CN106968269B - A kind of basement Retaining wall method based on brick fetal membrane moulding wall - Google Patents

A kind of basement Retaining wall method based on brick fetal membrane moulding wall Download PDF

Info

Publication number
CN106968269B
CN106968269B CN201710365158.2A CN201710365158A CN106968269B CN 106968269 B CN106968269 B CN 106968269B CN 201710365158 A CN201710365158 A CN 201710365158A CN 106968269 B CN106968269 B CN 106968269B
Authority
CN
China
Prior art keywords
wall
barricade
brick
basement
moulding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710365158.2A
Other languages
Chinese (zh)
Other versions
CN106968269A (en
Inventor
刘义权
张建东
刘博�
邹彦彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201710365158.2A priority Critical patent/CN106968269B/en
Publication of CN106968269A publication Critical patent/CN106968269A/en
Application granted granted Critical
Publication of CN106968269B publication Critical patent/CN106968269B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0283Retaining or protecting walls characterised by constructional features of mixed type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The invention discloses a kind of basement Retaining wall methods based on brick fetal membrane moulding wall, moulding wall is first set in basement foundation ditch crater wall, waterproof coiled material construction is carried out in moulding wall outer surface again and obtains barricade waterproof layer, is formed basement barricade outside-supporting completion basement barricade by moulding wall and barricade waterproof layer and is poured.It is characterized in that, the support pile merging welding screw rod on the outside of foundation pit crater wall connects brick fetal membrane, then pours to obtain moulding wall by setting brick fetal membrane as supporting.The advantages that present invention has construction is simple, and short time limit, expense is low, good water-proof effect is particularly suitable for practicing in the construction foundation working of the deeper skyscraper of foundation pit.

Description

A kind of basement Retaining wall method based on brick fetal membrane moulding wall
Technical field
The invention belongs to building foundation engineering construction fields, and in particular to a kind of basement gear based on brick fetal membrane moulding wall Wall construction method.
Background technique
With the development of economy with the sustainable growth of population, land resource increasingly seems urgent.University is promoted from religion Educating land used is commercialized land used transition to half Educational Return land used half, therewith it is adjoint be a large amount of comprehensive commercial mansion such as rain after It has emitted and has come out as spring bamboo.But commercial mansion will not only meet the land for teaching requirement of school, and meet business The benefit requirement of profit, so commercial mansion addressing generally can all be selected in close city road side, to largely increase The difficulty of construction, and Deep Foundation Pit construction is more intended to excavate without fertile slot.
Building foundation pit refers to that the outer foundation pit inner wall of building basement exterior wall does not scrape out slope without fertile slot excavation construction method, And state in a vertical shape, so that the operating space of outer wall of basement and foundation pit crater wall is than narrow building foundation pit construction method.
Traditional basement barricade waterproof construction first realizes basement barricade(That is outer wall of basement)Formwork pours, and waits gear After wall maintenance molding, asphalt water-proof coiled material is pasted on the outside of barricade, then a protective layer is set again, construction foundation working is complete It is backfilled again after finishing, completes entire construction.But basement barricade and foundation pit supporting system distance caused by thus being excavated without fertile slot Cross close, it is more difficult that barricade outboard template installs, and waterproof coiled material construction no operatton face is difficult to construct, and institute is so as to the construction that needs one kind new Technique solves problems.
To solve the above-mentioned problems, applicant considers that devise a kind of elder generation is arranged moulding wall in basement foundation ditch crater wall, Then it relies on moulding wall to be first arranged again to pour the mode of barricade after waterproof layer again and complete barricade waterproof construction, improves waterproof construction Convenience and reliability.But wherein how the construction technology is specifically arranged, in the construction for facilitating moulding wall, preferably raising waterproof The convenience and reliability of construction become and need further to be considered the problems of to solve.
Summary of the invention
In view of the above shortcomings of the prior art, the technical problem to be solved by the present invention is to:How a kind of construction letter is provided Single, short time limit, expense is low, the basement Retaining wall method based on brick fetal membrane moulding wall of good water-proof effect, is particularly suitable for base It cheats and is practiced in the construction foundation working of deeper skyscraper.
In order to solve the above-mentioned technical problem, present invention employs the following technical solutions:
First moulding is arranged in basement foundation ditch crater wall in a kind of basement Retaining wall method based on brick fetal membrane moulding wall Wall, moulding wall outer surface and basement barricade outer surface design shape correspond to it is consistent, then moulding wall outer surface carry out Waterproof coiled material construction obtains barricade waterproof layer, forms basement barricade outside-supporting by moulding wall and barricade waterproof layer, carries out Single side formwork on the inside of the binding of basement barricade reinforcing bar and barricade is completed basement barricade and is poured.It is characterized in that, basement foundation ditch Moulding wall is set in crater wall using the method for setting brick fetal membrane after-pouring moulding concrete, specifically includes following steps:
1)Support pile is buried elevationally outward in foundation pit crater wall in advance;
2)Surveying setting-out determines the welding screw rod setting position of brick fetal membrane setting position and bar planting;
3)Bar planting, the soil layer plane by support pile in face of foundation pit side are opened, drill, will weld on the side surface that support pile exposes It connects in the vertical implant holes in screw rod inner end and is welded and fixed, the horizontal face support pile in its outer end is made to extend outwardly fixation;
4)Use standard brick masonry brick wall in brick fetal membrane setting position, when building in brick wall along wall length direction at interval of 4.5-4.8 meters pour one of vertical constructional column of setting, pour one layer of collar tie beam of setting along high every 4 meters of wall, constructional column and collar tie beam enclose At region in build standard brick;The outer end of welding screw rod is poured fixed in collar tie beam or constructional column;
5)Complete brick wall while, after completing one section of height of wall brick, i.e., the casting concrete in brick wall, wall brick build with Inner concrete pours interval and carries out, until ultimately forming moulding wall wall base;
6), smear cement mortar outside moulding wall wall base and cover smooth, waterproof coiled material construction can be carried out.
In this way, first realizing that waterproof coiled material construction obtains barricade waterproof in moulding wall outer surface using after setting moulding wall Layer, barricade waterproof layer are generally obtained by waterproof roll layer and mortar levelling layer, then rely on moulding wall and barricade waterproof layer again, directly It connects single side formwork and realizes that basement barricade pours, thus greatly improve the convenience and reliability of construction of waterproof layer, have There is the characteristics of construction is simple, short time limit, expense is low, good water-proof effect.Then when moulding wall is arranged, after building brick fetal membrane The method for pouring moulding concrete realizes the support to brick fetal membrane by support pile bar planting connecting structure column and collar tie beam, without another Outer setting support mode greatly improves construction efficiency, while can also preferably improve moulding wall construction intensity.
As optimization, brick wall is 240mm thickness wall brick, with proof strength.As optimization, collar tie beam arrangement of reinforcement is 4 10 steel of Φ Muscle, stirrup are arranged according to spacing 250mm using 6 steel ring of Φ, are obtained using C20 concreting, to better ensure that intensity.
As optimization, constructional column column section is the square of 240mm × 240mm, uses 4 12 reinforcing bars of Φ for arrangement of reinforcement, is bound round Muscle is arranged using 6 steel ring of Φ according to spacing 150mm, is obtained using C20 concreting, to better ensure that intensity.
Further, welding screw rod is obtained using 16 screw rod of Φ, can better ensure that supporting intensity and reliability.
As optimization, 4)Step and 5)In step, concreting, concrete are realized using concreting distributing system Pouring cloth system includes the concrete tank car and Vehicle loaded pump for being located at ground on the outside of foundation pit, and the material distributing machine being set in foundation pit, concrete Tank car discharge port is connected with Vehicle loaded pump, and Vehicle loaded pump discharge pipe is connected by concrete conveyance conduit with the cloth pipeline in material distributing machine; Material distributing machine includes the steel bracket being mounted vertically in foundation pit and steel bracket upper end can be arranged in steel crossbearer with horizontally rotating, and steel is horizontal One end of frame is the discharge end that cloth pipeline is arranged, and cloth pipeline front end is connected with the pumping rubber vomit pipe extended downwardly, cloth Pipe material rear end is arranged downwards along steel bracket and is connected with concrete conveyance conduit.
In this way, the concreting distributing system combined using concrete tank car and Vehicle loaded pump and material distributing machine, has knot Structure is simple, easy to assembly, advantage easy to set up low in cost, greatly improves and pours efficiency and pour operation convenience.
Further, steel crossbearer is the Balance weight end for being provided with clump weight, discharge end distance away from the other end of discharge end The length of steel bracket is greater than Balance weight end distance steel stent length.In this way, more convenient holding steel bracket balance, improves smooth operation Property.
Further, steel bracket lower end has bottom support frame extended horizontally outward, and bottom support frame periphery is set It is equipped with supporting leg straight down, supporting leg lower end has the cushion block being horizontally set in foundation pit, lower section and base in the middle part of the support frame of bottom The first rubber tyre is provided between hole.In this way, installation and damping can be better ensured that, guarantee stability of strutting system, and avoid Destruction of the material distributing machine to bottom of foundation ditch base.
Still further, bottom support frame quadrangle has four horizontal extension legs being arranged horizontally outward, the supporting leg is set It sets below horizontal extension leg front end.In this way, can according to need the position of four each supporting legs of adjustment, keep its installation steady, simultaneously It can according to need elongation Retractive leg outside as far as possible when installation, better ensure that stability of strutting system.
Further, the lower section that concrete conveyance conduit enters foundation pit corner, which is also padded, is equipped with the second rubber tyre.In this way, second Rubber tyre can preferably concrete conveyance conduit whereabouts intersegmental part delivering concrete when impact buffered, preferably protection pipe Road and corresponding bottom of foundation ditch base layer structure.
Further, steel crossbearer rear and front end respectively hangs downwards and is provided with adjustment drawstring.In this way, can be convenient worker Front and back drawstring is pulled from below, carries out the adjustment rotated left and right to steel crossbearer, and structure is simple and easy to adjust quick, adjusts and stablizes Property is good.
Further, water-proof concrete can be configured to using waterproof material when wherein concrete configures to be poured, make Its barricade waterproof layer obtained with waterproof coiled material construction constitutes dual waterproof together, greatlys improve waterproof effect;Configure waterproof Concrete is realized using water-proof concrete configuration device below, including concrete tank car, is further included an agitator, is set in agitator It is equipped with a plastic water bag, plastic water bag upper end opening edge is consistent with agitator upper port edge and is connected, and plastic water bag prolongs Length after exhibition is equal to or higher than agitator depth, and agitator bottom, which is located at below plastic water bag, is provided with electronic weigher, electricity Sub- weighing apparatus has a horizontally disposed weighing face for being located at the top and the weighing face is located in the middle part of agitator, on agitator End side is also provided with and communicated with water inlet pipe outward, and water inlet pipe inner end is sealingly connected to inside plastic water bag, is equipped on water inlet pipe Water inlet switch valve, agitator lower end side are also provided with and communicated with outlet pipe outward, and outlet pipe inner end is sealingly connected to plastic water bag Inside is provided with effluent switch valve and water pump on outlet pipe, and outlet pipe water outlet is connected to the entrance of agitator tank on concrete tank car.
In this way, open water inlet switch valve in use, effluent switch valve can be closed first, by water inlet pipe to plastic water bag Interior water inlet closes water inlet switch valve after entering the water of fixed mass by electronic weigher metering, corresponding ratio is then added In PNC waterproof material to plastic water bag, after mixing evenly, then opens effluent switch valve and water pump and uniformly will be mixed with PNC waterproof The water of material is directly pumped into agitator tank, and concrete formulation is added and is stirred.In this way, first realizing that PNC is anti-by agitator It is added directly into concrete drums after the stirring and evenly mixing of water material, ensure that PNC waterproof material is mixed in concrete Even property and timeliness, the time conditions matching for using it with waterproof material itself, ensure that good waterproof effect.
It further include self- poking arrangement as optimization, self- poking arrangement includes a tripod, and tripod includes circumferential Upper equally distributed three foot levers, foot lever inner end are fixedly connected with a motor, foot lever length and the matching of agitator radius and foot lever Outer end under being it is curved for and the clamping of agitator edge bending, motor output end be connected with one extend straight down stir Axis is mixed, agitating shaft lower end extends to agitator middle and lower part position and the lower end is provided with stirring blade.
In this way, stirring barrel edge can be fixed on by tripod foot lever, so that stirring blade is deep into agitator Inside drives stirring blade to realize stirring to waterproof material by motor, more convenient and do not improve mixing effect again not Weight calculation is influenced to weigh.
Be additionally provided with one piece of intermediate plate as optimization, between electronic weigher and plastic water bag, intermediate plate it is horizontally disposed and Shape is consistent with agitator lumenal cross-section, and there are can slide up and down for intermediate plate between intermediate plate edge and stirring barrel cavity Gap, intermediate plate upper surface is directly and plastic water bag is affixed setting, the weighing at intermediate plate lower surface middle part and electronic weigher Face is affixed setting.It can improve and claim preferably by the weight transmitting to electronic weigher of plastic water bag by intermediate plate in this way Weight accuracy.Further, intermediate plate lower surface is provided with one layer of elastic rubber material, in this way can preferably and electronics The weighing face of weighing apparatus fits, and keeps its weighing accurate.
As optimization, electronic weigher has the display screen for being located at side, on the agitator side of display screen face It is provided with watch window.In this way, being conducive to reading.
As optimization, realized on the inside of barricade after carrying out the binding of basement barricade reinforcing bar using sizing truss mould plate support system Single side formwork,
The sizing truss mould plate support system includes vertically arranged barricade template, horizontal interval cloth on the outside of barricade template Several vertical back cords are equipped with, arranged for interval has several lateral back cords, horizontal interval on the outside of lateral back cord to vertical back cord elevationally outward If being provided with dry setting truss, the whole at right angles triangle of a sizing truss and right-angle side is mutually leaned on foundation pit ground, another Right-angle side is mutually leaned on lateral back cord, further includes several single wire drawing bars, single wire drawing bar is horizontally disposed and inner end is weldingly fixed on barricade In the barricade steel mesh bundled on the inside of template, outer end is fixed to be socketed on sizing truss.
In this way, sizing truss is prefabricated triangular framing knot using sizing truss as barricade template outside-supporting Structure realizes the compression to back cord by single wire drawing bar, and then compresses support shuttering, therefore can be realized Fast Installation and guarantee to mould The stability of strutting system of plate.
As optimization, the vertical back cord is that packet batten obtains in vertically arranged several shaped steels, batten side face To and be fitted in barricade template outer surface.
In this way, the batten and barricade template outer surface on the inside of vertical back cord can be preferably bonded power transmission, improves and stablize Property, several shaped steels in outside and lateral back cord contact the transmitting raising reliability that can preferably bear support force.
Further, lateral back cord is that the double flute steel back that the channel steel being arranged in pairs connects along its length is stupefied, in pairs The channel steel length direction junction of setting is provided with the bloom being adjacent between two pairs of channel steels being mutually connected, and wears by steel pin The connecting hole crossed on channel steel and bloom realizes connection;Bloom thickness is greater than single wire drawing shank diameter, and single wire drawing bar is arranged in double flute steel Between the pairs of channel steel of back cord.In this way, the intensity of lateral back cord can be better ensured that, and facilitates and improve single wire drawing bar connection The reliability of stability and force.
Further, single wire drawing bar outer end sockets on sizing truss by the way that truss fixed structure is fixed, truss fixed knot Structure includes a round steel hanging part, has a through-hole passed through for single wire drawing bar in the middle part of round steel hanging part, on round steel hanging part Lower both ends respectively have an outwardly extending hitching arm, and mounting facies medialis brachii is that arc and respective stress is socketed a purlin Frame, which is socketed, is arranged on each sizing truss and transmits single wire drawing bar to sizing purlin on round steel, truss sockets to be extended transversely through with round steel The pulling force of frame, is screwed on single wire drawing bar on the outside of round steel hanging part and the locking screw of the external screw thread cooperation of single wire drawing bar outer end It is female.Further, the locking nut is arranged side by side two, and the abutting that can mutually be screwed on is realized locked.
In this way, facilitating the quick connection installation of single wire drawing bar and truss of being formed and stablizing force, truss is socketed with round steel also It can make the entirety that common stress is constituted between each sizing truss, preferably raising stability.
As optimization, the sizing truss includes underlying surrounding whole right-angled trapezium in a rectangular trapezoid by steel bar Lower frame is connected to above right-angled trapezium lower frame and surrounds frame on whole at right angles triangle, right angled triangle by steel bar The vertical edge on the inside of vertical edge and right-angled trapezium lower frame on the inside of upper frame is located at same perpendicular, on right angled triangle outside frame The bevel edge of side and the bevel edge on the outside of right-angled trapezium lower frame are located at same oblique plane;Right-angled trapezium lower frame upper surface institute is in place It is bolted and fixed after the steel bar fitting of frame lower surface position on the steel bar and right angled triangle set.
In this way, sizing truss splices to obtain using two frames, the decomposition transport and spelling of the truss that more convenient can be formed Installation is connect, and quick and easy for installation.
Further, the steel bar upper end of frame vertical edge position upwardly extends to form stage+module on right angled triangle Portion, to being externally connected with the platform frame for surrounding rectangular triangle by steel bar, platform frame on the outside of stage+module portion Upper surface is horizontally disposed steel bar and constitutes people's row platform after being used to be laid with support plate.In this way, can be flat with more convenient people's row Platform sets up installation, carries out on people's row platform conducive to worker and the operation such as pours.
Further, platform frame outer end, which is fixed up, is connected with Terrace prevention bar.In this way, when setting up, it can To set safety net by the drawing of Terrace prevention bar, with the safety of guarantor's row platform.
Further, reinforcement steel bar arranged in a crossed manner is also fixedly connected with inside right-angled trapezium lower frame.Further mention The stability of high right-angled trapezium lower frame.
Further, the reinforcement that lower portion is additionally provided with that both ends are fixedly connected between each side on right angled triangle is used Steel bar.Further increase the stability of frame on right angled triangle.
Further, steel bar upper position where frame bevel edge is additionally provided with lifting lug on right angled triangle, when installing in this way The docking that right angled triangle upper ledge and right-angled trapezium lower frame can be first completed under foundation pit ground level state is fixed, then again Sizing truss pull-up state in a vertical shape is completed into installation by lifting lug lifting, improves the convenience of in-site installation construction.
Further, on right-angled trapezium lower frame and right angled triangle the respective bevel edge of frame the fixed connection outward in outside There is one section of support fashioned iron, support fashioned iron is used to shelve the connection that lateral truss joint steel pipe realizes each sizing truss.In this way, can Each sizing truss is connected to become a common stress entirety to facilitate, guarantees the stability and reliability of single side formwork.
Further, also there is the lower margin spiral shell of perforation setting upwards at the steel bar outer end where right-angled trapezium lower frame bottom edge Bolt connecting hole, foundation bolt connecting hole is used for and the vertical pre-buried foundation bolt in foundation pit ground is cooperatively connected.Sizing is achieved Positioning and fixation on the outside of when truss installa-tion improve installation convenience and guarantee that supporting & stablizing is reliable.
Further, it is additionally provided with anchor pole link block at the interior angle of right-angled trapezium lower frame bottom edge, be arranged on anchor pole link block There is anchor pole connecting hole, the also oblique outer lower side in steel bar lower end on the inside of right-angled trapezium lower frame where vertical edge is provided through anchor pole and wears Hole, anchor perforation face anchor pole connecting hole are arranged and socket for fixation after running through for the oblique pre-buried embedded anchor bar in foundation pit ground On anchor pole link block.
In this way, provide oblique pulling force by embedded anchor bar after facilitating installation, better ensure that the support of sizing truss unilateral side by Dynamic balance further increases the stability and reliability of support.
After basement barricade is poured and conserved, sizing truss and barricade template is removed, cuts off single wire drawing bar, pre-buried Basement Retaining wall is completed in foundation bolt and the extra exposed part of embedded anchor bar.
In conclusion the advantages that present invention has construction is simple, and short time limit, expense is low, good water-proof effect, is particularly suitable for base It cheats and is practiced in the construction foundation working of deeper skyscraper.
Detailed description of the invention
Fig. 1 is the schematic diagram of obtained basement barrier wall structure in specific embodiment.
Fig. 2 is the structure schematic diagram of the concreting distributing system of use in specific embodiment.
Fig. 3 is the amplified structural schematic diagram of independent material distributing machine in the concreting distributing system of Fig. 2.
Fig. 4 is the structural schematic diagram of unillustrated concrete configuration device in the concreting distributing system of Fig. 2.
Fig. 5 is that moulding wall is arranged in basement foundation ditch crater wall and is made using setting brick fetal membrane after-pouring in specific embodiment The moulding wall formwork erecting structure schematic diagram that the method for type concrete obtains.
Fig. 6 is the structural schematic diagram of Fig. 5 right view direction.
Fig. 7 is the structural schematic diagram in one support pile horizontal distance of Fig. 5 overlook direction.
Fig. 8 is the structural representation sketch of the sizing truss mould plate support system of use in specific embodiment.
Fig. 9 is the stupefied junction partial structurtes of double flute steel back in lateral back cord in Fig. 8 on the outside of barricade template, after component decomposes Schematic perspective view.
Specific embodiment
The present invention is described in further detail with attached drawing With reference to embodiment.
Specific embodiment:
First moulding is arranged in basement foundation ditch crater wall in a kind of basement Retaining wall method based on brick fetal membrane moulding wall Wall, moulding wall outer surface and basement barricade outer surface design shape correspond to it is consistent, then moulding wall outer surface carry out Waterproof coiled material construction obtains barricade waterproof layer, forms basement barricade outside-supporting by moulding wall and barricade waterproof layer, carries out Single side formwork on the inside of the binding of basement barricade reinforcing bar and barricade is completed basement barricade and is poured.It builds, in basement foundation ditch crater wall Moulding wall is set using the method for setting brick fetal membrane after-pouring moulding concrete, specifically includes following steps:
1)Support pile is buried elevationally outward in foundation pit crater wall in advance;
2)Surveying setting-out determines the welding screw rod setting position of brick fetal membrane setting position and bar planting;
3)Bar planting, the soil layer plane by support pile in face of foundation pit side are opened, drill, will weld on the side surface that support pile exposes It connects in the vertical implant holes in screw rod inner end and is welded and fixed, the horizontal face support pile in its outer end is made to extend outwardly fixation;
4)Use standard brick masonry brick wall in brick fetal membrane setting position, when building in brick wall along wall length direction at interval of 4.5-4.8 meters pour one of vertical constructional column of setting, pour one layer of collar tie beam of setting along high every 4 meters of wall, constructional column and collar tie beam enclose At region in build standard brick;The outer end of welding screw rod is poured fixed in collar tie beam or constructional column;
5)Complete brick wall while, after completing one section of height of wall brick, i.e., the casting concrete in brick wall, wall brick build with Inner concrete pours interval and carries out, until ultimately forming moulding wall wall base;
6), smear cement mortar outside moulding wall wall base and cover smooth, waterproof coiled material construction can be carried out.
In this way, first realizing that waterproof coiled material construction obtains barricade waterproof in moulding wall outer surface using after setting moulding wall Layer, barricade waterproof layer are generally obtained by waterproof roll layer and mortar levelling layer, then rely on moulding wall and barricade waterproof layer again, directly It connects single side formwork and realizes that basement barricade pours, thus greatly improve the convenience and reliability of construction of waterproof layer, have There is the characteristics of construction is simple, short time limit, expense is low, good water-proof effect.Then when moulding wall is arranged, after building brick fetal membrane The method for pouring moulding concrete realizes the support to brick fetal membrane by support pile bar planting connecting structure column and collar tie beam, without another Outer setting support mode greatly improves construction efficiency, while can also preferably improve moulding wall construction intensity.
The basement barrier wall structure obtained after this method construction is as shown in Figure 1(It is using setting brick fetal membrane after-pouring in Fig. 1 The method of moulding concrete obtains moulding wall), including pouring the ground being arranged on the preset retaining wall foundation 1 of basement foundation ditch earth's surface Lower room barricade 2,2 lateral surface of basement barricade are provided with waterproof layer 3 made from waterproof roll, and feature is that 3 foreign minister of waterproof layer is sticked It is equipped with moulding wall, moulding wall main body obtains for concreting, pours and connects with foundation pit walls on the outside of moulding wall.
Wherein, steel plate for sealing water 4 is additionally provided between retaining wall foundation 1 and basement barricade 2, steel plate for sealing water 4 is kept off along basement The setting of wall length, 4 lower end of steel plate for sealing water are embedded in the middle part of retaining wall foundation, and steel plate for sealing water upper end is poured in basement barricade.Into One step 4 upper and lower ends of steel plate for sealing water be respectively inclined outwardly setting.In this way, leak can be better protected from.
Wherein, moulding wall includes the moulding wall main body 5 that concreting obtains and the brick positioned at 5 outside of moulding wall main body Wall 6 also has vertical inbuilt support pile 8 in the soil layer 7 outside foundation pit walls, and being horizontally disposed between support pile 8 and brick wall has welding Screw rod 9, welding 9 one end of screw rod are weldingly fixed in the aperture of support pile 8, and welding 9 other end of screw rod, which sockets, is fixed on brick wall 6 It is interior.In this way, the moulding wall being arranged by the way of brick fetal membrane so that moulding wall main body pour construction when without individually branch Mould facilitates construction, and the welding screw rod for socketing setting guarantees the construction reliability poured to moulding wall main body.
Wherein, brick wall 6 includes the vertical constructional column of the multiple tracks that pours setting at interval of 4.5-4.8 meters along wall length direction 10, and the multilayer collar tie beam 11 of setting is poured along high every 4 meters of wall, masonry standard in the region that constructional column 10 and collar tie beam 11 surround Brick;The outer end of welding screw rod 9 is poured fixed in collar tie beam or constructional column.In this way, better assuring that the stability of brick wall itself And reliability.
Wherein, brick wall 6 is 240mm thickness wall brick, with proof strength.
Wherein, it is collar tie beam arrangement of reinforcement that 4 10 reinforcing bars of Φ are provided in collar tie beam 11 along rectangular arrangement, is provided with several 6 reinforcing bars of Φ Circle is arranged to make up collar tie beam stirrup according to spacing 250mm;Collar tie beam pours to obtain using C20 concrete material.It in this way can be preferably Proof strength.
Wherein, 10 column section of constructional column is the square of 240mm × 240mm, uses 4 12 reinforcing bar rectangles of Φ in constructional column It is arranged as constructional column arrangement of reinforcement, arranges to form construction column tie-bar according to spacing 150mm using several 6 steel rings of Φ, constructional column uses C20 concrete material pours to obtain.Intensity can be better ensured that in this way.
Wherein, welding screw rod 9 is obtained using 16 screw rod of Φ, can better ensure that supporting intensity and reliability.
Above-mentioned use is arranged in the method for brick fetal membrane after-pouring moulding concrete, the moulding wall formwork obtained based on brick fetal membrane Structure as illustrated in figs. 5-7, including the brick fetal membrane constituted by being vertically provided at the brick wall 6 on front side of foundation pit crater wall, its main feature is that foundation pit Also there is vertical inbuilt support pile 8, being horizontally disposed between support pile 8 and brick wall 6 has welding screw rod 9, weldering in soil layer outside wall It connects 9 one end of screw rod to be weldingly fixed in the aperture of support pile 8, sockets and socketed and be fixed in brick wall 6 with the welding screw rod other end.This Sample, the moulding wall being arranged by the way of brick fetal membrane so that moulding wall main body pour construction when without independent formwork, side Just it constructs, the welding screw rod for socketing setting takes full advantage of support pile as immobilizing foundation, no longer needs to independent formwork, guarantees to making The construction reliability that type wall main body pours.
Wherein, brick wall 6 includes the vertical constructional column of the multiple tracks that pours setting at interval of 4.5-4.8 meters along wall length direction 10, and the multilayer collar tie beam 11 of setting is poured along high every 4 meters of wall, masonry standard in the region that constructional column 10 and collar tie beam 11 surround Brick;The outer end of welding screw rod 9 is poured fixed in collar tie beam or constructional column.In this way, better assuring that the stability of brick wall itself And reliability.
Wherein, brick wall 6 is 240mm thickness wall brick, with proof strength.
Wherein, it is collar tie beam arrangement of reinforcement 61 that 4 10 reinforcing bars of Φ are provided in collar tie beam 11 along rectangular arrangement, is provided with several 6 steel of Φ Rib ring is arranged to make up collar tie beam stirrup 62 according to spacing 250mm;Collar tie beam pours to obtain using C20 concrete material.It in this way can be more Proof strength well.
Wherein, 10 column section of constructional column is the square of 240mm × 240mm, uses 4 12 reinforcing bar rectangles of Φ in constructional column It is arranged as constructional column arrangement of reinforcement 63, arranges to form construction column tie-bar 64, constructional column according to spacing 150mm using several 6 steel rings of Φ It pours to obtain using C20 concrete material.Intensity can be better ensured that in this way.
Wherein, welding screw rod 9 is obtained using 16 screw rod of Φ, can better ensure that supporting intensity and reliability.
In above embodiment, using concreting distributing system(Participate in Fig. 2-Fig. 4)Realize concreting(And Subsequent barricade pours), concreting distributing system includes the concrete tank car 33 and Vehicle loaded pump 34 positioned at ground on the outside of foundation pit, with And it is set to the material distributing machine in foundation pit, 33 discharge port of concrete tank car is connected with Vehicle loaded pump 34, and Vehicle loaded pump discharge pipe is conveyed by concrete Pipeline 35 is connected with the cloth pipeline 36 in material distributing machine;Material distributing machine includes the steel bracket 38 being mounted vertically in foundation pit and can be horizontal It is rotatably arranged at the steel crossbearer 37 of steel bracket upper end, one end of steel crossbearer 37 is the discharge end that cloth pipeline 36 is arranged, cloth 36 front end of pipeline is connected with the pumping rubber vomit pipe 39 extended downwardly, 36 rear end of cloth pipeline arranged downwards along steel bracket and and Concrete conveyance conduit 35 is connected.
In this way, the concreting distributing system combined using concrete tank car and Vehicle loaded pump and material distributing machine, has knot Structure is simple, easy to assembly, advantage easy to set up low in cost, greatly improves and pours efficiency and pour operation convenience.
Wherein, steel crossbearer 37 is the Balance weight end for being provided with clump weight 31, discharge end distance away from the other end of discharge end The length of steel bracket 38 is greater than Balance weight end distance steel stent length.In this way, more convenient holding steel bracket balance, it is flat to improve operation Stability.
Wherein, 38 lower end of steel bracket has bottom support frame 32 extended horizontally outward, 32 periphery of bottom support frame It is provided with supporting leg 40 straight down, 40 lower end of supporting leg has a cushion block 41 being horizontally set in foundation pit, in bottom support frame 32 The first rubber tyre 42 is provided between foundation pit below portion.In this way, installation and damping can be better ensured that, guarantee that support is steady It is qualitative, and avoid destruction of the material distributing machine to bottom of foundation ditch base.
Wherein, there are four horizontal extension legs 43 being arranged horizontally outward 32 4 jiaos of bottom support frame, the supporting leg 40 is set It sets below 43 front end of horizontal extension leg.In this way, can according to need the position of four each supporting legs of adjustment, keep its installation steady, together When can according to need elongation Retractive leg outside as far as possible when installing, better ensure that stability of strutting system.
Wherein, the lower section that concrete conveyance conduit enters foundation pit corner, which is also padded, is equipped with the second rubber tyre 44.In this way, the second rubber Rubber tire tire 44 can preferably concrete conveyance conduit whereabouts intersegmental part delivering concrete when impact buffered, preferably protection pipe Road and corresponding bottom of foundation ditch base layer structure.
Wherein, steel crossbearer rear and front end respectively hangs downwards and is provided with adjustment drawstring 45.In this way, can be convenient worker from Lower section pulls front and back drawstring, carries out the adjustment rotated left and right to steel crossbearer, and structure is simple and easy to adjust quick, adjusts stability It is good.Further, adjustment is additionally provided with pull ring 46 with 45 lower end of drawstring, and worker is facilitated to pull force.
When implementation, can also be configured to water-proof concrete using waterproof material when concrete configures and poured, make itself and The barricade waterproof layer that waterproof coiled material construction obtains constitutes dual waterproof together, greatlys improve waterproof effect;Configure anti-water coagulation When native, using water-proof concrete configuration device below(Participate in Fig. 4)It realizes, including concrete tank car 33, further includes an agitator 47, a plastic water bag 48,48 upper end opening edge of plastic water bag and agitator upper port edge one are provided in agitator 47 It causes and is connected, the length after plastic water bag 48 extends is equal to or higher than 47 depth of agitator, and 47 bottom of agitator is located at plastics water Bag lower section is provided with electronic weigher 49, and electronic weigher 49 has the horizontally disposed weighing face for being located at the top and should Weighing face is located in the middle part of agitator, and 47 upper end side of agitator is also provided with and communicated with water inlet pipe 50 outward, and 50 inner end of water inlet pipe is close Envelope is connected to inside plastic water bag, water inlet switch valve 51 is equipped on water inlet pipe 50,47 lower end side of agitator is also connected to outward It is provided with outlet pipe 52, outlet pipe inner end is sealingly connected to inside plastic water bag, and effluent switch valve 53 is provided on outlet pipe 52 With water pump 54, outlet pipe water outlet is connected to the entrance of agitator tank on concrete tank car.
In this way, open water inlet switch valve in use, effluent switch valve can be closed first, by water inlet pipe to plastic water bag Interior water inlet closes water inlet switch valve after entering the water of fixed mass by electronic weigher metering, corresponding ratio is then added In PNC waterproof material to plastic water bag, after mixing evenly, then opens effluent switch valve and water pump and uniformly will be mixed with PNC waterproof The water of material is directly pumped into agitator tank, and concrete formulation is added and is stirred.In this way, first realizing that PNC is anti-by agitator It is added directly into concrete drums after the stirring and evenly mixing of water material, adds cement and sandstone stirring, ensure that concrete The mixed uniformity of middle PNC waterproof material and timeliness, the time conditions matching for using itself and waterproof material itself, guarantee Good waterproof effect.
It wherein, further include self- poking arrangement, self- poking arrangement includes a tripod 55, and tripod 55 includes circumferential Upper equally distributed three foot levers, foot lever inner end are fixedly connected with a motor 56, foot lever length and the matching of agitator radius and foot Bar outer end under being it is curved for and agitator edge clamping bending, motor output end is connected with one and extends straight down Agitating shaft 57, agitating shaft lower end extend to agitator middle and lower part position and the lower end are provided with stirring blade 58.
In this way, stirring barrel edge can be fixed on by tripod foot lever, so that stirring blade is deep into agitator Inside drives stirring blade to realize stirring to waterproof material by motor, more convenient and do not improve mixing effect again not Weight calculation is influenced to weigh.
Wherein, one piece of intermediate plate 59 is additionally provided between electronic weigher 49 and plastic water bag 48,59 level of intermediate plate is set It sets and shape is consistent with agitator lumenal cross-section, there are can be on intermediate plate between 59 edge of intermediate plate and stirring barrel cavity The gap of lower slider, 59 upper surface of intermediate plate is directly and plastic water bag is affixed setting, 59 lower surface of intermediate plate middle part and electronic scale The weighing face of treasure 49 is affixed setting.It in this way can be preferably by the weight transmitting of plastic water bag to electronic-weighing by intermediate plate On device, weighing accuracy is improved.Further, 59 lower surface of intermediate plate is provided with one layer of elastic rubber material, in this way can It is enough preferably to fit with the weighing face of electronic weigher, keep its weighing accurate.
Wherein, electronic weigher 49 has the display screen for being located at side, sets on the agitator side of display screen face It is equipped with watch window.In this way, being conducive to reading.
The present invention is when it is implemented, can be using sizing truss mould plate support system after carrying out the binding of basement barricade reinforcing bar Realize single side formwork on the inside of barricade.
The sizing truss mould plate support system(Participate in Fig. 8-9)Including vertically arranged barricade template 71, barricade template 71 outsides horizontal interval are disposed with several vertical back cords 72, and arranged for interval has several lateral back cords to vertical back cord 72 elevationally outward 73, if being horizontally spaced about on the outside of lateral back cord 73 has a dry setting truss, the whole at right angles triangle of sizing truss and one it is straight The arm of angle is mutually leaned on foundation pit ground, another right-angle side is mutually leaned on lateral back cord, further includes several single wire drawing bars 74, single wire drawing bar 74 Horizontally disposed and inner end is weldingly fixed in the barricade steel mesh bundled on the inside of barricade template 71, and fixed socket in outer end is being formed On truss.
In this way, sizing truss is prefabricated triangular framing knot using sizing truss as barricade template outside-supporting Structure realizes the compression to back cord by single wire drawing bar, and then compresses support shuttering, therefore can be realized Fast Installation and guarantee to mould The stability of strutting system of plate.
Wherein, the vertical back cord 72 is that packet batten obtains in vertically arranged several shaped steels, and batten side faces And it is fitted in barricade template outer surface.
In this way, the batten and barricade template outer surface on the inside of vertical back cord can be preferably bonded power transmission, improves and stablize Property, several shaped steels in outside and lateral back cord contact the transmitting raising reliability that can preferably bear support force.
Wherein, lateral back cord 73 is that the double flute steel back that the channel steel being arranged in pairs connects along its length is stupefied, is set in pairs The channel steel length direction junction set is provided with the bloom 75 being adjacent between two pairs of channel steels being mutually connected, by steel pin 76 Connecting hole on channel steel and bloom 75 realizes connection;75 thickness of bloom is greater than single 74 diameter of wire drawing bar, and single wire drawing bar is worn Between the stupefied pairs of channel steel of double flute steel back.In this way, can be convenient the installation settings of lateral back cord, and better ensure that lateral back Stupefied intensity, additionally it is possible to facilitate the reliability of the stability and force that improve single wire drawing bar connection.
Wherein, single 74 outer end of wire drawing bar sockets on sizing truss by the way that truss fixed structure is fixed, truss fixed structure Including a round steel hanging part 77, there is a through-hole passed through for single wire drawing bar 74, round steel mounting in the middle part of round steel hanging part 77 77 upper and lower ends of part respectively have an outwardly extending hitching arm, and mounting facies medialis brachii is that arc and respective stress sockets One truss, which is socketed, to be arranged on each sizing truss on round steel, truss sockets to be extended transversely through with round steel and is transmitted single wire drawing bar pair It is formed the pulling force of truss, is screwed on single wire drawing bar on the outside of round steel hanging part and the lock of the external screw thread cooperation of single wire drawing bar outer end Tight nut.Further, the locking nut is arranged side by side two, and the abutting that can mutually be screwed on is realized locked.
In this way, facilitating the quick connection installation of single wire drawing bar and truss of being formed and stablizing force, truss is socketed with round steel also It can make the entirety that common stress is constituted between each sizing truss, preferably raising stability.
Wherein, the sizing truss includes underlying surrounding whole right-angled trapezium lower frame in a rectangular trapezoid by steel bar Frame 78, be connected to 78 top of right-angled trapezium lower frame surrounds frame 79 on whole at right angles triangle, right angle trigonometry by steel bar Vertical edge in shape on the inside of the vertical edge and right-angled trapezium lower frame of 79 inside of frame is located at same perpendicular, right angled triangle upper ledge The bevel edge on the outside of bevel edge and right-angled trapezium lower frame on the outside of frame is located at same oblique plane;Right-angled trapezium lower frame upper surface institute It is bolted and fixed after the steel bar fitting of frame lower surface position on the steel bar and right angled triangle of position.
In this way, sizing truss splices to obtain using two frames, the decomposition transport and spelling of the truss that more convenient can be formed Installation is connect, and quick and easy for installation.
Wherein, the steel bar upper end of 79 vertical edge position of frame upwardly extends to form stage+module portion on right angled triangle, To being externally connected with the platform frame 80 for surrounding rectangular triangle by steel bar, platform frame 80 on the outside of stage+module portion Upper surface is horizontally disposed steel bar and constitutes people's row platform after being used to be laid with support plate.In this way, can be flat with more convenient people's row Platform sets up installation, carries out on people's row platform conducive to worker and the operation such as pours.
Wherein, 80 outer end of platform frame, which is fixed up, is connected with Terrace prevention bar 81.In this way, when setting up, it can To set safety net by the drawing of Terrace prevention bar, with the safety of guarantor's row platform.
Wherein, reinforcement steel bar arranged in a crossed manner is also fixedly connected with inside right-angled trapezium lower frame 78.It further increases The stability of right-angled trapezium lower frame.
Wherein, the reinforcement steel that both ends are fixedly connected between each side is additionally provided on right angled triangle inside frame 79 Item.Further increase the stability of frame on right angled triangle.
Wherein, steel bar upper position where 79 bevel edge of frame is additionally provided with lifting lug 82 on right angled triangle, when installing in this way The docking that right angled triangle upper ledge and right-angled trapezium lower frame can be first completed under foundation pit ground level state is fixed, then again Sizing truss pull-up state in a vertical shape is completed into installation by lifting lug lifting, improves the convenience of in-site installation construction.
Wherein, the fixed connection outward in the outside of the respective bevel edge of frame 79 on right-angled trapezium lower frame 78 and right angled triangle There is one section of support fashioned iron 83, support fashioned iron 83 is used to shelve the connection that lateral truss joint steel pipe 84 realizes each sizing truss. Each sizing truss is connected to become to a common stress is whole in this way, can be convenient, guarantee single side formwork stability and can By property.
Wherein, also there is the foundation bolt of perforation setting upwards at the steel bar outer end where 78 bottom edge of right-angled trapezium lower frame Connecting hole, foundation bolt connecting hole is used for and the vertical pre-buried foundation bolt 85 in foundation pit ground is cooperatively connected.Sizing is achieved Positioning and fixation on the outside of when truss installa-tion improve installation convenience and guarantee that supporting & stablizing is reliable.
Wherein, it is additionally provided with anchor pole link block 86 at the interior angle of right-angled trapezium lower frame bottom edge, is provided on anchor pole link block Anchor pole connecting hole, the also oblique outer lower side in steel bar lower end where the vertical edge of right-angled trapezium lower frame inside are provided through anchor pole and wear Hole, anchor perforation face anchor pole connecting hole are arranged and draw for fixed after running through for the oblique pre-buried embedded anchor bar 87 in foundation pit ground It connects on anchor pole link block.
In this way, provide oblique pulling force by embedded anchor bar after facilitating installation, better ensure that the support of sizing truss unilateral side by Dynamic balance further increases the stability and reliability of support.
After basement barricade is poured and conserved, sizing truss and barricade template is removed, cuts off single wire drawing bar, pre-buried Basement Retaining wall is completed in foundation bolt and the extra exposed part of embedded anchor bar.

Claims (10)

1. first moulding is arranged in basement foundation ditch crater wall in a kind of basement Retaining wall method based on brick fetal membrane moulding wall Wall, moulding wall outer surface and basement barricade outer surface design shape correspond to it is consistent, then moulding wall outer surface carry out Waterproof coiled material construction obtains barricade waterproof layer, forms basement barricade outside-supporting by moulding wall and barricade waterproof layer, carries out Single side formwork on the inside of the binding of basement barricade reinforcing bar and barricade is completed basement barricade and is poured;It is characterized in that, basement foundation ditch Moulding wall is set in crater wall using the method for setting brick fetal membrane after-pouring moulding concrete, specifically includes following steps:
1)Support pile is buried elevationally outward in foundation pit crater wall in advance;
2)Surveying setting-out determines the welding screw rod setting position of brick fetal membrane setting position and bar planting;
3)Bar planting, the soil layer plane by support pile in face of foundation pit side are opened, are drilled on the side surface that support pile exposes, by welding wire It in the vertical implant holes in bar inner end and is welded and fixed, the horizontal face support pile in its outer end is made to extend outwardly fixation;
4)Standard brick masonry brick wall is used in brick fetal membrane setting position, along wall length direction at interval of 4.5- when building in brick wall 4.8 meters pour one of vertical constructional column of setting, pour one layer of collar tie beam of setting along high every 4 meters of wall, what constructional column and collar tie beam surrounded Standard brick is built in region;The outer end of welding screw rod is poured fixed in collar tie beam or constructional column;
5)While completing brick wall, after completing one section of height of wall brick, i.e., the casting concrete in brick wall, wall brick is built and inside Concreting interval carries out, until ultimately forming moulding wall wall base;
6), smear cement mortar outside moulding wall wall base and cover smooth, waterproof coiled material construction can be carried out.
2. the basement Retaining wall method as described in claim 1 based on brick fetal membrane moulding wall, which is characterized in that 4)Step With 5)In step, concreting is realized using concreting distributing system, concreting distributing system includes being located at base The concrete tank car and Vehicle loaded pump on hole outside ground, and the material distributing machine being set in foundation pit, concrete tank car discharge port are connected with Vehicle loaded pump, Vehicle loaded pump discharge pipe is connected by concrete conveyance conduit with the cloth pipeline in material distributing machine;Material distributing machine includes being mounted vertically in foundation pit Interior steel bracket and steel bracket upper end can be arranged in steel crossbearer with horizontally rotating, one end of steel crossbearer are setting cloth pipeline Discharge end, cloth pipeline front end are connected with the pumping rubber vomit pipe extended downwardly, and cloth rear end of pipeline is along the downward cloth of steel bracket It sets and is connected with concrete conveyance conduit.
3. the basement Retaining wall method as claimed in claim 2 based on brick fetal membrane moulding wall, which is characterized in that steel crossbearer The other end away from discharge end is the Balance weight end for being provided with clump weight, length of the discharge end apart from steel bracket be greater than Balance weight end away from From steel bracket length.
4. the basement Retaining wall method as claimed in claim 2 based on brick fetal membrane moulding wall, which is characterized in that steel bracket Lower end has bottom support frame extended horizontally outward, and bottom support frame periphery is provided with supporting leg straight down, supporting leg Lower end has the cushion block being horizontally set in foundation pit, is provided with the first rubber wheel between lower section and foundation pit in the middle part of the support frame of bottom Tire.
5. the basement Retaining wall method as claimed in claim 4 based on brick fetal membrane moulding wall, which is characterized in that bottom branch Support quadrangle has four horizontal extension legs being arranged horizontally outward, and the supporting leg is arranged below horizontal extension leg front end.
6. the basement Retaining wall method as claimed in claim 2 based on brick fetal membrane moulding wall, which is characterized in that concrete conveying The lower section that pipeline enters foundation pit corner, which is also padded, is equipped with the second rubber tyre.
7. the basement Retaining wall method as described in claim 1 based on brick fetal membrane moulding wall, which is characterized in that carry out ground Single side formwork on the inside of barricade is realized using sizing truss mould plate support system after lower room barricade reinforcing bar binding,
The sizing truss mould plate support system includes vertically arranged barricade template, and horizontal interval is disposed on the outside of barricade template Several vertical back cords, arranged for interval has several lateral back cords to vertical back cord elevationally outward, is horizontally spaced about on the outside of lateral back cord If there is dry setting truss, the whole at right angles triangle of a sizing truss and right-angle side is mutually leaned on foundation pit ground, another right angle Side is mutually leaned on lateral back cord, further includes several single wire drawing bars, single wire drawing bar is horizontally disposed and inner end is weldingly fixed on barricade template In the barricade steel mesh that inside has bundled, outer end is fixed to be socketed on sizing truss.
8. the basement Retaining wall method as claimed in claim 7 based on brick fetal membrane moulding wall, which is characterized in that described perpendicular It is that packet batten obtains in vertically arranged several shaped steels to back cord, batten side faces and is fitted in table on the outside of barricade template Face.
9. the basement Retaining wall method as claimed in claim 8 based on brick fetal membrane moulding wall, which is characterized in that described fixed Type truss include it is underlying whole right-angled trapezium lower frame in a rectangular trapezoid is surrounded by steel bar, be connected under right-angled trapezium Frame on whole at right angles triangle is surrounded by steel bar above frame, vertical edge and right angle ladder on right angled triangle on the inside of frame Vertical edge on the inside of shape lower frame is located at same perpendicular, bevel edge and right-angled trapezium lower frame on right angled triangle on the outside of frame The bevel edge in outside is located at same oblique plane;The steel bar and right angled triangle upper ledge of right-angled trapezium lower frame upper surface position It is bolted and fixed after the steel bar fitting of frame lower surface position.
10. the basement Retaining wall method as claimed in claim 9 based on brick fetal membrane moulding wall, which is characterized in that right angle The steel bar upper end of frame vertical edge position upwardly extends to form stage+module portion on triangle, connects outward on the outside of stage+module portion Be connected to the platform frame that rectangular triangle is surrounded by steel bar, platform frame upper surface be horizontally disposed steel bar and For constituting people's row platform after being laid with support plate.
CN201710365158.2A 2017-05-22 2017-05-22 A kind of basement Retaining wall method based on brick fetal membrane moulding wall Active CN106968269B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710365158.2A CN106968269B (en) 2017-05-22 2017-05-22 A kind of basement Retaining wall method based on brick fetal membrane moulding wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710365158.2A CN106968269B (en) 2017-05-22 2017-05-22 A kind of basement Retaining wall method based on brick fetal membrane moulding wall

Publications (2)

Publication Number Publication Date
CN106968269A CN106968269A (en) 2017-07-21
CN106968269B true CN106968269B (en) 2018-11-16

Family

ID=59327118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710365158.2A Active CN106968269B (en) 2017-05-22 2017-05-22 A kind of basement Retaining wall method based on brick fetal membrane moulding wall

Country Status (1)

Country Link
CN (1) CN106968269B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107435335A (en) * 2017-09-15 2017-12-05 上海建工建集团有限公司 Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam
CN108149718A (en) * 2017-12-27 2018-06-12 中国二十冶集团有限公司 A kind of waterproof construction method
CN108793843B (en) * 2018-06-26 2021-04-06 杭州富丽华建材有限公司 High-performance recycled concrete tire diaphragm plate and construction method thereof
CN110258621B (en) * 2019-04-30 2021-03-26 上海二十冶建设有限公司 Assembled retaining wall convenient to quick construction
CN113802721B (en) * 2021-09-23 2022-12-13 武汉建工集团股份有限公司 Deep foundation pit and outer wall integrated structure and construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08151645A (en) * 1994-11-30 1996-06-11 Nippon Steel Metal Prod Co Ltd Deep foundation pile type earth retaining wall
CN104975614B (en) * 2015-06-16 2017-03-15 中铁建大桥工程局集团第五工程有限公司 Shaped steel combination formula single side formwork strengthening construction engineering method

Also Published As

Publication number Publication date
CN106968269A (en) 2017-07-21

Similar Documents

Publication Publication Date Title
CN106968269B (en) A kind of basement Retaining wall method based on brick fetal membrane moulding wall
CN107130631B (en) A kind of basement Retaining wall method based on concreting moulding wall
CN109736353A (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
CN206844659U (en) Basement barricade single side formwork system
CN106978819B (en) It is a kind of without fertile slot construct basement barricade
CN110424460A (en) A kind of tunnel open excavation construction technology
CN107366303A (en) Construction method and retaining wall of the aluminum alloy mould plate as highway gravity retaining wall template
CN111441343A (en) Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application
CN108035360B (en) A method of for pattern foundation pit supporting structure
CN104695446B (en) Basement construction method for supporting
KR101901368B1 (en) A Permanent Retaining Wall Method Using by Double I Beam
CN109056844B (en) Waterproof construction method for outer wall of basement of building
CN207469303U (en) A kind of removable assembled template peace tears operating system open
CN207017271U (en) Suitable for the concreting distributing system of basement construction
CN208870043U (en) On the anti-pit accident across existing tunnel ruggedized construction
CN206722391U (en) Basement barricade moulding wall formwork erecting structure based on brick fetal membrane
CN206722406U (en) A kind of sizing truss structure for basement barricade single side formwork
CN207193947U (en) It is a kind of to be used for rotary digging stake and the connection buckle of Larsen steel sheet pile
CN206902721U (en) A kind of foundation pit supporting system
CN110306534A (en) A kind of construction method of three-in-one underground diaphragm wall
CN206928298U (en) A kind of basement foundation ditch material distributing machine
JPH06257169A (en) Small-scale basement
JPS6198817A (en) Method of forming concrete wall of underground structure employing composite sheet pile and composite sheet pile as weir panel
CN110093945A (en) A kind of installation elevator steel construction pit
CN109653193A (en) Inversion underground continuous wall construction method

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant