CN205840930U - A kind of high back pressure little steam turbine heating extraction for heat supply system - Google Patents

A kind of high back pressure little steam turbine heating extraction for heat supply system Download PDF

Info

Publication number
CN205840930U
CN205840930U CN201620578191.4U CN201620578191U CN205840930U CN 205840930 U CN205840930 U CN 205840930U CN 201620578191 U CN201620578191 U CN 201620578191U CN 205840930 U CN205840930 U CN 205840930U
Authority
CN
China
Prior art keywords
heating
heater
steam
steam turbine
back pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201620578191.4U
Other languages
Chinese (zh)
Inventor
赵丽华
肖官和
陈远东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Longwei Power Generation Technology Co Ltd
Original Assignee
Beijing Longwei Power Generation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Longwei Power Generation Technology Co Ltd filed Critical Beijing Longwei Power Generation Technology Co Ltd
Priority to CN201620578191.4U priority Critical patent/CN205840930U/en
Application granted granted Critical
Publication of CN205840930U publication Critical patent/CN205840930U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00—Combustion technologies with mitigation potential
    • Y02E20/14—Combined heat and power generation [CHP]

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

一种高背压小汽机采暖抽汽供热系统,主要包括中压缸、低压缸、高背压小汽机、尖峰加热器、前置加热器、异步发电机、疏水泵、电动闸阀、电动调节阀、电动蝶阀、循环水泵、热网供水管路、热网回水管路,主要针对亚临界300MW及以上容量等级汽轮机采暖抽汽供热改造项目,在其中低压连通管抽出的高品质蒸汽,先经过高背压小汽机做功,蒸汽降压后进入前置加热器加热热网循环水。采暖期间尽量保持高背压小汽机满负荷运行,通过尖峰加热器的调节满足供热负荷变化的调节要求。热网循环水经热网回水管路依次进入前置加热器和尖峰加热器加热后通过热网供水管路供给热用户。本实用新型增加了机组发电能力,实现了能量梯级利用,具有良好的经济性和运行灵活性。

A high back pressure small steam turbine heating extraction steam heating supply system, mainly including medium pressure cylinder, low pressure cylinder, high back pressure small steam turbine, peak heater, front heater, asynchronous generator, drain pump, electric gate valve, electric adjustment Valves, electric butterfly valves, circulating water pumps, heating network water supply pipelines, and heating network return pipelines are mainly for subcritical 300MW and above steam turbine heating extraction and heating supply renovation projects. Among them, the high-quality steam extracted from the low-pressure connecting pipe is After the high back pressure small steam turbine does work, the steam depressurizes and enters the front heater to heat the circulating water of the heating network. During the heating period, try to keep the high back pressure small steam turbine running at full load, and meet the adjustment requirements of the heating load change through the adjustment of the peak heater. The circulating water of the heating network enters the pre-heater and the peak heater in sequence through the heating network return water pipeline to be heated and then supplied to the heat users through the heating network water supply pipeline. The utility model increases the power generation capacity of the unit, realizes energy cascade utilization, and has good economy and operation flexibility.

Description

一种高背压小汽机采暖抽汽供热系统A high back pressure small turbine heating extraction steam heating system

技术领域technical field

本实用新型属于火力发电厂节能技术领域,直接应用于亚临界300MW及以上容量等级汽轮机采暖抽汽供热改造项目上,以实现热电联产,提高机组循环效率。The utility model belongs to the technical field of energy-saving of thermal power plants, and is directly applied to the renovation project of subcritical 300MW and above-capacity steam turbines for heating extraction and heating supply, so as to realize cogeneration of heat and power and improve the cycle efficiency of the unit.

背景技术Background technique

目前国内主要的采暖抽汽供热改造方案是在汽轮机的中低压连通管上打孔、引出中压缸排汽进入热网加热器加热热网循环水实现对外供热。该改造方案针对200MW及以下容量等级汽轮机来说实施简单,初期投资小,在国内已有大量成熟的案例,不足之处是对于亚临界300MW及以上容量等级汽轮机,由于中压缸排汽压力较高(0.7Mpa以上,远大于热网加热器加热热网循环水所需要的蒸汽压力0.2-0.3MPa),某些电厂的做法是将该高压蒸汽经减压阀降压后再引入热网加热器加热热网循环水实现对外供热,这在一定程度上浪费了高品质的蒸汽。At present, the main domestic heating extraction and heat supply transformation scheme is to drill holes in the medium and low pressure connecting pipes of the steam turbine, lead the medium pressure cylinder exhaust steam into the heating network heater to heat the circulating water of the heating network to achieve external heating. The transformation plan is simple to implement for steam turbines with a capacity of 200MW and below, and the initial investment is small. There are already a large number of mature cases in China. High (above 0.7Mpa, far greater than the steam pressure 0.2-0.3MPa required by the heating network heater to heat the circulating water of the heating network). The external heating is realized by heating the circulating water of the heating network, which wastes high-quality steam to a certain extent.

发明内容Contents of the invention

本实用新型提供了一种高背压小汽机采暖抽汽供热系统,该系统在保证满足采暖抽汽供热需求的同时增发一定电量,解决了亚临界300MW及以上容量等级汽轮机中压缸排汽减压后直接对外供热所造成的高品质蒸汽浪费的问题。The utility model provides a high-back pressure small steam turbine heating and steam extraction heating system. The system can meet the needs of heating, steam extraction and heating while generating a certain amount of electricity, and solves the problem of subcritical 300MW and above capacity steam turbines. The problem of waste of high-quality steam caused by direct external heating after steam decompression.

本实用新型解决其技术问题所采用的技术方案是:一种高背压小汽机采暖抽汽供热系统,主要包括中压缸、低压缸、高背压小汽机、尖峰加热器、前置加热器、异步发电机、疏水泵、电动闸阀、电动调节阀、电动蝶阀、循环水泵、热网供水管路、热网回水管路。所述前置加热器和尖峰加热器均为表面式加热器,分汽侧和水侧两部分,汽侧对应蒸汽进口和疏水出口,水侧对应水侧进口和水侧出口。所述中压缸的排汽口设有两条支路,一条支路与低压缸的进口相连,在该支路上装有电动蝶阀,通过电动蝶阀开度的大小控制低压缸进汽量,实现抽汽压力调节功能;当采暖期结束后,该电动蝶阀全开,机组恢复纯凝工况运行;另一条支路为供热蒸汽管路,该供热蒸汽管路又分为两个分支,一个分支与高背压小汽机相连,中压缸排汽作为高背压小汽机的驱动汽源,带动与高背压小汽机相连的异步发电机发电,高背压小汽机排汽进入前置加热器汽侧进口;另一个分支与尖峰加热器汽侧进口相连。所述前置加热器水侧和尖峰加热器水侧串联连接,前置加热器将由热网供水管路送来的热网循环水由70度加热至95度,尖峰加热器将热网循环水由95度加热至130度或热网要求的温度后供给热用户。在整个采暖期内,尽量保持高背压小汽机满负荷运行,使高背压小汽机具有较高的运行经济性。所述尖峰加热器兼具调节功能,当热负荷变化时,通过尖峰加热器调节热网循环水供水温度。所述尖峰加热器为全容量表面式加热器,可以承担热网系统100%的供热负荷,即在高背压小汽机停运时可将热网循环水由70℃直接加热至130℃或热网要求的温度。The technical scheme adopted by the utility model to solve the technical problem is: a heating system with high back pressure small steam turbine, which mainly includes medium pressure cylinder, low pressure cylinder, high back pressure small steam turbine, peak heater, front heating Devices, asynchronous generators, drain pumps, electric gate valves, electric control valves, electric butterfly valves, circulating water pumps, heating network water supply pipelines, and heating network return water pipelines. Both the front heater and the peak heater are surface heaters, which are divided into two parts: the steam side and the water side. The steam side corresponds to the steam inlet and the drain outlet, and the water side corresponds to the water side inlet and the water side outlet. The exhaust port of the medium-pressure cylinder is provided with two branches, one of which is connected to the inlet of the low-pressure cylinder, and an electric butterfly valve is installed on the branch, and the steam intake of the low-pressure cylinder is controlled by the opening of the electric butterfly valve to realize Extraction pressure adjustment function; when the heating period is over, the electric butterfly valve is fully opened, and the unit returns to pure condensation operation; the other branch is the heating steam pipeline, which is divided into two branches, One branch is connected with the small steam turbine with high back pressure. The exhaust steam of the medium pressure cylinder is used as the driving steam source of the small steam turbine with high back pressure to drive the asynchronous generator connected with the small steam turbine with high back pressure to generate electricity. The exhaust steam of the small steam turbine with high back pressure enters the front The inlet of the steam side of the heater; the other branch is connected with the inlet of the steam side of the peak heater. The water side of the pre-heater and the water side of the peak heater are connected in series, the pre-heater heats the circulating water of the heating network sent by the water supply pipeline of the heating network from 70 degrees to 95 degrees, and the peak heater heats the circulating water of the heating network After heating from 95 degrees to 130 degrees or the temperature required by the heating network, it will be supplied to heat users. During the whole heating period, try to keep the small steam turbine with high back pressure running at full load, so that the small steam turbine with high back pressure has high operating economy. The peak heater also has an adjustment function, and when the heat load changes, the temperature of the circulating water supply of the heating network is adjusted through the peak heater. The peak heater is a full-capacity surface heater, which can bear 100% of the heating load of the heating network system, that is, it can directly heat the circulating water of the heating network from 70°C to 130°C or The temperature required by the heating network.

所述前置加热器和尖峰加热器的疏水经疏水泵加压后返回至凝结水系统。The drainage of the pre-heater and the peak heater is pressurized by the drainage pump and then returned to the condensate system.

在供热蒸汽管路上装有电动调节阀,当采暖期结束,该电动调节阀关闭,机组恢复纯凝工况运行。An electric regulating valve is installed on the heating steam pipeline. When the heating period is over, the electric regulating valve is closed, and the unit returns to pure condensing operation.

在高背压小汽机蒸汽进口处装有电动闸阀,当高背压小汽机故障时或需要高背压小汽机停运时,该电动闸阀关闭。An electric gate valve is installed at the steam inlet of the small steam turbine with high back pressure. When the small steam turbine with high back pressure fails or needs to be shut down, the electric gate valve is closed.

在热网回水管路连接前置加热器水侧出口的管路上装有电动闸阀,当高背压小汽机正常运行时该电动闸阀关闭,当高背压小汽机停运时该电动闸阀打开,此时热网循环水不进入前置加热器,直接进入尖峰加热器加热。An electric gate valve is installed on the pipeline connecting the return water pipeline of the heating network to the water side outlet of the front heater. When the high back pressure small steam turbine is running normally, the electric gate valve is closed, and when the high back pressure small steam turbine is out of operation, the electric gate valve is opened. At this time, the circulating water of the heating network does not enter the front heater, but directly enters the peak heater for heating.

本实用新型的有益效果是,通过在供热改造系统中增加高背压小汽机,利用较高参数的抽汽发电,降低参数后再引入前置加热器对热网循环水进行加热;尖峰加热器的设置保证了在热负荷变化时或高背压小汽机停运时供热系统仍能满足热负荷要求。本实用新型提高了机组的发电能力,实现了能量梯级利用,具有良好的经济性和运行的灵活性。The beneficial effect of the utility model is that, by adding a small steam turbine with high back pressure in the heating reformation system, steam extraction with a higher parameter is used to generate electricity, and after the parameter is reduced, a front heater is introduced to heat the circulating water of the heating network; the peak heating The setting of the device ensures that the heating system can still meet the heat load requirements when the heat load changes or when the small steam turbine with high back pressure is out of service. The utility model improves the power generation capacity of the unit, realizes energy cascade utilization, and has good economy and operation flexibility.

附图说明Description of drawings

下面结合附图和实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1 是本实用新型的结构示意图。Fig. 1 is a structural schematic diagram of the utility model.

图中 1.中压缸,2.低压缸,3.高背压小汽机, 4.异步发电机,5.前置加热器,6.尖峰加热器,7.疏水泵,8.电动蝶阀, 9.电动闸阀,10.循环水泵,11.电动调节阀,12.热网供水管路,13.热网回水管路,14.电动闸阀。In the figure 1. Medium pressure cylinder, 2. Low pressure cylinder, 3. High back pressure small steam turbine, 4. Asynchronous generator, 5. Front heater, 6. Peak heater, 7. Drain pump, 8. Electric butterfly valve, 9. Electric gate valve, 10. Circulating water pump, 11. Electric regulating valve, 12. Heat network water supply pipeline, 13. Heat network return water pipeline, 14. Electric gate valve.

具体实施方式detailed description

在图1所示的实施例中,在所述中压缸(1)的排汽口设有两条支路,一条支路与低压缸(2)的进口相连,在该支路上装有电动蝶阀(8);另一条支路分为两个分支,一个分支与高背压小汽机(3)相连,高背压小汽机(3)与异步发电机(4)相连;另一个分支与尖峰加热器(6)的汽侧进口相连。高背压小汽机(3)的排汽进入前置加热器(5)的汽侧进口。热网循环水经热网回水管路(13)依次进入前置加热器(5)和尖峰加热器(6),从尖峰加热器(6)的水侧出口出来的热网循环水经热网供水管路(12)供给热用户。非采暖期停运高背压小汽机(3),关闭电动调节阀(11)和电动闸阀(14)、电动闸阀(9),全开电动蝶阀(8),机组恢复至纯凝工况运行。采暖期内当高背压小汽机(3)故障时,需要将高背压小汽机(3)从系统中切除,此时关闭电动闸阀(14),打开电动闸阀(9),由尖峰加热器(6)将热网循环水由70℃直接加热至130℃或热网要求的温度。In the embodiment shown in Figure 1, there are two branches at the exhaust port of the medium-pressure cylinder (1), one branch is connected to the inlet of the low-pressure cylinder (2), and an electric motor is installed on the branch. Butterfly valve (8); the other branch is divided into two branches, one branch is connected with the high back pressure small steam turbine (3), and the high back pressure small steam turbine (3) is connected with the asynchronous generator (4); the other branch is connected with the peak The steam side inlet of the heater (6) is connected. The exhaust steam of the high back pressure small turbine (3) enters the steam side inlet of the front heater (5). The circulating water of the heating network enters the front heater (5) and the peak heater (6) sequentially through the return water pipeline (13) of the heating network, and the circulating water of the heating network coming out of the water side outlet of the peak heater (6) passes through the heating network The water supply pipeline (12) supplies heat consumers. Shut down the small steam turbine (3) with high back pressure during the non-heating period, close the electric regulating valve (11), electric gate valve (14), electric gate valve (9), fully open the electric butterfly valve (8), and the unit returns to pure condensing operation . During the heating period, when the high back pressure small steam turbine (3) fails, it is necessary to remove the high back pressure small steam turbine (3) from the system. At this time, the electric gate valve (14) is closed, the electric gate valve (9) is opened, and the peak heater (6) Directly heat the circulating water of the heating network from 70°C to 130°C or the temperature required by the heating network.

前置加热器(5)和尖峰加热器(6)的疏水经疏水泵(7)加压后返回至凝结水系统。The drainage of the front heater (5) and the peak heater (6) is pressurized by the drainage pump (7) and then returned to the condensate system.

具体而言,本实用新型主要针对亚临界300MW及以上容量等级汽轮机采暖抽汽供热改造项目,在其中低压连通管抽出的高品质蒸汽,先经过高背压小汽机做功,蒸汽降压后进入前置加热器加热热网循环水。为保证高背压小汽机具有较高的热效率,在采暖期间,尽量保持高背压小汽机满负荷运行,通过尖峰加热器的调节满足供热负荷变化的调节要求。前置加热器和尖峰加热器的疏水经疏水泵加压后进入凝结水系统。热网循环水经热网回水管路依次进入前置加热器和尖峰加热器,加热后通过热网供水管路供给热用户。在汽轮机供热运行期间,当热负荷一定时,汽轮机电功率有最低限制值,以保证汽轮机有足够的进汽量,进而保证低压缸有足够的进汽量,以确保低压缸运行的安全性。根据汽轮机容量、抽汽参数及流量的不同,高背压小汽机可选用额定功率为5MW-12MW的机型,数量1-2台。Specifically, this utility model is mainly aimed at the subcritical 300MW and above-capacity steam turbine heating extraction and heat supply renovation project, in which the high-quality steam extracted from the low-pressure connecting pipe first passes through a small steam turbine with high back pressure to do work, and the steam enters after depressurization The pre-heater heats the circulating water of the heating network. In order to ensure the high thermal efficiency of the small steam turbine with high back pressure, during the heating period, try to keep the small steam turbine with high back pressure running at full load, and meet the adjustment requirements of the heating load change through the adjustment of the peak heater. The drainage of the front heater and the peak heater enters the condensate system after being pressurized by the drainage pump. The circulating water of the heating network enters the pre-heater and the peak heater in turn through the return water pipeline of the heating network, and is supplied to the heat user through the water supply pipeline of the heating network after being heated. During the heating operation of the steam turbine, when the heat load is constant, the electrical power of the steam turbine has a minimum limit value to ensure that the steam turbine has sufficient steam intake, and then the low-pressure cylinder has sufficient steam intake to ensure the safety of the low-pressure cylinder operation. According to the different steam turbine capacity, steam extraction parameters and flow rate, the high back pressure small steam turbine can choose a model with a rated power of 5MW-12MW, and the number is 1-2.

Claims (1)

1.一种高背压小汽机采暖抽汽供热系统,主要包括中压缸、低压缸、高背压小汽机、尖峰加热器、前置加热器、异步发电机、疏水泵、电动闸阀、电动调节阀、电动蝶阀、循环水泵、热网供水管路、热网回水管路,其特征是:所述中压缸的排汽口设有两条支路,一条支路与低压缸的进口相连,在该支路上装有电动蝶阀;另一条支路为供热蒸汽管路,该供热蒸汽管路又分为两个分支,一个分支与高背压小汽机相连,高背压小汽机与异步发电机相连,高背压小汽机的排汽进入前置加热器的汽侧进口;另一个分支与尖峰加热器汽侧进口相连,所述前置加热器和尖峰加热器均为表面式加热器,分汽侧和水侧两部分,汽侧对应蒸汽进口和疏水出口,疏水出口装有疏水泵;水侧对应水侧进口和水侧出口,所述前置加热器水侧和尖峰加热器水侧串联连接,在供热蒸汽管路上装有电动调节阀,在高背压小汽机蒸汽进口处和热网回水管路连接前置加热器水侧出口的管路上均装有电动闸阀。1. A high back pressure small steam turbine heating extraction steam heating supply system, mainly including medium pressure cylinder, low pressure cylinder, high back pressure small steam turbine, peak heater, front heater, asynchronous generator, drain pump, electric gate valve, Electric regulating valve, electric butterfly valve, circulating water pump, heating network water supply pipeline, heating network return water pipeline, characterized in that: the exhaust port of the medium pressure cylinder is provided with two branches, one branch and the inlet of the low pressure cylinder An electric butterfly valve is installed on this branch; the other branch is a heating steam pipeline, which is divided into two branches, one branch is connected with a small steam turbine with high back pressure, and the small steam turbine with high back pressure It is connected with the asynchronous generator, and the exhaust steam of the small steam turbine with high back pressure enters the steam side inlet of the preheater; the other branch is connected with the steam side inlet of the peak heater, and the preheater and the peak heater are both surface type The heater is divided into two parts: the steam side and the water side. The steam side corresponds to the steam inlet and the drain outlet, and the drain outlet is equipped with a drain pump; the water side corresponds to the water side inlet and the water side outlet. The water side of the pre-heater and the peak heating The water side of the heater is connected in series, an electric regulating valve is installed on the heating steam pipeline, and an electric gate valve is installed on the steam inlet of the small steam turbine with high back pressure and the return water pipeline of the heating network connected to the outlet of the water side of the front heater.
CN201620578191.4U 2016-06-16 2016-06-16 A kind of high back pressure little steam turbine heating extraction for heat supply system Expired - Lifetime CN205840930U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620578191.4U CN205840930U (en) 2016-06-16 2016-06-16 A kind of high back pressure little steam turbine heating extraction for heat supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620578191.4U CN205840930U (en) 2016-06-16 2016-06-16 A kind of high back pressure little steam turbine heating extraction for heat supply system

Publications (1)

Publication Number Publication Date
CN205840930U true CN205840930U (en) 2016-12-28

Family

ID=58153296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620578191.4U Expired - Lifetime CN205840930U (en) 2016-06-16 2016-06-16 A kind of high back pressure little steam turbine heating extraction for heat supply system

Country Status (1)

Country Link
CN (1) CN205840930U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111895488A (en) * 2019-05-06 2020-11-06 河北大唐国际张家口热电有限责公司 Steam inlet regulating valve applied to heat supply network system and control method
CN112049700A (en) * 2020-07-23 2020-12-08 华电电力科学研究院有限公司 A comprehensive energy system and its control method utilizing the residual energy of high-parameter heating steam in co-generation of heat and power
CN112523821A (en) * 2020-12-21 2021-03-19 西安热工研究院有限公司 Network source coordinated heating system and method with self-adaptive steam extraction and heating load
CN114941554A (en) * 2022-05-09 2022-08-26 中国船舶重工集团公司第七0三研究所 Energy cascade system for cogeneration of heating steam and utilization method
CN117703549A (en) * 2023-12-19 2024-03-15 中核能源科技有限公司 Supercritical high-temperature gas cooled reactor thermoelectric water combined supply system and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111895488A (en) * 2019-05-06 2020-11-06 河北大唐国际张家口热电有限责公司 Steam inlet regulating valve applied to heat supply network system and control method
CN112049700A (en) * 2020-07-23 2020-12-08 华电电力科学研究院有限公司 A comprehensive energy system and its control method utilizing the residual energy of high-parameter heating steam in co-generation of heat and power
CN112523821A (en) * 2020-12-21 2021-03-19 西安热工研究院有限公司 Network source coordinated heating system and method with self-adaptive steam extraction and heating load
CN114941554A (en) * 2022-05-09 2022-08-26 中国船舶重工集团公司第七0三研究所 Energy cascade system for cogeneration of heating steam and utilization method
CN114941554B (en) * 2022-05-09 2023-09-08 中国船舶重工集团公司第七0三研究所 Cascade system for heating steam to carry out heat and electricity combined energy and utilization method
CN117703549A (en) * 2023-12-19 2024-03-15 中核能源科技有限公司 Supercritical high-temperature gas cooled reactor thermoelectric water combined supply system and method

Similar Documents

Publication Publication Date Title
CN110725725B (en) A gas-steam combined cycle system and method based on regenerative start-up
CN205957280U (en) Absorption heat pump heating steam extracting and heat supplying system
CN105927298A (en) Heating steam-extraction and heating-supply system adopting high-back-pressure small steam turbine
CN106091074A (en) A kind of absorption heat pump heating extraction for heat supply system
CN106287902B (en) Combined heat and power unit combined with electric heat pump and heat storage device and its peak regulation method
CN109322716B (en) Gas-steam combined cycle high back pressure heat supply unit and rotor-changing non-stop combustion machine method
CN111577410B (en) Gas turbine inlet air temperature control device and gas turbine inlet air temperature control method
CN205101052U (en) Novel heating system of thermal power plant
CN108005741B (en) Cogeneration system for improving heat supply safety of back condensation and back extraction and adjustment method
CN111365748B (en) Heat supply method and heat supply system of cogeneration unit
CN102011616A (en) High-flow, low-parameter and high-backpressure expansion power energy-saving system
CN209145663U (en) A kind of heat supply steam extraction optimization system based on small * damage Mixing Technology
CN204299632U (en) For back pressure machine acting and the heating arrangement of Steam Turbine Through IP Admission steam discharge heating network
CN209877073U (en) A heating device with integrated application of screw expander and heat pump
CN201916008U (en) Expansion power energy-saving system with high flow, low parameter and high back pressure
CN105298555B (en) Pure condensate-high back pressure circulating water heating double mode single rotor steam turbine and its system
CN103363564A (en) Energy-saving heat supplying system and heat supplying method capable of improving low-grade steam heat utilization efficiency
CN210511852U (en) High-backpressure coupling large-temperature-difference heat supply system for indirect air cooling unit
CN207674551U (en) A kind of cooling tower antifreezing system for the solidifying pumping back of the body heat supply of steam turbine
CN203478400U (en) Energy-saving heat supply system for improving low-grade steam heat energy utilization efficiency
CN111503703B (en) Heat supply method of cogeneration unit and cogeneration unit
CN210483828U (en) Energy-saving power generation and utilization system utilizing exhaust steam waste heat of steam turbine of thermal power plant
CN108469059A (en) A kind of the steam energy cascade utilization coupled system and working method of annual operation
CN217653946U (en) Peak-shaving heat supply and energy-saving system of gas-steam combined cycle heat supply unit
CN118815560A (en) A system and method for realizing zero-power access to the grid for a cogeneration unit using electric heat storage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100044 18th floor, Fangyuan building, No.56, Zhongguancun South Street, Haidian District, Beijing

Patentee after: Beijing Guoneng Longwei Power Generation Technology Co.,Ltd.

Address before: 100044 18th floor, Fangyuan building, No.56, Zhongguancun South Street, Haidian District, Beijing

Patentee before: BEIJING LONGWEI POWER GENERATION TECHNOLOGY Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20161228