CN106961134A - Charging and conversion electric facility safety utilization of electric power control method and system - Google Patents

Charging and conversion electric facility safety utilization of electric power control method and system Download PDF

Info

Publication number
CN106961134A
CN106961134A CN201610829565.XA CN201610829565A CN106961134A CN 106961134 A CN106961134 A CN 106961134A CN 201610829565 A CN201610829565 A CN 201610829565A CN 106961134 A CN106961134 A CN 106961134A
Authority
CN
China
Prior art keywords
control system
charging
real
conversion electric
platform area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610829565.XA
Other languages
Chinese (zh)
Other versions
CN106961134B (en
Inventor
戴晨松
刘隽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIO Holding Co Ltd
Original Assignee
NIO Nextev Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIO Nextev Ltd filed Critical NIO Nextev Ltd
Priority to CN201610829565.XA priority Critical patent/CN106961134B/en
Publication of CN106961134A publication Critical patent/CN106961134A/en
Application granted granted Critical
Publication of CN106961134B publication Critical patent/CN106961134B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J7/0027
    • H02J7/0021
    • H02J7/0022

Abstract

The invention belongs to charging technique field, and in particular to a kind of charging and conversion electric facility safety utilization of electric power control method.Present invention seek to address that how to realize the problem of electricity consumption situation and the electricity consumption situation real-time matching of other equipments of charging and conversion electric facility are coordinated.For this purpose, the method for the present invention comprises the following steps:The real-time total current Iin in platform area is obtained, and is sent to master control system;Master control system calculates the real-time utilization r for putting into effect area's capacitance according to real-time total current Iin and platform area maximum allowed current Imax;The utilization state of platform area capacitance is divided into multiple electricity consumption areas according to the real-time utilization of platform area capacitance;Master control system is communicated with charging and conversion electric facility control system according to specific electricity consumption area;Charging and conversion electric facility control system reads the parameter current of master control system, regulates and controls the electricity consumption strategy of charging and conversion electric facility.Technical scheme can be in real-time response circuit power consumption change, making full use of while being available for power consumption of circuit, accomplishing safety utilization of electric power, coordinate electricity consumption.

Description

Charging and conversion electric facility safety utilization of electric power control method and system
Technical field
The invention belongs to Charge Management technical field, and in particular to a kind of charging and conversion electric facility safety utilization of electric power control method and be System.
Background technology
Extensive with charging and conversion electric facility is pushed open, and increasing charging and conversion electric facility (includes but is not limited to charging pile, changed Power station, charging vehicle, charging inlet etc.) have to equip (hereinafter referred to as " other equipments ") altogether with other electrically-charging equipments or electricity consumption With being connected under a transformer, or one with electric line, and shares capacity after same table, i.e., all facilities it is total Power consumption is limited by circuit active volume.The problem produced therewith is, how the charging and conversion electric facility that is controlled is set and closed The maximum electricity consumption threshold value of reason.Due to the randomness and dispersiveness of other equipment electricity consumptions, if with the maximum power consumption of other equipments For that according to the maximum electricity consumption threshold value for setting charging and conversion electric facility, certainly will cause during other equipment free time or low power consumption, to fill and change Electric facility can not be substantially less than normal with the available power that this calculates charging and conversion electric facility using the electricity capacity vacated.If according to The maximum electricity consumption threshold value of charging and conversion electric facility is set according to the numerical value of the maximum power consumption of other equipments of region, and it cannot be guaranteed that changed filling When the high-order electricity consumption of electric facility is run, other equipment non unexpected increases of electricity consumption, so as to cause total electricity consumption to exceed Circuit definite value and act protection device, and then influence the normal electricity consumption of charging and conversion electric facility and whole piece circuit.
Therefore, this area needs a kind of safety utilization of electric power control method, realizes that the electricity consumption situation of charging and conversion electric facility is filled with other The real-time matching of standby electricity consumption situation is coordinated.That is, in other equipment low power consumption phases, charging and conversion electric facility can be made to utilize it in time He equips the idle capacity conceded;During other equipment power consumption rapid increases, charging and conversion electric facility can be made to adjust use in time Electric strategy, forces down power consumption, it is ensured that total electricity consumption in circuit will not trigger protection device action and influence charging and conversion electric facility with And the normal electricity consumption of whole piece circuit.
The content of the invention
In order to solve above mentioned problem of the prior art, be solve how to realize the electricity consumption situation of charging and conversion electric facility with The problem of electricity consumption situation real-time matching of other equipments is coordinated, the invention provides a kind of charging and conversion electric facility safety utilization of electric power controlling party Method.Methods described comprises the following steps:
The real-time total current Iin in platform area is obtained, and is sent to master control system;
Master control system calculates according to the real-time total current Iin and maximum allowed current Imax in platform area and puts into effect the real-time of area's capacitance Utilization rate r;
The utilization state of platform area capacitance is divided into multiple electricity consumption areas according to the real-time utilization r of platform area capacitance;
Master control system is communicated with charging and conversion electric facility control system according to the electricity consumption area being presently in;And
Charging and conversion electric facility control system reads the parameter current of master control system and regulates and controls charging and conversion electric according to the parameter current and sets The electricity consumption strategy applied.
Above-mentioned charging and conversion electric facility safety utilization of electric power control method further comprises:Master control system is according to the reality of platform area capacitance When utilization rate r calculate the real-time available power in platform area.
In above-mentioned charging and conversion electric facility safety utilization of electric power control method, the multiple electricity consumption area include comfort zone, vigilant area and Hazardous area.
Further, the comfort zone is set to green, represents that the utilization rate of platform area capacitance is less than 60%;It is described vigilant Area is set to yellow, represents the utilization rate of platform area capacitance between 60%~80%;The hazardous area is set to red, represents The utilization rate of platform area capacitance is higher than 80%.
In above-mentioned charging and conversion electric facility safety utilization of electric power control method, the multiple electricity consumption area includes comfort zone, vigilant area, danger Danger zone and urgent area.
Further, the comfort zone is set to green, represents that the utilization rate of platform area capacitance is less than 60%;
The vigilant area is set to yellow, represents the utilization rate of platform area capacitance between 60%~80%;
The hazardous area is set to red, represents the utilization rate of platform area capacitance between 80%~95%;
The urgent area is set to black, represents that the utilization rate of platform area capacitance is higher than 95%.
Further, master control system is according to the real-time utilization r of platform area capacitance, by the real-time electricity consumption of platform area capacitance Status indication is one kind in the green, yellow, red and black.
Further, master control system controls system according to real-time set with electricity condition of platform area capacitance with charging and conversion electric facility The communication frequency of system.
Above-mentioned charging and conversion electric facility safety utilization of electric power control method further comprises:
When platform area capacitance real-time is changed with the color of electricity condition, master control system and charging and conversion electric facility control system Communicated;
When the color keep of the real-time use electricity condition of platform area capacitance is constant, master control system is according to when foreground partition capacitance Real-time utilization r change is set and charging and conversion electric facility control according to the communication time interval of charging and conversion electric facility control system The frequency of system communication processed;
In above-mentioned charging and conversion electric facility safety utilization of electric power control method, real-time when platform area capacitance is held with the color of electricity condition When continuing in green, the real-time utilization of platform area capacitance often changes 10%, or master control system is controlled with charging and conversion electric facility The communication time interval of system is often more than 1 minute, and master control system is once communicated with charging and conversion electric facility control system;Work as platform When area's capacitance real-time is continuously in yellow with the color of electricity condition, when the real-time utilization of platform area capacitance often changes 5%, Or master control system and the communication time interval of charging and conversion electric facility control system are often more than 30 seconds, master control system and charging and conversion electric Facility control system is once communicated;When platform area capacitance real-time is continuously in red with the color of electricity condition, work as platform The real-time utilization of area's capacitance often changes between 1%, or master control system and the call duration time of charging and conversion electric facility control system Every often, more than 10 seconds, master control system was once communicated with charging and conversion electric facility control system;When the real-time use of platform area capacitance When the color of electricity condition is continuously in black, master control system carries out instant messaging or each with charging and conversion electric facility control system Second is once communicated.
Further, charging and conversion electric facility control system reads the current of master control system by being communicated with master control system Parameter, the parameter current includes the real-time of platform area capacitance and uses electricity condition and real-time active volume.
Further, charging and conversion electric facility control system regulates and controls electricity consumption strategy according to parameter current:
When platform area capacitance is green comfort zone with electricity condition, power consumption can be increased, also can disposably put into many with Denso is standby;
When platform area capacitance is that yellow is vigilant area with electricity condition, electricity consumption level is kept, if new electricity consumption equipment need to be put into, is needed Synchronously force down and equipped in the power consumption or excision equipped with electricity consumption with electricity consumption;
When platform area capacitance is red hazardous area with electricity condition, electricity consumption level is reduced, new electricity consumption equipment is no longer put into, simultaneously Force down and equipped in the power consumption equipped with electricity consumption or progressively cut off with electricity consumption;
When platform area capacitance is the urgent area of black with electricity condition, immediately successively or complete resection is equipped with electricity consumption.
Above-mentioned charging and conversion electric facility safety utilization of electric power control method further comprises, the acquisition modes of the real-time total current Iin Including:Real-time total current Iin numerical value is obtained from the existing current measurement module of step down side;Or it is low in transformer Press side that current measurement module is installed, measure real-time total current Iin numerical value;Or where charging and conversion electric facility and other equipments The real-time current I and its phase angle theta of each bar circuit are obtained on each bar circuit in existing current measurement module, and then according to the reality When electric current I and its phase angle theta calculate real-time total current Iin;Or where the charging and conversion electric facility and other described equipments Current measurement module is installed on each bar circuit, the real-time current I and its phase angle theta of each bar circuit is measured, and then according to described real-time Electric current I and its phase angle theta calculate real-time total current Iin.
Above-mentioned charging and conversion electric facility safety utilization of electric power control method further comprises:The real-time utilization of described area's capacitance Computing formula is:R=Iin/Imax,
Wherein, r is the real-time utilization of platform area capacitance, and Iin is the real-time total current in platform area, and Imax is maximum allowable for platform area Electric current.
Above-mentioned charging and conversion electric facility safety utilization of electric power control method further comprises:The maximum allowed current depends on platform area most Big electricity capacity, the computing formula of platform area maximum electricity capacity is:KVAmax=k1*kVArated;
Wherein, kVAmax is the maximum electricity capacity in platform area, and k1 is overload factor, and kVArated is specified power consumption
The real-time available power computing formula is:
KVAavail=α * (1-r) * kVAmax;
Wherein, kVAavail is the real-time available power in platform area, and α is safety coefficient, and r is the real-time utilization of platform area capacitance, KVAmax is the maximum electricity capacity in platform area.
Further, master control system with charging and conversion electric control system is by optical fiber, cable or is wirelessly communicated;Or it is main Control system is communicated with charging and conversion electric control system by bus or connection;Or master control system controls system with charging and conversion electric System is integrated on a machine or one piece of board, by the way that mode communicates in machine or in plate.
Further, protection device is provided with the circuit in platform area, when the electric current in circuit exceedes pre-set current value, institute Protection device is stated to cut off the equipment of the electricity consumption in circuit.
Further, the protection device is relay, fuse and/or breaker.
On the other hand, system is controlled present invention also offers a kind of charging and conversion electric facility safety utilization of electric power for being used to perform the above method System, the system includes the master control system and the charging and conversion electric facility control system.
In summary, in the inventive solutions, by the electric current for flowing through platform area protection device is measured come The real-time total current in platform area is obtained, and then calculates the real-time utilization and real-time available power for putting into effect area's capacitance, according to platform area The electricity consumption state demarcation in platform area is multiple electricity consumption areas, then master control system and charging and conversion electric facility control by the real-time utilization of electric current System processed is communicated according to the electricity consumption area being presently in, and changes the real-time electricity consumption shape that electric facility control system reads platform area capacitance State and real-time available power, correspondingly set the maximum power consumption of itself, accomplish to maximally utilize in the range of available power. It can also be changed according to the power consumption adjusted in time with electricity condition in real time in the electricity consumption strategy of itself, real-time response circuit, it is ensured that Total electricity consumption in circuit will not trigger protection device action, while being available for power consumption of circuit can made full use of, done To safety utilization of electric power, coordinate electricity consumption.
Scheme 1, a kind of charging and conversion electric facility safety utilization of electric power control method, it is characterised in that methods described comprises the following steps:
The real-time total current (Iin) in platform area is obtained, and is sent to master control system;
Master control system calculates according to the maximum allowed current (Imax) in real-time total current (Iin) and platform area and puts into effect area's capacitance Real-time utilization (r);
The utilization state of platform area capacitance is divided into multiple electricity consumption areas according to the real-time utilization (r) of platform area capacitance;
Master control system is communicated with charging and conversion electric facility control system according to the electricity consumption area being presently in;And
Charging and conversion electric facility control system reads the parameter current of master control system and regulates and controls charging and conversion electric according to the parameter current and sets The electricity consumption strategy applied.
Scheme 2, the charging and conversion electric facility safety utilization of electric power control method according to scheme 1, it is characterised in that further comprise:Master control System processed calculates the real-time available power of platform area capacitance according to the real-time utilization (r) of platform area capacitance.
Scheme 3, the charging and conversion electric facility safety utilization of electric power control method according to scheme 2, it is characterised in that the multiple electricity consumption area Including comfort zone, vigilant area and hazardous area.
Scheme 4, the charging and conversion electric facility safety utilization of electric power control method according to scheme 2, it is characterised in that the multiple electricity consumption area Also include comfort zone, vigilant area, hazardous area and urgent area.
Scheme 5, the charging and conversion electric facility safety utilization of electric power control method according to scheme 3, it is characterised in that the comfort zone is set For green, represent that the utilization rate of platform area capacitance is less than 60%;
The vigilant area is set to yellow, represents the utilization rate of platform area capacitance between 60%~80%;
The hazardous area is set to red, represents that the utilization rate of platform area capacitance is higher than 80%.
Scheme 6, the charging and conversion electric facility safety utilization of electric power control method according to scheme 4, it is characterised in that the comfort zone is set For green, represent that the utilization rate of platform area capacitance is less than 60%;
The vigilant area is set to yellow, represents the utilization rate of platform area capacitance between 60%~80%;
The hazardous area is set to red, represents the utilization rate of platform area capacitance between 80%~95%;
The urgent area is set to black, represents that the utilization rate of platform area capacitance is higher than 95%.
Scheme 7, the charging and conversion electric facility safety utilization of electric power control method according to scheme 5 or 6, it is characterised in that master control system According to the real-time utilization (r) of platform area capacitance, by the real-time electricity consumption status indication of platform area capacitance be the green, yellow, One kind in red and black.
Scheme 8, the charging and conversion electric facility safety utilization of electric power control method according to scheme 7, it is characterised in that master control system according to The real-time communication frequency set with electricity condition with charging and conversion electric facility control system of platform area capacitance.
Scheme 9, the charging and conversion electric facility safety utilization of electric power control method according to scheme 8, it is characterised in that:
When platform area capacitance real-time is changed with the color of electricity condition, master control system and charging and conversion electric facility control system Communicated;
When the color keep of the real-time use electricity condition of platform area capacitance is constant, master control system is according to when foreground partition capacitance The change of real-time utilization (r) is set and charging and conversion electric facility according to the communication time interval of charging and conversion electric facility control system The frequency of control system communication.
Scheme 10, the charging and conversion electric facility safety utilization of electric power control method according to scheme 9, it is characterised in that:
When platform area capacitance real-time is continuously in green with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 10%, or master control system and the communication time interval of charging and conversion electric facility control system are often more than 1 minute, master control system Once communicated with charging and conversion electric facility control system;
When platform area capacitance real-time is continuously in yellow with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 5%, or master control system and charging and conversion electric facility control system communication time interval often more than 30 seconds, master control system with Charging and conversion electric facility control system is once communicated;
When platform area capacitance real-time is continuously in red with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 1%, or master control system and charging and conversion electric facility control system communication time interval often more than 10 seconds, master control system with Charging and conversion electric facility control system is once communicated;
When platform area capacitance real-time is continuously in black with the color of electricity condition, master control system is controlled with charging and conversion electric facility System carries out instant messaging or once communicated for each second.
Scheme 11, the charging and conversion electric facility safety utilization of electric power control method according to scheme 8, it is characterised in that charging and conversion electric facility control System processed reads the parameter current of master control system by being communicated with master control system, and the parameter current includes platform area electric capacity The real-time of amount uses electricity condition and real-time active volume.
Scheme 12, the charging and conversion electric facility safety utilization of electric power control method according to scheme 11, it is characterised in that charging and conversion electric facility control System processed regulates and controls electricity consumption strategy according to the parameter current:
When platform area capacitance is green comfort zone with electricity condition, power consumption can be increased, also can disposably put into many with Denso is standby;
When platform area capacitance is that yellow is vigilant area with electricity condition, electricity consumption level is kept, if new electricity consumption equipment need to be put into, is needed Synchronously force down and equipped in the power consumption or excision equipped with electricity consumption with electricity consumption;
When platform area capacitance is red hazardous area with electricity condition, electricity consumption level is reduced, new electricity consumption equipment is no longer put into, simultaneously Force down and equipped in the power consumption equipped with electricity consumption or progressively cut off with electricity consumption;
When platform area capacitance is the urgent area of black with electricity condition, immediately successively or complete resection is equipped with electricity consumption.
Scheme 13, the charging and conversion electric facility safety utilization of electric power control method according to any one of scheme 2 to 12, it is characterised in that The acquisition modes of the real-time total current (Iin) include:
Real-time total current (Iin) numerical value is obtained from the existing current measurement module of step down side;Or
Current measurement module is installed in step down side, the numerical value of real-time total current (Iin) is measured;Or
On each bar circuit where being equipped from charging and conversion electric facility with other each bar circuit is obtained in existing current measurement module Real-time current (I) and its phase angle (θ), and then real-time total current is calculated according to the real-time current (I) and its phase angle (θ) (Iin);Or
Current measurement module is installed on each bar circuit where the charging and conversion electric facility and other described equipments, each bar line is measured The real-time current (I) and its phase angle (θ) on road, and then real-time total current is calculated according to the real-time current (I) and its phase angle (θ) (Iin)。
Scheme 14, the charging and conversion electric facility safety utilization of electric power control method according to scheme 13, it is characterised in that described area's electric capacity The computing formula of the real-time utilization of amount is:R=Iin/Imax,
Wherein, r is the real-time utilization of platform area capacitance, and Iin is the real-time total current in platform area, and Imax is maximum allowable for platform area Electric current.
Scheme 15, the charging and conversion electric facility safety utilization of electric power control method according to scheme 14, it is characterised in that described maximum allowable Electric current depends on the maximum electricity capacity in platform area, and the computing formula of platform area maximum electricity capacity is:
KVAmax=k1*kVArated;
Wherein, kVAmax is the maximum electricity capacity in platform area, and k1 is overload factor, and kVArated is specified power consumption.
Scheme 16, the charging and conversion electric facility safety utilization of electric power control method according to scheme 15, it is characterised in that described available in real time The computing formula of electricity is:
KVAavail=α * (1-r) * kVAmax;
Wherein, kVAavail is the real-time available power in platform area, and α is safety coefficient, and r is the real-time utilization of platform area capacitance, KVAmax is the maximum electricity capacity in platform area.
Scheme 17, the charging and conversion electric facility safety utilization of electric power control method according to scheme 16, it is characterised in that master control system with Charging and conversion electric control system is by optical fiber, cable or is wirelessly communicated;Or
Master control system is communicated with charging and conversion electric control system by bus or connection;Or
Master control system and charging and conversion electric control system integration are on a machine or one piece of board, by the way that mode is led in machine or in plate Letter.
Scheme 18, the charging and conversion electric facility safety utilization of electric power control method according to scheme 17, it is characterised in that on the circuit in platform area Protection device is provided with, when the electric current in circuit exceedes pre-set current value, the protection device is to cut off the use in circuit Denso is standby.
Scheme 19, the charging and conversion electric facility safety utilization of electric power control method according to scheme 18, it is characterised in that the protection device For relay, fuse and/or breaker.
Scheme 20, a kind of charging and conversion electric facility safety utilization of electric power control system, it is characterised in that the system include master control system and Charging and conversion electric facility control system, the master control system is configured to:Obtain the real-time total current (Iin) in platform area;According to platform area Real-time total current (Iin) and maximum allowed current (Imax) calculate the real-time utilization (r) of platform area capacitance;By platform area capacitance Utilization state be divided into multiple electricity consumption areas according to the real-time utilization (r) of platform area capacitance;
The charging and conversion electric facility control system is configured to:Electricity consumption area and the master control system according to being presently in are led to Letter;Read the parameter current of the master control system and regulate and control the electricity consumption strategy of charging and conversion electric facility according to the parameter current.
Scheme 21, the charging and conversion electric facility safety utilization of electric power control system according to scheme 20, it is characterised in that the main control system System is configured to calculate the real-time available power of platform area capacitance according to the real-time utilization (r) of platform area capacitance.
Scheme 22, the charging and conversion electric facility safety utilization of electric power control system according to scheme 21, it is characterised in that the multiple electricity consumption Area includes comfort zone, vigilant area and hazardous area.
Scheme 23, the charging and conversion electric facility safety utilization of electric power control system according to scheme 21, it is characterised in that the multiple electricity consumption Area includes comfort zone, vigilant area, hazardous area and urgent area.
Scheme 24, the charging and conversion electric facility safety utilization of electric power control system according to scheme 22, it is characterised in that the comfort zone is set Green is set to, represents that the utilization rate of platform area capacitance is less than 60%;
The vigilant area is set to yellow, represents the utilization rate of platform area capacitance between 60%~80%;
The hazardous area is set to red, represents that the utilization rate of platform area capacitance is higher than 80%.
Scheme 25, the charging and conversion electric facility safety utilization of electric power control system according to scheme 23, it is characterised in that the comfort zone is set Green is set to, represents that the utilization rate of platform area capacitance is less than 60%;
The vigilant area is set to yellow, represents the utilization rate of platform area capacitance between 60%~80%;
The hazardous area is set to red, represents the utilization rate of platform area capacitance between 80%~95%;
The urgent area is set to black, represents that the utilization rate of platform area capacitance is higher than 95%.
Scheme 26, the charging and conversion electric facility safety utilization of electric power control system according to scheme 24 or 25, it is characterised in that the master control The real-time electricity consumption status indication of platform area capacitance is described into the real-time utilization (r) according to platform area capacitance by system configuration processed One kind in green, yellow, red and black.
Scheme 27, the charging and conversion electric facility safety utilization of electric power control system according to scheme 26, it is characterised in that the main control system The real-time communication frequency set with electricity condition with the charging and conversion electric facility control system under unified central planning being set to according to platform area capacitance.
Scheme 28, the charging and conversion electric facility safety utilization of electric power control system according to scheme 27, it is characterised in that:
When platform area capacitance real-time is changed with the color of electricity condition, master control system and charging and conversion electric facility control system Communicated;
When the color keep of the real-time use electricity condition of platform area capacitance is constant, master control system is according to when foreground partition capacitance The change of real-time utilization (r) is set and charging and conversion electric facility according to the communication time interval of charging and conversion electric facility control system The frequency of control system communication.
Scheme 29, the charging and conversion electric facility safety utilization of electric power control system according to scheme 28, it is characterised in that:
When platform area capacitance real-time is continuously in green with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 10%, or master control system and the communication time interval of charging and conversion electric facility control system are often more than 1 minute, master control system Once communicated with charging and conversion electric facility control system;
When platform area capacitance real-time is continuously in yellow with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 5%, or master control system and charging and conversion electric facility control system communication time interval often more than 30 seconds, master control system with Charging and conversion electric facility control system is once communicated;
When platform area capacitance real-time is continuously in red with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 1%, or master control system and charging and conversion electric facility control system communication time interval often more than 10 seconds, master control system with Charging and conversion electric facility control system is once communicated;
When platform area capacitance real-time is continuously in black with the color of electricity condition, master control system is controlled with charging and conversion electric facility System carries out instant messaging or once communicated for each second.
Scheme 30, the charging and conversion electric facility safety utilization of electric power control system according to scheme 29, it is characterised in that the charging and conversion electric is set Control system is applied to be configured to read the parameter current of the master control system by communicating with the master control system, it is described to work as Preceding parameter includes the real-time of platform area capacitance and uses electricity condition and real-time active volume.
Scheme 31, the charging and conversion electric facility safety utilization of electric power control system according to scheme 30, it is characterised in that the charging and conversion electric is set Apply control system and electricity consumption strategy is regulated and controled according to the parameter current:
When platform area capacitance is green comfort zone with electricity condition, power consumption can be increased, also can disposably put into many with Denso is standby;
When platform area capacitance is that yellow is vigilant area with electricity condition, electricity consumption level is kept, if new electricity consumption equipment need to be put into, is needed Synchronously force down and equipped in the power consumption or excision equipped with electricity consumption with electricity consumption;
When platform area capacitance is red hazardous area with electricity condition, electricity consumption level is reduced, new electricity consumption equipment is no longer put into, simultaneously Force down and equipped in the power consumption equipped with electricity consumption or progressively cut off with electricity consumption;
When platform area capacitance is the urgent area of black with electricity condition, immediately successively or complete resection is equipped with electricity consumption.
Scheme 32, the charging and conversion electric facility safety utilization of electric power control system according to any one of scheme 21 to 31, it is characterised in that The acquisition modes of the real-time total current (Iin) include:
Real-time total current (Iin) numerical value is obtained from the existing current measurement module of step down side;Or
Current measurement module is installed in step down side, the numerical value of real-time total current (Iin) is measured;Or
On each bar circuit where being equipped from charging and conversion electric facility with other each bar circuit is obtained in existing current measurement module Real-time current (I) and its phase angle (θ), and then real-time total current is calculated according to the real-time current (I) and its phase angle (θ) (Iin);Or
Current measurement module is installed on each bar circuit where the charging and conversion electric facility and other described equipments, each bar line is measured The real-time current (I) and its phase angle (θ) on road, and then real-time total current is calculated according to the real-time current (I) and its phase angle (θ) (Iin)。
Scheme 33, the charging and conversion electric facility safety utilization of electric power control system according to scheme 32, it is characterised in that described area's electric capacity The computing formula of the real-time utilization of amount is:R=Iin/Imax,
Wherein, r is the real-time utilization of platform area capacitance, and Iin is the real-time total current in platform area, and Imax is maximum allowable for platform area Electric current.
Scheme 34, the charging and conversion electric facility safety utilization of electric power control system according to scheme 33, it is characterised in that described maximum allowable Electric current depends on the maximum electricity capacity in platform area, and the computing formula of platform area maximum electricity capacity is:
KVAmax=k1*kVArated;
Wherein, kVAmax is the maximum electricity capacity in platform area, and k1 is overload factor, and kVArated is specified power consumption.
Scheme 35, the charging and conversion electric facility safety utilization of electric power control system according to scheme 34, it is characterised in that described available in real time The computing formula of electricity is:
KVAavail=α * (1-r) * kVAmax;
Wherein, kVAavail is the real-time available power in platform area, and α is safety coefficient, and r is the real-time utilization of platform area capacitance, KVAmax is the maximum electricity capacity in platform area.
Scheme 36, the charging and conversion electric facility safety utilization of electric power control system according to scheme 35, it is characterised in that the main control system System with the charging and conversion electric control system is by optical fiber, cable or is wirelessly communicated;Or
The master control system is communicated with the charging and conversion electric control system by bus or connection;Or
The master control system and the charging and conversion electric control system integration are on a machine or one piece of board, by machine or plate Interior mode communicates.
Brief description of the drawings
Fig. 1 is a kind of platform plot structure schematic diagram of the charging and conversion electric facility safety utilization of electric power control method using the present invention;
Fig. 2 is another plot structure schematic diagram of the charging and conversion electric facility safety utilization of electric power control method using the present invention;
Fig. 3 is the electricity consumption Division schematic diagram of the charging and conversion electric facility safety utilization of electric power control method of the present invention.
Embodiment
The preferred embodiment of the present invention described with reference to the accompanying drawings.It will be apparent to a skilled person that this A little embodiments are used only for explaining the know-why of the present invention, it is not intended that limit the scope of the invention.
At present, charging and conversion electric facility (include but is not limited to charging pile, electrical changing station, charging vehicle, charging inlet etc.) and other Electrically-charging equipment or electricity consumption equipment (hereinafter referred to as " other equipment ") are commonly connected under a transformer, or one with electric line In, and share capacity after same table, i.e. the total electricity consumption of all facilities is limited by circuit active volume.Therefore, it is of the invention A kind of method for the electricity utilization rate that can be improved in circuit is aimed to provide, and ensures that the total electricity consumption in circuit will not be triggered Protection device acts and cuts off electrical equipment.It is pointed out that the term " platform area " in the application means to be commonly connected to one Under individual transformer or in a region constituted with all electrical equipments in electric line, the region both can be actual area Domain or Virtual space, these electrical equipments can be physically neighbouring, can also be located far away from one another.
Referring to Figures 1 and 2, Fig. 1 is a kind of platform area knot using the charging and conversion electric facility safety utilization of electric power control method of the present invention Structure schematic diagram;Fig. 2 is another plot structure schematic diagram of the charging and conversion electric facility safety utilization of electric power control method using the present invention.Such as Shown in Fig. 1 and Fig. 2, the electrical equipment in platform area includes charging and conversion electric facility and other equipment (common connections beyond charging and conversion electric facility Electrical equipment under same transformer), charging and conversion electric facility and other equipments are in same bus (as shown in Figure 1) or feedback On line (as shown in Figure 2), its upstream is provided with protection device, and the protection device is used to limiting and protecting charging and conversion electric facility and other The total electricity consumption of equipment.Specifically, protection device can be relay, fuse or breaker, the high voltage of power network conveying Electric energy is converted to the electric energy of 400V voltages by transformer, and then electric energy is distributed to each electrical equipment by the protection device. The protection device of each branch road is also equipped with each branch road of charging and conversion electric facility and other equipments simultaneously.This area is also set up There are master control system, other equipment control system and charging and conversion electric facility control system, wherein, master control system is used for control and monitor console area Interior electricity consumption situation, other equipment control system and charging and conversion electric facility control system are used for the use of each electrical equipment in control and monitor console area Electric situation.Also, master control system can be communicated with other equipment control system and charging and conversion electric facility control system.Specifically Ground, when master control system is in remote position with other equipment control system and charging and conversion electric facility control system, Ke Yitong The mode such as optical fiber, cable, wireless is crossed to communicate;When master control system and other equipment control system and charging and conversion electric facility control system During in same position, it can be communicated by modes such as bus or connections;In addition, master control system controls system with other equipment System and charging and conversion electric facility control system can also be integrated on a machine or one piece of board, then pass through mode in machine or in plate Communication.
On master control system, other equipment control system and charging and conversion electric facility control system, those skilled in the art are ripe Know there is no difference substantially in practical application between them, the difference is that only control object, they can be used Any appropriate form, both can be that hardware can also be software, and both can be multiple functional modules of discrete setting, can also It is integrated into multiple functional units on a hardware.Each as simplest form, in three kinds of control systems Can be controller, such as combinational logic control device, microprogram control unit, as long as the phase to monitored target can be realized The monitoring and regulation of related parameter.Certainly, master control system, other equipment control system and charging and conversion electric facility control system It can be integrated into as different modules on a physical equipment, these are all without departing from general principle of the invention and protection model Enclose.
The charging and conversion electric facility safety utilization of electric power control method of the present invention comprises the following steps:The total current Iin in platform area is obtained, and It is sent to master control system;Master control system is calculated according to the total current Iin and maximum allowed current Imax in platform area puts into effect area's electricity The real-time utilization r of capacity;The utilization state of platform area capacitance is divided into according to the real-time utilization r of platform area capacitance multiple Electricity consumption area;Master control system is communicated with charging and conversion electric facility control system according to the electricity consumption area being presently in;Charging and conversion electric facility Control system reads the parameter current of master control system, regulates and controls the electricity consumption strategy of charging and conversion electric facility.Further, master control system root The real-time available power for putting into effect area is calculated according to the real-time utilization r of platform area capacitance.Specifically, reference picture 3, Fig. 3 is this hair The electricity consumption Division schematic diagram of bright charging and conversion electric facility safety utilization of electric power control method.As shown in figure 3, the utilization shape of platform area capacitance State is divided into four electricity consumption areas according to the utilization rate of platform area capacitance, is respectively green comfort zone, the vigilant area of yellow, red danger Area and the urgent area of black.As an example, green comfort zone represents that the utilization rate of platform area capacitance is less than 60%;Yellow is vigilant area's table The utilization rate of Shi Tai areas capacitance is between 60%~80%;Red hazardous area represent the utilization rate of platform area capacitance 80%~ Between 95%;The urgent area of black represents that the utilization rate of platform area capacitance is higher than 95%.
The electric current that the real-time total current Iin in platform area can flow through protection device by measurement is obtained.Set due to platform area Protection device is used for the total electricity consumption for limiting and protecting charging and conversion electric facility and other equipments, therefore, and upstream guarantor is flowed through as long as measuring The electric current of protection unit, is the total current Iin of this area now, or measure the electricity for flowing through the protection device on other each branch roads Stream obtains the total current Iin of platform area now by calculating.Obtaining platform area total current Iin includes in the following manner:(1) transformer low voltage When there is current measurement module side (i.e. the high-tension electricity of power network conveying is converted to the side of 400V voltages through transformer), directly from the electricity Iin real time value is obtained in flow measurement module, and inputs master control system;(2) step down side does not have current measurement mould During block, current measurement module is installed in step down side, measurement obtains total current Iin real time value, and inputs main control System;(3) each bar line is obtained on each bar circuit where being equipped from charging and conversion electric facility with other in existing current measurement module The real-time current I and its phase angle theta on road;Or current measurement is installed on each bar circuit where charging and conversion electric facility and other equipments Module, measures the real-time current I and its phase angle theta of each bar circuit.The real-time current I and its phase angle theta of measurement are input to main control All real-time current I vectors are summed, obtain the real-time total current Iin in platform area numerical value by system by main control system.
Master control system calculates according to the real-time total current Iin and maximum allowed current Imax in platform area and puts into effect area's capacitance Real-time utilization r.Due to being provided with protection device in platform area, therefore, the maximum in platform area flows through guarantor of the electric current by protection device Protect definite value to determine, either relay, fuse or breaker, its setting electric current to overload protection is the maximum in platform area Allow electric current Imax.Now, the maximum power consumption in corresponding area is:KVAmax=k1*kVArated, k1 are overload factor (typically between 1.1~1.3), kVArated is specified electric quantity.When calculating the real-time utilization r of platform area capacitance, it can recognize It is directly proportional for electricity to electric current, therefore, the electricity real-time utilization in platform area may be calculated:R=Iin/Imax.And then, platform area Real-time available power can be calculated as:KVAavail=α * (1-r) * kVAmax;Wherein, kVAavail is the available in real time of platform area Electricity, α is safety coefficient, and r is the real-time utilization of platform area capacitance, and kVAmax is the maximum electricity capacity in platform area.Main control system The real-time utilization r united according to platform area capacitance, judges now which electricity consumption area the real-time of platform area capacitance belongs to electricity condition, Then by the color that the real-time electricity consumption status indication of platform area capacitance is correspondence electricity consumption area, i.e., labeled as green, yellow, red or Person's black.
Charging and conversion electric facility control system reads the current ginseng of master control system by being communicated with master control system Number, parameter current includes the real-time of platform area and uses electricity condition and real-time active volume kVAavail, then regulates and controls charging and conversion electric facility Electricity consumption strategy.Specifically, charging and conversion electric control system is according to the real-time active volume kVAavail when foreground partition and when foreground partition The power consumption of charging and conversion electric facility is adjusted with electricity condition in real time.More specifically, when platform area is green comfort zone with electricity condition, Power consumption can be increased, many electricity consumption equipments also can be disposably put into;When platform area is that yellow is vigilant area with electricity condition, keep Electricity consumption level, if new electricity consumption equipment need to be put into, needs synchronous to force down in the power consumption equipped with electricity consumption or cut off with Denso It is standby;When platform area is red hazardous area with electricity condition, electricity consumption level is reduced, new electricity consumption equipment is no longer put into, while forcing down The power consumption equipped with electricity consumption or progressively cut off is equipped with electricity consumption;When platform area is the urgent area of black with electricity condition, immediately Successively or complete resection is equipped with electricity consumption.It should be noted that when being in black region with electricity condition, main control, which is tied up to, to be set If fix time it is interior do not detect real-time power consumption and decline, emergency safety countermeasure will be started, the circuit of charging and conversion electric facility is controlled Or the protection device on branch road or switch motion, cut off charging and conversion electric facility.
Master control system and the communication frequency of charging and conversion electric facility control system can be set according to actual conditions.Example Such as, master control system can be communicated according to the real-time of platform area with electricity condition setting is different with charging and conversion electric facility control system Frequency.Specifically, when platform area real-time is changed with the color of electricity condition, master control system and charging and conversion electric facility control System processed is communicated;When the color keep of the real-time use electricity condition in platform area is constant, master control system is according to when foreground partition electricity The real-time utilization r of capacity change sets the frequency that is communicated with charging and conversion electric facility control system or set according to charging and conversion electric The communication time interval of control system is applied to set the frequency communicated with charging and conversion electric facility control system.Specifically, if platform area It is real-time the real-time utilization that can set platform area capacitance often changes 10% when being continuously in green with the color of electricity condition, Master control system is once communicated with charging and conversion electric facility control system, or master control system and charging and conversion electric facility control system Communication time interval often more than 1 minute, master control system is once communicated with charging and conversion electric facility control system;If platform area It is real-time when being continuously in yellow with the color of electricity condition, the real-time utilization that can set platform area capacitance often changes 5%, main Control system is once communicated with charging and conversion electric facility control system, or master control system and charging and conversion electric facility control system Communication time interval is often more than 30 seconds, and master control system is once communicated with charging and conversion electric facility control system;If platform area When being continuously in red with the color of electricity condition in real time, the real-time utilization that can set platform area capacitance often changes 1%, master control System processed is once communicated with charging and conversion electric facility control system, or master control system and charging and conversion electric facility control system is logical Time interval is believed often more than 10 seconds, and master control system is once communicated with charging and conversion electric facility control system;If the reality in platform area When being continuously in black with the color of electricity condition, can set master control system carried out with charging and conversion electric facility control system it is instant Communication is once communicated for each second.It should be noted that the communication of above-mentioned master control system and electric charging station control system Frequency is only signal, and specific setting value must consider to set according to actual conditions.
Master control system and the communication mode of charging and conversion electric control system are not limited.Both can be at office two, now can be with Communicated by optical fiber, cable or wirelessly.Both can also be in the same place, can now be led to by bus or connection Letter.Master control system can also be integrated on a machine or one piece of board with charging and conversion electric control system, by machine or in plate Mode communicates.
So far, combined preferred embodiment shown in the drawings describes technical scheme, still, this area Technical staff is it is easily understood that protection scope of the present invention is expressly not limited to these embodiments.Without departing from this On the premise of the principle of invention, those skilled in the art can make equivalent change or replacement to correlation technique feature, these Technical scheme after changing or replacing it is fallen within protection scope of the present invention.

Claims (10)

1. a kind of charging and conversion electric facility safety utilization of electric power control method, it is characterised in that methods described comprises the following steps:
The real-time total current (Iin) in platform area is obtained, and is sent to master control system;
Master control system calculates according to the maximum allowed current (Imax) in real-time total current (Iin) and platform area and puts into effect area's capacitance Real-time utilization (r);
The utilization state of platform area capacitance is divided into multiple electricity consumption areas according to the real-time utilization (r) of platform area capacitance;
Master control system is communicated with charging and conversion electric facility control system according to the electricity consumption area being presently in;And
Charging and conversion electric facility control system reads the parameter current of master control system and regulates and controls charging and conversion electric according to the parameter current and sets The electricity consumption strategy applied.
2. charging and conversion electric facility safety utilization of electric power control method according to claim 1, it is characterised in that further comprise:Master control System processed calculates the real-time available power of platform area capacitance according to the real-time utilization (r) of platform area capacitance.
3. charging and conversion electric facility safety utilization of electric power control method according to claim 2, it is characterised in that the multiple electricity consumption area Including comfort zone, vigilant area and hazardous area.
4. charging and conversion electric facility safety utilization of electric power control method according to claim 2, it is characterised in that the multiple electricity consumption area Also include comfort zone, vigilant area, hazardous area and urgent area.
5. charging and conversion electric facility safety utilization of electric power control method according to claim 3, it is characterised in that the comfort zone is set For green, represent that the utilization rate of platform area capacitance is less than 60%;
The vigilant area is set to yellow, represents the utilization rate of platform area capacitance between 60%~80%;
The hazardous area is set to red, represents that the utilization rate of platform area capacitance is higher than 80%.
6. charging and conversion electric facility safety utilization of electric power control method according to claim 4, it is characterised in that the comfort zone is set For green, represent that the utilization rate of platform area capacitance is less than 60%;
The vigilant area is set to yellow, represents the utilization rate of platform area capacitance between 60%~80%;
The hazardous area is set to red, represents the utilization rate of platform area capacitance between 80%~95%;
The urgent area is set to black, represents that the utilization rate of platform area capacitance is higher than 95%.
7. the charging and conversion electric facility safety utilization of electric power control method according to claim 5 or 6, it is characterised in that master control system According to the real-time utilization (r) of platform area capacitance, by the real-time electricity consumption status indication of platform area capacitance be the green, yellow, One kind in red and black.
8. charging and conversion electric facility safety utilization of electric power control method according to claim 7, it is characterised in that master control system according to The real-time communication frequency set with electricity condition with charging and conversion electric facility control system of platform area capacitance.
9. charging and conversion electric facility safety utilization of electric power control method according to claim 8, it is characterised in that:
When platform area capacitance real-time is changed with the color of electricity condition, master control system and charging and conversion electric facility control system Communicated;
When the color keep of the real-time use electricity condition of platform area capacitance is constant, master control system is according to when foreground partition capacitance The change of real-time utilization (r) is set and charging and conversion electric facility according to the communication time interval of charging and conversion electric facility control system The frequency of control system communication.
10. charging and conversion electric facility safety utilization of electric power control method according to claim 9, it is characterised in that:
When platform area capacitance real-time is continuously in green with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 10%, or master control system and the communication time interval of charging and conversion electric facility control system are often more than 1 minute, master control system Once communicated with charging and conversion electric facility control system;
When platform area capacitance real-time is continuously in yellow with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 5%, or master control system and charging and conversion electric facility control system communication time interval often more than 30 seconds, master control system with Charging and conversion electric facility control system is once communicated;
When platform area capacitance real-time is continuously in red with the color of electricity condition, the real-time utilization of platform area capacitance often becomes Change 1%, or master control system and charging and conversion electric facility control system communication time interval often more than 10 seconds, master control system with Charging and conversion electric facility control system is once communicated;
When platform area capacitance real-time is continuously in black with the color of electricity condition, master control system is controlled with charging and conversion electric facility System carries out instant messaging or once communicated for each second.
CN201610829565.XA 2016-09-18 2016-09-18 Charging and conversion electric facility safety utilization of electric power control method and system Active CN106961134B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610829565.XA CN106961134B (en) 2016-09-18 2016-09-18 Charging and conversion electric facility safety utilization of electric power control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610829565.XA CN106961134B (en) 2016-09-18 2016-09-18 Charging and conversion electric facility safety utilization of electric power control method and system

Publications (2)

Publication Number Publication Date
CN106961134A true CN106961134A (en) 2017-07-18
CN106961134B CN106961134B (en) 2019-10-22

Family

ID=59480768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610829565.XA Active CN106961134B (en) 2016-09-18 2016-09-18 Charging and conversion electric facility safety utilization of electric power control method and system

Country Status (1)

Country Link
CN (1) CN106961134B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055215A (en) * 2010-10-15 2011-05-11 国家电网公司 Control method and operation monitoring system of charging and exchanging station of electric vehicle
CN102290852A (en) * 2011-06-16 2011-12-21 丁凯 Charging control method and system
US20130173326A1 (en) * 2011-06-30 2013-07-04 International Business Machines Corporation Recharging of battery electric vehicles on a smart electrical grid system
CN103241130A (en) * 2013-04-10 2013-08-14 华中科技大学 Energy management method and system for electric bus charging and swap station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055215A (en) * 2010-10-15 2011-05-11 国家电网公司 Control method and operation monitoring system of charging and exchanging station of electric vehicle
CN102290852A (en) * 2011-06-16 2011-12-21 丁凯 Charging control method and system
US20130173326A1 (en) * 2011-06-30 2013-07-04 International Business Machines Corporation Recharging of battery electric vehicles on a smart electrical grid system
CN103241130A (en) * 2013-04-10 2013-08-14 华中科技大学 Energy management method and system for electric bus charging and swap station

Also Published As

Publication number Publication date
CN106961134B (en) 2019-10-22

Similar Documents

Publication Publication Date Title
CN103840473B (en) A kind of double set SVC cooperative control device
CN106972636B (en) A kind of smart grid detection platform based on cloud computing
CN104269860A (en) Novel low-voltage reactive compensation device
CN108189697A (en) Charge operation service system and management method based on terminal intelligent monitoring function
CN103532142B (en) Refined and stable control method and system of electric system
CN106229998A (en) A kind of electric power monitoring system
CN104362654A (en) Three-phase balance power supply system, three-phase balance method of three-phase balance system, as well as modular power distribution cabinet with three-phase balance power supply system
CN104135023A (en) Direct-current power emergency control device and direct-current power emergency support method
CN109494873A (en) A kind of control guard method of AC-DC hybrid power grid, apparatus and system
CN206850446U (en) A kind of intelligent load-balancing regulator
CN103825258B (en) A kind of definite value group setting method and system
CN106961134B (en) Charging and conversion electric facility safety utilization of electric power control method and system
CN105896735B (en) A kind of operation of power networks state real-time diagnosis method and system
CN103616610A (en) Simulation method of monitoring signals in power grid fault line
CN109510236A (en) A kind of intelligent micro-grid controller and control method integrating control monitoring for protection
CN104020393B (en) A kind of with electrical network one-phase short-circuit current Fault Locating Method
CN108429243A (en) Disconnection device and hydroelectric system
CN108988338A (en) The power grid for being suitable for open loop power supply based on strong continune component depth-first search adjusts method for electrically and device automatically
CN108964145A (en) A kind of low-frequency load shedding, overfrequency cut the test method and system of machine device
CN109004630A (en) A kind of flexible direct current power distribution network integrated protection system
CN106159916A (en) A kind of power distribution protective device
KR101734151B1 (en) Power System Management Method For Transmission Line Overload Mitigation
KR101734148B1 (en) Congestion Management System For Transmission Line Overload Mitigation
CN206650433U (en) High-speed switch extinguishing arc and protecting human body system
KR101734149B1 (en) Transmission Line Overload Management Method Using Energy Storage System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200827

Address after: Susong Road West and Shenzhen Road North, Hefei Economic and Technological Development Zone, Anhui Province

Patentee after: Weilai (Anhui) Holding Co., Ltd

Address before: Room 502, Bank of America Center, Cecil Harcourt Road, central, Hongkong, China, 12

Patentee before: NIO NEXTEV Ltd.

TR01 Transfer of patent right