CN106952044A CN201710179159.8A CN201710179159A CN106952044A CN 106952044 A CN106952044 A CN 106952044A CN 201710179159 A CN201710179159 A CN 201710179159A CN 106952044 A CN106952044 A CN 106952044A
Authority
CN
China
Prior art keywords
information
bid section
bid
project
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710179159.8A
Other languages
Chinese (zh)
Inventor
袁灿
章亦民
高莹
范利群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Network Communications Group Co Ltd
Original Assignee
China United Network Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Network Communications Group Co Ltd filed Critical China United Network Communications Group Co Ltd
Priority to CN201710179159.8A priority Critical patent/CN106952044A/en
Publication of CN106952044A publication Critical patent/CN106952044A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The present invention provides a kind for the treatment of method and apparatus of engineering construction, wherein, this method includes:Simultaneously the project initiation information of stored items, information on bidding, procurement request information are obtained successively;For each bid section in project, the order arrival information of bid section is obtained and stored;For each bid section in project, the information that goes into operation of bid section is obtained and stores, wherein, the information that goes into operation includes the formality information that goes into operation, and coordinates information of marching into the arena, marches into the arena time started, the deadline of marching into the arena;For each bid section in project, the engineering construction information of each link of bid section, and engineering construction information and each information of the above according to each bid section are obtained and stored, the GIS map for showing each bid section completeness is generated.So as to there is provided a kind of management-control method of engineering construction, obtain and handle each information in Process of Engineering Construction, be not easily susceptible to the limitation of manpower and physics, the progress and problem of each link of engineering project that effectively follows up in real time, management and control efficiency are higher.

Description

The treating method and apparatus of engineering construction
Technical field
The present invention relates to engineering construction technical field, more particularly to a kind for the treatment of method and apparatus of engineering construction.
Background technology
With the development and progress of society, the construction and implementation of all kinds of engineerings are seen everywhere, such as building construction project, Iron construction project, networking engineering etc..Now for all kinds of engineering constructions quality and speed all propose it is higher and higher It is required that.For example, with the development of the communication technology, the communication technology has been widely applied in the live and work of people, The communication technology is set up, it is necessary to set up communications facility, this is accomplished by the networking engineering for setting up communication.Fixed broadband network is whole The basis of individual internet, the total demand of bandwidth is climbing up and up, this quality and speed for all being built to telecommunication carrier networks Propose higher requirement.
In the prior art, conventional engineering construction field management method, is served as theme with the network planning, will purchase, and design, The links of construction and management are together in series, and scene is run by engineering project person liable and project manager, are ordered with pen and paper record Single contract arrival situation, correlation engineering personnel to hilllock situation and with safety inspection etc. in place.And then by way of manpower, it is right Engineering construction carries out overall management and control.
But in the prior art, this manpower carries out the mode of overall management and control to engineering construction, is vulnerable to manpower and thing The limitation of reason, it is impossible to the progress and problem for each link of engineering project that effectively follows up in real time, management and control inefficiency, and then with work The a large amount of engineering projects of Cheng Jianshe go into operation, how efficient fine management and control these engineering constructions engineering project into current urgent need The problem of solution.
The content of the invention
The present invention provides a kind for the treatment of method and apparatus of engineering construction, to solve in the prior art how efficient fine The problem of engineering project of these engineering constructions of ground management and control.
It is an aspect of the present invention to provide a kind of processing method of engineering construction, including:
Simultaneously the project initiation information of stored items, information on bidding, procurement request information are obtained successively;
For each bid section in the project, the order arrival information of bid section is obtained and stored;
For each bid section in project, the information that goes into operation of bid section is obtained and stores, wherein, the information that goes into operation includes the hand that goes into operation Continuous information, coordinates information of marching into the arena, marches into the arena time started, the deadline of marching into the arena;
For each bid section in project, the engineering construction information of each link of bid section is obtained and stores, and according to each bid section Engineering construction information and each information above, generate the GIS-Geographic Information System for showing each bid section completeness (Geographic Information System, abbreviation GIS) map.
Another aspect of the present invention there is provided a kind of processing unit of engineering construction, including:
Acquisition module, for obtaining simultaneously the project initiation information of stored items, information on bidding, procurement request information successively;
Order is to goods module, for for each bid section in the project, obtaining and storing the order arrival information of bid section;
Go into operation module, for for each bid section in project, obtaining and storing the information that goes into operation of bid section, wherein, go into operation letter Breath includes the formality information that goes into operation, and coordinates information of marching into the arena, marches into the arena time started, the deadline of marching into the arena;
Engineering construction module, for for each bid section in project, obtaining and storing the engineering construction of each link of bid section Information, and engineering construction information and each information of the above according to each bid section, generate the GIS for showing each bid section completeness Map.
The solution have the advantages that:By obtaining simultaneously the project initiation information of stored items, information on bidding, buying successively Application information;For each bid section in project, the order arrival information of bid section is obtained and stored;For each bid section in project, The information that goes into operation of bid section is obtained and stores, wherein, the information that goes into operation includes the formality information that goes into operation, and coordinates information of marching into the arena, marches into the arena out Time beginning, the deadline of marching into the arena;For each bid section in project, the engineering construction information of each link of bid section is obtained and stores, And engineering construction information and each information of the above according to each bid section, generate the GIS map for showing each bid section completeness. So as to there is provided a kind of management-control method of engineering construction, obtain and handle each information in Process of Engineering Construction, be difficult by To the limitation of manpower and physics, the effectively progress and problem of follow-up each link of engineering project in real time, management and control efficiency is higher.
Brief description of the drawings
Fig. 1 is the flow chart of the processing method for the engineering construction that the embodiment of the present invention one is provided;
Fig. 2 is the flow chart of the processing method for the engineering construction that the embodiment of the present invention two is provided;
Fig. 3 is the structural representation of the processing unit for the engineering construction that the embodiment of the present invention three is provided;
Fig. 4 is the structural representation of the processing unit for the engineering construction that the embodiment of the present invention four is provided.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 is the flow chart of the processing method for the engineering construction that the embodiment of the present invention one is provided, as shown in figure 1, this implementation The method of example, including:
Step 101, successively the project initiation information of acquisition and stored items, information on bidding, procurement request information.
In the present embodiment, specifically, the executive agent of the present embodiment can be the processing unit or engineering of engineering construction The processing system of construction, or other equipment that can perform the present embodiment, the present embodiment are not limited.
The present embodiment is illustrated by taking the processing unit of engineering construction as an example.Include in the processing unit of engineering construction and open Dynamic model block, bid module, procurement module, order to goods module, the module that goes into operation, engineering construction module, importing/export module and master Module etc. is controlled, wherein, main control module is connected with other each modules, for controlling each module.It can be born by main control module The information for blaming each intermodule is concentrated, storage, analysis and decision etc..
It is possible, firstly, into starting module cuit project initiation information, or, starting module into database from The project initiation information of dynamic acquisition project, wherein, project initiation information includes project name, builds time, project verification reply always Investment, construction unit, project type etc. information;Also, starting module needs to store the project initiation information.Then, to trick The information on bidding of cuit in module is marked, or, bid module automatic information on bidding for obtaining project into database, its In, information on bidding includes the type that calls for bid, and bid type has following all types of:Design, construction, management, the purchase of integrated, pure equipment Put;Also, bid module needs to store the information on bidding.It is then possible to which the procurement request of cuit is believed into procurement module Breath, or, procurement module actively obtains the procurement request information of project into database, wherein, procurement request information includes Framework type, requirement report numbering, requirement report title, procurement request submission date are purchased, wherein, buying framework type has following It is all types of:It is frameless, have framework through storehouse, have framework straight hair;Also, procurement module needs the procurement request information of stored items.
Step 102, for each bid section in project, obtain and store the order arrival information of bid section.
In the present embodiment, specifically, order is directed to each bid section in project to goods module, obtain and store ordering for bid section Single arrival information, order arrival information includes:Arrival time, arrival place, mug voucher, requirement report numbering, requirement report Title, supplier, cooperation unit acknowledging time and confirmation people, project manager's acknowledging time, wherein, retained on mug voucher Timestamp, global positioning system (Global Positioning System, abbreviation GPS) latitude and longitude coordinates and positional information.Enter And according to the procurement request of submission, order arrival situation is recorded successively.
Step 103, for each bid section in project, obtain and store the information that goes into operation of bid section, wherein, in the information that goes into operation wrap The formality information that goes into operation is included, coordinates information of marching into the arena, marches into the arena time started, the deadline of marching into the arena.
In the present embodiment, specifically, the module that goes into operation obtains and stored the letter that goes into operation of bid section for each bid section in project Breath, the information that goes into operation includes:Go into operation formality information, coordinates information of marching into the arena, marches into the arena time started, the deadline of marching into the arena.And then from It is dynamic to determine that related construction goes into operation formality, coordinates to march into the arena, record is marched into the arena time started, the deadline of marching into the arena, and uploads engineering The system of the processing unit of construction.
Step 104, for each bid section in project, obtain and store the engineering construction information of each link of bid section, and root According to the engineering construction information and each information of the above of each bid section, the GIS map for showing each bid section completeness is generated.
Wherein, at least include in engineering construction information:Critical process progress of implementation information, scene are registered information, letter of taking pictures Breath;There is register timestamp, latitude and longitude coordinates of registering, position of registering in information of taking pictures.
In the present embodiment, specifically, engineering construction module is directed to each bid section in project, obtain and store each of bid section The engineering construction information of link, engineering construction information includes:Critical process progress of implementation information, scene register information, take pictures Information, wherein, there is register timestamp, latitude and longitude coordinates of registering, position of registering, critical process includes out in information of taking pictures Work, equipment installation, power-up, commissioning, completion, safety inspection, final acceptance of construction etc.;According to the engineering construction information of each bid section and Project initiation information, information on bidding, procurement request information, order arrival information, go into operation information etc., generates for showing each mark The GIS map of section completeness.
For example, engineering construction module is registered function by main control module calls, is passed through in engineering construction links Taking Pictures recording workmen, designer, the field conduct situation of supervisor and project manager and register, retain through dimension, The watermark of positional information and timestamp, and get the progress that each link of construction project implementation is presented ready in real time in GIS map.
Also, more than during each step, record can be gone in each ring of engineering construction using a module of registering Information in section, and obtain the information registered of taking pictures that order arrival signs for each link, and mark longitude and latitude, position on photo Put and time point, and each link progress of engineering construction is presented in GIS map, wherein marking longitude and latitude, position and time point Function forges record of registering for preventing from being related to the personnel that register.Specifically, take pictures submodule, GPS are included in module of registering Module, timestamp submodule and GIS submodules.Take pictures submodule, order arrival can be obtained sign for taking pictures for each link and register Information, retain the field conduct situation and label of workmen, designer, supervisor and project manager for passing through to take pictures Examined and scored to record, and then to everyone.GPS submodules, can mark longitude and latitude, position and time on photo Point, the watermark for retaining longitude, dimension and positional information in photo of taking pictures.GIS submodules are used to show by GIS map Engineering progress, completeness, arrival situation of all engineering construction projects etc..Timestamp submodule is used to retain in photo of taking pictures Timestamp watermark, the time point at project scene captured by recording photograph, make the timestamp turn into the retention registered on time of personnel with Card.
The present embodiment by obtaining simultaneously the project initiation information of stored items, information on bidding, procurement request information successively;Pin To each bid section in project, the order arrival information of bid section is obtained and stored;For each bid section in project, obtain and store mark The information that goes into operation of section, wherein, the information that goes into operation includes the formality information that goes into operation, and coordinates information of marching into the arena, and the time started of marching into the arena, has marched into the arena Into the time;For each bid section in project, the engineering construction information of each link of bid section is obtained and stores, and according to each bid section Engineering construction information and above each information, generate the GIS map for showing each bid section completeness.So as to there is provided one kind The management-control method of engineering construction, can obtain and handle each information in Process of Engineering Construction, be not easily susceptible to manpower and physics Limitation, the progress and problem of each link of engineering project that effectively follows up in real time, management and control efficiency is higher.
Fig. 2 is the flow chart of the processing method for the engineering construction that the embodiment of the present invention two is provided, on the basis of embodiment one On, as shown in Fig. 2 the method for the present embodiment, before step 102, also includes:
Step 201, the information on bidding according to project, the acceptance of the bid information identified project, wherein, acceptance of the bid information includes acceptance of the bid Each bid section, the different bid winners for different bid sections.
In the present embodiment, specifically, further comprises acceptance of the bid processing module in the processing unit of engineering construction, acceptance of the bid processing Module can according to the information on bidding of the project in bid module, the acceptance of the bid information identified project, wherein, acceptance of the bid information includes each Get the bid bid section, the different bid winners for different bid sections, then, and acceptance of the bid processing module needs to store acceptance of the bid information.From And the module that calls for bid can be according to bid result distribution bid winner and corresponding bid section, and bid section allocation result is deposited Storage.
After step 102, also include:
Step 202, the order arrival information according to each bid section, count arrival promptness rate.
Wherein, at least include in order arrival information:Arrival time, arrival place, mug voucher;Mug with Remaining time stamp, GPS latitude and longitude coordinates and positional information on card.
In the present embodiment, specifically, further comprises order statistical module in the processing unit of engineering construction, order statistics Module can count arrival promptness rate according to the order arrival information of each bid section.Specifically, order statistical module can be counted Confirmation arrival time, place, confirmation people and the mug voucher of each bid section of project;Then order statistical module counts arrival The information such as promptness rate, examination standard is provided for supplier.
After step 104, also include:
The tracking information of step 203, each link for obtaining and storing each bid section, wherein, at least include opening in tracking information Time beginning, end time, overtime reason;Determine that each link of each bid section lasts duration, according to each link of each bid section with Track information and last duration generation engineering tracking form;Show engineering tracking form.
In the present embodiment, can be to entering specifically, further comprises progress chasing module in the processing unit of engineering construction The tracking information of each link of each bid section is inputted in degree tracking module, or progress chasing module obtains each in database automatically The tracking information of each link of bid section.Wherein, tracking information includes:Time started, end time, overtime reason, wherein, ring Section include charter claim, service bid, design reply, purchase arrival, coordination march into the arena, engineering construction, the project acceptance inspection, project Be completed, project closeout, it is then determined that each link of each bid section lasts duration, given birth to according to the tracking information of each link of each bid section Form, display engineering tracking form are tracked into engineering.So as to which progress chasing module can track engineering form with report form Each construction unit, each specialty, the overall construction situation of institute of projects portion pipe project is presented in terminal.
Wherein, in this course, a Reports module can be increased, for going to be formed and showing engineering tracking report Table, and then go the totality for showing each link of project construction to last statistics, averagely last statistics, completeness statistics etc..
After step 104, also include:
Step 204, the acceptance information for obtaining and storing each bid section, wherein, assets are at least included in acceptance information and check and accept true Recognize, resource is checked and accepted and confirmed.
In the present embodiment, can be to examination mould specifically, further comprises examination module in the processing unit of engineering construction The acceptance information of each bid section is inputted in block, or, the examination of each bid section stored in database can be obtained automatically by checking and accepting module Information.Wherein, acceptance information includes:Assets, which are checked and accepted confirmation, resource and checked and accepted, to be confirmed.Also, each mark can be stored by checking and accepting module The acceptance information of section.
Also, in this course of receiving, a module of registering can be used, by calling the information stored in module of registering, The assets for carrying out engineering construction engineering project check and accept the situation checked and accepted and confirmed with resource, and complete to hand over dimension.
After step 104, also include:
Step 205, according to each information, it is determined that with the corresponding scoring information of each information difference;According to right respectively with each information The scoring information answered, generation is for the implementation management department of project and the examination information of project manager.
In the present embodiment, specifically, further comprises scoring modules in the processing unit of engineering construction.Scoring modules can be with According to project initiation information, calculate and start scoring information;According to information on bidding, bid scoring information is calculated;According to procurement request Information, calculates buying scoring information;According to the order arrival information of each bid section, arrival scoring information is calculated;According to the information that goes into operation, Calculating goes into operation scoring information;According to the engineering construction information of each link, calculate and implement scoring information;Believed according to the tracking of each link Breath, calculates tracking scoring information;According to the acceptance information of each bid section, calculate and check and accept scoring information.Scoring modules are beaten according to startup Point information, bid scoring information, buying scoring information, arrival scoring information, the scoring information that goes into operation, implement scoring information, tracking Scoring information, examination scoring information, to examining workmen, designer, supervisor and the timely situation of equipment arrival Core, to generate the implementation management department for project and the examination information of project manager, and then the order arrival feelings for passing through statistics Construction quality situation of condition, the performance of engineering construction each operation and final acceptance of construction etc., scoring modules complete to service provider and Project Manager and the marking of project management department.And it is possible to which each scoring information is put into Reports module, stored, A score form can be formed, score statistics is completed.
Importing/export module can be provided, can be imported by importing/export module, export each information, and then lead above Enter implementation record and related data of the live managing and control system in site record, and export the backstage data storage after statistical analysis Etc..
The present embodiment by obtaining simultaneously the project initiation information of stored items, information on bidding, procurement request information successively;Root According to the information on bidding of project, the acceptance of the bid information identified project;For each bid section in project, the order for obtaining and storing bid section is arrived Goods information;According to the order arrival information of each bid section, arrival promptness rate is counted;For each bid section in project, obtain and store The information that goes into operation of bid section, wherein, the information that goes into operation includes the formality information that goes into operation, and coordination is marched into the arena information, the time started of marching into the arena, marches into the arena Deadline;For each bid section in project, the engineering construction information of each link of bid section is obtained and stores, and according to each bid section Engineering construction information and each information above, generate the GIS map for showing each bid section completeness;Obtain and store each The tracking information of each link of bid section, determines that each link of each bid section lasts duration, according to the tracking of each link of each bid section Information and last duration generation engineering tracking form;According to each information, it is determined that with the corresponding scoring information of each information difference;Root According to the corresponding scoring information of each information difference, generation for project implementation management department and project manager examination information. So as to there is provided a kind of management-control method of engineering construction, obtain and handle each information in Process of Engineering Construction, be difficult by To the limitation of manpower and physics, the effectively progress and problem of follow-up each link of engineering project in real time, management and control efficiency is higher.Together When, the management-control method for the engineering construction that the present embodiment is provided can meet the rule of the existing Construction procedures of implementation management department of operator Model technical requirements, it is ensured that the existing continuity for building link of operator, it is possible to achieve distribution, High Availabitity, expansible, efficient The traffic scheduling of rate.
Fig. 3 is the structural representation of the processing unit for the engineering construction that the embodiment of the present invention three is provided, as shown in figure 3, this The device of embodiment, including:
Acquisition module 31, for obtaining simultaneously the project initiation information of stored items, information on bidding, procurement request letter successively Breath;
Order is to goods module 32, for for each bid section in project, obtaining and storing the order arrival information of bid section;
The module that goes into operation 33, for for each bid section in project, obtaining and storing the information that goes into operation of bid section, wherein, go into operation Information includes the formality information that goes into operation, and coordinates information of marching into the arena, marches into the arena time started, the deadline of marching into the arena;
Engineering construction module 34, for for each bid section in project, the engineering for obtaining and storing each link of bid section to be real Information, and engineering construction information and each information of the above according to each bid section are applied, is generated for showing each bid section completeness GIS map.
The processing unit of the engineering construction of the present embodiment can perform the processing for the engineering construction that the embodiment of the present invention one is provided Method, its realization principle is similar, and here is omitted.
The present embodiment by obtaining simultaneously the project initiation information of stored items, information on bidding, procurement request information successively;Pin To each bid section in project, the order arrival information of bid section is obtained and stored;For each bid section in project, obtain and store mark The information that goes into operation of section, wherein, the information that goes into operation includes the formality information that goes into operation, and coordinates information of marching into the arena, and the time started of marching into the arena, has marched into the arena Into the time;For each bid section in project, the engineering construction information of each link of bid section is obtained and stores, and according to each bid section Engineering construction information and above each information, generate the GIS map for showing each bid section completeness.So as to there is provided one kind The management-control method of engineering construction, can obtain and handle each information in Process of Engineering Construction, be not easily susceptible to manpower and physics Limitation, the progress and problem of each link of engineering project that effectively follows up in real time, management and control efficiency is higher.
Fig. 4 is the structural representation of the processing unit for the engineering construction that the embodiment of the present invention four is provided, in embodiment three On the basis of, as shown in figure 4, the device of the present embodiment, also includes:
Acceptance of the bid processing module 41, for, to each bid section in project, obtaining in order to goods module pin 32 and storing bid section Order arrival information before, according to the information on bidding of project, the acceptance of the bid information identified project, wherein, acceptance of the bid information includes Each bid section of target, the different bid winners for different bid sections.
Order statistical module 42, for each bid section being directed in order to goods module 32 in project, obtains and stores bid section Order arrival information after, according to the order arrival information of each bid section, count arrival promptness rate;
Wherein, at least include in order arrival information:Arrival time, arrival place, mug voucher;Mug with Remaining time stamp, GPS latitude and longitude coordinates and positional information on card.
At least include in engineering construction information:Critical process progress of implementation information, scene are registered information, information of taking pictures;Its In, there is register timestamp, latitude and longitude coordinates of registering, position of registering in information of taking pictures.
The device, also includes:
Progress chasing module 43, for generating the GIS map for showing each bid section completeness in engineering construction module 34 Afterwards, the tracking information of each link of each bid section is obtained and stores, wherein, the time started is at least included in tracking information, is terminated Time, overtime reason;Determine that each link of each bid section lasts duration, according to the tracking information of each link of each bid section and go through Constantly long generation engineering tracks form;Show engineering tracking form.
Module 44 is checked and accepted, after generating the GIS map for showing each bid section completeness in engineering construction module 34, The acceptance information of each bid section is obtained and stores, wherein, assets are at least included in acceptance information and check and accept confirmation, resource examination confirmation.
Scoring modules 45, after generating the GIS map for showing each bid section completeness in engineering construction module 34, According to each information, it is determined that with the corresponding scoring information of each information difference;According to the corresponding scoring information of each information difference, generation The examination information of implementation management department and project manager for project.
The processing unit of the engineering construction of the present embodiment can perform the processing for the engineering construction that the embodiment of the present invention two is provided Method, its realization principle is similar, and here is omitted.
The present embodiment by obtaining simultaneously the project initiation information of stored items, information on bidding, procurement request information successively;Root According to the information on bidding of project, the acceptance of the bid information identified project;For each bid section in project, the order for obtaining and storing bid section is arrived Goods information;According to the order arrival information of each bid section, arrival promptness rate is counted;For each bid section in project, obtain and store The information that goes into operation of bid section, wherein, the information that goes into operation includes the formality information that goes into operation, and coordination is marched into the arena information, the time started of marching into the arena, marches into the arena Deadline;For each bid section in project, the engineering construction information of each link of bid section is obtained and stores, and according to each bid section Engineering construction information and each information above, generate the GIS map for showing each bid section completeness;Obtain and store each The tracking information of each link of bid section, determines that each link of each bid section lasts duration, according to the tracking of each link of each bid section Information and last duration generation engineering tracking form;According to each information, it is determined that with the corresponding scoring information of each information difference;Root According to the corresponding scoring information of each information difference, generation for project implementation management department and project manager examination information. So as to there is provided a kind of management-control method of engineering construction, obtain and handle each information in Process of Engineering Construction, be difficult by To the limitation of manpower and physics, the effectively progress and problem of follow-up each link of engineering project in real time, management and control efficiency is higher.Together When, the management-control method for the engineering construction that the present embodiment is provided can meet the rule of the existing Construction procedures of implementation management department of operator Model technical requirements, it is ensured that the existing continuity for building link of operator, it is possible to achieve distribution, High Availabitity, expansible, efficient The traffic scheduling of rate.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above-mentioned each method embodiment can lead to The related hardware of programmed instruction is crossed to complete.Foregoing program can be stored in a computer read/write memory medium.The journey Sequence upon execution, performs the step of including above-mentioned each method embodiment;And foregoing storage medium includes:ROM, RAM, magnetic disc or Person's CD etc. is various can be with the medium of store program codes.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To be modified to the technical scheme described in foregoing embodiments, or to which part technical characteristic progress equivalent; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (14)

1. a kind of processing method of engineering construction, it is characterised in that including:
Simultaneously the project initiation information of stored items, information on bidding, procurement request information are obtained successively;
For each bid section in the project, the order arrival information of bid section is obtained and stored;
For each bid section in project, the information that goes into operation of bid section is obtained and stores, wherein, the information that goes into operation includes the formality letter that goes into operation Breath, coordinates information of marching into the arena, marches into the arena time started, the deadline of marching into the arena;
For each bid section in project, the engineering construction information of each link of bid section is obtained and stores, and according to the work of each bid section Journey implementation information and above each information, generate the Distribution GIS map for showing each bid section completeness.
2. according to the method described in claim 1, it is characterised in that in each bid section being directed in the project, obtain simultaneously After the order arrival information for storing bid section, also include:
According to the order arrival information of each bid section, arrival promptness rate is counted;
Wherein, at least include in the order arrival information:Arrival time, arrival place, mug voucher;Described take pictures is deposited Remaining time stamp, global position system GPS latitude and longitude coordinates and positional information on shelves voucher.
3. according to the method described in claim 1, it is characterised in that at least include in the engineering construction information:Critical process Progress of implementation information, scene are registered information, information of taking pictures;
Wherein, there is register timestamp, latitude and longitude coordinates of registering, position of registering in information of taking pictures.
4. the method according to claim any one of 1-3, it is characterised in that in each mark being directed in the project Before section, the order arrival information for obtaining and storing bid section, also include:
According to the information on bidding of project, the acceptance of the bid information identified project, wherein, each bid section of the acceptance of the bid information including acceptance of the bid, For the different bid winners of different bid sections.
5. the method according to claim any one of 1-3, it is characterised in that generated described for showing that each bid section is completed After the GIS map of degree, also include:
Obtain and store the tracking information of each link of each bid section, wherein, in tracking information at least include the time started, at the end of Between, overtime reason;
Determine that each link of each bid section lasts duration, according to the tracking information of each link of each bid section and described last duration Generate engineering tracking form;
Show engineering tracking form.
6. the method according to claim any one of 1-3, it is characterised in that generated described for showing that each bid section is completed After the GIS map of degree, also include:
The acceptance information of each bid section is obtained and stores, wherein, assets are at least included in acceptance information and check and accept confirmation, resource examination really Recognize.
7. the method according to claim any one of 1-3, it is characterised in that generated described for showing that each bid section is completed After the GIS map of degree, also include:
According to each described information, it is determined that with the corresponding scoring information of each described information difference;
According to each described information difference corresponding scoring information, implementation management department and project manager of the generation for project Check and rate information.
8. a kind of processing unit of engineering construction, it is characterised in that including:
Acquisition module, for obtaining simultaneously the project initiation information of stored items, information on bidding, procurement request information successively;
Order is to goods module, for for each bid section in the project, obtaining and storing the order arrival information of bid section;
Go into operation module, for for each bid section in project, obtaining and storing the information that goes into operation of bid section, wherein, in the information that goes into operation Including the formality information that goes into operation, coordinate information of marching into the arena, march into the arena time started, the deadline of marching into the arena;
Engineering construction module, for for each bid section in project, obtaining and storing the engineering construction information of each link of bid section, And engineering construction information and each information of the above according to each bid section, generate the GIS map for showing each bid section completeness.
9. device according to claim 8, it is characterised in that described device, also includes:
Order statistical module, for each bid section being directed in the order to goods module in the project, obtains and stores bid section Order arrival information after, according to the order arrival information of each bid section, count arrival promptness rate;
Wherein, at least include in the order arrival information:Arrival time, arrival place, mug voucher;Described take pictures is deposited Remaining time stamp, GPS latitude and longitude coordinates and positional information on shelves voucher.
10. device according to claim 8, it is characterised in that at least include in the engineering construction information:Critical process Progress of implementation information, scene are registered information, information of taking pictures;
Wherein, there is register timestamp, latitude and longitude coordinates of registering, position of registering in information of taking pictures.
11. the device according to claim any one of 8-10, it is characterised in that described device, also includes:
Acceptance of the bid processing module, for each bid section being directed in the order to goods module in the project, obtains and stores bid section Order arrival information before, according to the information on bidding of project, the acceptance of the bid information identified project, wherein, the acceptance of the bid packet Include each bid section of middle target, the different bid winners for different bid sections.
12. the device according to claim any one of 8-10, it is characterised in that described device, also includes:
Progress chasing module, after generating the GIS map for showing each bid section completeness in the engineering construction module, Obtain and store the tracking information of each link of each bid section, wherein, in tracking information at least include the time started, the end time, Overtime reason;Determine that each link of each bid section lasts duration, according to the tracking information of each link of each bid section and described go through Constantly long generation engineering tracks form;Show engineering tracking form.
13. the device according to claim any one of 8-10, it is characterised in that described device, also includes:
Module is checked and accepted, after generating the GIS map for showing each bid section completeness in the engineering construction module, is obtained And the acceptance information of each bid section is stored, wherein, assets are at least included in acceptance information and check and accept confirmation, resource examination confirmation.
14. the device according to claim any one of 8-10, it is characterised in that described device, also includes:
Scoring modules, after generating the GIS map for showing each bid section completeness in the engineering construction module, according to Each described information, it is determined that with the corresponding scoring information of each described information difference;According to marking corresponding with each described information difference Information, generation is for the implementation management department of project and the examination information of project manager.
CN201710179159.8A 2017-03-23 2017-03-23 The treating method and apparatus of engineering construction Pending CN106952044A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710179159.8A CN106952044A (en) 2017-03-23 2017-03-23 The treating method and apparatus of engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710179159.8A CN106952044A (en) 2017-03-23 2017-03-23 The treating method and apparatus of engineering construction

Publications (1)

Publication Number Publication Date
CN106952044A true CN106952044A (en) 2017-07-14

Family

ID=59472799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710179159.8A Pending CN106952044A (en) 2017-03-23 2017-03-23 The treating method and apparatus of engineering construction

Country Status (1)

Country Link
CN (1) CN106952044A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110689255A (en) * 2019-09-23 2020-01-14 广州轨道交通建设监理有限公司 Engineering supervision enterprise integrated service management system
CN111738486A (en) * 2020-05-09 2020-10-02 北京兴中海建工程造价咨询有限公司 Comprehensive management method and system for construction project cost, bid inviting and consultation
CN113487119A (en) * 2020-09-03 2021-10-08 国家电网有限公司 Extra-high voltage power grid infrastructure management method and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110689255A (en) * 2019-09-23 2020-01-14 广州轨道交通建设监理有限公司 Engineering supervision enterprise integrated service management system
CN111738486A (en) * 2020-05-09 2020-10-02 北京兴中海建工程造价咨询有限公司 Comprehensive management method and system for construction project cost, bid inviting and consultation
CN111738486B (en) * 2020-05-09 2024-03-01 北京兴中海建工程造价咨询有限公司 Comprehensive management method and system for construction project cost, bid-inviting and consultation
CN113487119A (en) * 2020-09-03 2021-10-08 国家电网有限公司 Extra-high voltage power grid infrastructure management method and system

Similar Documents

Publication Publication Date Title
CN105095588B (en) The Forecasting Methodology and device of mobile Internet customer complaint
Lee et al. Timing, order and durability of new product advantages with imitation
CN107317672A (en) A kind of light weight terminating machine block catenary system
CN107864198A (en) A kind of block chain common recognition method based on deep learning training mission
CN107358340A (en) A kind of project management system based on list of engineering
CN106952044A (en) The treating method and apparatus of engineering construction
CN109740622A (en) Image labeling task crowdsourcing method and system based on the logical card award method of block chain
CN109299943A (en) A kind of method and device of the intellectual property transaction based on block chain
CN106815728A (en) A kind of big data based on block chain technology really weighs method and system
CN108320127A (en) A kind of power engineering term computer management system
CN104794609A (en) Instant communication system capable of supporting enterprise cooperative office
CN109491735B (en) Integrated data generation and verification integrated monitoring human-computer interface configuration implementation method
CN106790003A (en) A kind of supply chain status data method for tracing based on block chain
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN107270921A (en) A kind of generation dimension polling path method and device for planning
CN110781650A (en) Method and system for automatically generating referee document based on deep learning
CN113902037A (en) Abnormal bank account identification method, system, electronic device and storage medium
CN108600839A (en) A kind of copyright video the whole network rating record system for mechanism of being known together based on CBC-PBFT
CN115185244A (en) Product quality tracing system and method based on identification analysis technology
CN108229816A (en) Management method is matched by the battalion of Internet of Things networking based on distributed management
CN109726237B (en) Correlation completion method for multi-path real-time stream data
Ziarnetzky et al. Simulation-based optimization for integrated production planning and capacity expansion decisions
CN109767092A (en) Monitoring method, device, storage medium and processor
Kodikara et al. The use of bills of quantities in building contractor organizations
CN117078208A (en) Project management system of intelligent environment-friendly supervision platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170714