CN106949521B - A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum - Google Patents

A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum Download PDF

Info

Publication number
CN106949521B
CN106949521B CN201710213037.6A CN201710213037A CN106949521B CN 106949521 B CN106949521 B CN 106949521B CN 201710213037 A CN201710213037 A CN 201710213037A CN 106949521 B CN106949521 B CN 106949521B
Authority
CN
China
Prior art keywords
vacuum
preposition
cylinder
low pressure
condenser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710213037.6A
Other languages
Chinese (zh)
Other versions
CN106949521A (en
Inventor
黄治坤
张攀
杜旭
张芬芳
孙斌
刘月辉
李响
王军舵
梁云鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yuanshen Energy Technology Co.,Ltd.
Original Assignee
Sheng Yuan Hi Tech (beijing) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sheng Yuan Hi Tech (beijing) Technology Co Ltd filed Critical Sheng Yuan Hi Tech (beijing) Technology Co Ltd
Priority to CN201710213037.6A priority Critical patent/CN106949521B/en
Publication of CN106949521A publication Critical patent/CN106949521A/en
Application granted granted Critical
Publication of CN106949521B publication Critical patent/CN106949521B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • F01D17/10Final actuators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28BSTEAM OR VAPOUR CONDENSERS
    • F28B9/00Auxiliary systems, arrangements, or devices
    • F28B9/10Auxiliary systems, arrangements, or devices for extracting, cooling, and removing non-condensable gases

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The present invention provides a kind of turbine condenser high vacuum operation heat supply process, and the system configuration and transformation operation method of the technology are provided, the system configuration mainly includes steam turbine high-pressure cylinder, intermediate pressure cylinder, low pressure (LP) cylinder, mesolow cylinder contact regulating butterfly valve, water ring vacuum pump, preposition vacuum extractor, preposition vacuum extractor isolation stop valve, preposition vacuum extractor bypass stop valve and the valve and pipe fitting that connect the said equipment.The present invention improves turbine condenser end vacuum using preposition vacuum extractor, heat supply period is allowd to improve condenser vacuum operation, so as to reduce low pressure (LP) cylinder minimum through-current capacity, you can arrange extraction for heat supply ability in increase steam turbine, unit vacuum can be improved again to reach energy-saving purpose.The simple low cost of the technological transformation, it is adapted to not transform in turbine body and is applied on the unit of needs increase heat capacity.And technical principle and embodiment to improving Steam Turbine Condenser Vacuum operation increase unit heat capacity have also made corresponding introduction.

Description

A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum
Technical field
The present invention relates to the application field of thermal power generation unit, changes more particularly, to thermal power generation unit increase heat capacity The method made.
Background technology
Present Thermal Power accounts for 65% or so of national installed capacity, it is anticipated that the thermoelectricity within the following quite a long time It all will be the important component of China's energy resource system.Energy-saving and emission-reduction are the state basic policies that China's economy realizes sustainable development.For Thermal power industry, cogeneration of heat and power transformation is carried out, is the important means for realizing national energy-saving emission reduction targets.Currentlyying propel the energy Under the overall background of revolution, the cogeneration of heat and power opportunity to develop rare by a new round is welcome is intelligent, to clean, standardize will be it Important Characteristics of Development, it will more be highlighted in the status in coal fired power generation field.With the quickening of urbanization process, city needs The area of central heating gradually increases, and northern area surrounding city pure condensate unit has been changed to extraction condensing type thermal power plant unit, root substantially There is the demand by transforming increase heat capacity according to growth requirement some extraction condensing type thermal power plant units.
The cogeneration of heat and power forms of modification of the extraction condensing type unit heat capacity of main flow increase at present has following several:
1st, Heat Supplying with Low Vacuum is transformed:Alternatively referred to as high back pressure heat supply renovation technique, the technology are to transport turbine condenser Row back pressure brings up to 30-50kPa or so so that turbine discharge can directly heat heat supply network recirculated water, can heat heat supply network circulation Water is to 70-80 DEG C, and in order to solve, exhaust temperature is high and blade flutter, Heating Period need to be replaced with the heat supply low pressure specially designed and turn Son, heat supply gain pure condensate low pressure rotor after terminating.The technological merit is:Heating load is big, in the case that area of heat-supply service is sufficiently large Cold section of loss of steam turbine can be reduced to zero, burden requirement is stable, safe.Shortcoming is:Invest it is bigger than normal, need to increase heat supply network circulation Water, row, which draws gas, during heat supply peak period needs carries out spike heating, needs routine replacement rotor every year, reduces unit load regulation Flexibility, it is impossible to adapt to relatively low electric load operation.
2nd, lithium bromide absorption type heat pump heat supply is transformed:The technology be using lithium-bromide solution as working medium, using middle row draw gas as Steam is driven, reclaims cooling circulating water waste heat, using heat pump by heat supply network circulating-heating to 70-90 DEG C, heating peak period passes through again Middle row, which draws gas, to be heated to heat user demand temperature and confesses.The technological merit is:Larger transformation is not carried out to turbine body, can increased Add unit heat capacity, flexible operation, do not influence Steam Turbine on-load, it is low to the temperature requirement of low temperature exhaust heat, it is not necessary to drop Low unit vacuum.Shortcoming is:Huge, lithium bromide heat pump short life is invested, maintenance workload is larger.
3rd, low pressure (LP) cylinder optical axis is transformed:The technology is that Low Pressure Steam Turbine is replaced by into optical axis so that intermediate pressure cylinder steam discharge can Whole heat supplies, to sacrifice part generating capacity as cost, low pressure rotor is replaced with optical axis, functions only as being connected work with generator With.The technological merit is:Safe, counter investment is smaller, and increase heat capacity is larger.Shortcoming is:Set for middle row pressure power Haggle over high unit, consider intermediate pressure cylinder blade security, less adapt to transformation, performance driving economy is poor after transformation, influences to generate electricity Measure more.
Application number:201510739574.5 Chinese invention patent discloses pure condensate --- high back pressure circulating water heating double mode Single rotor steam turbine and its system, the system include steam turbine in be sequentially connected high pressure cylinder, intermediate pressure cylinder, mesolow clutch, Low pressure (LP) cylinder, low pressure clutch and generator, low pressure (LP) cylinder inlet valve is connected between intermediate pressure cylinder and low pressure (LP) cylinder, is provided with low pressure (LP) cylinder Low pressure rotor, is provided with some grade blades on low pressure rotor, pure condensate steam turbine of the final blade length in blade than ad eundem Exhaust stage blade is short, and final blade length is longer than the high back pressure circulating water heating last stage vane of steam turbine of ad eundem.The invention has Beneficial effect is when replacing with non-heating period pure condensate the high back pressure circulating water heating phase entirely different without shutting down exchange blade two It root low pressure (LP) cylinder rotor, need to not only shut down using same roots rotor, reach that summer heat consumption is high, winter cold source energy is zero Purpose safety monitoring device and high back pressure circulating water heating meet an urgent need thermal device ensure that exhaust stage blade dynamic stress does not transfinite.Should Technology is to improve turbine discharge back pressure, that is, reduces condenser vacuum, heat supply network recirculated water is directly heated with steamer vapour steam discharge.In addition The technology need to do a series of transformations to turbine body, and improvement expenses is higher, and difficulty of construction is big, cycle length.The patent and this hair The bright technology path has an essential distinction, and system of the present invention is without transform turbine body, and technical approach is to carry Pump gas ablity is arranged in high vacuum operation increase, transformation amount is smaller, and expense is low.
Application number:CN201610251992.4 Chinese invention patents disclose a kind of optical axis high back pressure heat supply steam turbine, it It is related to a kind of heat supply steam turbine.The invention solves existing butterfly valve and adjusts steam extraction heat supply unit under supplying thermal condition, low pressure rotor Air blast fever phenomenon is also easy to produce, and the problem of generatine set heat efficiency is low, and heat supply pump gas ablity is poor.The low pressure rotor of the invention is light Axle rotor, the upper end of low pressure (LP) cylinder are provided with two low pressure admission mouths, and each low pressure admission mouth is respectively tightly connected with a closure plate, heating The lower end of extraction line connects with two middle pressure gas ports above intermediate pressure cylinder, is opened respectively on the upper end tube wall of heating extraction line Provided with the first steam supply mouth and the second steam supply mouth, the first steam supply mouth is connected with existing heat exchangers for district heating, and the second steam supply mouth steams with cooling One end connection in steam pipe road, the other end of cooling steam pipeline pass through one of closure plate and connected with corresponding low pressure admission mouth, Reducing-and-cooling plant is arranged in cooling steam pipeline.The invention need to carry out optical axis transformation to turbine low pressure cylinder rotor, sacrifice Unit part generating capacity, performance driving economy is poor, and improvement expenses is higher, has essential distinction with technology of the present invention.
To sum up, in the prior art the defects of, essentially consists in:
1st, Heat Supplying with Low Vacuum is transformed:Invest bigger than normal, need to increase heat supply network quantity of circulating water, row draws gas progress during heat supply peak period needs Spike heats, and needs routine replacement rotor every year, reduces unit load flexible adjustment, it is impossible to adapts to relatively low electric load fortune OK.
2nd, lithium bromide absorption type heat pump heat supply is transformed:Huge, lithium bromide heat pump short life is invested, maintenance workload is larger.
3rd, low pressure (LP) cylinder optical axis is transformed:Invest larger, for the higher unit of middle row's pressure design, consider intermediate pressure cylinder blade peace Quan Xing, transformation is less adapted to, performance driving economy is poor after transformation, and it is more to influence generated energy.
The content of the invention
In order to overcome drawbacks described above of the prior art, the invention provides a kind of thermal power generation unit to increase heat capacity The technology of transformation, any transformation is not carried out to turbine body, only need to increase preposition vacuum extractor and its isolation and bypass valve Door, Steam Turbine Condenser Vacuum is improved in operation, to reduce low pressure (LP) cylinder minimum through-current capacity, so as to arrange the amount of drawing gas increase machine in increasing Group heat capacity.And technological investment of the present invention is small, long lifespan, maintenance workload is smaller.Further, change with respect to optical axis Radiography sound generated energy is less, is adapted to all extraction and condensing units to carry out heat capacities increase transformation.To sum up, technology of the present invention is increasing The technical thought in terms of heat capacity is added to be different from existing any technology, need to only transform on a small quantity can increase larger heat supply energy Power.
In order to solve the above problems, a kind of turbine condenser high vacuum operation heat supply process is invented, and provide the skill The system configuration and transformation operation method, the system configuration of art mainly include steam turbine high-pressure cylinder(101), Steam Turbine Through IP Admission (102), turbine low pressure cylinder (103), generator(104), condenser(105), heat exchangers for district heating(106), water ring vacuum pump (107), preposition vacuum extractor(108), mesolow cylinder contact regulating butterfly valve(109), preposition vacuum extractor isolation stop valve (110), preposition vacuum extractor bypass stop valve(111), heat supply extraction stop valve(112), main steam(201), reheated steam (202), water ring vacuum pump row's air(203), heat supply network backwater(204), heat supply network water supply(205), heat exchangers for district heating is hydrophobic(206), And the valve and pipe fitting of connection the said equipment.
This patent system schematic is shown in accompanying drawing 1:Main steam in the system(201)Into steam turbine high-pressure cylinder(101) After finishing work(, reheated device continues to heat, the reheated steam after heating(202)Into Steam Turbine Through IP Admission (102), intermediate pressure cylinder row Vapour gets in touch with regulating butterfly valve through mesolow cylinder all the way(109)Continue to do work into turbine low pressure cylinder (103), connection is hot all the way in addition Net heater(106)To heat heat supply network backwater(204), heated heat supply network supplies water(205)It is supplied to heat user, heat supply network heating Device is hydrophobic(206)Picked out through heat exchangers for district heating bottom, drain recovery to condenser hotwell;Condenser(105)It is connected with low pressure (LP) cylinder Connect, generator(104)It is coaxially connected with steam turbine, the mechanical work of steam turbine is converted into electric energy;Draw in condenser supercooling region Main pipe is vacuumized, main pipe isolates stop valve through preposition vacuum extractor all the way(110), preposition vacuum extractor(108)It is led to water Ring vacuum pump(107)Arrange air by the road again(203), bypass stop valve through preposition vacuum extractor all the way in addition(111)Directly It is led to that water ring vacuum pump arranges air by the road again, two-way can switch under different unit operation operating modes.
Turbine condenser high vacuum runs heat supply scheme:Open preposition vacuum extractor isolation stop valve(110), open Preposition vacuum extractor(108), close preposition vacuum extractor bypass stop valve(111), work as condenser(105)Vacuum is near 2kPa or so, suitably turn mesolow cylinder contact regulating butterfly valve down(109)Aperture, you can the increase intermediate pressure cylinder steam discharge amount of drawing gas, reach Increase the purpose of unit heat capacity.
System of the present invention realizes that unit increase heat capacity key point has at following 2 points:Determine that low pressure (LP) cylinder minimum is through-flow Amount, improve condenser vacuum.
First, low pressure (LP) cylinder minimum through-current capacity is determined
Volume flow before turbine low pressure cylinder exhaust stage blade is too small, can occur flow separation at blade root first, occurs Whirlpool is flowed back, and at this moment steam does not do work not only, also has the opposite effect, and produces air blast, causes final stage efficiency drastically to decline, in the process of running Avoid the generation of air blast phenomenon.It is generally acknowledged that unit may occur in higher back pressure underload because volume flow reduces Air blast.And the presence of Overblow state so that rise from blade root to the steam temperature in the about 45% high region of leaf, turn into superheated steam, so Unit is in higher back pressure little volume flow, if pole when low pressure (LP) cylinder exhaust temperature is higher than the saturation temperature under exhaust steam pressure corresponds to It is possible to have occurred and that air blast phenomenon, is at this moment intervened.In general extraction condensing sets run, low pressure (LP) cylinder has a minimum volume Flow restriction, for general extraction and condensing unit back pressure in 4.9-6kPa or so, low pressure (LP) cylinder minimum mass flow is 120-145t/h or so, If unit back pressuce is reduced into 1.5-2kPa, in the case where minimum volume flow restriction is constant, then low pressure (LP) cylinder minimum mass stream Measure as 39-51t/h.Row's amount of drawing gas in 81-94 t/h can be increased, realize the increase of unit heat capacity.
2nd, condenser vacuum is improved
Condenser vacuum determines the size of the minimum through-flow mass flow of low pressure (LP) cylinder, and it is crucial for the present invention how to improve vacuum One of point, for power plant's pumped vacuum systems, because vacuum capability is poor under water ring pump low pressure conditions, generally below 10KPa efficiency drastically declines, and the preposition vacuum extractor that the present invention chooses(108)Vacuum capability with the reduction of pressure Change is smaller, therefore by preposition vacuum extractor(108)It is connected on before water ring vacuum pump, sets up preposition vacuum extractor isolation Stop valve(110), preposition vacuum extractor bypass stop valve(111), during into Heating Period, open preposition vacuum extractor isolation Stop valve(110), open preposition vacuum extractor(108), close preposition vacuum extractor bypass stop valve(111)It can improve Unit condenser vacuum.If original system is equipped with two water ring vacuum pumps, preposition vacuum extractor of connecting(108)The water ring of configuration is true Empty pump is the small water ring vacuum pump that unit original system water ring vacuum pump is either newly purchased, and small Water-ring vacuum pump power is less than raw water Ring vacuum pump power, but not less than the 1/3 of raw water ring vacuum pump power.
Using the method for the present invention, relative to prior art, can advantage is obtained that:
1st, technology of the present invention, any transformation is not carried out to turbine body, need to only increase preposition vacuum extractor and It is isolated and bypass valve, Steam Turbine Condenser Vacuum is improved in operation, to reduce low pressure (LP) cylinder minimum through-current capacity, in increasing Arrange the amount of drawing gas increase unit heat capacity.
2nd, system investments of the present invention are small, long lifespan, and maintenance workload is smaller.
3rd, relative optical axis transformation influence generated energy is less, is adapted to all extraction and condensing units to carry out heat capacity increase transformation.
4th, technical thought of the technology of the present invention in terms of heat capacity is increased is different from existing any technology, need to only lack Amount transformation can increase larger heat capacity.
Brief description of the drawings
Next, by refer to the attached drawing, the invention will be further described, wherein:
Fig. 1:High vacuum runs heating system schematic diagram
In figure:Steam turbine high-pressure cylinder(101), Steam Turbine Through IP Admission (102), turbine low pressure cylinder (103), generator (104), condenser(105), heat exchangers for district heating(106), water ring vacuum pump(107), preposition vacuum extractor(108), mesolow Cylinder gets in touch with regulating butterfly valve(109), preposition vacuum extractor isolation stop valve(110), preposition vacuum extractor bypass stop valve (111), heat supply extraction stop valve(112), main steam(201), reheated steam(202), water ring vacuum pump row's air(203), heat Net backwater(204), heat supply network water supply(205), heat exchangers for district heating is hydrophobic(206)
Embodiment
Refer to the attached drawing 1, the invention provides a kind of technology of thermal power generation unit increase heat capacity transformation, not to steamer Machine body carries out any transformation, only need to increase preposition vacuum extractor and its isolation and bypass valve, steam turbine is improved in operation Condenser vacuum, to reduce low pressure (LP) cylinder minimum through-current capacity, so as to arrange the amount of drawing gas increase unit heat capacity in increasing.And this hair The bright technological investment is small, long lifespan, and maintenance workload is smaller.Further, it is less with respect to optical axis transformation influence generated energy, fit Close all extraction and condensing units and carry out heat capacity increase transformation.To sum up, skill of the technology of the present invention in terms of heat capacity is increased Art thinking is different from existing any technology, and need to only transform on a small quantity can increase larger heat capacity.
In order to solve the above problems, a kind of turbine condenser high vacuum operation heat supply process is invented, and provide the skill The system configuration and transformation operation method, the system configuration of art mainly include steam turbine high-pressure cylinder(101), Steam Turbine Through IP Admission (102), turbine low pressure cylinder (103), generator(104), condenser(105), heat exchangers for district heating(106), water ring vacuum pump (107), preposition vacuum extractor(108), mesolow cylinder contact regulating butterfly valve(109), preposition vacuum extractor isolation stop valve (110), preposition vacuum extractor bypass stop valve(111), heat supply extraction stop valve(112), main steam(201), reheated steam (202), water ring vacuum pump row's air(203), heat supply network backwater(204), heat supply network water supply(205), heat exchangers for district heating is hydrophobic(206), And the valve and pipe fitting of connection the said equipment.
This patent system schematic is shown in accompanying drawing 1:Main steam in the system(201)Into steam turbine high-pressure cylinder(101) After finishing work(, reheated device continues to heat, the reheated steam after heating(202)Into Steam Turbine Through IP Admission (102), intermediate pressure cylinder row Vapour gets in touch with regulating butterfly valve through mesolow cylinder all the way(109)Continue to do work into turbine low pressure cylinder (103), connection is hot all the way in addition Net heater(106)To heat heat supply network backwater(204), heated heat supply network supplies water(205)It is supplied to heat user, heat supply network heating Device is hydrophobic(206)Picked out through heat exchangers for district heating bottom, drain recovery to condenser hotwell;Condenser(105)It is connected with low pressure (LP) cylinder Connect, generator(104)It is coaxially connected with steam turbine, the mechanical work of steam turbine is converted into electric energy;Draw in condenser supercooling region Main pipe is vacuumized, main pipe isolates stop valve through preposition vacuum extractor all the way(110), preposition vacuum extractor(108)It is led to water Ring vacuum pump(107)Arrange air by the road again(203), bypass stop valve through preposition vacuum extractor all the way in addition(111)Directly It is led to that water ring vacuum pump arranges air by the road again, two-way can switch under different unit operation operating modes.
Turbine condenser high vacuum runs heat supply scheme:Open preposition vacuum extractor isolation stop valve(110), open Preposition vacuum extractor(108), close preposition vacuum extractor bypass stop valve(111), work as condenser(105)Vacuum is near 2kPa or so, suitably turn mesolow cylinder contact regulating butterfly valve down(109)Aperture, you can the increase intermediate pressure cylinder steam discharge amount of drawing gas, reach Increase the purpose of unit heat capacity.
System of the present invention realizes that unit increase heat capacity key point has at following 2 points:Determine that low pressure (LP) cylinder minimum is through-flow Amount, improve condenser vacuum.
First, low pressure (LP) cylinder minimum through-current capacity is determined
Volume flow before turbine low pressure cylinder exhaust stage blade is too small, can occur flow separation at blade root first, occurs Whirlpool is flowed back, and at this moment steam does not do work not only, also has the opposite effect, and produces air blast, causes final stage efficiency drastically to decline, in the process of running Avoid the generation of air blast phenomenon.It is generally acknowledged that unit may occur in higher back pressure underload because volume flow reduces Air blast.And the presence of Overblow state so that rise from blade root to the steam temperature in the about 45% high region of leaf, turn into superheated steam, so Unit is in higher back pressure little volume flow, if pole when low pressure (LP) cylinder exhaust temperature is higher than the saturation temperature under exhaust steam pressure corresponds to It is possible to have occurred and that air blast phenomenon, is at this moment intervened.In general extraction condensing sets run, low pressure (LP) cylinder has a minimum volume Flow restriction, for general extraction and condensing unit back pressure in 4.9-6kPa or so, low pressure (LP) cylinder minimum mass flow is 120-145t/h or so, If unit back pressuce is reduced into 1.5-2kPa, in the case where minimum volume flow restriction is constant, then low pressure (LP) cylinder minimum mass stream Measure as 39-51t/h.Row's amount of drawing gas in 81-94 t/h can be increased, realize the increase of unit heat capacity.
2nd, condenser vacuum is improved
Condenser vacuum determines the size of the minimum through-flow mass flow of low pressure (LP) cylinder, and it is crucial for the present invention how to improve vacuum One of point, for power plant's pumped vacuum systems, because vacuum capability is poor under water ring pump low pressure conditions, generally below 10KPa efficiency drastically declines, and the preposition vacuum extractor that the present invention chooses(108)Vacuum capability with the reduction of pressure Change is smaller, therefore by preposition vacuum extractor(108)It is connected on before water ring vacuum pump, sets up preposition vacuum extractor isolation Stop valve(110), preposition vacuum extractor bypass stop valve(111), during into Heating Period, open preposition vacuum extractor isolation Stop valve(110), open preposition vacuum extractor(108), close preposition vacuum extractor bypass stop valve(111)It can improve Unit condenser vacuum.If original system is equipped with two water ring vacuum pumps, preposition vacuum extractor of connecting(108)The water ring of configuration is true Empty pump is the small water ring vacuum pump that unit original system water ring vacuum pump is either newly purchased, and small Water-ring vacuum pump power is less than raw water Ring vacuum pump power, but not less than the 1/3 of raw water ring vacuum pump power.
Using the method for the present invention, relative to prior art, can advantage is obtained that:
1st, technology of the present invention, any transformation is not carried out to turbine body, need to only increase preposition vacuum extractor and It is isolated and bypass valve, Steam Turbine Condenser Vacuum is improved in operation, to reduce low pressure (LP) cylinder minimum through-current capacity, in increasing Arrange the amount of drawing gas increase unit heat capacity.
2nd, system investments of the present invention are small, long lifespan, and maintenance workload is smaller.
3rd, relative optical axis transformation influence generated energy is less, is adapted to all extraction and condensing units to carry out heat capacity increase transformation.
4th, technical thought of the technology of the present invention in terms of heat capacity is increased is different from existing any technology, need to only lack Amount transformation can increase larger heat capacity.
Example explanation:
1 330MW sucking condensing turbine group of certain power plant, steam turbine model:C330/262-16.7/0.49/538/538, should Steam turbine maximum is drawn gas when the amount of drawing gas 550t/h is arranged in operating mode, unit low pressure (LP) cylinder minimum mass through-current capacity about 145t/h, the unit back of the body 4.9kPa is pressed, steam discharge enthalpy about 2320.4kJ/kg, corresponding steam discharge specific volume is 25.89m3/ kg, as the power plant undertakes heat supply The increase of area, the transformation demand of existing increase unit heat capacity.
Transformed according to system and method described in the technology of the present invention, specially increase preposition vacuum extractor, preposition take out Vacuum plant isolation stop valve, preposition vacuum extractor bypass stop valve and corresponding pipeline modification.
After transformation after Heating Period input modernization system, turbine condenser back pressure is controlled in 2kPa or so, not changed On the premise of turbine low pressure cylinder minimum volume flow, when unit back pressuce 2kPa is run, corresponding steam discharge specific volume is 60.93 m3/ Kg, corresponding unit low pressure (LP) cylinder minimum mass through-current capacity are changed into 61.6 t/h.
Arranging the amount of drawing gas after transformation in unit can increase by 83.4 t/h, and in the case that main vapour amount is constant, maximum is drawn gas in operating mode Row's maximum amount of drawing gas can increase to 633.4t/h.Correctional effect is obvious.
Preposition vacuum extractor in system described in the technology of the present invention(108)Can be centrifugal vacuum pump, or steam Injector and Roots type vacuum pump.
Although embodiments of the invention have been shown and described above, it is to be understood that above-described embodiment is example Property, it is impossible to limitation of the present invention is interpreted as, one of ordinary skill in the art within the scope of the invention can be to above-mentioned Embodiment is changed, changed, replacing and modification, and these change, modification, replacement and modification are also considered as the protection model of the present invention Enclose.

Claims (2)

1. a kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum, does not carry out any change to turbine body Make, only need to increase preposition vacuum extractor and its isolation and bypass valve, Steam Turbine Condenser Vacuum is improved in operation, to reduce Low pressure (LP) cylinder minimum through-current capacity, so as to arrange the amount of drawing gas increase unit heat capacity in increasing, it is characterised in that:
The system configuration being related to mainly includes steam turbine high-pressure cylinder (101), Steam Turbine Through IP Admission (102), turbine low pressure cylinder (103), generator (104), condenser (105), heat exchangers for district heating (106), water ring vacuum pump (107), preposition vacuum extractor (108), mesolow cylinder contact regulating butterfly valve (109), preposition vacuum extractor isolation stop valve (110), preposition vacuum extractor Stop valve (111) is bypassed, heat supply extraction stop valve (112), main steam (201), reheated steam (202), water ring vacuum pump row is greatly Gas (203), heat supply network backwater (204), heat supply network supply water (205), and heat exchangers for district heating is hydrophobic (206), and the valve of connection the said equipment Door and pipe fitting;
After main steam (201) finishes work(into steam turbine high-pressure cylinder (101) in the system, reheated device continues to heat, heating Reheated steam (202) afterwards enters Steam Turbine Through IP Admission (102), and intermediate pressure cylinder steam discharge gets in touch with regulating butterfly valve through mesolow cylinder all the way (109) continue to do work into turbine low pressure cylinder (103), connect heat exchangers for district heating (106) all the way in addition and returned to heat heat supply network Water (204), heated heat supply network water supply (205) are supplied to heat user, and heat exchangers for district heating hydrophobic (206) is through heat exchangers for district heating bottom Pick out, drain recovery to condenser hotwell;Condenser (105) is connected with low pressure (LP) cylinder, and generator (104) coaxially connects with steam turbine Connect, the mechanical work of steam turbine is converted into electric energy;Condenser supercooling region, which is drawn, vacuumizes main pipe, and main pipe is taken out very through preposition all the way Empty device isolation stop valve (110), preposition vacuum extractor (108) are led to that water ring vacuum pump (107) arranges air by the road again (203), bypass stop valve (111) through preposition vacuum extractor all the way in addition and be directly led to that water ring vacuum pump is arranged greatly by the road again Gas, two-way can switch under different unit operation operating modes;
In the process of running, turbine condenser high vacuum operation heat supply scheme:Open preposition vacuum extractor isolation stop valve (110) preposition vacuum extractor (108), is opened, preposition vacuum extractor bypass stop valve (111) is closed, when condenser (105) Near 2kPa of vacuum or so, suitably turn mesolow cylinder contact regulating butterfly valve (109) aperture down, increase the intermediate pressure cylinder steam discharge amount of drawing gas;
Two target patterns are determined in running, one is to determine that low pressure (LP) cylinder minimum through-current capacity, two are to improve condenser vacuum;
First, low pressure (LP) cylinder minimum through-current capacity is determined
When unit is in higher back pressure little volume flow, if saturation temperature of the low pressure (LP) cylinder exhaust temperature higher than exhaust steam pressure under corresponding When spending, it is most likely that have occurred and that air blast phenomenon, at this moment to be intervened, in extraction condensing sets run, low pressure (LP) cylinder has one most Little volume flow limits, and for 300MW level extraction and condensing unit back pressures in 4.9-6kPa or so, low pressure (LP) cylinder minimum mass flow is 120- 145t/h or so, if unit back pressuce is reduced into 1.5-2kPa, in the case where minimum volume flow restriction is constant, then low pressure (LP) cylinder Minimum mass flow is 39-51t/h, you can arranges the amount of drawing gas in increase 81-94t/h;
2nd, condenser vacuum is improved
Before preposition vacuum extractor (108) is connected on into water ring vacuum pump in the system, preposition vacuum extractor isolation is set up Stop valve (110), preposition vacuum extractor bypass stop valve (111), during into Heating Period, open preposition vacuum extractor isolation Stop valve (110), preposition vacuum extractor (108) is opened, closing preposition vacuum extractor bypass stop valve (111) can improve Unit condenser vacuum;
In system, the water ring vacuum pump (107) connected with preposition vacuum extractor (108) be unit original system water ring vacuum pump or Person is the small water ring vacuum pump newly purchased, and small Water-ring vacuum pump power is less than raw water ring vacuum pump power, but is not less than raw water ring The 1/3 of vacuum pump power.
2. according to the method for claim 1, wherein in system preposition vacuum extractor (108) be centrifugal vacuum pump or It is steam jet ejector and Roots type vacuum pump.
CN201710213037.6A 2017-04-01 2017-04-01 A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum Active CN106949521B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710213037.6A CN106949521B (en) 2017-04-01 2017-04-01 A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710213037.6A CN106949521B (en) 2017-04-01 2017-04-01 A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum

Publications (2)

Publication Number Publication Date
CN106949521A CN106949521A (en) 2017-07-14
CN106949521B true CN106949521B (en) 2017-12-08

Family

ID=59474267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710213037.6A Active CN106949521B (en) 2017-04-01 2017-04-01 A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum

Country Status (1)

Country Link
CN (1) CN106949521B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939463A (en) * 2017-12-21 2018-04-20 天津国电津能热电有限公司 A kind of condensing turbine group based on sorption type heat pump
CN108253812B (en) * 2017-12-31 2020-03-03 东北电力大学 Method for reducing temperature of circulating water in winter to improve vacuum of steam turbine condenser and cooler thereof
CN108180767B (en) * 2018-02-24 2024-01-19 西安西热节能技术有限公司 Plate type evaporative condenser applied to direct air cooling unit
CN109306877A (en) * 2018-07-28 2019-02-05 西安西热节能技术有限公司 It is a kind of to have the subsidiary engine system tune power source system for cutting cylinder functional bands heat supply
CN110821585A (en) * 2019-11-27 2020-02-21 国电电力发展股份有限公司大连开发区热电厂 Back-pressure heat supply technology-based condensation and extraction integrated system and application thereof
CN110926232A (en) * 2019-12-24 2020-03-27 哈尔滨广瀚新能动力有限公司 Air cooling island anti-freezing device used after cylinder transformation on direct air cooling type generator set
CN113847825B (en) * 2021-09-18 2024-03-12 西安热工研究院有限公司 System and method for adjusting cooling water quantity of independent condenser of small induced draft fan turbine

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103016082A (en) * 2012-12-25 2013-04-03 华北电力大学 300MW-capacity-level low vacuum heat supply steam turbine system and adjusting method thereof
CN205349434U (en) * 2015-12-31 2016-06-29 华电莱州发电有限公司 Two backpressure condenser energy saving and emission reduction systems of thermal power factory
CN105783082A (en) * 2016-04-29 2016-07-20 大唐东北电力试验研究所有限公司 Energy-saving heating network circulating water system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4997062B2 (en) * 2007-10-25 2012-08-08 本田技研工業株式会社 Cogeneration system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103016082A (en) * 2012-12-25 2013-04-03 华北电力大学 300MW-capacity-level low vacuum heat supply steam turbine system and adjusting method thereof
CN205349434U (en) * 2015-12-31 2016-06-29 华电莱州发电有限公司 Two backpressure condenser energy saving and emission reduction systems of thermal power factory
CN105783082A (en) * 2016-04-29 2016-07-20 大唐东北电力试验研究所有限公司 Energy-saving heating network circulating water system

Also Published As

Publication number Publication date
CN106949521A (en) 2017-07-14

Similar Documents

Publication Publication Date Title
CN106949521B (en) A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum
CN101696643B (en) Low-temperature heat energy recovering apparatus of heat and electricity co-generation and recovering method thereof
CN102720551B (en) Control method for steam thermal system with dual-machine backheating steam extraction
CN206468378U (en) A kind of Thermal generation unit heat storage type frequency modulation peak regulation system
CN201560812U (en) Cogeneration low temperature thermal energy recovery device
CN209688957U (en) The high back pressure heating system of thermoelectricity decoupling
CN206397550U (en) Low pressure cylinder cooling system after steam turbine optical axis heat supply transformation
CN109798157A (en) A kind of solidifying pumping back coupling steam extraction integrated system and its operation method for thermoelectricity unit power peak regulation
CN106091074A (en) A kind of absorption heat pump heating extraction for heat supply system
CN205957280U (en) Absorption heat pump heating steam extracting and heat supplying system
CN208124429U (en) A kind of thermal power plant unit steam extraction waste heat recycling system
CN107859538A (en) It is a kind of to be used for the solidifying co-generation unit and its operation method for taking out back of the body heat supply
CN106499455A (en) Combined-cycle power plant's soda pop backheat and fuel heating integrated put forward effect system
CN112856363B (en) System and method for improving heat supply steam parameters of deep peak shaving heat supply unit
CN102997309A (en) Classification heating system with high-temperature heat source heater bypass pipe
CN207813675U (en) A kind of co-generation unit for carrying on the back heat supply for solidifying pumping
CN107120147A (en) A kind of varying duty thermal power plant heating energy-saving structure and its adjusting method
CN107131545A (en) A kind of energy saving for power plants emission reduction heating system and its operation method
CN206440032U (en) A kind of recovery Steam Turbine exhaust steam residual heat system based on heat pump
CN210483828U (en) Energy-saving power generation and utilization system utilizing exhaust steam waste heat of steam turbine of thermal power plant
CN205840930U (en) A kind of high back pressure little steam turbine heating extraction for heat supply system
CN209877073U (en) Heating device for comprehensive application of screw expander and heat pump
CN210088955U (en) Combined cycle device for steam extraction integration and heat storage peak regulation coupling
CN208871717U (en) A kind of across season multi-level phase change heat reservoir suitable for high back pressure thermal power plant unit
CN107143391A (en) A kind of new middle backheating gas turbine combined cycle system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20171113

Address after: 100000 Beijing city Haidian District sorghum Bridge No. 44 District No. 89 13B-15

Applicant after: Sheng Yuan hi tech (Beijing) Technology Co., Ltd.

Address before: 350000 No. 36 East Main Road, Gulou District, Fujian, Fuzhou

Applicant before: Zhu Fengjuan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210810

Address after: 100142 515, floor 5, No. 111, Fucheng Road, Haidian District, Beijing

Patentee after: Beijing Yuanshen Energy Technology Co.,Ltd.

Address before: 100000 13B-15, 89, 44 District 1, Haidian District, Beijing.

Patentee before: Sheng Yuan hi tech (Beijing) Technology Co.,Ltd.

TR01 Transfer of patent right