CN106958437B - A kind of wellfracturing raising recovery ratio new method - Google Patents

A kind of wellfracturing raising recovery ratio new method Download PDF

Info

Publication number
CN106958437B
CN106958437B CN201710342086.XA CN201710342086A CN106958437B CN 106958437 B CN106958437 B CN 106958437B CN 201710342086 A CN201710342086 A CN 201710342086A CN 106958437 B CN106958437 B CN 106958437B
Authority
CN
China
Prior art keywords
fluid
reservoir
construction
preposition
oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710342086.XA
Other languages
Chinese (zh)
Other versions
CN106958437A (en
Inventor
卢祥国
谢坤
刘进祥
曹伟佳
刘义刚
张云宝
潘赫
刘爽
吕金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Petroleum University
Original Assignee
Northeast Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Petroleum University filed Critical Northeast Petroleum University
Priority to CN201710342086.XA priority Critical patent/CN106958437B/en
Publication of CN106958437A publication Critical patent/CN106958437A/en
Application granted granted Critical
Publication of CN106958437B publication Critical patent/CN106958437B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention belongs to oil field development technical fields, and in particular to a kind of wellfracturing raising recovery ratio new method.This method are as follows: 1, pressing crack construction well and fractured layer position chosen according to actual reservoir physical property and characteristic of production dynamic;2, type, injection rate and the injection discharge capacity and the type of fracturing fluid, composition, injection rate and injection discharge capacity of preposition displacing fluid are determined according to reservoir properties, formation fracture pressure value and scope of construction item;3, under conditions of being lower than reservoir fracture pressure, preposition displacing fluid is injected to reservoir according to design construction parameter;4, after having infused preposition displacing fluid, pressing crack construction is carried out according to design construction parameter injection fracturing fluid;5, after the completion of pressing crack construction, subsequent opening well and making production is carried out, and monitors oil well production dynamic.Displacement process forms high oil saturation region in reservoir, enhances oily phase fluid ability, is increased under producing pressure differential effect by the oil mass that crack near wall flows into crack after pressing crack construction, be finally reached and improve recovery ratio purpose.

Description

A kind of wellfracturing raising recovery ratio new method
Technical field:
The invention belongs to oil field development technical fields, and in particular to a kind of wellfracturing raising recovery ratio new method.
Background technique:
Formation fracturing is a kind of important yield-increasing technology that reservoir properties are transformed, improve effect of reservoir development, in reservoir rock Physical property is widely used in poor oil field.In conventional fracturing process, usually first prepad fluid huge discharge is injected, injection is caused to press Power increases rapidly, and when injection pressure is greater than reservoir rock fracture pressure, reservoir ruptures, and subsequent process is injected separately into takes again Sand liquid and displacement fluid are finally completed entire pressing crack construction.In practical fracturing process, to reduce fracturing fluid dosage and reducing medicament expense With, usually require that fracturing fluid have good wave making machine, i.e., fracture faces formed temporarily blocking layer, to reduce filter loss.So often Fracture near wall oil phase displacement effect is weaker in rule fracturing process, it is difficult to which in crack, near wall and crack leading edge are formed High oil-containing region.Pressing crack construction terminates after starting production, and nearby reservoir Crude Oil passes through crack under producing pressure differential effect to the borehole wall Oil well is flowed into, but effectively involved by reservoir properties difference and subsequent displacement fluid the factors such as be limited in scope to be influenced, relies primarily on production Differential pressure action is difficult to that reservoir oil saturation is caused to reduce by a relatively large margin, therefore conventional pressing crack construction face is generally faced with production and sees The problem that effect is fast but the period that takes effect is shorter.
Summary of the invention:
It is difficult to solve existing conventional oil well fracturing technology in place of the present invention makes up and improve above-mentioned the deficiencies in the prior art To employ near wellbore zone crude oil, production reduces the problem that the period is short and oil increasing effect is limited, devises a kind of wellfracturing raising Recovery ratio method, this method propose the new processes of " pressure break after first displacement " instead of conventional direct fracturing technology, preposition displacement Process can improve in nearly well reservoir while being driven to the near wellbore zone crude oil for being difficult to employ in conventional exploitation close to injection well Oily phase fluid ability is conducive to improve the production effect after pressing crack construction, is finally reached and improves recovery ratio purpose.(technical principle Schematic diagram is shown in Fig. 1)
The technical solution adopted by the present invention are as follows: a kind of wellfracturing raising recovery ratio new method, the construction technology of this method Are as follows:
Step 1: choosing pressing crack construction well and fractured layer position according to actual reservoir physical property and characteristic of production dynamic;
Step 2: determining type, the injection of preposition displacing fluid according to reservoir properties, formation fracture pressure value and scope of construction item Amount and injection discharge capacity and the type of fracturing fluid, composition, injection rate and injection discharge capacity;
Step 3: injecting preposition displacement to reservoir according to design construction parameter under conditions of being lower than reservoir fracture pressure Liquid;
Step 4: carrying out pressing crack construction according to design construction parameter injection fracturing fluid after having infused preposition displacing fluid;
Step 5: carrying out subsequent opening well and making production after the completion of pressing crack construction, and monitor oil well production dynamic.
The type of the fracturing fluid includes the type of prepad fluid, load fluid and displacement fluid, and the composition of fracturing fluid includes preposition The composition ratio of liquid, load fluid and displacement fluid.
The type of the preposition displacing fluid is selected for practical pressure break reservoir properties, oil displacement system include clear water, Surfactant solution, general polymer solution, binary system and ternary system, wherein binary system is that polymer/surface is living Property agent compound system, ternary system be alkali/Surfactant/Polymer compound system.
The preposition displacing fluid injection rate is designed for practical pressure break scale and reservoir properties.
The type and injection rate of the fracturing fluid are designed for practical pressure break scale and reservoir properties.
Beneficial effects of the present invention: compared with the direct pressing crack construction technique of existing routine, of the invention " presses after first displacement Split " on the one hand the preposition displacement process in new process can will be difficult to the near wellbore zone employed original in conventional exploitation before pressing crack construction Oil is driven to close to injection well, and be conducive to expansion subsequent production process displacement fluid effectively involves range;Another aspect displacement stream Journey forms high oil saturation region in reservoir, enhances oily phase fluid ability, acts on after pressing crack construction in producing pressure differential Under increased by the oil mass that crack near wall flows into crack, both sides comprehensive function can effectively improve the life after pressing crack construction Effect is produced, is finally reached and improves recovery ratio purpose.
Detailed description of the invention:
Fig. 1 is technical principle schematic diagram of the invention.
Fig. 2 is the rock core structure schematic diagram in the embodiment of the present invention one.
Fig. 3 is the displacement equipment flowsheet schematic diagram in the present invention in embodiment one.
Fig. 4 is the inverted nine-spot pattern schematic diagram in the embodiment of the present invention two.
Fig. 5 is the geological model schematic diagram in the embodiment of the present invention two.
Specific embodiment: it since practical reservoir media is complicated and reservoir properties are because development stimulation difference has differences, presses It splits the more difficult similar block of physical property height that finds in work progress and carries out construction effect comparative evaluation.In recent years, oil reservoir physics mould Quasi- and numerical simulation technology plays important function in Development Response of Oilfield research process, therefore the present invention uses physical analogy Experiment and numerical simulation carry out specific implementation Contrast on effect.
Embodiment one
Pressing crack construction technological effect physical analogy evaluation is carried out using quartz sand epoxy resin cementitious artificial homogeneous rock core.
1, experimental material
Preposition displacing fluid is polymer solution (mass fraction 0.1%) and fracturing fluid is polymer gel fracturing fluid (0.13% + 0.4% ammonium persulfate of+0.12% cleanup additive+2.0%DZ-2 crosslinking agent of polymer).Polymer is production department, Daqing Refinery company Divide hydrolyzed polyacrylamide dry powder (HPAM), relative molecular mass is respectively M=1900 × 104, effective content 88.0%;The row of helping Agent is that Daqing High-tech Park Hualongxiang Chemical Co., Ltd. produces nonionic surface active agent, and crosslinking agent is organic chrome cross linker, Gel breaker is ammonium persulfate.
Experimental water is that fracturing fluid used in Daqing oil field site operation prepares water.Experiment is simulation oil with oil, by Daqing oil Field crude oil is mixed with lighter hydrocarbons, and viscosity is 9.8mPas under the conditions of 45 DEG C.
Experiment crack rock core is quartz sand epoxy resin cementitious homogeneous rock core, by two pieces of appearance geometric dimensions: high × wide × Length=2.25cm × 4.5cm × 60cm composition, core permeability Kg=150 × 10-3μm2, structural schematic diagram is shown in Fig. 2.
2, instrument and equipment
Experimental facilities mainly includes ISCO pump, pressure sensor, core holding unit, hand pump and intermediate receptacle etc., is removed Outside ISCO pump and hand pump, other parts are placed in the insulating box at 45 DEG C of experimental temperature, and equipment and flow diagram are shown in Fig. 3, note Flow quantity is 0.3mL/min, and data recording time interval is 30min.
3, experimental method
1), claim two blocks of rock cores to dry weight, evacuate saturation experiments water, claim weight in wet base, calculate pore volume;
2), two blocks of rock cores are merged, centre is put into plastic interlayer, and with outside polytetrafluoroethylene (PTFE) adhesive tape winding rock core Portion (except end face) makes it remain an entirety.Then rock core is put into core holding unit, is satisfied under the conditions of reservoir temperature And simulation oil.Rock core is stood for 24 hours later, calculates oil saturation;
3), water drive collects different mining phase Discharge rates in production end, calculates moisture content and recovery ratio to aqueous 95%.
4), " pressure break after first displacement ": from injection end with 0.3mL/min injection rate inject 6mL polymer solution after, by rock The heart takes out from clamper, removes polytetrafluoroethylene (PTFE) unsintered tape and plastic central interlayer outside rock core.According to experimental design crack Penetration ratio, plastic interlayer is reentered among rock core, and (interlayer is interlayer with seam, and segment length with seam is fracture length 1/4 and twines Around polytetrafluoroethylene (PTFE) unsintered tape, it is then placed in core holding unit.Fracturing fluid is injected under 2MPa pressure difference, fracturing fluid is along exposure crack Wall leak-off, and region remaining oil will be flowed through and push rock core deep to.Produced Liquid is collected, filter loss is calculated;
" direct pressure break ": rock core is taken out from clamper, removes polytetrafluoroethylene (PTFE) unsintered tape and intermediate modeling outside rock core Expect interlayer.According to experimental design crack penetration ratio, plastic interlayer is reentered among rock core, and (interlayer is interlayer with seam, with seam Segment length is fracture length 1/4 and winding polytetrafluoroethylene (PTFE) unsintered tape, is then placed in core holding unit.It is injected under 2MPa pressure difference Fracturing fluid, fracturing fluid will flow through region remaining oil and push rock core deep to along exposure sides of fracture leak-off.Produced Liquid is collected, is calculated Filter loss;
5) it, repeats in above-mentioned experimental procedure 4 results of fracture simulation technique 3 times, increases interlayer segment length with seam every time, value added is Fracture length 1/4.
6), subsequent waterflooding records different time sections liquid outlet quantity and oil pump capacity, calculates recovery ratio to aqueous 95%.
4, experimental result
Different pressing crack construction technique oil increasing effects influence experimental result and are shown in Table 1.
Table 1: recovery ratio experimental result
From table 1 it follows that increasing after " pressure break after first displacement " technique pressing crack construction compared with " direct pressure break " technique Oily effect is more preferable.
Embodiment two
Numerical model is established using CMG software and carries out the evaluation of pressing crack construction technological effect numerical simulation.
1, experiment condition
Fracturing fluid type is carried out to pressing crack construction influential effect numerical simulation study using ideal model.The practical well pattern of mining site For inverted nine-spot pattern, its 1/4(1 mouthfuls of injection well, 3 mouthfuls of producing wells are intercepted) geological model is established, see Fig. 4.According to practical oil reservoir feelings Condition, the reservoir top depth that designs a model are 900m, and small thickness 4m, porosity 0.23, oil-water interfaces depth is 909m.Model water Square to size of mesh opening be 5m × 5m, the minimum 0.01m of size of mesh opening at crack on longitudinal direction, from crack to two sides size of mesh opening by 1m is gradually increased to, sees Fig. 5.It is 11MPa that initial pressure at 900 meters, which is arranged, initially executes gravity-hollow billet without gas and oil hiding to one Dynamic balance initialization calculates.Ideal model is initialized according to gravity-hollow billet dynamic balance, irreducible water saturation is 0.3257.When well spacing is 150m and permeability is Kg=150 × 10-3μm2When, oil in place is 1.410 × 104m3
2, conceptual design
Injection well (INJECTOR) carries out level pressure (13MPa) waterflooding development in target well group, when oil well comprehensive water cut reaches When 60%, pressure break is carried out to 3 mouthfuls of oil wells (PROD1, PROD2 and PROD3) of the well group.After pressing crack construction, well group continues to implement level pressure (13MPa) waterflooding development adds up oil increment and recovery ratio after calculating target well group pressing crack construction in 2 years.
In producer-injector spacing, reservoir mean permeability, time for fracturing (water ratio in oil well when pressure break) and crack penetration ratio etc. Under parameter value rigid condition, " direct pressure break " (fracturing fluid is polymer gel fracturing fluid) and " pressure break after first displacement " are compared respectively (preposed attributives are polymer solution, and fracturing fluid is polymer gel fracturing fluid) two kinds of technique numerical simulation oil increasing effects, polymerization Object solution, fracturing fluid property are consistent with 1 physical simulation experiment of example.
3, interpretation of result
Pressure break mode influences numerical simulation result to target well group polymer pressure break oil increasing effect and is shown in Table 2.
Table 2: pressure break oil increasing effect
From table 2 it can be seen that pressure break leak-off mode is different, recovery ratio amplification is different, compared with " direct pressure break " mode, The recovery ratio amplification of " pressure break after first displacement " mode is higher.
The foregoing is merely case embodiments of the invention, are not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (3)

1. a kind of wellfracturing improves recovery ratio new method, it is characterised in that: the construction technology of this method are as follows:
Step 1: choosing pressing crack construction well and fractured layer position according to actual reservoir physical property and characteristic of production dynamic;
Step 2: according to reservoir properties, formation fracture pressure value and scope of construction item determine the type of preposition displacing fluid, injection rate and Inject type, composition, injection rate and the injection discharge capacity of discharge capacity and fracturing fluid;
Step 3: injecting preposition displacing fluid to reservoir according to design construction parameter under conditions of being lower than reservoir fracture pressure;
Step 4: carrying out pressing crack construction according to design construction parameter injection fracturing fluid after having infused preposition displacing fluid;
Step 5: carrying out subsequent opening well and making production after the completion of pressing crack construction, and monitor oil well production dynamic;
The type of the preposition displacing fluid is selected for practical pressure break reservoir properties, and oil displacement system includes clear water, surface Activator solution, general polymer solution, binary system and ternary system, wherein binary system is polymer/surfactant Compound system, ternary system are alkali/Surfactant/Polymer compound system;
The injection rate of the preposition displacing fluid is designed for practical pressure break scale and reservoir properties.
2. a kind of wellfracturing according to claim 1 improves recovery ratio new method, it is characterised in that: the fracturing fluid Type includes the type of prepad fluid, load fluid and displacement fluid, and the composition of fracturing fluid includes the group of prepad fluid, load fluid and displacement fluid It is proportional.
3. a kind of wellfracturing according to claim 1 improves recovery ratio new method, it is characterised in that: the fracturing fluid Type and injection rate be designed for practical pressure break scale and reservoir properties.
CN201710342086.XA 2017-05-16 2017-05-16 A kind of wellfracturing raising recovery ratio new method Active CN106958437B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710342086.XA CN106958437B (en) 2017-05-16 2017-05-16 A kind of wellfracturing raising recovery ratio new method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710342086.XA CN106958437B (en) 2017-05-16 2017-05-16 A kind of wellfracturing raising recovery ratio new method

Publications (2)

Publication Number Publication Date
CN106958437A CN106958437A (en) 2017-07-18
CN106958437B true CN106958437B (en) 2019-03-15

Family

ID=59481861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710342086.XA Active CN106958437B (en) 2017-05-16 2017-05-16 A kind of wellfracturing raising recovery ratio new method

Country Status (1)

Country Link
CN (1) CN106958437B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109594959B (en) * 2018-10-31 2021-02-05 东北石油大学 Fracturing oil displacement method for improving recovery economic efficiency of thin and poor reservoir of old oil field
CN113187458B (en) * 2021-05-31 2023-05-12 新疆正通石油天然气股份有限公司 Method for injecting oil displacement agent into oil layer by using fracturing pad fluid to improve recovery ratio
CN114324073B (en) * 2021-11-22 2024-04-30 中国石油天然气股份有限公司 Screening method and application of porous medium oil displacement system
CN117468908A (en) * 2023-12-04 2024-01-30 东北石油大学 Novel method for improving recovery ratio of pressure flooding of medium-low permeability reservoir

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4017119A (en) * 1976-03-25 1977-04-12 The United States Of America As Represented By The United States Energy Research And Development Administration Method for rubblizing an oil shale deposit for in situ retorting
CN1291253A (en) * 1998-04-06 2001-04-11 大庆石油管理局 Foam compsoite oil drive method
CN102587880A (en) * 2012-03-05 2012-07-18 中国石油天然气股份有限公司 Oil extraction method
WO2013163645A1 (en) * 2012-04-27 2013-10-31 The Trustees Of Columbia University In The City Of New York Methods and systems for causing reaction driven cracking in subsurface rock formations
CN103615228A (en) * 2013-11-26 2014-03-05 中国石油天然气股份有限公司 Temporary plugging and fracturing process in degradable fiber clearance
CN103939078A (en) * 2014-03-27 2014-07-23 上海井拓石油开发技术有限公司 Equal-fluidity fuel scavenge and fracturing integrated technology
CN104790928A (en) * 2015-04-07 2015-07-22 东北石油大学 Method for increasing crude oil recovery ratio of post-polymer flooding slug combination system
CN106246150A (en) * 2016-09-18 2016-12-21 中国石油天然气股份有限公司 A kind of oil field compression fracture remodeling method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4017119A (en) * 1976-03-25 1977-04-12 The United States Of America As Represented By The United States Energy Research And Development Administration Method for rubblizing an oil shale deposit for in situ retorting
CN1291253A (en) * 1998-04-06 2001-04-11 大庆石油管理局 Foam compsoite oil drive method
CN102587880A (en) * 2012-03-05 2012-07-18 中国石油天然气股份有限公司 Oil extraction method
WO2013163645A1 (en) * 2012-04-27 2013-10-31 The Trustees Of Columbia University In The City Of New York Methods and systems for causing reaction driven cracking in subsurface rock formations
CN103615228A (en) * 2013-11-26 2014-03-05 中国石油天然气股份有限公司 Temporary plugging and fracturing process in degradable fiber clearance
CN103939078A (en) * 2014-03-27 2014-07-23 上海井拓石油开发技术有限公司 Equal-fluidity fuel scavenge and fracturing integrated technology
CN104790928A (en) * 2015-04-07 2015-07-22 东北石油大学 Method for increasing crude oil recovery ratio of post-polymer flooding slug combination system
CN106246150A (en) * 2016-09-18 2016-12-21 中国石油天然气股份有限公司 A kind of oil field compression fracture remodeling method

Also Published As

Publication number Publication date
CN106958437A (en) 2017-07-18

Similar Documents

Publication Publication Date Title
CN108830020B (en) A method of the micro- Fracturing Technology crack extension of simulation offshore oilfield
CN105626006B (en) Low-permeability oil deposit CO2Drive technical limit well space and determine method
Zhongxing et al. Development modes of Triassic Yanchang formation Chang 7 member tight oil in Ordos Basin, NW China
CN106958437B (en) A kind of wellfracturing raising recovery ratio new method
Zhang et al. Prediction of sustained annular pressure and the pressure control measures for high pressure gas wells
CN109612896A (en) True sandstone core physical simulation and Displacement Efficiency method containing crack
CN107066769B (en) Efficient acidification design method suitable for ultra-deep layer crack type carbonate reservoir
Jurus et al. Modeling water flow in hydraulically-fractured shale wells
CN103089224A (en) Fracturing method for comprehensively controlling fracture height
Zhao et al. Performance and applicable limits of multi-stage gas channeling control system for CO2 flooding in ultra-low permeability reservoirs
CN104675371B (en) It is a kind of it is poly- drive plus subsequent waterflooding after alternately inject gel and polymer solution complex oil displacing experimental method
CN105317407B (en) A kind of development approach of ultra-high water cut stage Untabulated reservoirs
Sun et al. Combining preformed particle gel and curable resin-coated particles to control water production from high-temperature and high-salinity fractured producers
CN109577945A (en) A kind of experimental provision and method of hypotonic-Oil in Super-low Permeability oil reservoir fluid-channeling channel differentiation
CN109751033A (en) A kind of fracturing process for tight sandstone reservoir
CN110259421A (en) A kind of broken up compact oil reservoir water filling supplement ENERGY METHOD
Zhao et al. Experimental investigation on the fracture propagation of three-stage acid fracturing of tight sandstone gas reservoir
CN105134148A (en) Experimental method for foam oil assisted methane huff-and-puff of thin heavy oil reservoir
CN115288647A (en) Composite capacity expansion method for improving oil well recovery ratio
CN106014401B (en) A kind of experimental method of simulation oil well fracturing fracture extension and fracturing fluid leak process
CN106089165B (en) Foam pressure cone blocking water Visual evaluation device and its method of work under the conditions of one kind simulation oil reservoir
CN115081352B (en) Design optimization method and device for deepwater high-temperature high-pressure loose sandstone end portion sand removal process
Garland Selective plugging of water injection wells
CN103048253A (en) Testing method of substrate permeation rate of repeated fracturing plugging agent
CN109899050A (en) Form the bed gas reservoir fracturing process of complex fracture network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant