |
| CN101004097A (en) * | 2007-01-23 | 2007-07-25 | 建研科技股份有限公司 | Intermeshing type opening anchorage in use for tendon of steel strand |
| KR20120119639A (en) * | 2011-04-22 | 2012-10-31 | 박병구 | Straight removable anchor head that can be refitted by hitting |
| CN103485486A (en) * | 2013-09-13 | 2014-01-01 | 中南林业科技大学 | Novel open type steel strand anchor |
| CN105672578A (en) * | 2016-04-05 | 2016-06-15 | 中国京冶工程技术有限公司 | Tool anchorage for shearing bars of constructed unbounded prestressed concrete structure |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109057163A (en) * | 2018-09-29 | 2018-12-21 | 朱建玉 | Ready-package prestressing force Special ground tackle |
| CN109797910A (en) * | 2019-03-04 | 2019-05-24 | 东南大学 | A kind of clip for anchoring FRP bar, processing method and anchoring method |
| CN109797910B (en) * | 2019-03-04 | 2021-02-26 | 东南大学 | Clamping piece for anchoring FRP (fiber reinforced Plastic) rib, machining method and anchoring method |
| CN110778139A (en) * | 2019-10-21 | 2020-02-11 | 上海市政工程设计研究总院(集团)有限公司 | Local hole-opening construction method for unbonded prestressed tendon concrete slab |
| CN111441239A (en) * | 2020-04-15 | 2020-07-24 | 上海建工材料工程有限公司 | Prefabricated cover beam prestress deep-buried anchor sleeve and installation process thereof |
| CN111441239B (en) * | 2020-04-15 | 2021-06-18 | 上海建工建材科技集团股份有限公司 | Prefabricated cover beam prestress deep-buried anchor sleeve and installation process thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106968400B (en) | 2019-05-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3147410B1 (en) | Construction method and structure of pressure dispersing expansion head anchor rod | |
| CN106968400A (en) | One kind removes unbonded prestressed concrete structure moveable anchor and its application method | |
| WO2021031373A1 (en) | Prefabricated bridge pier reinforcing bar connecting structure and construction method therefor | |
| CN205935422U (en) | Novel half grout sleeve that can spacing reinforcing bar | |
| CN107762135B (en) | Construction method of scaffold wall connecting piece of building outer wall | |
| CN105201514A (en) | Water-bearing rock stratum borehole wall structure and construction method | |
| CN207553314U (en) | A kind of concrete postposition beam anchor bar constructing structure | |
| CN106480880B (en) | Recoverable soil nailing and the construction method for using recoverable soil nail | |
| CN105201147A (en) | Full-grouting sleeve adopting eccentric connection of reinforcing steel bars and usage method of sleeve | |
| CN103741673B (en) | A kind of self-anchoring type steel strand pre-tensioning system centrifugal concrete pile and manufacture method thereof | |
| CN104763161A (en) | Beam-adding reinforced structure of a reinforced concrete floor with an opening and construction method | |
| CN110306729A (en) | Design and construction method of detachable sleeve grouting connection | |
| CN204626393U (en) | For the pile extension assembly of concrete pile | |
| CN105951825B (en) | It is a kind of hollow from base expanding and base expanding crab-bolt and its installation method | |
| CN105064676A (en) | Twisted bolt as well as a building template and building external wall insulation construction method | |
| CN104975710A (en) | Connecting method and connecting structure of scaffold and main body structure | |
| CN105369986A (en) | Steel bar eccentric connection half grouting sleeve and using method thereof | |
| CN102852229A (en) | After-embedding mechanical cold connection wall body drawknot rib construction member and installation method | |
| CN106836245A (en) | A kind of soil nailed wall retaining structure and construction method | |
| CN201704695U (en) | Slope reinforcement structure supported by glass fiber pre-stressed soil nails | |
| CN105735487A (en) | Wall tied reinforcement component | |
| CN210317309U (en) | Hydraulic auxiliary splitting device for rock breaking | |
| CN203878968U (en) | Connecting structure between scaffold and main body structure | |
| CN204753583U (en) | Recoverable anchor rope type of high pressure jet soil cement stock bears head | |
| CN202391092U (en) | U-shaped anchor bolt fixing device of overhanging steel beam |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |