CN106958311A - A kind of encased steel plate reinforced concrete combination shear wall and its construction method - Google Patents

A kind of encased steel plate reinforced concrete combination shear wall and its construction method Download PDF

Info

Publication number
CN106958311A
CN106958311A CN201710209744.8A CN201710209744A CN106958311A CN 106958311 A CN106958311 A CN 106958311A CN 201710209744 A CN201710209744 A CN 201710209744A CN 106958311 A CN106958311 A CN 106958311A
Authority
CN
China
Prior art keywords
stirrup
steel plate
section
welding
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710209744.8A
Other languages
Chinese (zh)
Inventor
张立平
陈星�
徐卫
梁志标
何惠文
洪磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Design and Research Institute of Guangdong Province
Original Assignee
Architectural Design and Research Institute of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design and Research Institute of Guangdong Province filed Critical Architectural Design and Research Institute of Guangdong Province
Priority to CN201710209744.8A priority Critical patent/CN106958311A/en
Publication of CN106958311A publication Critical patent/CN106958311A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8623Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers and at least one form leaf being monolithic
    • E04B2/8629Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers and at least one form leaf being monolithic with both form leaves and spacers being monolithic

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of encased steel plate reinforced concrete combination shear wall and its construction method, it is provided with encased steel plate wall, concrete and multigroup stirrup pair in the inner chamber of encased steel plate wall;Stirrup is to including the first stirrup and the second stirrup, they are provided with the equal welding section of quantity and raised section, each section welding section of first stirrup is welded on the medial surface of the first steel plate metope, each section welding section of second stirrup is welded on the medial surface of the second steel plate metope, each section raised section of first stirrup and each section raised section of the second stirrup are corresponded, and the region in the vertical direction that the region that the raised section of the first corresponding stirrup is surrounded is surrounded with the raised section of the second stirrup partially overlaps.The present invention can realize acting on drawing between the steel plate metope of two sides by less welding job amount, effectively confined concrete generation brittle break and can greatly improve the anti-earthquake ductility of shear wall, and have the advantages that steel using amount is few, can save cost.

Description

A kind of encased steel plate reinforced concrete combination shear wall and its construction method
Technical field
The present invention relates to a kind of encased steel plate reinforced concrete combination shear wall and its construction method.
Background technology
Super-high building structure is to shear wall intensity and Ductility Requirement more and more higher, and strength grade of concrete is higher, its The intrinsic brittleness of material brings adverse effect again, and this can be preferably solved using encased steel plate combined concrete shear wall One problem.Encased steel plate can prevent brittle break by some construction measures with operative constraint high-strength concrete, and steel plate Itself can greatly improve ductility of sheer wall again.
In existing encased steel plate combined concrete shear wall, strengthen construction side of the encased steel plate to concrete effect of contraction Formula mainly has two kinds of forms of built-in ribbed stiffener and split bolt, is aided with the collaborative work that peg strengthens two kinds of materials.But it is existing These makes have the following disadvantages:Built-in ribbed stiffener welding job amount is big, for the easy formation welding deformation of sheet metal, Correct difficulty big, and ribbed stiffener is limited by steel plate flakiness ratio and welding operation is limited, and time processing steel plate wall limited length is right It need to increase perps in longer steel plate wall, further increase welding job amount and correction difficulty;Split bolt need to be in both sides steel plate Preformed hole, weakens steel plate section, and strengthens arranging for also needing to do enough rigidity in high soft steel plate wall transport, hoisting process Deformation, scene contraposition requirement could be met by applying.
The content of the invention
The technical problems to be solved by the invention are:A kind of encased steel plate reinforced concrete combination shear wall is provided, with gram Clothes be difficult in the prior art between taking into account welding job amount and realizing two sides steel plate metope the problem of acting on drawing.
Above-mentioned technical problem is solved, the technical solution adopted in the present invention is as follows:
A kind of encased steel plate reinforced concrete combination shear wall, provided with the encased steel plate wall that is enclosed by steel plate and is poured Build the concrete in the inner chamber of the encased steel plate wall, wherein, the encased steel plate wall have the first steel plate metope and The horizontal-extending direction phase of second steel plate metope, the first steel plate metope and the second steel plate metope and the encased steel plate wall Together, it is characterised in that:Described encased steel plate reinforced concrete combination shear wall is additionally provided with positioned at the encased steel plate wall Multigroup stirrup pair in inner chamber;Stirrup described in each group is to vertically arranged for interval, and stirrup is to including into described in each group To the first stirrup and the second stirrup of setting, first stirrup and the second stirrup are provided with the equal welding section of quantity and connection The raised section between welding section described in two adjacent sections, each section welding section of first stirrup is welded on first steel On the medial surface in board wall face, second stirrup respectively saves the medial surface that the welding section is welded on the second steel plate metope On, and cause:Respectively the save raised section and each section raised section of second stirrup of first stirrup are corresponded, And the region that the region that is surrounded of the raised section of corresponding first stirrup is surrounded with the raised section of second stirrup In the vertical direction partially overlaps.
In order that stirrup can be optimal to role, the preferred embodiment of the present invention is used as:For same The group stirrup pair, each section of welding section of first stirrup and each section of raised section are located in same level, second hoop Each section of welding section of muscle and each section of raised section are located in same level, first stirrup and the second stirrup in the vertical direction Spacing within 10cm.
It is used as the preferred embodiment of the present invention:First stirrup and second stirrup bent by a reinforcing bar and Into.
It is used as the preferred embodiment of the present invention:First stirrup and second stirrup are by multiple stirrup unit groups Horizontal-extending direction arranged for interval of the Cheng Bingjun along the encased steel plate wall, each section stirrup unit of first stirrup and Each section stirrup unit of second stirrup is formed by a reinforcing bar bending, and is respectively provided with a raised section and is divided Not Wei Yu the raised section two ends left welding section and right welding section;First stirrup is located at the left weldering of the stirrup unit of the leftmost side Meet the right welding section of stirrup unit positioned at the rightmost side of section, first stirrup, the Combination Welding Duan Junzuo of first stirrup For a welding section of first stirrup, wherein, the Combination Welding section of first stirrup includes its two neighboring stirrup list Positioned at the right welding section and the left welding section positioned at right side person of left side person in member;Second stirrup is located at the stirrup list of the leftmost side The left welding section of member, second stirrup are located at the combination weldering of the right welding section of the stirrup unit of the rightmost side, second stirrup Connect a welding sections of the Duan Jun as second stirrup, wherein, the Combination Welding of second stirrup section comprising its adjacent two Positioned at the right welding section and the left welding section positioned at right side person of left side person in individual stirrup unit.
It is used as the preferred embodiment of the present invention:The two neighboring stirrup unit of first stirrup and second stirrup In be located at the right welding section and spacing distance between the left welding section of right side person of left side person within 20cm.
It is used as the preferred embodiment of the present invention:The welding section of the welding section of first stirrup and second stirrup is equal For linear pattern, the raised section of the raised section of first stirrup and second stirrup is U-shaped or V-type.
In order to further reduce the deformation of steel plate metope, the preferred embodiment of the present invention is used as:First stirrup Respectively save the welding section and paste and be welded on the medial surface of the first steel plate metope, each section weldering of second stirrup Connect section and paste and be welded on the medial surface of the second steel plate metope.
In order to enhance the rigidity of steel plate metope, to reduce steel plate metope during transport, lifting and casting concrete Deformation, be used as the preferred embodiment of the present invention:The lateral surface of the first steel plate metope and the second steel plate metope is welded There is the water of the transverse stiffener and the vertical encased steel plate wall along the horizontal-extending direction extension of the encased steel plate wall The longitudinal stiffener of flat bearing of trend extension.
It is used as the preferred embodiment of the present invention:The medial surface of the encased steel plate wall is welded with many pegs.
A kind of construction method of encased steel plate reinforced concrete combination shear wall, it is characterised in that:Described construction method Including:
Step 1: preparing the first stirrup and the second stirrup, first stirrup and the second stirrup are provided with the equal weldering of quantity Connect section and be connected to raised section between welding section described in two adjacent sections so that each section raised section of first stirrup with Each section raised section of second stirrup is corresponded;
Step 2: welding many first hoops on the first steel plate metope in vertically spaced apart mode Muscle, many second stirrups, and described first are welded on the second steel plate metope in vertically spaced apart mode The quantity of stirrup and the second stirrup is equal and they are ranked up by the position on vertical direction respectively, wherein, described first The welding section that respectively saves of stirrup is welded on the medial surface of the first steel plate metope, described in each section of second stirrup Welding section is welded on the medial surface of the second steel plate metope;
Step 3: using the first steel plate metope and the second steel plate metope as the part of encased steel plate wall, The encased steel plate wall that job site processing is enclosed by steel plate so that:The first steel plate metope and the second steel plate metope Identical with the horizontal-extending direction of the encased steel plate wall, first stirrup and the second stirrup are respectively positioned on the encased steel plate In the inner chamber of wall, first stirrup and the second stirrup with identical sequence constitute one group of stirrup pair, are bound round described in same group The region that the raised section of corresponding first stirrup of muscle Middle Phase is surrounded is surrounded with the raised section of second stirrup Region in the vertical direction partially overlaps;
Step 4: in the inner chamber of the encased steel plate wall casting concrete.
Compared with prior art, the invention has the advantages that:
First, the present invention is provided with multigroup stirrup pair in the inner chamber of encased steel plate wall, and each group of stirrup is to including The first stirrup and the second stirrup being arranged in pairs, three below effect can be played simultaneously:
Effect one, be embedded in due to the first stirrup and the second stirrup concrete and respectively with the first steel plate metope and second Steel plate metope is welded to connect so that the first steel plate metope can be increased by the first stirrup its cohesive force between concrete, Second steel plate metope can increase its cohesive force between concrete by the second stirrup;
The region and the raised section of the second stirrup that effect two, the raised section by the first corresponding stirrup are surrounded are enclosed Region in the vertical direction firmly partially overlaps so that:After concrete coagulation, the first corresponding stirrup and the second stirrup are logical The concrete crossed in the overlapping region positioned at raised section and raised section is connected, i.e., corresponding the first stirrup and the second stirrup Hoop is enclosed in formation, so that, the stirrup of each group first and the second stirrup that enclose hoop are formed to the first steel plate metope and the second steel plate metope To the effect to drawing, be prevented from two sides steel plate metope compressive buckling, and can more efficiently constraint two sides steel plate metope it Between concrete, thus improve the anti-earthquake ductility of shear wall, make two kinds of materials of steel plate and concrete more fully to cooperate with work Make more preferably to play their performance;
Effect three, only it is welded to connect by its welding section and steel plate metope due to the first stirrup and the second stirrup, And their raised section is then without being welded so that without continuously being welded over long distances on steel plate metope, therefore, this The welding job amount of invention is few, the problem of in the absence of steel plate metope distortion is caused because of welding;Also, due to the first stirrup and second The region that stirrup is surrounded in their raised section is all hollow, and therefore, the present invention can reduce steel using amount, save cost;
In summary, the present invention can realize making to drawing between the steel plate metope of two sides by less welding job amount With, effectively confined concrete can occur brittle break and greatly improve the anti-earthquake ductility of shear wall, and with steel using amount Less, the advantage of cost can be saved.
Second, construction method of the invention, due to its first by the first all stirrups be welded on the first steel plate metope with And the second all stirrups is welded on the second steel plate metope, then with the first steel plate metope and the second steel plate metope process Covered with Angles Board wall body, it is to avoid " because using the ribbed stiffener being welded between the steel plate metope of two sides, and make it that steel plate metope is needed in the prior art To be constructed paragraph by paragraph, so there is time processing steel plate wall limited length " the problem of, therefore, construction method of the invention adds The advantage that work speed is fast, efficiency of construction is high.
Brief description of the drawings
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the encased steel plate reinforced concrete combination shear wall of the embodiment of the present invention one;
Fig. 2 is the structural representation of the encased steel plate reinforced concrete combination shear wall of the embodiment of the present invention two;
Fig. 3 is the structural representation of the encased steel plate reinforced concrete combination shear wall of the embodiment of the present invention three;
Fig. 4 is the structural representation of the encased steel plate reinforced concrete combination shear wall of the embodiment of the present invention four;
Fig. 5 is the structural representation of the encased steel plate reinforced concrete combination shear wall of the embodiment of the present invention five.
Embodiment
As shown in Figure 1 to Figure 3, disclosed by the invention is a kind of encased steel plate reinforced concrete combination shear wall, and it is provided with The encased steel plate wall 1 enclosed by steel plate and the concrete 2 being cast in the inner chamber of encased steel plate wall 1, wherein, outsourcing Steel plate wall 1 has the first steel plate metope 11 and a second steel plate metope 12, the first steel plate metope 11 and the second steel plate metope 12 with The horizontal-extending direction of encased steel plate wall 1 is identical;The present invention inventive concept be:The encased steel plate armored concrete of the present invention Compound shear wall is additionally provided with multigroup stirrup pair in the inner chamber of encased steel plate wall 1;Each group stirrup is between vertically Every arrangement, each group of stirrup is to comprising the first stirrup 3 and the second stirrup 4 being arranged in pairs, the first stirrup 3 and the second stirrup 4 Provided with the equal welding section of quantity and it is connected to raised section, each section welding section of the first stirrup 3 between two adjacent sections welding section 3a is welded on the medial surface of the first steel plate metope 11, and each section welding section 4a of the second stirrup 4 is welded on the second steel plate wall On the medial surface in face 12, and cause:Each section raised section 3b of first stirrup 3 and a pair of each section raised section 4b 1 of the second stirrup 4 Should, and the region that is surrounded with the raised section 4b of the second stirrup 4 of the regions that are surrounded of raised section 3b of the first corresponding stirrup 3 In the vertical direction partially overlaps.
Multigroup stirrup set by the present invention is to that can play three below effect simultaneously:
Effect one, be embedded in due to the first stirrup 3 and the second stirrup 4 concrete 2 and respectively with the first steel plate metope 11 Be welded to connect with the second steel plate metope 12 so that the first steel plate metope 11 can by the first stirrup 3 increase itself and concrete 2 it Between cohesive force, the second steel plate metope 12 its cohesive force between concrete 2 can be increased by the second stirrup 4;
The region that effect two, the raised section 3b by the first corresponding stirrup 3 are surrounded and the raised section of the second stirrup 4 The region in the vertical direction that 4b is surrounded partially overlaps so that:After the condensation of concrete 2, corresponding the first stirrup 3 and the Two stirrups 4 are connected by the concrete 2 in raised section 3b and raised section 4b overlapping region, i.e., and corresponding first Hoop is enclosed in the formation of the stirrup 4 of stirrup 3 and second, so that, form 4 pair of first steel plate wall of each group the first stirrup 3 and the second stirrup for enclosing hoop The steel plate metope 12 of face 11 and second plays a part of to drawing, is prevented from two sides steel plate metope compressive buckling, and can more have Concrete 2 between the constraint two sides steel plate metope of effect, thus the anti-earthquake ductility of shear wall is improved, make two kinds of steel plate and concrete Material can more fully cooperate more preferably to play their performance;
Effect three, only pass through its welding section and steel plate metope progress welding company due to the first stirrup 3 and the second stirrup 4 Connect, and their raised section is then without being welded so that without continuously being welded over long distances on steel plate metope, because This, welding job amount of the invention is few, the problem of in the absence of steel plate metope distortion is caused because of welding;Also, due to the first stirrup 3 The region surrounded with the second stirrup 4 in their raised section is all hollow, and therefore, the present invention can reduce steel using amount, section Save cost;
To sum up, the present invention can realize acting on drawing between the steel plate metope of two sides, energy by less welding job amount Enough effective confined concretes occur brittle break and greatly improve the anti-earthquake ductility of shear wall, and with steel using amount is few, energy Enough save the advantage of cost.
In addition, in order that stirrup can be optimal to role, being used as the preferred embodiment of the present invention:For Same group of stirrup pair, each section of welding section 3a of the first stirrup 3 and each section of raised section 3b are located in same level, the second stirrup 4 Each section of welding section 4a and each section of raised section 4b be located in same level, the first stirrup 3 and the in the vertical direction of the second stirrup 4 Spacing within 10cm, it is optimal to be close together.
In order to further reduce the deformation of steel plate metope, the preferred embodiment of the present invention is used as:Above-mentioned first stirrup 3 Each section welding section 3a, which is pasted, to be welded on the medial surface of the first steel plate metope 11, and each section welding section 4a of the second stirrup 4 is pasted On the medial surface for being welded on the second steel plate metope 12.
The invention also discloses a kind of construction method of encased steel plate reinforced concrete combination shear wall, including:
Step 1: preparing the first stirrup 3 and the second stirrup 4, the first stirrup 3 and the second stirrup 4 are provided with the equal weldering of quantity Connect section and be connected to raised section between two adjacent sections welding section so that each section raised section 3b and the second stirrup 4 of the first stirrup 3 Each section raised section 4b correspond;
Step 2: many first stirrups 3 are welded in vertically spaced apart mode on the first steel plate metope 11, Many second stirrups 4, and the first stirrup 3 and are welded in vertically spaced apart mode on the second steel plate metope 12 The quantity of two stirrups 4 is equal and they are ranked up by the position on vertical direction respectively, wherein, each section of the first stirrup 3 Welding section 3a is welded on the medial surface of the first steel plate metope 11, and each section welding section 4a of the second stirrup 4 is welded on second On the medial surface of steel plate metope 12;
Step 3: using the first steel plate metope 11 and the second steel plate metope 12 as the part of encased steel plate wall 1, The encased steel plate wall 1 that job site processing is enclosed by steel plate so that:First steel plate metope 11 and the second steel plate metope 12 Identical with the horizontal-extending direction of encased steel plate wall 1, the first stirrup 3 and the second stirrup 4 are respectively positioned on the interior of encased steel plate wall 1 In chamber, the first stirrup 3 and the second stirrup 4 with identical sequence constitute one group of stirrup pair, and same group of stirrup Middle Phase is corresponding The region in the vertical direction that the region that the raised section 3b of first stirrup 3 is surrounded is surrounded with the raised section 4b of the second stirrup 4 Partially overlap;
Step 4: in the inner chamber of encased steel plate wall 1 casting concrete 2.
Because the first all stirrups 3 is first welded to the second stirrups on the first steel plate metope 11 and all by the present invention 4 are welded on the second steel plate metope 12, then process encased steel plate wall 1 with the first steel plate metope 11 and the second steel plate metope 12, Avoid and " because using the ribbed stiffener being welded between the steel plate metope of two sides, and make it that steel plate metope needs paragraph by paragraph in the prior art Constructed, so there is time processing steel plate wall limited length " the problem of, therefore, construction method process velocity of the invention Hurry up, the advantage that efficiency of construction is high.
Foregoing invention design is illustrated below by five embodiments:
Embodiment one
As shown in figure 1, the embodiment of the present invention one is conceived based on foregoing invention, the first stirrup 3 and the second stirrup 4 are employed Scheme in detail below:
In the present embodiment one, the first stirrup 3 and the second stirrup 4 are formed by a reinforcing bar bending;Also, the first stirrup 3 Welding section 3a and the welding section 4a of the second stirrup 4 be linear pattern, the raised section 3b of the first stirrup 3 and the second stirrup 4 it is convex Rise section 4b be it is U-shaped.
Embodiment two
As shown in Fig. 2 the embodiment of the present invention two is conceived based on foregoing invention, the first stirrup 3 and the second stirrup 4 are employed Scheme in detail below:
In the present embodiment two, the welding section 4a of the welding section 3a of the first stirrup 3 and the second stirrup 4 is linear pattern, first The raised section 4b of the raised section 3b of stirrup 3 and the second stirrup 4 is U-shaped;Also, the first stirrup 3 and the second stirrup 4 are by multiple Stirrup unit composition is simultaneously along the horizontal-extending direction arranged for interval of encased steel plate wall 1, each section stirrup list of the first stirrup 3 Each section stirrup unit 41 of the stirrup 4 of member 31 and second is formed by the bending of reinforcing bar, and be respectively provided with a raised section and It is located at the left welding section and right welding section at the raised section two ends respectively;First stirrup 3 is located at a left side for the stirrup unit 31 of the leftmost side Welding section 31a, the first stirrup 3 are located at the Combination Welding section of the right welding section 31b of the stirrup unit 31 of the rightmost side, the first stirrup 3 As a welding section 3a of the first stirrup 3, wherein, the Combination Welding section of the first stirrup 3 includes its two neighboring stirrup list It is located at the right welding section 31b and the left welding section 31a positioned at right side person of left side person in member 31;Second stirrup 4 is located at the leftmost side The left welding section 41a of stirrup unit 41, the second stirrup 4 are located at the right welding section 41b of the stirrup unit 41 of the rightmost side, the second stirrup 4 Combination Welding Duan Jun as the second stirrup 4 a welding section 4a, wherein, the Combination Welding of the second stirrup 4 section includes its phase It is located at the right welding section 41b and the left welding section 41a positioned at right side person of left side person in adjacent two stirrup units 41.Wherein, first Right welding section in the two neighboring stirrup unit of the stirrup 4 of stirrup 3 and second positioned at left side person and the left welding positioned at right side person Spacing distance between section is preferably within 20cm.
Embodiment three
As shown in figure 3, the embodiment of the present invention three is conceived based on foregoing invention, the first stirrup 3 and the second stirrup 4 are employed Scheme in detail below:
In the present embodiment three, the first stirrup 3 and the second stirrup 4 are formed by a reinforcing bar bending;Also, the first stirrup 3 Welding section 3a and the welding section 4a of the second stirrup 4 be linear pattern, the raised section 3b of the first stirrup 3 and the second stirrup 4 it is convex Play section 4b and be V-type.
Example IV
As shown in figure 4, the embodiment of the present invention four is conceived based on foregoing invention, i.e., the embodiment of the present invention four can be based on above-mentioned Any one embodiment of embodiment one into embodiment three is implemented, and its difference is:In the present embodiment four, the first steel plate metope 11 and second steel plate metope 12 lateral surface be welded with along encased steel plate wall 1 horizontal-extending direction extension lateral stiffening The longitudinal stiffener 6 of the horizontal-extending direction extension of rib 5 and vertical encased steel plate wall 1;So as to enhance the firm of steel plate metope Degree, to reduce deformation of the steel plate metope during transport, lifting and casting concrete.
Embodiment five
As shown in figure 5, the embodiment of the present invention five is conceived based on foregoing invention, i.e., the embodiment of the present invention four can be based on above-mentioned Any one embodiment of embodiment one into example IV is implemented, and its difference is:In the present embodiment five, encased steel plate wall 1 medial surface is welded with many pegs 7.So as to, it is that it is vertical apart from upper group number in shear wall unit in the density of stirrup pair, Two pieces of steel plate walls are met enough in the case of draw and require, the density of stirrup pair is set to it is minimum, then by setting peg 7 To increase the first steel plate metope 11 and the second steel plate metope 12 and the cohesive force of concrete 2, i.e., it can not influence two sides steel plate Metope reduces steel using amount on the premise of acting on drawing.
The present invention is not limited to above-mentioned embodiment, according to the above, according to the ordinary technical knowledge of this area And customary means, under the premise of above-mentioned basic fundamental thought of the invention is not departed from, the present invention can also make other diversified forms Equivalent modifications, replace or change, all fall among protection scope of the present invention.For example:Encased steel plate wall 1 can be by One concrete-filled rectangular steel tube newel post 13, the second concrete-filled rectangular steel tube newel post 14 and the first steel being connected between the two butts post The steel plate metope 12 of board wall face 11 and second, which is enclosed, to be formed, it would however also be possible to employ two blocks of steel plates mix to substitute the first foregoing rectangular steel pipe Concrete-filled rectangular steel tube newel post 14 of solidifying soil newel post 13 and second.And for example:The raised section of first stirrup 3 and the second stirrup 4 can be with Using other shapes.Or:The first stirrup 3 and the second stirrup 4 in embodiment three can be also made up of multiple stirrup units.

Claims (10)

1. a kind of encased steel plate reinforced concrete combination shear wall, provided with the encased steel plate wall (1) enclosed by steel plate and The concrete (2) in the inner chamber of the encased steel plate wall (1) is cast in, wherein, the encased steel plate wall (1) has first Steel plate metope (11) and the second steel plate metope (12), the first steel plate metope (11) and the second steel plate metope (12) with it is described outer The horizontal-extending direction of steel plated wall (1) is identical, it is characterised in that:Described encased steel plate reinforced concrete combination shear wall It is additionally provided with multigroup stirrup pair in the inner chamber of the encased steel plate wall (1);Stirrup described in each group is between vertically Every arrangement, stirrup described in each group is to comprising the first stirrup (3) and the second stirrup (4) being arranged in pairs, first stirrup (3) it is provided with the equal welding section of quantity with the second stirrup (4) and is connected to raised section between welding section described in two adjacent sections, institute Each section welding section (3a) for stating the first stirrup (3) is welded on the medial surface of the first steel plate metope (11), described Each section welding section (4a) of second stirrup (4) is welded on the medial surface of the second steel plate metope (12), and is caused: Each section raised section (3b) of first stirrup (3) and each section raised section (4b) of second stirrup (4) are one by one Correspondence, and the region that is surrounded of raised section (3b) and the projection of second stirrup (4) of corresponding first stirrup (3) The region in the vertical direction that section (4b) is surrounded partially overlaps.
2. encased steel plate reinforced concrete combination shear wall according to claim 1, it is characterised in that:For same group of institute Stirrup pair is stated, each section of welding section (3a) of first stirrup (3) and each section of raised section (3b) are located in same level, described Each section of welding section (4a) of the second stirrup (4) and each section of raised section (4b) are located in same level, first stirrup (3) and The spacing of the second stirrup (4) in the vertical direction is within 10cm.
3. encased steel plate reinforced concrete combination shear wall according to claim 1, it is characterised in that:First stirrup (3) formed with second stirrup (4) by a reinforcing bar bending.
4. encased steel plate reinforced concrete combination shear wall according to claim 1, it is characterised in that:First stirrup (3) constituted with second stirrup (4) by multiple stirrup units and along the horizontal-extending side of the encased steel plate wall (1) To arranged for interval, each section stirrup unit (31) of first stirrup (3) and each section stirrup list of second stirrup (4) First (41) are formed by a reinforcing bar bending, and are respectively provided with a raised section and are located at the left side at the raised section two ends respectively Welding section and right welding section;First stirrup (3) is located at the left welding section (31a), described of the stirrup unit (31) of the leftmost side First stirrup (3) is located at the right welding section (31b) of the stirrup unit (31) of the rightmost side, the Combination Welding of first stirrup (3) Duan Jun as first stirrup (3) a welding section (3a), wherein, the Combination Welding of first stirrup (3) section is included Positioned at the right welding section (31b) and the left welding section (31a) positioned at right side person of left side person in its two neighboring stirrup unit (31); Second stirrup (4) is located at the left welding section (41a) of the stirrup unit (41) of the leftmost side, second stirrup (4) and is located at most The right welding section (41b) of the stirrup unit (41) on right side, the Combination Welding Duan Jun of second stirrup (4) are used as the described second hoop One welding section (4a) of muscle (4), wherein, the Combination Welding section of second stirrup (4) includes its two neighboring stirrup unit (41) positioned at the right welding section (41b) and the left welding section (41a) positioned at right side person of left side person in.
5. encased steel plate reinforced concrete combination shear wall according to claim 1, it is characterised in that:First stirrup (3) and in the two neighboring stirrup unit of second stirrup (4) it is located at the right welding section of left side person and the left side positioned at right side person Spacing distance between welding section is within 20cm.
6. encased steel plate reinforced concrete combination shear wall according to claim 1, it is characterised in that:First stirrup (3) welding section (3a) and the welding section (4a) of second stirrup (4) is linear pattern, the projection of first stirrup (3) The raised section (4b) of section (3b) and second stirrup (4) is U-shaped or V-type.
7. encased steel plate reinforced concrete combination shear wall according to claim 1, it is characterised in that:First stirrup (3) each section welding section (3a) pastes weldering and is welded on the medial surface of the first steel plate metope (11), second hoop Each section welding section (4a) of muscle (4) pastes weldering and is welded on the medial surface of the second steel plate metope (12).
8. the encased steel plate reinforced concrete combination shear wall according to claim 1 to 7 any one, it is characterised in that: The lateral surface of the first steel plate metope (11) and the second steel plate metope (12) is welded with along the encased steel plate wall (1) What the transverse stiffener (5) of horizontal-extending direction extension and the horizontal-extending direction of the vertical encased steel plate wall (1) extended Longitudinal stiffener (6).
9. the encased steel plate reinforced concrete combination shear wall according to claim 1 to 7 any one, it is characterised in that: The medial surface of the encased steel plate wall (1) is welded with many pegs (7).
10. a kind of construction method of encased steel plate reinforced concrete combination shear wall, it is characterised in that:Described construction method bag Include:
Step 1: preparing the first stirrup (3) and the second stirrup (4), first stirrup (3) and the second stirrup (4) are provided with quantity Equal welding section and it is connected to raised section between welding section described in two adjacent sections so that each section of first stirrup (3) Each section raised section (4b) of the raised section (3b) and second stirrup (4) is corresponded;
Step 2: welding many first stirrups on the first steel plate metope (11) in vertically spaced apart mode (3) many second stirrups (4), are welded in vertically spaced apart mode on the second steel plate metope (12), and The quantity of first stirrup (3) and the second stirrup (4) is equal and they are ranked up by the position on vertical direction respectively, Wherein, each section welding section (3a) of first stirrup (3) is welded on the medial surface of the first steel plate metope (11) On, each section welding section (4a) of second stirrup (4) is welded on the medial surface of the second steel plate metope (12);
Step 3: being used as the composition of encased steel plate wall (1) using the first steel plate metope (11) and the second steel plate metope (12) Part, processes the encased steel plate wall (1) enclosed by steel plate at the construction field (site) so that:The first steel plate metope (11) It is identical with the horizontal-extending direction of the encased steel plate wall (1) with the second steel plate metope (12), first stirrup (3) and Two stirrups (4) are respectively positioned in the inner chamber of the encased steel plate wall (1), first stirrup (3) with identical sequence and Two stirrups (4) constitute one group of stirrup pair, the raised section (3b) of corresponding first stirrup (3) of stirrup Middle Phase described in same group The region in the vertical direction that the region surrounded is surrounded with the raised section (4b) of second stirrup (4) partially overlaps;
Step 4: in the inner chamber of the encased steel plate wall (1) casting concrete (2).
CN201710209744.8A 2017-03-31 2017-03-31 A kind of encased steel plate reinforced concrete combination shear wall and its construction method Pending CN106958311A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710209744.8A CN106958311A (en) 2017-03-31 2017-03-31 A kind of encased steel plate reinforced concrete combination shear wall and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710209744.8A CN106958311A (en) 2017-03-31 2017-03-31 A kind of encased steel plate reinforced concrete combination shear wall and its construction method

Publications (1)

Publication Number Publication Date
CN106958311A true CN106958311A (en) 2017-07-18

Family

ID=59483156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710209744.8A Pending CN106958311A (en) 2017-03-31 2017-03-31 A kind of encased steel plate reinforced concrete combination shear wall and its construction method

Country Status (1)

Country Link
CN (1) CN106958311A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2034700A (en) * 2023-03-09 2023-06-15 China Railway 17Th Bureau Group Shanghai Rail Transit Eng Co Ltd A prefabricated z-shaped shear wall structure and a construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11166290A (en) * 1997-10-02 1999-06-22 Akira Tashiro Space truss composite board
CN1474904A (en) * 2000-11-13 2004-02-11 �Ƹ�����ר���������޹�˾ Concrete formwork wall serving also as reinforcement
US20120047816A1 (en) * 2010-08-24 2012-03-01 Empire Technology Development Llc Prefabricated wall panels
JP2012092584A (en) * 2010-10-27 2012-05-17 Nippon Steel Corp Sandwich structure
CN105780967A (en) * 2016-04-27 2016-07-20 合肥工业大学 Web waveform rib tie force riffled plate concrete composite prefabricated wall
CN106013506A (en) * 2016-06-22 2016-10-12 杭州铁木辛柯钢结构设计有限公司 Anti-buckling steel plate seismic shear wall provided with stiffening ribs
CN106088412A (en) * 2016-06-02 2016-11-09 初明进 L-type steel beam column
CN206769120U (en) * 2017-03-31 2017-12-19 广东省建筑设计研究院 A kind of encased steel plate reinforced concrete combination shear wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11166290A (en) * 1997-10-02 1999-06-22 Akira Tashiro Space truss composite board
CN1474904A (en) * 2000-11-13 2004-02-11 �Ƹ�����ר���������޹�˾ Concrete formwork wall serving also as reinforcement
US20120047816A1 (en) * 2010-08-24 2012-03-01 Empire Technology Development Llc Prefabricated wall panels
JP2012092584A (en) * 2010-10-27 2012-05-17 Nippon Steel Corp Sandwich structure
CN105780967A (en) * 2016-04-27 2016-07-20 合肥工业大学 Web waveform rib tie force riffled plate concrete composite prefabricated wall
CN106088412A (en) * 2016-06-02 2016-11-09 初明进 L-type steel beam column
CN106013506A (en) * 2016-06-22 2016-10-12 杭州铁木辛柯钢结构设计有限公司 Anti-buckling steel plate seismic shear wall provided with stiffening ribs
CN206769120U (en) * 2017-03-31 2017-12-19 广东省建筑设计研究院 A kind of encased steel plate reinforced concrete combination shear wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2034700A (en) * 2023-03-09 2023-06-15 China Railway 17Th Bureau Group Shanghai Rail Transit Eng Co Ltd A prefabricated z-shaped shear wall structure and a construction method thereof

Similar Documents

Publication Publication Date Title
CN106968367A (en) A kind of new 3D printing reinforced wall and its construction method
CN106284840B (en) A kind of second pouring steel reinforced concrete frame beam and its construction method
CN113832907A (en) Pile top connecting structure of high-pile wharf and construction method of pile top connecting structure
CN106948514A (en) A kind of superelevation masonry wall anti-seismic construction and its construction method
CN103498531A (en) Long-span pre-stressing I-shaped steel reinforced concrete superposed beam
CN104453079B (en) The anti-folding light cellular partition board of assembled
CN106958311A (en) A kind of encased steel plate reinforced concrete combination shear wall and its construction method
CN206769120U (en) A kind of encased steel plate reinforced concrete combination shear wall
CN110258927A (en) A kind of production method of orthogonal bar frame superimposed sheet
CN208280453U (en) Girder with rolled steel section en cased in concrete lacing wire constructing device
CN105133788A (en) CFST-RC horizontal batten plate-lattice column structure and construction method thereof
CN206667529U (en) A kind of superelevation masonry wall anti-seismic construction
CN204983309U (en) Joint construction of real abdomen formula steel case conversion roof beam and this conversion roof beam and reinforced concrete shear force wall
CN208830585U (en) A kind of reinforcement structure of the rib of large-span prestressed T plate
CN109898704A (en) A kind of band reinforcing bar Truss Steel board group combination shearing wall
CN206220359U (en) A kind of support heel for reinforced bar and support system
CN215167032U (en) Prefabricated sandwich laminated slab
CN205712740U (en) Four pencil ultra-high performance concrete constraint normal concrete rectangular columns
CN205116536U (en) A framework of steel reinforcement template for post -cast strip
CN209353351U (en) A kind of shape for hat combined steel plate stake top crown beam structure for pattern foundation pit supporting structure
CN106836556A (en) A kind of composite reinforcing steel bar cage truss support shear wall
CN210216406U (en) Net sheet for manufacturing square pile
CN201411809Y (en) Precast element for concrete floors
CN209509311U (en) A kind of rectangular opening girder construction
CN106639148A (en) Concrete beam column with steel plate mesh framework and structure design method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170718