CN106949567A - Shock absorbing pipe and air-conditioner - Google Patents

Shock absorbing pipe and air-conditioner Download PDF

Info

Publication number
CN106949567A
CN106949567A CN201710243706.4A CN201710243706A CN106949567A CN 106949567 A CN106949567 A CN 106949567A CN 201710243706 A CN201710243706 A CN 201710243706A CN 106949567 A CN106949567 A CN 106949567A
Authority
CN
China
Prior art keywords
shock absorbing
caliber
bellows
absorbing pipe
connecting tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710243706.4A
Other languages
Chinese (zh)
Inventor
李宏伟
许永锋
梁伯启
卜其辉
吴晓鸿
董世龙
吴孔祥
陈毅聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea HVAC Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710243706.4A priority Critical patent/CN106949567A/en
Publication of CN106949567A publication Critical patent/CN106949567A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/08Compressors specially adapted for separate outdoor units
    • F24F1/12Vibration or noise prevention thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Air-Conditioning Systems (AREA)

Abstract

The present invention provides the air-conditioner of a kind of shock absorbing pipe and the application shock absorbing pipe.The shock absorbing pipe is connected to the compressor of air-conditioner, and the shock absorbing pipe includes bellows, and the caliber of the caliber of the bellows and the pipeline of compressor matches, and the caliber scope of the bellows is 6~32mm.The present invention applies the air-conditioner of the shock absorbing pipe with preferably damping effect.

Description

Shock absorbing pipe and air-conditioner
Technical field
The present invention relates to air-conditioning technical field, more particularly to a kind of shock absorbing pipe and the air-conditioner using the shock absorbing pipe.
Background technology
With the lifting of air-conditioning converter technique, compressor can be operated with high-frequency and ultra-high frequency.However, compressor is with height When frequency and ultra-high frequency operating, the vibration stress of its pipeline can be caused bigger than normal, cause pipeline fatigue, pipe occur and split, even break Pipe, so as to limit the use scope of compressor.
Generally the vibration stress of the pipeline is reduced in setting shock absorbing pipe in air-conditioning.However, existing shock absorbing pipe can not have The vibration stress of the pipeline of effect ground reduction compressor, causes the unfailing performance of existing air-conditioning not good.
The content of the invention
In view of the above problems, the invention provides a kind of shock absorbing pipe, it is desirable to provide a kind of effectively to reduce the pipe of compressor The shock absorbing pipe of the vibration stress on road.
In order to solve the above technical problems, the shock absorbing pipe that the present invention is provided is connected to the compressor of air-conditioner, the shock absorbing pipe Including bellows, the caliber of the caliber of the bellows and the pipeline of compressor matches, and the caliber scope of the bellows is 6 ~32mm.
Further, the caliber scope of the bellows is 16~32mm.
Further, the caliber scope of the bellows is 16~22mm, 16~28mm or 19~32mm.
Further, the caliber scope of the bellows is 6~19mm.
Further, the caliber scope of the bellows is 6~12mm, 6~16mm or 8~19mm.
Further, the shock absorbing pipe also includes the first connecting tube and the second company for being connected to the bellows two ends Adapter, the caliber scope of first connecting tube and the second connecting tube is 6~28mm.
Further, the caliber scope of first connecting tube and the second connecting tube is 12~28mm.
Further, the caliber scope of first connecting tube and the second connecting tube be 12~19mm, 12~25mm or 16~28mm.
Further, the caliber scope of first connecting tube and the second connecting tube is 6~16mm.
Further, the caliber scope of first connecting tube and the second connecting tube be 6~9mm, 6~12mm or 7~ 16mm。
The present invention also provides a kind of air-conditioner, including economizer, and the air-conditioner also includes four-way valve or gas-liquid separator, its It is characterised by, the air-conditioner also includes two shock absorbing pipes, the pipeline of the compressor includes muffler and playpipe, its In one end of bellows of a shock absorbing pipe be connected with muffler, the other end is connected with four-way valve or gas-liquid separator, another shock-absorbing The two ends of the bellows of pipe are connected with playpipe and economizer respectively.
When shock absorbing pipe of the present invention is applied to the compressor of air-conditioner, the pipeline connection of bellows and compressor, due to the ripple The caliber of line pipe is 6~32mm, and the caliber of the caliber of the bellows and the pipeline of compressor matches so that the pipe of the compressor The vibration stress on road can preferably be transferred to the bellows, so as to be effectively reduced the vibration stress of the pipeline, prevent the pipeline There is fatigue, pipe to split, even break and manage, drastically increase the reliability of the air-conditioner.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Structure according to these accompanying drawings obtains other accompanying drawings.
Fig. 1 is the structural representation of the embodiment of shock absorbing pipe one of the present invention.
Drawing reference numeral explanation:
Label Title Label Title
100 Shock absorbing pipe 30 First connecting tube
10 Bellows 50 Second connecting tube
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its His embodiment, belongs to the scope of protection of the invention.
It is to be appreciated that institute is directional in the embodiment of the present invention indicates that (such as up, down, left, right, before and after ...) is only used In explaining relative position relation, motion conditions under a certain particular pose (as shown in drawings) between each part etc., if should When particular pose changes, then directionality indicates also correspondingly therewith to change.
In addition, the description for being related to " first ", " second " etc. in the present invention is only used for describing purpose, and it is not intended that referring to Show or imply its relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " are defined At least one this feature can be expressed or be implicitly included to two " feature.In addition, the technical scheme between each embodiment can To be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical scheme occurs It is conflicting or when can not realize it will be understood that the combination of this technical scheme is not present, also not in the protection model of application claims Within enclosing.
Fig. 1 is refer to, the present invention provides a kind of shock absorbing pipe 100.
The shock absorbing pipe 100 is connected to the compressor of air-conditioner, and the shock absorbing pipe 100 includes bellows 10, the ripple The caliber of the caliber of pipe 10 and the pipeline of compressor matches, and the caliber scope of the bellows 10 is 6~32mm.
It should be understood that bellows 10 is corrugated stainless steel tubing, its hardness is relatively low so that bellows 10 is softer, can absorb Compressor is transferred to the vibration stress of bellows 10.
It should be understood that when the caliber of the bellows 10 is less than 6mm or more than 32mm, the caliber of the bellows 10 and compression The caliber of the pipeline of machine do not match that, when the vibration stress of the pipeline of compressor is transferred to caliber unmatched bellows 10, meeting Cause the amplitude of the unmatched bellows 10 of the caliber bigger than normal, cause the easy bending of the unmatched bellows 10 of the caliber, fracture, lead Causing the vibration stress of the pipeline of compressor can not effectively pass out, so as to influence the reliability of air-conditioner.
When shock absorbing pipe 100 of the present invention is applied to the compressor of air-conditioner, bellows 10 is connected with the pipeline of compressor, due to The caliber of the bellows 10 is 6~32mm, and the caliber of the caliber of the bellows 10 and the pipeline of compressor matches so that the pressure The vibration stress of the pipeline of contracting machine can preferably be transferred to the bellows 10, so that the vibration stress of the pipeline is effectively reduced, Preventing the pipeline from occurring, fatigue, pipe are split, even break pipe, drastically increases the reliability of the air-conditioner.
The caliber scope of the bellows 10 is 16~32mm.
In one embodiment of the invention, the caliber scope of the bellows 10 for 16~22mm, 16~28mm or 19~ 32mm。
In one embodiment of the invention, the caliber scope of the bellows 10 is 6~19mm.
It should be understood that for the air-conditioner of different capabilities, the power of its outdoor unit is also different, accordingly, compressor The caliber size of pipeline is also different.Therefore, the shock absorbing pipe 100 of different tube diameters according to the difference of air-conditioner capacity, need to be set, so that The vibration stress of the pipeline of compressor can preferably be transferred to the shock absorbing pipe 100 being adapted to it, so as to be effectively reduced the compression The vibration stress of the pipeline of machine, to improve the reliability of the air-conditioner.
It should be understood that caliber scope can connect for 16~32mm bellows 10 with the muffler of compressor, the return-air Caliber of the caliber of pipe with the caliber scope for 16~32mm bellows 10 is adapted so that the vibration that compressor is produced can lead to Cross muffler and be preferably transferred to bellows 10.
For the air-conditioner that capacity is 7~16kw, the caliber scope for the bellows 10 being connected with muffler is 16~22mm, It should be understood that the caliber of the bellows 10 can be any integer or fraction in 16~22mm.The caliber model of the bellows 10 Preferably 16~19mm is enclosed, the caliber of the bellows 10 concretely 16mm, 17mm, 18mm or 19mm etc..
For the air-conditioner that capacity is 17~25.2kw, the caliber scope of the bellows 10 be connected with muffler is 16~ 28mm, it is possible to understand that, the caliber of the bellows 10 can be any integer or fraction in 16~28mm.The pipe of the bellows 10 Footpath ranges preferably from 19~28mm, more preferably 19~22mm, the caliber of the bellows 10 concretely 19mm, 20mm, 21mm or 22mm etc..
For the air-conditioner that capacity is 26~66kw, the caliber scope of the bellows 10 be connected with muffler is 16~ 28mm, it is possible to understand that, the caliber of the bellows 10 can be any integer or fraction in 16~28mm.The pipe of the bellows 10 Footpath ranges preferably from 22~28mm, the caliber of the bellows 10 concretely 22mm, 23mm, 24mm, 25mm, 26mm, 27mm or 28mm etc..
For the air-conditioner that capacity is 67~90kw, the caliber scope of the bellows 10 be connected with muffler is 16~ 32mm, it is possible to understand that, the caliber of the bellows 10 can be any integer or fraction in 16~32mm.The pipe of the bellows 10 Footpath ranges preferably from 19~32mm, more preferably 22~32mm, the caliber of the bellows 10 concretely 22mm, 23mm, 24mm, 25mm, 26mm, 27mm, 28mm, 29mm, 30mm, 31mm or 32mm etc..
The caliber scope of the bellows 10 of technical solution of the present invention is 16~32mm, and the bellows 10 of the caliber scope can be with The muffler connection of compressor, because the bellows 10 of the caliber scope has the caliber being adapted with the muffler so that pressure The vibration that contracting machine is produced can preferably be transferred to bellows 10 by muffler, to reduce the vibration stress for the pipe that goes back, and improve empty Adjust the reliability of device.
The caliber scope of the bellows 10 is 6~19mm.
In one embodiment of the invention, the caliber scope of the bellows 10 is 6~12mm, 6~16mm or 8~19mm.
In one embodiment of the invention, the caliber scope of the bellows 10 is 8~16mm.
It should be understood that caliber scope can connect for 6~19mm bellows 10 with the playpipe of compressor, the playpipe Caliber and the caliber scope be adapted for the caliber of 6~19mm bellows 10 so that the vibration that compressor is produced can also lead to Overspray pipe is preferably transferred to bellows 10.
For the air-conditioner that capacity is 7~16kw, the caliber scope for the bellows 10 being connected with playpipe is 6~12mm, It should be understood that the caliber of the bellows 10 can be any integer or fraction in 6~12mm.The caliber of the bellows 10 is specific Can be 6mm, 7mm, 8mm, 9mm, 10mm, 11mm or 12mm etc..
For the air-conditioner that capacity is 17~25.2kw, the caliber scope of the bellows 10 be connected with playpipe is 6~ 16mm.It should be understood that the caliber of the bellows 10 can be any integer or fraction in 6~16mm.The pipe of the bellows 10 Footpath ranges preferably from 8~16mm, the caliber of the bellows 10 concretely 8mm, 9mm, 10mm, 11mm, 12mm, 13mm, 14mm, 15mm or 16mm etc..
For the air-conditioner that capacity is 26~66kw, the caliber scope for the bellows 10 being connected with playpipe is 6~19mm, It should be understood that the caliber of the bellows 10 can be any integer or fraction in 6~19mm.The caliber scope of the bellows 10 Preferably 8~19mm, the caliber of the bellows 10 concretely 8mm, 9mm, 10mm, 11mm, 12mm, 13mm, 14mm, 15mm, 16mm, 17mm, 18mm or 19mm etc..
For the air-conditioner that capacity is 67~90kw, the caliber scope for the bellows 10 being connected with playpipe is 6~19mm, It should be understood that the caliber of the bellows 10 can be any integer or fraction in 6~19mm.The caliber scope of the bellows 10 Preferably 8~19mm, the caliber of the bellows 10 concretely 8mm, 9mm, 10mm, 11mm, 12mm, 13mm, 14mm, 15mm, 16mm, 17mm, 18mm or 19mm etc..
The caliber scope of the bellows 10 of technical solution of the present invention is 6~19mm, and the bellows 10 of the caliber scope can be with The playpipe connection of compressor, because the bellows 10 of the caliber scope has the caliber being adapted with the playpipe so that pressure The vibration that contracting machine is produced can preferably be transferred to bellows 10 by playpipe, to reduce the vibration stress of playpipe, improve empty Adjust the reliability of device.
The shock absorbing pipe 100 also includes the first connecting tube 30 and the second connection for being connected to the two ends of bellows 10 Pipe 50, the caliber scope of the connecting tube 50 of the first connecting tube 30 and second is 6~28mm.
It should be understood that the shock absorbing pipe 10 of connection muffler and the shock absorbing pipe 10 of connection playpipe include the first connecting tube 30 and second connecting tube 50.
Specifically, the first connecting tube 30 of the first shock absorbing pipe of the present invention is connected to four-way valve or the gas-liquid separation of air-conditioner Device, the second connecting tube 50 of the first shock absorbing pipe is connected to the muffler of compressor.The caliber of the bellows 10 of first shock absorbing pipe Scope is 16~32mm.
Further, the first connecting tube 30 of the first shock absorbing pipe of the invention is contained in the four-way valve or gas-liquid point of air-conditioner From the pipeline of device, the second connecting tube 50 of the first shock absorbing pipe is contained in the muffler of compressor so that the ripple of the first shock absorbing pipe Pipe 10 can directly be contacted with muffler so that the vibration stress of muffler can preferably be transferred to bellows 10, and bellows 10 is inhaled The vibration stress is received, concentrates and ruptures or fracture to prevent non-return tracheae stress.
Specifically, the first connecting tube 30 of the second shock absorbing pipe of the present invention is connected to the economizer of air-conditioner, the second shock-absorbing Second connecting tube 50 of pipe is connected to the playpipe of compressor.The caliber scope of the bellows 10 of second shock absorbing pipe be 6~ 19mm.Economical Guan Kewei metal plates formula heat exchanger or sleeve pipe etc..
Further, the first connecting tube 30 of the second shock absorbing pipe of the invention is contained in the pipeline of the economizer of air-conditioner, Second connecting tube 50 of the second shock absorbing pipe is contained in the playpipe of compressor so that the bellows 10 of the second shock absorbing pipe can be with injection Pipe is directly contacted so that the vibration stress of playpipe can preferably be transferred to bellows 10, and bellows 10 absorbs the vibration stress, Rupture or be broken to prevent playpipe stress from concentrating.
The shock absorbing pipe 100 of technical solution of the present invention also includes the He of the first connecting tube 30 for being connected to the two ends of bellows 10 Second connecting tube 50, the caliber scope of the connecting tube 50 of the first connecting tube 30 and second is 6~28mm so that bellows 10 It can be connected by the second connecting tube 50 with muffler or playpipe so that the vibration stress of muffler or playpipe can be transferred to ripple Line pipe 10.Bellows 10 can be also connected by the first connecting tube 30 with four-way valve, gas-liquid separator or economic pipe so that compressor It can be connected by shock absorbing pipe 100 with four-way valve, gas-liquid separator or economic pipe.
In one embodiment of the invention, the caliber scope of the connecting tube 50 of the first connecting tube 30 and second is 12~ 28mm.Specifically, the first connecting tube 30 of the first shock absorbing pipe and the caliber scope of the second connecting tube 50 are 12~28mm.
In one embodiment of the invention, the caliber scope of the connecting tube 50 of the first connecting tube 30 and second is 12~ 19mm, 12~25mm or 16~28mm.Specifically, the caliber of the first connecting tube 30 of the first shock absorbing pipe and the second connecting tube 50 Scope is 12~19mm, 12~25mm or 16~28mm.
The caliber of the first connecting tube 30 and the second connecting tube 50 of first shock absorbing pipe and the second shock absorbing pipe is respectively less than corresponding The caliber of bellows 10.Because the caliber of bellows 10 is adapted or phase with the caliber of the muffler of compressor and playpipe Match somebody with somebody so that the caliber of the first connecting tube 30 and the second connecting tube 50 of the first shock absorbing pipe and the second shock absorbing pipe is respectively less than corresponding time The caliber of tracheae and playpipe.
It should be understood that the first connecting tube 30 of the first shock absorbing pipe is contained in or is connected to the four-way valve or gas-liquid of air-conditioner Separator, the second connecting tube 50 of the first shock absorbing pipe is contained in muffler so that the tube wall of the bellows 10 of the first shock absorbing pipe can Directly contacted with the tube wall of muffler.
For the air-conditioner that capacity is 7~16kw, the first connecting tube 30 of the first shock absorbing pipe and the pipe of the second connecting tube 50 Footpath is 12~19mm, preferably 12~16mm.It should be understood that the first connecting tube 30 and the second connecting tube 50 of the first shock absorbing pipe Caliber can be any integer or fraction in 12~19mm.Now, the caliber scope of the bellows 10 of the first shock absorbing pipe is 16 ~22mm.
For the air-conditioner that capacity is 17~25.2kw, the first connecting tube 30 of the first shock absorbing pipe and the second connecting tube 50 Caliber is 12~25mm, more preferably preferably 16~25mm, 17~19mm.It should be understood that the first of the first shock absorbing pipe The caliber of the connecting tube 50 of connecting tube 30 and second can be any integer or fraction in 12~25mm.Now, first shock absorbing pipe The caliber scope of bellows 10 is 16~28mm.
For the air-conditioner that capacity is 26~66kw, the first connecting tube 30 of the first shock absorbing pipe and the pipe of the second connecting tube 50 Footpath is 12~28mm, preferably 19~28mm.It should be understood that the first connecting tube 30 and the second connecting tube 50 of the first shock absorbing pipe Caliber can be any integer or fraction in 12~28mm.Now, the caliber scope of the bellows 10 of the first shock absorbing pipe is 16 ~28mm.
For the air-conditioner that capacity is 67~90kw, the first connecting tube 30 of the first shock absorbing pipe and the pipe of the second connecting tube 50 Footpath is 12~28mm, preferably 19~28mm.It should be understood that the first connecting tube 30 and the second connecting tube 50 of the first shock absorbing pipe Caliber can be any integer or fraction in 12~28mm.Now, the caliber scope of the bellows 10 of the first shock absorbing pipe is 16 ~32mm.
First connecting tube 30 of the first shock absorbing pipe of technical solution of the present invention and the caliber scope of the second connecting tube 50 are 12~28mm, the caliber of the second connecting tube 50 of the first shock absorbing pipe is less than the caliber of muffler so that the second of the first shock absorbing pipe Connecting tube 50 can be contained in muffler so that the tube wall of the bellows 10 of the first shock absorbing pipe can directly connect with the tube wall of muffler Touch, the vibration that compressor is produced can preferably be transferred to bellows 10 by muffler, to reduce the vibration stress of muffler, carry The reliability of high air-conditioner.
In one embodiment of the invention, the caliber scope of the connecting tube 50 of the first connecting tube 30 and second is 6~16mm. Specifically, the first connecting tube 30 of the second shock absorbing pipe and the caliber scope of the second connecting tube 50 are 6~16mm.
In one embodiment of the invention, the caliber scope of the connecting tube 50 of the first connecting tube 30 and second is 6~9mm, 6 ~12mm or 7~16mm.Specifically, the first connecting tube 30 of the second shock absorbing pipe and the caliber scope of the second connecting tube 50 are 6 ~9mm, 6~12mm or 7~16mm.
It should be understood that the first connecting tube 30 of the second shock absorbing pipe and the caliber of the second connecting tube 50 are respectively less than corresponding ripple The caliber of line pipe 10.Because the caliber of the bellows 10 of the second shock absorbing pipe is adapted or phase with the caliber of the playpipe of compressor Match somebody with somebody so that the first connecting tube 30 of the second shock absorbing pipe and the caliber of the second connecting tube 50 are respectively less than the caliber of corresponding playpipe. First connecting tube 30 of the second shock absorbing pipe is contained in or is connected to the economic pipe of air-conditioner, and the second connecting tube 50 is contained in injection Pipe so that the tube wall of the bellows 10 of the second shock absorbing pipe can directly be contacted with the tube wall of playpipe.The vibration stress of playpipe can The bellows 10 of the second shock absorbing pipe is preferably transferred to, the bellows 10 of the second shock absorbing pipe absorbs the vibration stress, to prevent spray Pipe stress is penetrated to concentrate and rupture or be broken.
For the air-conditioner that capacity is 7~16kw, the first connecting tube 30 of the second shock absorbing pipe and the pipe of the second connecting tube 50 Footpath is 6~9mm.It should be understood that the first connecting tube 30 of the second shock absorbing pipe and the caliber of the second connecting tube 50 can be 6~9mm Interior any integer or fraction, such as 6mm, 7mm, 8mm or 9mm.Now, the caliber scope of the bellows 10 of the second shock absorbing pipe is 6 ~12mm.
For the air-conditioner that capacity is 17~25.2kw, the first connecting tube 30 of the second shock absorbing pipe and the second connecting tube 50 Caliber is 6~12mm, preferably 7~12mm.It should be understood that the first connecting tube 30 and the second connecting tube 50 of the second shock absorbing pipe Caliber can be any integer or fraction in 6~12mm.Now, the caliber scope of the bellows 10 of the second shock absorbing pipe be 6~ 16mm。
For the air-conditioner that capacity is 26~66kw, the first connecting tube 30 of the second shock absorbing pipe and the pipe of the second connecting tube 50 Footpath is 6~12mm, preferably 7~12mm.It should be understood that the first connecting tube 30 and second connecting tube 50 of the second shock absorbing pipe Caliber can be any integer or fraction in 6~12mm.Now, the caliber scope of the bellows 10 of the second shock absorbing pipe be 6~ 19mm。
For the air-conditioner that capacity is 67~90kw, the first connecting tube 30 of the second shock absorbing pipe and the pipe of the second connecting tube 50 Footpath is 6~16mm, preferably 7~16mm.It should be understood that the first connecting tube 30 and second connecting tube 50 of the second shock absorbing pipe Caliber can be any integer or fraction in 6~16mm.Now, the caliber scope of the bellows 10 of the second shock absorbing pipe be 6~ 19mm。
First connecting tube 30 of the second shock absorbing pipe of technical solution of the present invention and the caliber scope of the second connecting tube 50 are 6 ~19mm, the caliber of the second connecting tube 50 of the second shock absorbing pipe is less than the caliber of playpipe so that the second of the second shock absorbing pipe connects Adapter 50 can be contained in playpipe so that the tube wall of the bellows 10 of the second shock absorbing pipe can directly connect with the tube wall of playpipe Touch, the vibration that compressor is produced can preferably be transferred to bellows 10 by playpipe, to reduce the vibration stress of playpipe, carry The reliability of high air-conditioner.
The present invention also provides a kind of air-conditioner, including compressor and economizer, and the compressor includes muffler and injection Pipe, the air-conditioner also includes four-way valve or gas-liquid separator, and the air-conditioner also includes two shock absorbing pipes 100, i.e., first Shock absorbing pipe and the second shock absorbing pipe, one end of the bellows 10 of the first shock absorbing pipe are connected with muffler, the other end and four-way valve or gas Liquid/gas separator is connected, and the two ends of the bellows 10 of the second shock absorbing pipe are connected with playpipe and economizer respectively.
Because the air-conditioner employs whole technical schemes of above-mentioned all embodiments, therefore at least there is above-described embodiment All beneficial effects for being brought of technical scheme, this is no longer going to repeat them.
First shock absorbing pipe and the second shock absorbing pipe include the first connecting tube 30 for being connected to the two ends of bellows 10 With the second connecting tube 50, the first connecting tube 30 of the first shock absorbing pipe is connected with four-way valve or gas-liquid separator, the first shock absorbing pipe Second connecting tube 50 and muffler connection;First connecting tube 30 of the second shock absorbing pipe is connected with economizer, and the of the second shock absorbing pipe Two connecting tubes 50 are connected with playpipe.
In one embodiment of the invention, the first connecting tube 30 of the first shock absorbing pipe is connected to or is contained in four-way valve or gas-liquid point From the pipeline of device, the second connecting tube 50 of the first shock absorbing pipe is contained in muffler so that the pipe of the bellows 10 of the first shock absorbing pipe Wall can directly be contacted with the tube wall of muffler;First connecting tube 30 of the second shock absorbing pipe is connected to or is contained in the pipe of economic pipe Road, the second connecting tube 50 of the second shock absorbing pipe is contained in playpipe so that the tube wall of the bellows 10 of the second shock absorbing pipe can be with spray The tube wall for penetrating pipe is directly contacted.
The bellows 10 of first shock absorbing pipe of this case technical scheme is directly contacted with muffler, the bellows of the second shock absorbing pipe 10 directly contact with playpipe so that compressor is transferred to the vibration stress of muffler and playpipe, can preferably be transferred to The bellows 10 of the shock absorbing pipe of bellows 10 and second of one shock absorbing pipe, prevents that muffler and playpipe from leading because vibration stress is excessive Cause rupture or be broken, the bellows 10 of the shock absorbing pipe of bellows 10 and second of the first shock absorbing pipe absorbs the vibration stress, so as to carry The reliability of high air-conditioner so that air-conditioner has preferably damping effect.
Embodiment 1:
For air injection enthalpy-increasing serial multi-connected air conditioner device of the capacity for 90KW, the second connecting tube 50 being connected with muffler Caliber is 25mm, and the caliber of the bellows 10 contacted with muffler is 32mm, i.e. the first connecting tube 30 of the first shock absorbing pipe and the The caliber of two connecting tubes 50 is 25mm, and the caliber of the bellows 10 of the first shock absorbing pipe is 32mm;Second be connected with playpipe connects The caliber of adapter 50 is 16mm, and the caliber of bellows 10 is 19mm, i.e. the first connecting tube 30 of the second shock absorbing pipe and the second connection The caliber of pipe 50 is 16mm, and the caliber of the bellows 10 of the second shock absorbing pipe is 19mm.
The first shock absorbing pipe and the second shock absorbing pipe of embodiment 1 have toughness, can preferably absorb compressor muffler and The vibration stress of playpipe, the reliability of the serial multi-connected air conditioner device of lifting air injection enthalpy-increasing.
Embodiment 2:
For air injection enthalpy-increasing serial multi-connected air conditioner device of the capacity for 66KW, the second connecting tube 50 being connected with muffler Caliber is 24mm, and the caliber of the bellows 10 contacted with muffler is 28mm, i.e. the first connecting tube 30 of the first shock absorbing pipe and the The caliber of two connecting tubes 50 is 24mm, and the caliber of the bellows 10 of the first shock absorbing pipe is 28mm;Second be connected with playpipe connects The caliber of adapter 50 is 9mm, and the caliber of bellows 10 is 12mm, i.e. the first connecting tube 30 of the second shock absorbing pipe and the second connection The caliber of pipe 50 is 9mm, and the caliber of the bellows 10 of the second shock absorbing pipe is 12mm.
The first shock absorbing pipe and the second shock absorbing pipe of embodiment 2 have toughness, can preferably absorb compressor muffler and The vibration stress of playpipe, the reliability of the serial multi-connected air conditioner device of lifting air injection enthalpy-increasing.
Embodiment 3:
For air injection enthalpy-increasing serial multi-connected air conditioner device of the capacity for 25.2KW, the second connecting tube 50 being connected with muffler Caliber be 16mm, the caliber of the bellows 10 contact with muffler is 20mm, i.e. the He of the first connecting tube 30 of the first shock absorbing pipe The caliber of second connecting tube 50 is 16mm, and the caliber of the bellows 10 of the first shock absorbing pipe is 20mm;Second be connected with playpipe The caliber of connecting tube 50 is 8mm, and the caliber of bellows 10 is 10mm, i.e. the first connecting tube 30 and second of the second shock absorbing pipe connects The caliber of adapter 50 is 8mm, and the caliber of the bellows 10 of the second shock absorbing pipe is 10mm.
The first shock absorbing pipe and the second shock absorbing pipe of embodiment 3 have toughness, can preferably absorb compressor muffler and The vibration stress of playpipe, the reliability of the serial multi-connected air conditioner device of lifting air injection enthalpy-increasing.
Embodiment 4:
For air injection enthalpy-increasing serial multi-connected air conditioner device of the capacity for 16KW, the second connecting tube 50 being connected with muffler Caliber is 12mm, and the caliber of the bellows 10 contacted with muffler is 16mm, i.e. the first connecting tube 30 of the first shock absorbing pipe and the The caliber of two connecting tubes 50 is 12mm, and the caliber of the bellows 10 of the first shock absorbing pipe is 16mm;Second be connected with playpipe connects The caliber of adapter 50 is 6mm, and the caliber of bellows 10 is 7mm, i.e. the first connecting tube 30 of the second shock absorbing pipe and the second connecting tube 50 caliber is 6mm, and the caliber of the bellows 10 of the second shock absorbing pipe is 7mm.
The first shock absorbing pipe and the second shock absorbing pipe of embodiment 4 have toughness, can preferably absorb compressor muffler and The vibration stress of playpipe, the reliability of the serial multi-connected air conditioner device of lifting air injection enthalpy-increasing.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every in the present invention Inventive concept under, the equivalent structure transformation made using description of the invention and accompanying drawing content, or be directly or indirectly used in Other related technical fields are included in the scope of patent protection of the present invention.

Claims (11)

1. a kind of shock absorbing pipe, is connected to the compressor of air-conditioner, the shock absorbing pipe includes bellows, it is characterised in that the ripple The caliber of the caliber of line pipe and the pipeline of compressor matches, and the caliber scope of the bellows is 6~32mm.
2. shock absorbing pipe as claimed in claim 1, it is characterised in that the caliber scope of the bellows is 16~32mm.
3. shock absorbing pipe as claimed in claim 2, it is characterised in that the caliber scope of the bellows be 16~22mm, 16~ 28mm or 19~32mm.
4. shock absorbing pipe as claimed in claim 1, it is characterised in that the caliber scope of the bellows is 6~19mm.
5. shock absorbing pipe as claimed in claim 4, it is characterised in that the caliber scope of the bellows be 6~12mm, 6~ 16mm or 8~19mm.
6. the shock absorbing pipe as described in claim any one of 1-5, it is characterised in that the shock absorbing pipe also includes being connected to institute First connecting tube and the second connecting tube at bellows two ends are stated, the caliber scope of first connecting tube and the second connecting tube is 6~28mm.
7. shock absorbing pipe as claimed in claim 6, it is characterised in that the caliber scope of first connecting tube and the second connecting tube It is 12~28mm.
8. shock absorbing pipe as claimed in claim 7, it is characterised in that the caliber scope of first connecting tube and the second connecting tube It is 12~19mm, 12~25mm or 16~28mm.
9. shock absorbing pipe as claimed in claim 6, it is characterised in that the caliber scope of first connecting tube and the second connecting tube It is 6~16mm.
10. shock absorbing pipe as claimed in claim 9, it is characterised in that the caliber model of first connecting tube and the second connecting tube Enclose and be 6~9mm, 6~12mm or 7~16mm.
11. a kind of air-conditioner, including economizer, the air-conditioner also include four-way valve or gas-liquid separator, it is characterised in that described Air-conditioner also includes the shock absorbing pipe two as described in claim any one of 1-10, the pipeline of the compressor include muffler with Playpipe, wherein one end of the bellows of a shock absorbing pipe is connected with muffler, the other end is connected with four-way valve or gas-liquid separator, The two ends of the bellows of another shock absorbing pipe are connected with playpipe and economizer respectively.
CN201710243706.4A 2017-04-13 2017-04-13 Shock absorbing pipe and air-conditioner Pending CN106949567A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710243706.4A CN106949567A (en) 2017-04-13 2017-04-13 Shock absorbing pipe and air-conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710243706.4A CN106949567A (en) 2017-04-13 2017-04-13 Shock absorbing pipe and air-conditioner

Publications (1)

Publication Number Publication Date
CN106949567A true CN106949567A (en) 2017-07-14

Family

ID=59477322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710243706.4A Pending CN106949567A (en) 2017-04-13 2017-04-13 Shock absorbing pipe and air-conditioner

Country Status (1)

Country Link
CN (1) CN106949567A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019100215A1 (en) * 2017-11-21 2019-05-31 广东美的暖通设备有限公司 Compressor assembly, air conditioner outdoor unit, and air conditioning system

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2126556Y (en) * 1991-12-13 1993-01-13 北京长城空调器厂 Low noise structure for air conditioning machinery in room
CN2599460Y (en) * 2002-12-23 2004-01-14 海尔集团公司 Hose connected air conditioner
CN2656184Y (en) * 2003-11-14 2004-11-17 攀枝花市瑞通制冷设备有限责任公司 Car-driving shock-absorbing air conditioner
CN201059694Y (en) * 2007-07-31 2008-05-14 广东志高空调有限公司 Home-use outdoor machine of air-conditioner vibration damping pipeline
CN201621389U (en) * 2010-03-09 2010-11-03 江苏华东电力冶金机械总厂 Metal corrugated pipe
CN201730794U (en) * 2010-06-21 2011-02-02 珠海华宇金属有限公司 Air return pipe in refrigerating system of air conditioner
CN202581602U (en) * 2012-05-30 2012-12-05 台州市华丰空调阀门有限公司 Air conditioner connecting pipe
CN202946798U (en) * 2012-11-29 2013-05-22 常州华宇特种波纹管有限公司 Refrigeration shock hose
CN205174908U (en) * 2015-10-27 2016-04-20 广东美的暖通设备有限公司 Air conditioning system
CN105737273A (en) * 2014-12-10 2016-07-06 常州科林华欣制冷设备有限公司 Household air conditioner outdoor unit vibration damping pipeline
CN205939456U (en) * 2016-08-03 2017-02-08 广东美的制冷设备有限公司 Air conditioner outdoor unit and air conditioner
CN206695265U (en) * 2017-04-13 2017-12-01 广东美的暖通设备有限公司 Shock absorbing pipe and air conditioner

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2126556Y (en) * 1991-12-13 1993-01-13 北京长城空调器厂 Low noise structure for air conditioning machinery in room
CN2599460Y (en) * 2002-12-23 2004-01-14 海尔集团公司 Hose connected air conditioner
CN2656184Y (en) * 2003-11-14 2004-11-17 攀枝花市瑞通制冷设备有限责任公司 Car-driving shock-absorbing air conditioner
CN201059694Y (en) * 2007-07-31 2008-05-14 广东志高空调有限公司 Home-use outdoor machine of air-conditioner vibration damping pipeline
CN201621389U (en) * 2010-03-09 2010-11-03 江苏华东电力冶金机械总厂 Metal corrugated pipe
CN201730794U (en) * 2010-06-21 2011-02-02 珠海华宇金属有限公司 Air return pipe in refrigerating system of air conditioner
CN202581602U (en) * 2012-05-30 2012-12-05 台州市华丰空调阀门有限公司 Air conditioner connecting pipe
CN202946798U (en) * 2012-11-29 2013-05-22 常州华宇特种波纹管有限公司 Refrigeration shock hose
CN105737273A (en) * 2014-12-10 2016-07-06 常州科林华欣制冷设备有限公司 Household air conditioner outdoor unit vibration damping pipeline
CN205174908U (en) * 2015-10-27 2016-04-20 广东美的暖通设备有限公司 Air conditioning system
CN205939456U (en) * 2016-08-03 2017-02-08 广东美的制冷设备有限公司 Air conditioner outdoor unit and air conditioner
CN206695265U (en) * 2017-04-13 2017-12-01 广东美的暖通设备有限公司 Shock absorbing pipe and air conditioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019100215A1 (en) * 2017-11-21 2019-05-31 广东美的暖通设备有限公司 Compressor assembly, air conditioner outdoor unit, and air conditioning system

Similar Documents

Publication Publication Date Title
JP6496415B2 (en) Sealed sleeve
CN106949567A (en) Shock absorbing pipe and air-conditioner
CN206695265U (en) Shock absorbing pipe and air conditioner
CN107606366A (en) A kind of 90 ° of elbows for buffering Water Hammer
CN209944573U (en) Air conditioner outdoor unit and air conditioner
CN206695266U (en) Shock absorbing pipe and air conditioner
CN108151378B (en) Pipeline, pipeline system and air conditioner
CN107062435A (en) shock absorbing pipe and air conditioner
CN203298408U (en) Four-way valve pipeline system
CN109059130A (en) A kind of exhaust pipe structure and air conditioner
CN203364281U (en) Piping of air conditioner outdoor unit
CN209196356U (en) A kind of damping tube for refrigeration unit compressor
CN208920343U (en) A kind of exhaust pipe structure and air conditioner
CN110566436A (en) Novel liquid storage device of double-cylinder compressor
CN105298798A (en) Reciprocating linear compressor and inner exhaust tube set thereof
CN203223681U (en) Connecting pipe for inner unit and outer unit of air conditioner
CN209877299U (en) Flexible damping device for high-pressure pipe of air-conditioning scroll compressor
CN207454999U (en) A kind of band guide shell expansion joint
CN202126025U (en) Compressor piping pipeline of air conditioner and air conditioner using same
CN206539480U (en) Suction conduit assembly, compressor air suction mouth structure and compressor
CN206695264U (en) Shock absorbing pipe and air conditioner
CN210660493U (en) Novel liquid storage device of double-cylinder compressor
CN206817727U (en) The shock absorbing pipe and air-conditioning system of air-conditioning system
CN212204797U (en) Heat exchanger, air condensing units and air conditioner
CN204388308U (en) A kind of exhaust pipe assembly, gas extraction system and Domestic dehumidifying machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170714