CN106951500A - A kind of power scheduling distant place historical record inquiry system and method - Google Patents

A kind of power scheduling distant place historical record inquiry system and method Download PDF

Info

Publication number
CN106951500A
CN106951500A CN201710156362.3A CN201710156362A CN106951500A CN 106951500 A CN106951500 A CN 106951500A CN 201710156362 A CN201710156362 A CN 201710156362A CN 106951500 A CN106951500 A CN 106951500A
Authority
CN
China
Prior art keywords
remote station
historical record
main website
monitoring system
record
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710156362.3A
Other languages
Chinese (zh)
Inventor
于海
王海峰
潘洪湘
梁锋
蒋文辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Nanjing NARI Group Corp
Original Assignee
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201710156362.3A priority Critical patent/CN106951500A/en
Publication of CN106951500A publication Critical patent/CN106951500A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/242Query formulation
    • G06F16/2423Interactive query statement specification based on a database schema
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/951Indexing; Web crawling techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of power scheduling distant place historical record inquiry system and method, wherein system includes main website, remote station and the background monitoring system being sequentially connected, and background monitoring system is connected with the protection device and measure and control device at scheduled end;Main website, which is used to set after querying condition to remote station, issues historical record calling order, and selection page number carries out inquiry operation according to actual needs, and the historical record feedback information uploaded according to remote station includes Query Result in query interface;Remote station is used for the record calling order of background monitoring system forwarding history, and forwards the historical record feedback information that background monitoring system is uploaded to main website;Background monitoring system is used for the historical record calling order for receiving and responding remote station forwarding, and the historical record feedback information that the local search completed according to querying condition is obtained is uploaded to remote station.The history alarm information inquired about in scheduling station in the transformer station of a distant place can be effectively realized.

Description

A kind of power scheduling distant place historical record inquiry system and method
Technical field
The present invention relates to a kind of inquiry of historical record, more particularly to a kind of power scheduling distant place historical record inquiry system And method, belong to power system automation technology field.
Background technology
Currently, the use of power network remote control technology is very universal, and most transformer stations all realize unmanned value The method of operation of class.The monitoring work of transformer station focuses on Surveillance center's monitoring by scattered station end monitoring, is led to by monitoring personnel Cross scheduling automatic main station system and remotely monitor and control are implemented to transformer station through Substation Station end telecontrol system.
At present, main station system is substantially real by IEC101, IEC104 or DL476 (alarm direct transfers) etc. with station end communication When means of communication, and can not directly be obtained for the history alarm information main website of transformer substation end, can only be by manually in transformer station End is consulted, and for unattended station, this mode is extremely inconvenient.
So there is provided a kind of main website distant place historical record inquiry system, filling up existing electric power scheduling automatization system remote The blank of square historical record query aspects, it is to avoid artificial alerted in transformer substation end query history records, and is beneficial act.
The content of the invention
It is a primary object of the present invention to overcoming deficiency of the prior art, there is provided a kind of power scheduling distant place history note Inquiry system and method are recorded, the history alarm information inquired about in scheduling station in the transformer station of a distant place can be effectively realized, is easy to row Failure is looked into, so as to avoid the step of inquiring about of manually entering the station, the working strength for mitigating operations staff simultaneously improves work execution efficiency, more The good normal operation service for dispatch automated system, has broad application prospects.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of power scheduling distant place historical record inquiry system, including be sequentially connected and follow stipulations and interact communication Main website, remote station and background monitoring system, the main website are located at the dispatching terminal of power system, and the remote station is with after Platform monitoring system is located at the scheduled end of power system, and the background monitoring system is filled with the protection device at scheduled end and observing and controlling Put connected;
The main website, for set after querying condition to remote station issue historical record calling order, and according to It is actually needed selection page number and carries out inquiry operation, the historical record feedback information uploaded according to remote station will be inquired about and tied Fruit is shown in query interface;
The remote station, for being ordered to the record calling of background monitoring system forwarding history, and is forwarded to main website The historical record feedback information that background monitoring system is uploaded;
The background monitoring system, order is called for receiving and responding the historical record of remote station forwarding, and The historical record feedback information that the local search completed according to querying condition is obtained is uploaded to remote station.
The system of the present invention is further arranged to:The querying condition include the time started, the end time, alarm type, Comprising character string and every page of record quantity, and by being set on query interface.
The system of the present invention is further arranged to:The historical record calling order includes the calling order of historical record quantity Call and order with historical record content.
The system of the present invention is further arranged to:After the main website setting querying condition history note is issued to remote station Record calling order, remote station is parsed after querying condition to the record calling order of background monitoring system forwarding history;Backstage Monitoring system response historical record calling order, and recorded according to the local qualified history alarm of querying condition inquiry, press Page storage, and recorded to the history alarm of main website upload first page;Main website receives and shows the history alarm record of first page, and Page selection querying command is issued after selection page number so that background monitoring system is uploaded accordingly to main website according to actual needs The history alarm record of page selection number.
The system of the present invention is further arranged to:The main website orders obtained history to be accused according to historical record calling is issued Alert to record backward remote station and issue the calling order of historical record content, remote station is to background monitoring system forwarding history Record content calling order;Background monitoring system response historical record content calling order, uploads to main website and meets querying condition History alarm record content.
The system of the present invention is further arranged to:The remote station and background monitoring system are carried out by messaging bus Interactive correspondence is substituted with graph gateway machine.
The system of the present invention is further arranged to:The interactive correspondence uses heartbeat message interactive mode.
The system of the present invention is further arranged to:The stipulations are DL476 stipulations, between the main website and remote station Set up TCP connections.
The present invention also provides a kind of power scheduling distant place historical record querying method, comprises the following steps:
1) by issuing historical record to remote station after the main website at electric power system dispatching end setting querying condition Calling order;
2) call order to be transmitted to historical record by remote station to supervise positioned at the backstage at the scheduled end of power system Control system;
3) historical record that remote station forwards is received and responded by background monitoring system call order, and to remote Dynamic work station uploads the historical record feedback information that the local search completed according to querying condition is obtained;
4) historical record feedback information is transmitted to main website by remote station;
5) the historical record feedback information that main website is uploaded according to remote station includes Query Result in query interface, And stop according to actual needs or re-start inquiry operation.
The method of the present invention is further arranged to:The step 1) specifically, main website is set on query interface as needed Put querying condition, wherein querying condition includes time started, end time, alarm type, includes character string and every page of record number Amount;After main website setting querying condition the calling order of historical record quantity is issued to remote station;
The step 2) specifically, remote station is received after the calling order of historical record quantity, obtained by packet parsing Querying condition is obtained, and is sent by messaging bus to background monitoring system;
The step 3) specifically, background monitoring system inquires about local qualified history alarm note according to querying condition Record, is stored by page, and the history alarm record of first page is sent to remote station by messaging bus;
The step 4) specifically, remote station receives the history alarm note for the first page that background monitoring system is uploaded Record, and it is transmitted to main website;
The step 5) specifically, main website receives and shows that the history alarm of first page is recorded in query interface, and root According to needing to choose whether to continue, perhaps replacing querying condition continues to inquire about in query history record;
If main website selection continues query history record content, send page selection number after selection page number according to actual needs and look into Order is ask, i.e., to the history alarm record queries order of remote station transmission band page selection number;Remote station passes through message The history alarm record queries order of Bus repeater band page selection number is to background monitoring system, and background monitoring system is looked into corresponding Ask result and be uploaded to main website through remote station, main website receives Query Result and is shown in by page in query interface;
Continue to inquire about if querying condition is changed in main website selection, return to step 1), perform step 1)~step 5).
Compared with prior art, the invention has the advantages that:
1st, the present invention is provided power scheduling distant place historical record inquiry system and method, can be effectively realized in scheduling master The history alarm information stood in inquiry distant place transformer station, is easy to investigate failure, so as to avoid the step of inquiring about of manually entering the station, mitigates The working strength of operations staff simultaneously improves work execution efficiency, is preferably the normal operation service of dispatch automated system.
2nd, the remote station that the present invention is used only is responsible for the secondary assembling and forwarding of message, the excessive telemechanical without taking Machine system resource, will not destroy the stability of remote station system.
3rd, the present invention is effectively avoided because history alarm records knot that is excessive and causing by the way of by page inquiry Sent on fruit it is slow, situations such as block, search efficiency can be greatly improved.
4th, the present invention can effectively realize normalizing operation using DL476 stipulations;And for remote station with after Platform monitoring system is substituted with graph gateway machine, then can omit remote station this link, by main website directly and graph gateway Machine sets up the inquiry of distant place history alarm record.
The above is only the general introduction of technical solution of the present invention, in order to be better understood upon the technological means of the present invention, under With reference to accompanying drawing, the invention will be further described in face.
Brief description of the drawings
Fig. 1 is the structural representation of power scheduling distant place historical record inquiry system of the present invention;
Fig. 2 is the flow chart that power scheduling distant place historical record querying method of the present invention completes a distant place inquiry.
Embodiment
With reference to Figure of description, the present invention is further illustrated.
The present invention provides a kind of power scheduling distant place historical record inquiry system, as shown in figure 1, including being sequentially connected and abiding by Main website 1, remote station 2 and background monitoring system 3 that stipulations DL476 stipulations interact communication are followed, the main website 1 is located at electricity The dispatching terminal of Force system, the remote station 2 and background monitoring system 3 are located at the scheduled end of power system, the backstage Monitoring system 3 is connected with the protection device and measure and control device at scheduled end.
TCP connections are set up between the main website 1 and remote station 2, for setting after querying condition to remote station 2 Historical record calling order is issued, and selection page number carries out inquiry operation according to actual needs, according to remote station 2 The historical record feedback information of upload includes Query Result in query interface;Wherein, querying condition includes time started, knot Beam time, alarm type, comprising character string and every page of record quantity, and by being set on query interface.
The remote station 2, for the record calling order of the forwarding history of background monitoring system 3, and to 1 turn of main website Send out the historical record feedback information that background monitoring system 3 is uploaded.The remote station 2 and background monitoring system 3 pass through message Bus interacts communication or substituted with graph gateway machine, and wherein interactive correspondence uses heartbeat message interactive mode.
The background monitoring system 3, order is called for receiving and responding the historical record of the forwarding of remote station 2, and And the historical record feedback information that the local search completed according to querying condition is obtained is uploaded to remote station 2.
After the main website setting querying condition historical record calling order, remote station parsing are issued to remote station Go out after querying condition to the record calling order of background monitoring system forwarding history;Background monitoring system response historical record calling life Order, and local qualified history alarm record is inquired about according to querying condition, stored by page, and first page is uploaded to main website History alarm is recorded;Main website receives and shows the history alarm record of first page, and is issued according to actual needs after selection page number Page selection querying command so that the history alarm that background monitoring system uploads corresponding page selection number to main website is recorded.
The main website orders obtained history alarm to record backward remote station according to the calling of historical record quantity is issued The calling order of historical record content is issued, remote station is ordered to the record content calling of background monitoring system forwarding history;Afterwards The response historical record content calling order of platform monitoring system, the history alarm record content for meeting querying condition is uploaded to main website.
The power scheduling distant place historical record inquiry system that the present invention is provided, historical record is realized using DL476 stipulations Inquiry, is easy to increase the extension of agreement, it is necessary to which explanation, this programme follows DL476 stipulations, the ASDU of expansion basic principle It is the frame structure and communication flow for not changing DL476 agreements.
The present invention provides a kind of power scheduling distant place historical record querying method, comprises the following steps:
1) by issuing historical record to remote station after the main website at electric power system dispatching end setting querying condition Calling order;
2) call order to be transmitted to historical record by remote station to supervise positioned at the backstage at the scheduled end of power system Control system;
3) historical record that remote station forwards is received and responded by background monitoring system call order, and to remote Dynamic work station uploads the historical record feedback information that the local search completed according to querying condition is obtained;
4) historical record feedback information is transmitted to main website by remote station;
5) the historical record feedback information that main website is uploaded according to remote station includes Query Result in query interface, And stop according to actual needs or re-start inquiry operation.
A kind of power scheduling distant place historical record querying method, is embodied as,
1) main website sets querying condition on query interface as needed, and wherein querying condition includes the time started, terminated Time, alarm type, include character string and every page record quantity;After main website setting querying condition history is issued to remote station Record quantity calling order;
2) remote station is received after the calling order of historical record quantity, obtains querying condition by packet parsing, and lead to Messaging bus is crossed to send to background monitoring system;
3) background monitoring system is inquired about local qualified history alarm according to querying condition and recorded, and is stored by page, and The history alarm record of first page is sent to remote station by messaging bus;
4) remote station receives the history alarm record for the first page that background monitoring system is uploaded, and is transmitted to main website;
5) main website receive and show first page history alarm record in query interface, and choose whether as needed after Querying condition is perhaps changed in continuous query history record to continue to inquire about;
If main website selection continues query history record content, send page selection number after selection page number according to actual needs and look into Order is ask, i.e., to the history alarm record queries order of remote station transmission band page selection number;Remote station passes through message The history alarm record queries order of Bus repeater band page selection number is to background monitoring system, and background monitoring system is looked into corresponding Ask result and be uploaded to main website through remote station, main website receives Query Result and is shown in by page in query interface;
Continue to inquire about if querying condition is changed in main website selection, return to step 1), perform step 1)~step 5).
In order to perform the above method, the present invention establishes the logic of transformer station's distant place historical query message interaction process, and Detailed setting has been carried out to the form of message, has been discussed in detail below in conjunction with Fig. 2.
1st, main website 1 initially sets up TCP with remote station 2 and is connected, and port numbers can fix and use 3002, be successfully established After TCP connections, main website 1 sends the A_ASSOCIATE connections in DL476 to remote station 2, and remote station 2 is returned to main website 1 A_ASSOCIATE_ACK is returned, heartbeat message interaction can be started by completing main website 1 and remote station 2 after DL476 connections.
2nd, when main website 1 needs calling substation history alarm record, it is necessary first to set and inquire about in corresponding query interface Condition, such as time started, the end time, alarm type, include character string and every page record quantity.Querying condition is set to complete Afterwards, main website 1 sends corresponding history alarm record calling message to remote station 2, and the message utilizes BID in DL476 messages Number for 39 ASCII character block ASDU realize.Specific message is defined as follows shown in table 1.
Table 1
Asked in table 1 service data form be:
SERVICE::GetHisAlarm (StartTime=YYYY-MM-DD HH:MM:SS.mmm, EndTime= YYYY-MM-DD HH:MM:SS.mmm, AlarmType=1, PerPageNum=50, KeyWork=main transformer)
Wherein SERVICE is name space, and this is unique mark;
The required parameter that it is the service in Service name, bracket that GetHisAlarm, which is,;
Initial time, the i.e. time started of StratTime query history alarm records for needed for, the form of time is YYYY-MM-DD HH:MM:SS.mmm, wherein, the YYYY expressions of years, MM is month, and DD is the date, and mmm is millisecond.24 hours System, virtual value is (00-23), and the scope of MM and SS value is (00-59), and the scope of mmm value is (000-999).The moon, day, When, each 2 characters of minute, second, ten should mend 0 during less than 10,3 characters of millisecond, and ten should mend 0 during less than 10, hundred during less than 100 Position should mend 0;
The end time of EndTime query history alarm records for needed for, the same StartTime of time format;
AlarmType is alarm type, and the definition on alarm type refers to alert the regulation in the function that direct transfers, such as table Shown in 2:
Parameter value Alarm Classification
0 All types
1 Accident
2 It is abnormal
3 It is out-of-limit
4 Displacement
5 Inform
6 Operation
Table 2
PerPageNum be in the history alarm quantity called every time, the quantity and the inquiry system of main website 1 every page can show The alarm quantity shown is consistent;
KeyWork is keyword, i.e., substation query warning record when need to using the content of KeyWord parameters as inquiry mistake Filter condition.
3rd, remote station 2 is received after the history alarm querying command that above-mentioned main website 1 is sent out, and message is passed through into messaging bus Send to background monitoring system.
4th, background monitoring system calls local history alarm to record according to querying condition, according in parameter PerPageNum Value carries out Fragmentation, and the data of first page are sent into remote station by DL476 messages.Specific message format such as table 3 It is shown.
Table 3
Wherein, sending sequence number for header portion can directly use 0x00H with Receive sequence number.Wall scroll history alarm record data Form be:<Alarm level><Space>Alarm time<Space>Device name<Space>Warning content<Space>Alarm cause. Alarm level is with reference to described in table 2, warning content preferably reference《Grid equipment generic data model Naming conventions》, for example, certain Alert record data content for "<1>2013-05-24 09:52:59.651, Wu Zhuan stations, Tianjin/220kV.2202 switches/three-phase Inconsistent trip operation ".
5th, remote station is received after back-end data, is rewritten and is sent sequence number and Receive sequence number, and forwards the packet To main website.
6th, main website receives after history alarm record data progress data parsing, then shows the in corresponding query page One page history alarm information.
7th, can be total by message between remote station and monitoring backstage after a GetHisAlarm service was carried out Line sets up heartbeat interaction, when continuous three heartbeat messages of monitoring backstage do not receive the confirmation of remote station, monitoring backstage Remove the history alarm record inquired about before caching.
8th,, please still using the DL476 message formats of table 1 when main website needs to inquire about the history alarm information of other page numbers The data form for asking service is:
SERVICE::GetHisAlarmPage (PageNo=3)
Wherein, the page number that PageNo parameters are inquired about for needed for.
9th, when the closing of main website query page or reset querying condition are inquired about, main website first issues termination inquiry life Order, using the DL476 message formats of table 1, the data form of request service is:
SERVICE::StopHisAlarm()
10th, background monitoring system is received after the termination querying command of remote station forwarding, removes the slow of this inquiry Deposit data, terminates the heartbeat message interaction between remote station.
The innovative point of the present invention is the flow for improving scheduling distant place historical record inquiry, improves search efficiency, subtracts Few artificial normal operation service for participating in, being preferably dispatch automated system.
General principle, principal character and the advantage of the present invention has been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, the original for simply illustrating the present invention described in above-described embodiment and specification Reason, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appending claims and its equivalent circle It is fixed.

Claims (9)

1. a kind of power scheduling distant place historical record inquiry system, it is characterised in that:Carried out including being sequentially connected and following stipulations Main website, remote station and the background monitoring system of interactive correspondence, the main website are located at the dispatching terminal of power system, the telemechanical Work station and background monitoring system are located at the scheduled end of power system, and the background monitoring system and the protection at scheduled end are filled Put and be connected with measure and control device;
The main website, issue historical record calling order to remote station, and according to reality for setting after querying condition Selection page number is needed to carry out inquiry operation, the historical record feedback information uploaded according to remote station shows Query Result Show in query interface;
The remote station, for being ordered to the record calling of background monitoring system forwarding history, and forwards backstage to main website The historical record feedback information that monitoring system is uploaded;
The background monitoring system, the historical record for receiving and responding remote station forwarding calls order, and to remote Dynamic work station uploads the historical record feedback information that the local search completed according to querying condition is obtained.
2. a kind of power scheduling distant place historical record inquiry system according to claim 1, it is characterised in that:The inquiry Condition include the time started, the end time, alarm type, comprising character string and every page of record quantity, and by query interface It is upper to be set.
3. a kind of power scheduling distant place historical record inquiry system according to claim 1, it is characterised in that:The main website Setting querying condition after to remote station issue historical record calling order, remote station parse querying condition it is backward after The record calling order of platform monitoring system forwarding history;Background monitoring system response historical record calling order, and according to inquiry bar The local qualified history alarm record of part inquiry, is stored by page, and the history alarm for uploading first page to main website is recorded;It is main Stand and receive and show the history alarm record of first page, and issue the life of page selection number inquiry after selection page number according to actual needs Order so that the history alarm that background monitoring system uploads corresponding page selection number to main website is recorded.
4. a kind of power scheduling distant place historical record inquiry system according to claim 3, it is characterised in that:The main website The calling of historical record content is issued according to issuing the obtained history alarm of historical record calling order and recording backward remote station Order, remote station is ordered to the record content calling of background monitoring system forwarding history;Background monitoring system response history note Content calling order is recorded, the history alarm record content for meeting querying condition is uploaded to main website.
5. a kind of power scheduling distant place historical record inquiry system according to claim 1, it is characterised in that:The telemechanical Work station and background monitoring system interact communication by messaging bus or substituted with graph gateway machine.
6. a kind of power scheduling distant place historical record inquiry system according to claim 5, it is characterised in that:The interaction Communication uses heartbeat message interactive mode.
7. a kind of power scheduling distant place historical record inquiry system according to claim 1, it is characterised in that:The stipulations For DL476 stipulations, TCP connections are set up between the main website and remote station.
8. a kind of power scheduling distant place historical record querying method, it is characterised in that comprise the following steps:
1)Called by issuing historical record to remote station after the main website at electric power system dispatching end setting querying condition Order;
2)Order is called to be transmitted to the background monitoring system positioned at the scheduled end of power system historical record by remote station System;
3)The historical record that remote station forwards is received and responded by background monitoring system calls order, and to telemechanical work Make station and upload the historical record feedback information that the local search completed according to querying condition is obtained;
4)Historical record feedback information is transmitted to main website by remote station;
5)The historical record feedback information that main website is uploaded according to remote station includes Query Result in query interface, and root Stop according to being actually needed or re-start inquiry operation.
9. a kind of power scheduling distant place historical record querying method according to claim 8, it is characterised in that:The step 1)Specifically, main website sets querying condition on query interface as needed, wherein querying condition include the time started, at the end of Between, alarm type, include character string and every page record quantity;After main website setting querying condition history note is issued to remote station Record quantity calling order;
The step 2)Specifically, remote station is received after the calling order of historical record quantity, looked into by packet parsing Inquiry condition, and sent by messaging bus to background monitoring system;
The step 3)Recorded specifically, background monitoring system inquires about local qualified history alarm according to querying condition, Stored by page, and the history alarm record of first page is sent to remote station by messaging bus;
The step 4)Specifically, remote station receives the history alarm record for the first page that background monitoring system is uploaded, and It is transmitted to main website;
The step 5)Specifically, main website receives and shows that the history alarm of first page is recorded in query interface, and according to need Choose whether to continue perhaps to change querying condition continuation inquiry in query history record;
If main website selection continues query history record content, select to send the life of page selection number inquiry after page number according to actual needs Order, i.e., to the history alarm record queries order of remote station transmission band page selection number;Remote station passes through messaging bus Forward the history alarm record queries order of band page selection number to background monitoring system, background monitoring system ties corresponding inquiry Fruit is uploaded to main website through remote station, and main website receives Query Result and is shown in by page in query interface;
Continue to inquire about if querying condition is changed in main website selection, return to step 1), perform step 1)~ step 5).
CN201710156362.3A 2017-03-16 2017-03-16 A kind of power scheduling distant place historical record inquiry system and method Pending CN106951500A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710156362.3A CN106951500A (en) 2017-03-16 2017-03-16 A kind of power scheduling distant place historical record inquiry system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710156362.3A CN106951500A (en) 2017-03-16 2017-03-16 A kind of power scheduling distant place historical record inquiry system and method

Publications (1)

Publication Number Publication Date
CN106951500A true CN106951500A (en) 2017-07-14

Family

ID=59472576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710156362.3A Pending CN106951500A (en) 2017-03-16 2017-03-16 A kind of power scheduling distant place historical record inquiry system and method

Country Status (1)

Country Link
CN (1) CN106951500A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110365114A (en) * 2019-08-05 2019-10-22 国电南瑞科技股份有限公司 The energy-accumulating power station total management system and information interacting method integrated based on multimode
CN111565136A (en) * 2020-06-22 2020-08-21 广东电网有限责任公司佛山供电局 Application system and method for counting total calling transmission duration and rate of telecontrol channel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102937789A (en) * 2012-11-28 2013-02-20 国电南瑞科技股份有限公司 Power dispatching programming control system and method
CN104468566A (en) * 2014-12-05 2015-03-25 广东电网有限责任公司江门供电局 Electric power protocol communication method
CN104468703A (en) * 2014-10-20 2015-03-25 广东电网有限责任公司江门供电局 Communication method and system for distributed small power source and upper computer
CN104753178A (en) * 2015-04-16 2015-07-01 河南行知专利服务有限公司 Power grid fault handling system
CN105958650A (en) * 2016-06-17 2016-09-21 国网浙江省电力公司绍兴供电公司 Electric power communication protocol extension-based master substation remote programmed control method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102937789A (en) * 2012-11-28 2013-02-20 国电南瑞科技股份有限公司 Power dispatching programming control system and method
CN104468703A (en) * 2014-10-20 2015-03-25 广东电网有限责任公司江门供电局 Communication method and system for distributed small power source and upper computer
CN104468566A (en) * 2014-12-05 2015-03-25 广东电网有限责任公司江门供电局 Electric power protocol communication method
CN104753178A (en) * 2015-04-16 2015-07-01 河南行知专利服务有限公司 Power grid fault handling system
CN105958650A (en) * 2016-06-17 2016-09-21 国网浙江省电力公司绍兴供电公司 Electric power communication protocol extension-based master substation remote programmed control method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
倪建立,等: "《农村电网节能降损与自动化实用技术》", 31 January 2008 *
谷水清: "《配电系统自动化》", 30 April 2004 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110365114A (en) * 2019-08-05 2019-10-22 国电南瑞科技股份有限公司 The energy-accumulating power station total management system and information interacting method integrated based on multimode
CN111565136A (en) * 2020-06-22 2020-08-21 广东电网有限责任公司佛山供电局 Application system and method for counting total calling transmission duration and rate of telecontrol channel
CN111565136B (en) * 2020-06-22 2020-12-22 广东电网有限责任公司佛山供电局 Application system and method for counting total calling transmission duration and rate of telecontrol channel

Similar Documents

Publication Publication Date Title
CN103684817B (en) The monitoring method and system of data center
CN106953918B (en) Master-slave station programmed control system and method based on universal service protocol
CN107749811B (en) Power distribution terminal access adaptive debugging analysis method based on power distribution master station
CN104636986B (en) A kind of method that scheduling telesecurity remote control based on service is checked
CN102324793B (en) Method and system for realizing a plurality of virtual power distribution terminals
CN102593953A (en) Automatic line pulling control method based on provincial and regional integration
CN108173261B (en) New energy grid-connected active high-reliability automatic control system
CN102255389A (en) Method for implementing intensive intelligent substation based on intelligent power grid system
CN106951500A (en) A kind of power scheduling distant place historical record inquiry system and method
CN103442003B (en) Data acquisition towards SCADA system backfills system and method
CN103095498A (en) Method and system of phone bill collection
CN110969341A (en) Intelligent maintenance method, device and system for power distribution terminal
CN109067560B (en) Self-description terminal plug and play method based on open communication
CN110365114A (en) The energy-accumulating power station total management system and information interacting method integrated based on multimode
CN105743695A (en) Monitoring method and system based on IEC 104 protocol
CN112822171A (en) Preposed acquisition system and method based on Internet of things protocol
CN103944271B (en) Based on the control method of the Intelligent Substation System of technology of Internet of things
CN114094702B (en) One-key execution method for whole scene of power grid dispatching instruction
CN111478434A (en) Power dispatching remote maintenance system
CN103716306A (en) Seamless communication method for substation and dispatching master station
CN108632290B (en) Real-time data forwarding system and method for power dispatching automation system
CN102611194A (en) Control method, device and system of power system
CN101499682A (en) Improved implementation method for power distribution automation
CN114296954A (en) Data acquisition management system and method applied to industrial field
CN101000712A (en) Method of operation guide for power supply spot

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171106

Address after: 211106 Jiangning City, Nanjing Province, the integrity of the road No. 19,

Applicant after: NARI Technology Development Co., Ltd.

Applicant after: SGCC NARI Nanjing Control System Co., Ltd.

Applicant after: Nanjing Nari Co., Ltd.

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID JIANGSU ELECTRIC POWER COMPANY

Address before: High road 210061 Jiangsu city of Nanjing province high tech Industrial Development Zone No. 20

Applicant before: NARI Technology Development Co., Ltd.

Applicant before: SGCC NARI Nanjing Control System Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170714