CN106958179B - Slow down the urban road structure and its method of construction of waterlogging - Google Patents

Slow down the urban road structure and its method of construction of waterlogging Download PDF

Info

Publication number
CN106958179B
CN106958179B CN201710231096.6A CN201710231096A CN106958179B CN 106958179 B CN106958179 B CN 106958179B CN 201710231096 A CN201710231096 A CN 201710231096A CN 106958179 B CN106958179 B CN 106958179B
Authority
CN
China
Prior art keywords
road
rubble
isolation strip
curb
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710231096.6A
Other languages
Chinese (zh)
Other versions
CN106958179A (en
Inventor
何宁
钱亚俊
周彦章
何斌
张桂荣
王国利
李登华
汪璋淳
李东兵
许滨华
姚明帅
姜彦彬
张中流
黄宙晟
梅聚福
张贤
方涛
刘中仪
吴璐璐
张家胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Original Assignee
Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources filed Critical Nanjing Hydraulic Research Institute of National Energy Administration Ministry of Transport Ministry of Water Resources
Priority to CN201710231096.6A priority Critical patent/CN106958179B/en
Publication of CN106958179A publication Critical patent/CN106958179A/en
Application granted granted Critical
Publication of CN106958179B publication Critical patent/CN106958179B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/223Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/06Methods or arrangements for protecting foundations from destructive influences of moisture, frost or vibration
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

Slow down the road structure and its method of construction of urban waterlogging, it is equipped with roadbed, roadbed bed course and pavement structure surface layer from bottom to top on basic foundation, is equipped with isolation strip in both sides of the road, the periphery of the both sides of the road isolation strip is equipped with curb, it is characterized in that, the curb uses non-watertight road edge stone;Rubble vertical drainage body is equipped with below the both sides of the road isolation strip;Between the rubble vertical drainage body and the infrastructure, it is equipped with rubble horizontal row water layer, which covers the full width of road foundation yet to be built.When being equipped with flower bed isolation strip among road, rubble vertical drainage body is again provided with below the flower bed isolation strip;The curb on flower bed isolation strip periphery also uses non-watertight road edge stone.Rainfall can be discharged into rapidly the vertical drainage body of lower part by the present invention in the rainwash that road surface is formed by slot (hole) on curb, and it road lower part is quickly discharged by roadbed lower horizontal displacement hull can preferably realize the effect of alleviating urban waterlogging in water storage soil.

Description

Slow down the urban road structure and its method of construction of waterlogging
Technical field
The invention belongs to the fields such as urban transportation and hydraulic engineering, and in particular to a kind of new road for slowing down urban waterlogging Structural shape and its method of construction.
Background technique
With the fast development of China's economic society and the continuous acceleration of urbanization process, the coverage rate of urban road is also got over Come higher, the main cities path area of current developed country accounts for about the 20% of the city gross area, Chinese such as Beijing, Shanghai one The urban road area accounting in line city also has been approached 10%, and still with the development of faster speed.Due to using hard surface Urban road is developed at a too fast speed, and the central drainage facility in designing of city road is designed by 1~2 year chance standard substantially, works as incident Urban road is difficult to the rainwash in time forming rainfall emptying when meeting the rainfall of super design standard, frequent so as to cause city Waterlogging occurs, has seriously affected the normal life of city dweller and the development of urban economy.Portion 2010 is firmly built to 32, China Display is investigated in the waterlogging situation in 351 cities in province, from 2008, has 213 cities to occur different degrees of Ponding waterlogging accounts for the 62% of investigation city, and the frequency of urban waterlogging is in rising trend;The effectiveness factors 1 year city more than 3 times The western and northern city such as just there are 137, or even are expanded to the Xi'an of drought, Shenyang.Firmly build the statistics also table in portion Bright: Chinese city effectiveness factors maximum depth of accumulated water is more than that the city of 50mm accounts for 74.6%, and depth of accumulated water is more than that 15mm is more than 90%.;The ponding time is more than that the city of half an hour accounts for 78.9%, wherein the maximum ponding time for having 57 cities is more than 12 hours; According to another the ground such as Beijing in recent years, Guangzhou, Chengdu, Wuhan it is successive caused by from the point of view of rainwater waterlogging event, urban waterlogging disaster is shown Strong ascendant trend.
Expert thinks the " increasing of city Permeable stratum area after studying the reason of serious urban waterlogging in Wuhan in 2016 by analysis It is more " it is one of them extremely important reason.Natural soils have the function of absorption and water moisture self restraint, by penetrating into rainwater Underground, and mutually converted between the soil water and underground water, it revert to rainwater in nature, and then maintain city water cycle system The balance of system.With the increase of urban construction path area, so that natural soils are gradually by concrete road surface and bituminous pavement etc. Intimate impermeable stratum is covered, and the lower infiltration approach of rainwater has directly been cut off, and greatly reduces the infiltration capacity of soil, and rainwash Amount and runoff coefficient are gradually increased, so that the water resource for being seeped into underground under this originally is changed into rainwash and can not infiltrate, thus An important source as effectiveness factors.It is recorded according to Hubei Province's yearbook, since road is mated formation mostly with fluid-tight drip in Wuhan urban district Based on green, cement pavement, therefore this construction considerably increases the Permeable stratum area in city.Furthermore the increase meeting of Permeable stratum area Cause the Manning coefficient of original ground substantially to reduce, so as to shorten the rainwater conflux time, and then increases pipe network rainwater flow and pipe Net burden, greatly improves the risk of urban rainstorm waterlogging.
The sponge urban construction technology of planning and test spread solution China is got worse China energetically The urban construction new technology of urban waterlogging problem, and carried out some earlier test pilot works thus, investigation shows to be included in In 30 cities of pilot, still there are this year 19 cities that waterlogging occurs, accounting 63% just includes Beijing, Tianjin, Chongqing among these Equal municipalities directly under the Central Government, further include multiple provincial capitals such as Foochow, Wuhan, Jinan, Nanning.Some sponge cities for carrying out Pilot project construction do not have There is the function of really making good use of natural soils absorption and water moisture self restraint in city, sponge urban construction is also not short time one or two years It can complete.
Sponge urban construction is a system engineering, and the new city road construction for accounting for 10% or more the city gross area is sponge One important component of urban construction, the new city highway layout of waterlogging is slowed down in current sponge city and construction is still in Starting stage serves city road planning design system, road structure and evaluation method of sponge urban construction etc. also Mature not to the utmost, reported the relevant technologies are also only limitted to using road surface seepy material technology, the technology non-motorized lane, The urban roads such as pavement simply use permeable pavement, such as porous pavement, permeable ceramic pavement brick and pervious concrete, technology It has the drawback that and does not pay attention to integrally using road surface, roadbed bed course, road lower part ground as a system, do not coordinate to examine The water permeability for considering roadbed bed course, the rate of water absorption and storage capacity of ground under road, it is undesirable to eventually lead to implementation result, practical Poor, the economy wretched insufficiency of property, it is difficult to effectively be promoted.
China's big and medium-sized cities waterlogging problem is got worse at present, and urban road area accounting is increasing, concentrate pipe network and River has been unable to meet the requirement of municipal drainage, propose it is a kind of rainwater quickly can be discharged into underlying soil and give full play to soil storage The new road structure of outlet capacity has very important significance, and is that one of the sponge urban construction that China widelys popularize is important Component part.
Summary of the invention
The object of the present invention is to provide a kind of road structures for slowing down urban waterlogging, this is that one kind can arrange rapidly rainwater Enter the new city road structure pattern in road underlying soil.Required technical problems to be solved are the road surfaces with urban road Structure, roadbed bed course and road lower part ground are accounted for as a system, fully absorb the hydraulic engineerings such as reservoir dam at Ripe row, water storage technology, propose to be suitble to different grounds and row, water storage target call new city road structure pattern and its build If technology and construction method, sponge urban construction is served, alleviates the urban waterlogging problem that China gets worse.
The technical solution for accomplishing the above inventive task is that a kind of road structure for slowing down urban waterlogging, on basic foundation It is equipped with roadbed, roadbed bed course and pavement structure surface layer from bottom to top, is equipped with isolation strip, the both sides of the road isolation in both sides of the road The periphery of band is equipped with curb, which is characterized in that the curb uses non-watertight road edge stone;In the both sides of the road isolation strip Rubble vertical drainage body is arranged below;Between the rubble vertical drainage body and the infrastructure, it is equipped with rubble horizontal drainage Layer, the rubble horizontal drainage slice width degree cover the full width of road foundation yet to be built.
When being equipped with flower bed isolation strip among road, rubble vertical drainage body is again provided with below the flower bed isolation strip; The curb on flower bed isolation strip periphery also uses non-watertight road edge stone.
The rubble drainage blanket is point two layers to pave and roll respectively, 20~30cm of every thickness degree;
The rubble drainage blanket width covers the full width of road foundation yet to be built, and the two sides isolation strip is in Between vertical drainage body below flower bed isolation strip be connected with roadbed horizontal row water layer.
The rubble vertical drainage body top width is greater than 2m, and is greater than isolation flower bed width and flower bed two sides curb width Summation, extending slope ratio downwards is 1:1, cope level and the same elevation of bed course.
The technical solution for completing second invention task of the application is the construction of the road structure for slowing down urban waterlogging Method, which is characterized in that steps are as follows:
(1) carries out clear list processing to the place of road yet to be built and completes basement process;
(2) the roadbed that is laid with rubble of a layer thickness not less than 50cm using layered rolling construction method on ground is horizontal Drainage blanket;
(3) arranges rubble vertical drainage body on the design position of both sides of the road isolation strip and intermediate flower bed isolation strip;
(4) each isolation strip periphery curb of road uses the precast slab or stone plate in trough of belt (hole), has Rainwash is formed conducive to rainfall, and rubble vertical drainage body is quickly discharged by curb bracket groove (hole),
(5) the other position roadbeds of road and roadbed bed course use traditional material with layered rolling by traditional cities road structure Mode fills design altitude;
(6) is laid with pavement asphalt or concrete structure surface layer on roadbed bed course.
Above step (3)-number order of step (5) do not represent sequence of construction.That is, above step (3)-construction of step (5) Sequence can be different from this number order.For example, first roadbed paving and roadbed bed course, rear that rubble vertical drainage body is arranged;Or Roadbed paving and roadbed bed course carry out simultaneously with setting rubble vertical drainage body.
The roadbed horizontal row water layer of the rubble of above step (2) is point two layers to pave and roll respectively, every thickness degree 20~ 30cm, rubble drainage blanket width covers the full width of road foundation yet to be built, in the two sides isolation strip of road yet to be built and centre Roadbed vertical drainage body is respectively set at flower bed isolation strip (if any) to be connected with roadbed horizontal row water layer,
The rubble vertical drainage body of above step (3);Rubble vertical drainage body is similarly clean rubble, is paved using layering And the mode of rolling is constructed, 20~30cm of every thickness degree, rubble vertical drainage body top width is greater than 2m, and it is wide to be greater than isolation flower bed Degree and flower bed two sides curb width summation, extending slope ratio downwards is 1:1, cope level and the same elevation of bed course.
In other words, the present invention by lower part ground (also referred to as basic foundation, for can water storage soil), roadbed horizontal row water layer, Roadbed vertical drainage body, roadbed, bed course, fluting (hole) non-watertight road edge stone, pavement structure surface layer, flower bed isolation strip composition. After carrying out clear list processing to the place of road yet to be built and complete basement process, one is laid with using layered rolling construction method on it The roadbed horizontal row water layer of rubble of the thickness degree not less than 50cm, rubble drainage blanket, which divides two layers, to pave and rolls respectively, every thickness 20~30cm is spent, rubble drainage blanket width covers the full width of road foundation yet to be built, in the two sides isolation strip of road yet to be built It is connected with roadbed vertical drainage body is respectively set at intermediate flower bed isolation strip (if any) with roadbed horizontal row water layer, roadbed is vertically arranged Water body material is similarly clean rubble, is paved using layering and the mode of rolling is constructed, 20~30cm of every thickness degree, and roadbed is perpendicular It is greater than 2m to displacement hull top width, and is greater than isolation flower bed width and flower bed two sides curb width summation, extends slope ratio downwards For 1:1, cope level and the same elevation of bed course, the other position roadbeds of road and bed course are adopted by traditional cities road structure Design altitude is filled in a manner of layered rolling with traditional material, each isolation strip periphery curb of road uses trough of belt (hole) Precast slab or stone plate, be conducive to rainfall and form rainwash to be quickly discharged into rubble by curb bracket groove (hole) Vertical drainage body, and (can water storage by the ground that rubble horizontal row water layer is diffused rapidly to the entire area range of road lower part Soil), " sponge " soil of water storage is formed, in case the need of subsequent sections water, pavement structure surface layer and the flower bed isolation of road Band continues to use traditional material and traditional structure pattern, and construction method also remains unchanged, and curb is fixed and construct also using tradition Technology and methods.
More optimized and in more detail, feature of the invention, structure and function are as follows:
1) roadbed horizontal row water layer, roadbed vertical drainage body material are clean rubble, to guarantee that displacement hull has good row Water characteristic, while there is sufficient intensity and resistance capacity to deformation, to meet road stabilization and good compression and sedimentation and deformation characteristic It is required that;
2) roadbed horizontal row water layer thickness is not less than 50cm, to meet the requirement of horizontal row water;
3) roadbed horizontal row water layer width covers the full width of road foundation yet to be built, is paved and is rolled using layering Mode is constructed, 20~30cm of every thickness degree;
4) roadbed vertical drainage body is connected with roadbed horizontal row water layer, position be located at two sides isolation strip and intermediate flower bed every At band (if any);
5) roadbed vertical drainage body top width is greater than 2m, and total greater than isolation flower bed width and flower bed two sides curb width With extending slope ratio downwards is 1:1, cope level and the same elevation of bed course;
6) roadbed vertical drainage body is paved using layering and the mode of rolling is constructed, 20~30cm of every thickness degree;
7) each isolation strip periphery curb of road uses the precast slab or stone plate in trough of belt (hole), opens Slot (hole) area is not less than 30%, and formation rainwash is erected by curb bracket groove (hole) quick rubble that is discharged into after being conducive to rainfall To displacement hull, and (can water storage soil by the ground that rubble horizontal row water layer is diffused rapidly to the entire area range of road lower part Earth), " sponge " soil of water storage is formed, in case the need of subsequent sections water;
8) roadbed of road carries out consolidation process, road foundation, bed course, pavement structure using traditional technology method Traditional material and traditional structure pattern are continued to use in surface layer and flower bed isolation strip, and construction method also remains unchanged, curb it is fixed and Construction also uses traditional technology and method.
In other words, the scheme of the invention is: being mainly characterized by of new city road structure and its method of construction absorbs water Library dam smokestack type Drainage Design thinking is adopted to traditional cities road mature structure and technique without changing With crushed stone material widely used in engineering, makes full use of its drainage performance good and have high-intensitive and highly resistance compression property spy Point is trough of belt (hole) curb by changing traditional curb, so that slot of the surface water of rainfall formation by curb (hole) is discharged into ground under road (can water storage soil) by rubble displacement hull rapidly after catchmenting, and realizes city underlying soil water storage sea The effect of spongy soils body, can achieve the purpose for alleviating urban waterlogging.The present invention can preferably serve China and push greatly Wide sponge urban construction work.
New city road structure and its method of construction structure proposed by the invention is simple, changes to traditional cities road Small, road travel function and traditional cities road indistinction, construction cost are much better than at present using pervious asphalt or pervious asphalt Concrete road surface is to solve the construction cost of the urban road of rainwater infiltration, and roadbed due to urban road and bed course are wanted Ask and roll that quality is higher, and water penetration is also relatively poor, pass through rainwater is seeped under pervious asphalt or pervious asphalt concrete road surface will Road lower part ground can not be quickly penetrated into, not can be well solved surface gathered water problem, and new city road proposed by the present invention Rainwater preferably quickly can be discharged into road lower part by the middle discharge structure designed through the invention by line structure and its method of construction Ground (can water storage soil) preferably solves the problems, such as the effect of surface gathered water is with more preferable completion alleviation urban waterlogging.
Detailed description of the invention
Fig. 1 is the schematic cross-sectional view (having intermediate flower bed isolation strip) of new city road structure of the present invention;
Fig. 2 is the schematic cross-sectional view of new city road structure of the present invention (without intermediate flower bed isolation strip);
Fig. 3 is the trough of belt curb pictorial diagram that new city road of the present invention uses.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing and specific implementation Case is described in further detail the method for the present invention.Specific implementation case described herein only to explain the present invention, and It is not used in the restriction present invention.
Embodiment 1 has intermediate flower bed isolation strip new city road construction
1) clear list processing is carried out to highway foundation 1;
2) ground of economical rationality is designed to foundation bearing capacity, intensity and stability requirement according to road foundation characteristic and highway Base processing mode is completed the consolidation process of highway foundation 1 by design requirement using reasonable construction technology and technique;
3) highway foundation completed to consolidation process carries out leveling processing, is laid with rubble horizontal row water layer 2, rubble water thereon Flat raft water layer thickness is not less than 50cm, is compacted using layered rolling, every 20~30cm of lift height;
4) 4 lower part rubble vertical drainage body 3 of flower bed isolation strip and roadbed 7, which are densified to portion using layered rolling, designs height Journey, every 20~30cm of lift height;
5) after the completion of roadbed 7 is constructed, roadbed paving bed course 6, then completion pavement asphalt or concrete structure on it thereon The laying of surface layer 5;
6) construction of road flower bed isolation strip 4 is completed on 3 top of rubble vertical drainage body, one layer of flower bed bottom laying is permeable The not strong clay of property is to improve flower bed soil water-retaining function;
7) laying of its periphery curb 8, new city road flower bed are completed after clearing up 4 periphery of flower bed isolation strip Isolation strip periphery curb is using (hole) structure of slotting shown in Fig. 3, and fluting (hole) area is not less than 30%, convenient for rainfall exists The rainwash that road surface is formed is discharged into rapidly the vertical drainage body of its underpart by slot (hole) on curb, and passes through roadbed lower part Horizontal row water body is quickly discharged into road lower part can be in water storage soil (ground).
Embodiment 2, without intermediate flower bed isolation strip new city road construction.
1) 1 step 1)~7 of example are repeated) it completes without intermediate flower bed isolation strip new city road construction;
2) due to without intermediate flower bed isolation strip, fluting (hole) structure road without intermediate flower bed isolation strip new city road Along stone fluting (hole) area Ying Genggao, fluting (hole) area ratio should be not less than 50%.

Claims (6)

1. a kind of road structure for slowing down urban waterlogging is equipped with roadbed, roadbed bed course and road surface from bottom to top on basic foundation Structure surface layer is equipped with isolation strip in both sides of the road, and the periphery of the both sides of the road isolation strip is equipped with curb, which is characterized in that The curb uses non-watertight road edge stone;Rubble vertical drainage body is equipped with below the both sides of the road isolation strip;It is broken at this Between stone vertical drainage body and infrastructure, it is equipped with rubble horizontal row water layer, which covers road yet to be built The full width of road roadbed;
When being equipped with flower bed isolation strip among road, rubble vertical drainage body, flower bed isolation are equipped with below the flower bed isolation strip Curb with periphery uses non-watertight road edge stone;
The curb is equipped with permeable slot or hole, slots or the area in hole is not less than 30%, without intermediate flower bed isolation strip Curb on permeable slot or hole area ratio be not less than 50%.
2. the road structure according to claim 1 for slowing down urban waterlogging, which is characterized in that the rubble horizontal drainage Layer is point two layers to pave and roll respectively, 20~30cm of every thickness degree.
3. the road structure according to claim 1 for slowing down urban waterlogging, which is characterized in that the two sides isolation strip and Vertical drainage body below intermediate flower bed isolation strip is connected with the rubble horizontal row water layer.
4. slowing down the road structure of urban waterlogging described in one of -3 according to claim 1, which is characterized in that the rubble is perpendicular It is greater than 2m to displacement hull top width, and is greater than isolation flower bed width and flower bed two sides curb width summation, extends slope ratio downwards For 1:1, cope level and the same elevation of bed course.
5. the method for construction of the road structure described in claim 1 for slowing down urban waterlogging, which is characterized in that steps are as follows:
(1) carries out clear list processing to the place of road yet to be built and completes basement process;
(2) is laid with the rubble horizontal row water layer that a layer thickness is not less than 50cm using layered rolling construction method on ground;
(3) rubble vertical drainage body is arranged on the position of both sides of the road isolation strip and intermediate flower bed isolation strip in;
(4) each isolation strip periphery curb of road is conducive to using trough of belt or the precast slab or stone plate in hole Rainfall forms rainwash and is quickly discharged into rubble vertical drainage body by curb bracket groove or hole,
(5) the other position roadbeds of road and roadbed bed course use traditional material in a manner of layered rolling by traditional cities road structure Fill design altitude;
(6) is laid with pavement asphalt or concrete structure surface layer on roadbed bed course;
Above step (3)-number order of step (5) do not represent sequence of construction;
Step (2) described in pave and roll respectively for rubble horizontal row water layer point two layers, 20~30cm of every thickness degree;
Step (2) described in rubble drainage blanket width cover the full width of road foundation yet to be built, be isolated with the two sides of step (3) Roadbed vertical drainage body is respectively set at band and intermediate flower bed isolation strip to be connected with roadbed horizontal row water layer.
6. the method for construction of the road structure according to claim 5 for slowing down urban waterlogging, which is characterized in that step (3) institute The rubble vertical drainage body stated is clean rubble, is paved using layering and the mode of rolling is constructed, 20~30cm of every thickness degree, The rubble vertical drainage body top width is greater than 2m, and is greater than isolation flower bed width and flower bed two sides curb width summation, downwards Extension slope ratio is 1:1, cope level and the same elevation of bed course.
CN201710231096.6A 2017-04-11 2017-04-11 Slow down the urban road structure and its method of construction of waterlogging Active CN106958179B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710231096.6A CN106958179B (en) 2017-04-11 2017-04-11 Slow down the urban road structure and its method of construction of waterlogging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710231096.6A CN106958179B (en) 2017-04-11 2017-04-11 Slow down the urban road structure and its method of construction of waterlogging

Publications (2)

Publication Number Publication Date
CN106958179A CN106958179A (en) 2017-07-18
CN106958179B true CN106958179B (en) 2019-04-09

Family

ID=59483385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710231096.6A Active CN106958179B (en) 2017-04-11 2017-04-11 Slow down the urban road structure and its method of construction of waterlogging

Country Status (1)

Country Link
CN (1) CN106958179B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359366A (en) * 2019-07-02 2019-10-22 中国公路工程咨询集团有限公司 It is a kind of using the bridge drainage structure of pervious concrete and the calculation method of pervious concrete permeability rate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202202227U (en) * 2011-09-02 2012-04-25 中国市政工程西北设计研究院有限公司 Urban road brick curb and road and flower bed rainwater drainage combined system
CN104005344A (en) * 2014-06-10 2014-08-27 山东大学 Device and method for draining capillary water out of roadbed
CN105625549A (en) * 2016-03-16 2016-06-01 南京林业大学 Multifunctional system for rainwater infiltration, collection and storage and purification of sponge city
CN205296344U (en) * 2016-01-19 2016-06-08 广州道远建筑工程设计有限公司 High -grade road drainage system in city
CN106065656A (en) * 2016-06-24 2016-11-02 西安建筑科技大学 Guard system and construction method is oozed under the regularization of Collapsible Loess District rainwater

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202202227U (en) * 2011-09-02 2012-04-25 中国市政工程西北设计研究院有限公司 Urban road brick curb and road and flower bed rainwater drainage combined system
CN104005344A (en) * 2014-06-10 2014-08-27 山东大学 Device and method for draining capillary water out of roadbed
CN205296344U (en) * 2016-01-19 2016-06-08 广州道远建筑工程设计有限公司 High -grade road drainage system in city
CN105625549A (en) * 2016-03-16 2016-06-01 南京林业大学 Multifunctional system for rainwater infiltration, collection and storage and purification of sponge city
CN106065656A (en) * 2016-06-24 2016-11-02 西安建筑科技大学 Guard system and construction method is oozed under the regularization of Collapsible Loess District rainwater

Also Published As

Publication number Publication date
CN106958179A (en) 2017-07-18

Similar Documents

Publication Publication Date Title
CN105735082B (en) It is permeable to plant framed and multi-functional porous pavement structural system and its method for paving
CN106638918A (en) Construction method for sponge city rainwater collection system
CN106351103A (en) Permeable pavement structure with high strength and high permeability and paving method thereof
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN205711609U (en) Framed and the multi-functional porous pavement structural system of permeable plantation
CN105887609A (en) Method for constructing ecological infiltration pavement in sponge city
CN111455772A (en) Road structure based on sponge city technology and construction method thereof
CN207362616U (en) A kind of paving structure of water-permeable brick
CN209338948U (en) A kind of water-permeable pavement structure
CN106088684B (en) The sunk type square and its construction method that a kind of rainwater-collecting recycles
CN109338839B (en) Urban seepage storage system for recycling construction waste
CN213804678U (en) Sponge city ecological road roadbed structure
CN204803703U (en) Concrete road surface water collect structures permeates water
CN107794822B (en) Permeable pavement based on sponge city idea
CN205591075U (en) Ecology structure of mating formation
CN106958179B (en) Slow down the urban road structure and its method of construction of waterlogging
CN201502019U (en) Permeable ground structure
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN207244389U (en) A kind of shallow-layer water storage road surface water-permeable brick
CN206090204U (en) Height ecological road surface structure of permeating water
CN214116117U (en) Sponge city permeable pavement
CN105474942B (en) The construction method on ground parking lawn
CN211848696U (en) Type bituminous paving structure permeates water
CN204940034U (en) The permeable terrace of energy original place water storage
CN205711616U (en) Based on the staggered water-permeable pavement brick carrying system laying pavior brick anyhow

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant