CN106948538A - Furred ceiling structure and building structure - Google Patents

Furred ceiling structure and building structure Download PDF

Info

Publication number
CN106948538A
CN106948538A CN201710332055.6A CN201710332055A CN106948538A CN 106948538 A CN106948538 A CN 106948538A CN 201710332055 A CN201710332055 A CN 201710332055A CN 106948538 A CN106948538 A CN 106948538A
Authority
CN
China
Prior art keywords
furred ceiling
petal
ceiling structure
joist
suspension rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710332055.6A
Other languages
Chinese (zh)
Inventor
石峰
徐永选
彭小飞
周杰
朱天送
唐兴勇
钱超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Decorative Engineering Co Ltd Of Builing Second Bureau
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Original Assignee
Decorative Engineering Co Ltd Of Builing Second Bureau
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Decorative Engineering Co Ltd Of Builing Second Bureau, China Construction Second Engineering Bureau Co Ltd filed Critical Decorative Engineering Co Ltd Of Builing Second Bureau
Priority to CN201710332055.6A priority Critical patent/CN106948538A/en
Publication of CN106948538A publication Critical patent/CN106948538A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/006Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/045Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like being laminated

Abstract

A kind of furred ceiling structure provided in an embodiment of the present invention and building structure, are related to construction engineering technical field.The furred ceiling structure includes multiple suspension rods and petal ceiling structure.One end of the multiple suspension rod is used to be fixedly connected on lighting roof, and the other end is connected with the petal ceiling structure.The furred ceiling structure also includes fire prevention film, and the fire prevention film is arranged on the petal ceiling structure.It is quick for installation, possess waterproof antimildew function by setting fire prevention film on petal ceiling structure.

Description

Furred ceiling structure and building structure
Technical field
The present invention relates to construction engineering technical field, in particular to a kind of furred ceiling structure and building structure.
Background technology
As domestic construction industry is continued to develop, Commercial Complex building is continued to bring out, and sets the public of large scale special-shaped furred ceiling Building is more and more, is difficult to meet the complicated engineering of span moulding using traditional ceiling construction technology;Not only engineering time length, Effect on environment is big, and can not meet moulding arbitrarily various, rich color requirement, how in casual labourer's phase, the feelings of safety and environmental protection Under condition, very specific creative furred ceiling engineering is completed, is problem urgently to be resolved hurrily in current Commercial Complex construction.
The content of the invention
It is an object of the invention to provide a kind of furred ceiling structure and building structure, it can improve above mentioned problem.For Above-mentioned purpose is realized, the technical scheme that the present invention takes is as follows:
In a first aspect, the embodiments of the invention provide a kind of furred ceiling structure, the furred ceiling structure includes multiple Suspension rod and petal ceiling structure.One end of the multiple suspension rod is used to be fixedly connected on lighting roof, the other end with it is described Petal ceiling structure connection.The furred ceiling structure also includes fire prevention film, and the fire prevention film is arranged at described petal hang On roof construction.
In preferred embodiments of the present invention, above-mentioned petal ceiling structure includes at least one petal furred ceiling component. At least one described petal furred ceiling component includes the petal furred ceiling component of first layer.The petal furred ceiling component bag of first layer Include multiple first main joists and multiple first secondary joists.The multiple first main joist splices in petal each other.It is the multiple First secondary joist is sequentially connected on the multiple first main joist and the axial direction of first secondary joist and described first Main joist axial direction the first predetermined angle of formation, it is arranged in a ring.The multiple suspension rod includes multiple first suspension rods.Each institute The one end for stating the first suspension rod is connected with first secondary joist, and the other end is respectively used for being fixedly connected on the steel construction of lighting roof Bottom, correspondingly, the fire prevention film is arranged on first secondary joist.
In preferred embodiments of the present invention, at least one above-mentioned petal furred ceiling component also includes that the second layer is petal hangs Top component.The internal diameter of the petal furred ceiling component of the second layer is more than the internal diameter of the petal furred ceiling component of the first layer.It is described The petal furred ceiling component of the second layer includes multiple second main joists and multiple second secondary joists.The multiple second main joist is each other Splicing is in petal.The multiple second secondary joist is sequentially connected on the multiple second main joist and second secondary joist Axial direction and the second main joist axial direction the second predetermined angle of formation, it is arranged in a ring.The multiple suspension rod is also Including multiple second suspension rods, one end of each second suspension rod is connected with second secondary joist, and the other end is respectively used for The lower end of the steel construction of lighting roof is fixedly connected on, correspondingly, the fire prevention film is also provided on second secondary joist.
In preferred embodiments of the present invention, the end of above-mentioned first main joist, the end Jun Bao of second main joist It is wrapped with plastic tube.
In preferred embodiments of the present invention, above-mentioned furred ceiling structure also includes otic placode.One end of first suspension rod It is connected by the otic placode with first secondary joist, the other end is respectively used for being fixedly connected under the steel construction of lighting roof End.
In preferred embodiments of the present invention, above-mentioned furred ceiling structure also includes woodwork plate, tube support.Described first The woodwork plate is provided with main joist, second main joist.The tube support is installed on the woodwork plate, it is described Tube support is used to install fluorescent tube.
In preferred embodiments of the present invention, above-mentioned first main joist, first secondary joist, second main joist, Second secondary joist, first suspension rod, second suspension rod are coating steel pipe.
In preferred embodiments of the present invention, above-mentioned furred ceiling structure also includes maintenance packway.The maintenance packway is set It is placed in the lower end of the petal ceiling structure.
In preferred embodiments of the present invention, expanded steel diamond mesh is provided with above-mentioned maintenance packway.
Second aspect, the embodiments of the invention provide a kind of building structure, the building structure include lighting roof, pendent lamp and Above-mentioned furred ceiling structure.The lighting roof is connected with the pendent lamp, the furred ceiling structure respectively.
A kind of furred ceiling structure provided in an embodiment of the present invention and building structure, the furred ceiling structure include multiple Suspension rod and petal ceiling structure.One end of the multiple suspension rod is used to be fixedly connected on lighting roof, the other end with it is described Petal ceiling structure connection.The furred ceiling structure also includes fire prevention film, and the fire prevention film is arranged at described petal hang On roof construction.It is quick for installation, possess waterproof antimildew function by setting fire prevention film on petal ceiling structure.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be attached to what is used needed for embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
The applied environment for the furred ceiling structure that Fig. 1 provides for first embodiment of the invention;
The structure of the petal furred ceiling component of first layer in the furred ceiling structure that Fig. 2 provides for first embodiment of the invention Schematic diagram;
The structure of the petal furred ceiling component of the second layer in the furred ceiling structure that Fig. 3 provides for first embodiment of the invention Schematic diagram;
The structure of the petal furred ceiling component of third layer in the furred ceiling structure that Fig. 4 provides for first embodiment of the invention Schematic diagram;
The arrangement schematic diagram of multiple suspension rods in the furred ceiling structure that Fig. 5 provides for first embodiment of the invention;
The arrangement schematic diagram of plastic tube in the furred ceiling structure that Fig. 6 provides for first embodiment of the invention;
The arrangement schematic diagram of otic placode in the furred ceiling structure that Fig. 7 provides for first embodiment of the invention;
The arrangement schematic diagram on packway is overhauled in the furred ceiling structure that Fig. 8 provides for first embodiment of the invention.
In figure:10- furred ceiling structures;The steel construction of 100- lighting roofs;The suspension rods of 110- first;The suspension rods of 120- second; The suspension rods of 130- the 3rd;The petal furred ceiling components of 210-;The petal furred ceiling component of 220- first layers;The main joists of 221- first;221a- Plastic tube;The secondary joists of 222- first;222a- otic placodes;The petal furred ceiling component of the 230- second layers;The main joists of 231- second;232- Second secondary joist;The petal furred ceiling component of 240- third layer;The main joists of 241- the 3rd;242- third time keel;300- fire prevention films; 301- overhauls packway;301a- expanded steel diamond mesh.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Present invention implementation generally here described and illustrated in accompanying drawing The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, the orientation of instruction such as term " on ", " under ", " interior ", " vertical " or Position relationship be based on orientation shown in the drawings or position relationship, or the orientation usually put when using of the invention product or Position relationship, is for only for ease of the description present invention and simplifies description, rather than indicate or imply that the device or element of meaning must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.In addition, art Language " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and it is not intended that indicating or implying relative importance.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " connection " should It is interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or is integrally connected;Can be that machinery connects Connect or electrically connect;Can be joined directly together, can also be indirectly connected to by intermediary, can be in two elements The connection in portion.For the ordinary skill in the art, the tool of above-mentioned term in the present invention can be understood with concrete condition Body implication.
First embodiment
Fig. 1 and Fig. 2 are please referred to, the embodiments of the invention provide a kind of furred ceiling structure 10, the furred ceiling Structure 10 includes multiple suspension rods and petal ceiling structure.One end of the multiple suspension rod is used to be fixedly connected on lighting roof On, the other end is connected with the petal ceiling structure.The furred ceiling structure 10 also includes fire prevention film 300, the fire prevention Film 300 is arranged on the petal ceiling structure.
Fig. 1 and Fig. 2 are please referred to, the steel construction 100 of lighting roof is curved.The petal ceiling structure is included at least One petal furred ceiling component 210.At least one described petal furred ceiling component 210 includes the petal furred ceiling component of first layer 220.The petal furred ceiling component 220 of first layer includes multiple first main joists 221 and multiple first secondary joists 222.It is described Multiple first main joists 221 splice in petal each other.The multiple first secondary joist 222 is sequentially connected to the multiple first On main joist 221 and the axial direction of first secondary joist 222 and the axial direction of the first main joist 221 formation are first pre- It is arranged in a ring if angle.First predetermined angle can be 0-90 degree.The multiple suspension rod includes multiple first suspension rods 110.One end of each first suspension rod 110 is connected with first secondary joist 222, and the other end is respectively used for being fixedly connected In the bottom of the steel construction 100 of lighting roof, correspondingly, the fire prevention film 300 is arranged on first secondary joist 222.Specifically Ground, the fire prevention film 300 is arranged between each first secondary joist 222.
In the present embodiment, as shown in Fig. 2 the multiple first main joist 221 can be six the first main joists 221. Multiple first secondary joists 222 are arranged at intervals with each axial direction of first main joist 221, it is arranged in a ring.First layer petal Shape furred ceiling component 220 is overall rounded, and radius is 15450mm.In practical application installation, the petal furred ceiling component of first layer 220 are arranged under lighting roof, because multiple first main joists 221 splice each other, are cross-linked, cause apart from ground level not Together, can be 17238mm or 17588mm apart from ground.
It should be noted that above-mentioned size and the first main joist 221 on the petal furred ceiling component 220 of first layer away from What data from the ground were merely exemplary, can be changed according to operation environment in actual production or installation process.
Please refer to Fig. 1 and Fig. 3, at least one described petal furred ceiling component 210 also includes that the second layer is petal to be hung Top component 230.The internal diameter of the petal furred ceiling component 230 of the second layer is more than the petal furred ceiling component 220 of the first layer Internal diameter.The petal furred ceiling component 230 of the second layer includes multiple second main joists 231 and multiple second secondary joists 232.It is the multiple Second main joist 231 splices in petal each other.The multiple second secondary joist 232 is sequentially connected to the multiple second main dragon On bone 231 and the axial direction of second secondary joist 232 and the axial direction of the second main joist 231 the second preset angle of formation Degree, it is arranged in a ring.Second predetermined angle can be 0-90 degree.The multiple suspension rod also includes multiple second suspension rods 120. One end of each second suspension rod 120 is connected with second secondary joist 232, and the other end is respectively used for being fixedly connected on and adopted The lower end of the steel construction 100 of spire, correspondingly, the fire prevention film 300 are also provided on second secondary joist 232.Specifically, The fire prevention film 300 is arranged between each second secondary joist 232.
In the present embodiment, as shown in figure 3, the multiple second main joist 231 can be eight the second main joists 231. Multiple second secondary joists 232 are arranged at intervals with each axial direction of second main joist 231, it is arranged in a ring.Second layer petal Shape furred ceiling component 230 is overall rounded, and radius is 18231mm.In practical application installation, the petal furred ceiling component of the second layer 230 are arranged under lighting roof, because multiple second main joists 231 splice each other, are cross-linked, cause apart from ground level not Together, can be 15025mm or 15375mm apart from ground.
It should be noted that above-mentioned size and the second main joist 231 on the petal furred ceiling component 230 of the second layer away from What data from the ground were merely exemplary, can be changed according to operation environment in actual production or installation process.
Incorporated by reference to Fig. 1 and Fig. 4, at least one described petal furred ceiling component 210 also includes the petal furred ceiling group of third layer Part 240.The internal diameter of the petal furred ceiling component 240 of third layer is more than the internal diameter of the petal furred ceiling component 240 of the third layer. The petal furred ceiling component 240 of third layer includes multiple 3rd main joists 241 and multiple third time keel 242.It is the multiple 3rd main joist 241 splices in petal each other.The multiple third time keel 242 are sequentially connected to the multiple 3rd main dragon On bone 241 and the axial direction of the third time keel 242 and the axial direction of the 3rd main joist 241 the 3rd preset angle of formation Degree, it is arranged in a ring.3rd predetermined angle can be 0-90 degree.The multiple suspension rod also includes multiple 3rd suspension rods 130, One end of each 3rd suspension rod 130 is connected with the third time keel 242, and the other end is respectively used for being fixedly connected on and adopted The lower end of the steel construction 100 of spire, correspondingly, the fire prevention film 300 are also provided on the third time keel 242.Specifically, The fire prevention film 300 is arranged between each third time keel 242.
In the present embodiment, as shown in figure 4, the multiple 3rd main joist 241 can be eight the 3rd main joists 241. Multiple third time keel 242 are arranged at intervals with each axial direction of 3rd main joist 241, it is arranged in a ring.Third layer petal Shape furred ceiling component 240 is overall rounded, and radius is 19961mm.In practical application installation, the petal furred ceiling component of third layer 240 are arranged under lighting roof, because multiple 3rd main joists 241 splice each other, are cross-linked, cause apart from ground level not Together, can be 13200mm or 13550mm apart from ground.
It should be noted that above-mentioned size and the 3rd main joist 241 on the petal furred ceiling component 240 of third layer away from What data from the ground were merely exemplary, can be changed according to operation environment in actual production or installation process.
It should be noted that can suitably increase petal furred ceiling component 210 so that petal to hang according to actual conditions Different petal shapes are presented in roof construction.
First main joist 221, the first secondary joist 222, the first suspension rod 110, the second main joist 231, the second secondary joist 232, Second suspension rod 120 is coating steel pipe.3rd main joist 241, third time keel 242, the 3rd suspension rod 130 are coating steel pipe. The petal furred ceiling component 220 of first layer, the petal furred ceiling component 230 of the second layer, the petal furred ceiling component 240 of third layer all exist Factory process, every petal is an individually entirety.It is convenient using Steel Structure Installation, component be entirely factory it is integrated plus Work, Assembling is fast, and a large amount of building wastes will not be produced to scene, and steel can be reclaimed, free from environmental pollution.
The fire prevention film 300 can be A grades of fire prevention films.Various petals can be determined according to the shape of each primary and secondary skeletal frame Shape, moulding is random, various.
Referring to Fig. 5, the arrangement schematic diagram of the multiple suspension rods for the furred ceiling structure 10 that Fig. 5 provides for the present embodiment, with The center of lighting roof is the center of circle, different radiuses, different concentric circles, with 9 degree of equal cyclotomy, at interval of 9 degree of cloth on each circumference Suspension rod is put, totally 40 suspension centres on each circumference.From it is interior outward, at interval of 9 degree of arrangements, each first hangs on second circumference At interval of 9 degree of arrangement each second suspension rods 120 on bar 110, the 3rd circumference, each is arranged at interval of 9 degree on the 3rd circumference 3rd suspension rod 130.
Incorporated by reference to Fig. 1 and Fig. 6, the end of the first main joist 221 is enclosed with plastic tube 221a.Similarly, second master The end of keel 231, the end of the 3rd main joist 241 are enclosed with plastic tube 221a.It is similar with Fig. 6, it is easy for description, do not draw Go out its schematic diagram.
Referring to Fig. 7, furred ceiling structure 10 also includes otic placode 222a.One end of first suspension rod 110 passes through described Otic placode 222a is connected with first secondary joist 222, and the other end is respectively used for being fixedly connected on the steel construction 100 of lighting roof Lower end.As a kind of embodiment, otic placode 222a perforation returns connection with high-strength bolt.
It is understood that the second suspension rod 120 and the petal furred ceiling component 230 of the second layer, the 3rd suspension rod 130 and third layer Each junction of petal furred ceiling component 240 can be provided with otic placode 222a, similar with Fig. 7, easy for description, be not drawn into it Schematic diagram.
Furred ceiling structure 10 also includes woodwork plate, tube support.First main joist 221, second main joist The woodwork plate is provided with 231.The tube support is installed, the tube support is used to install lamp on the woodwork plate Pipe.So that the contrast of fire prevention film 300 is glossy.
Referring to Fig. 8, the furred ceiling structure 10 also includes maintenance packway 301.The maintenance packway 301 is arranged at institute State the lower end of petal ceiling structure.Expanded steel diamond mesh 301a is provided with the maintenance packway 301.In order to which the later stage is petal The petal furred ceiling component 220 of each petal such as first layer of furred ceiling component 210, the petal furred ceiling component 230 of the second layer, third layer The service work of petal furred ceiling component 240.
The specific size of each several part is all according to the mark in design drawing in the furred ceiling structure 10 that the present embodiment is provided Note is produced, for example, in wherein a kind of embodiment, the steel length of boom in multiple suspension rods has 16 kinds, respectively For 3172mm, 3270mm, 3620mm, 464mm, 3018mm, 3522mm, 814mm, 3368mm, 2572mm, 2222mm, 2465mm, 1749mm、502mm、519mm、2115mm、366mm.The material of steel suspension rod such as the first suspension rod 110 in multiple suspension rods 100 is Q235B, specification are PIP50x3.The otic placode 222a at suspension rod two ends specification is PL6x6, weld seam (1.5%), the ear at suspension rod two ends The bolt of connection is M16x45 between plate 222a.
When implementing to install, the steel suspension rod with lighting roof steel structure connection is all connected with high-strength bolt first, Then the petal furred ceiling component 220 of first layer, the petal furred ceiling component 230 of the second layer, the petal furred ceiling component of third layer are connected 240, the overlapped sequential of petal is noted during installation, uppermost first to fill, nethermost rear dress, after petal is assembled, at every The end of petal is wrapped up round steel pipe using plastic tube 221a, and inspection is set below the petal furred ceiling component 240 of third layer Packway 301 is repaiied, expanded steel diamond mesh 301a, finally, the tensioning A grades of fire prevention film on petal are laid on passage.
Specifically, the above-mentioned construction procedure for furred ceiling structure 10 is as follows:
Step 1, the welding of lighting roof otic placode, specifically, first using prefabricated otic placode and lighting roof welding for steel structure, weldering Stitch (1.5%), position is centrally arranged in weld, and otic placode must ensure perpendicularity, and top layer counterdie is combined with steel structural roof Closing in is blocked in face using stainless steel plate flanging, flexible pipe, to reach decorative effect requirement.
Step 2, arrangement suspension rod.Specifically, first the first suspension rod 110 of the petal furred ceiling component 220 of connection first layer All with lighting roof steel structure connection, then the petal furred ceiling component 220 of first layer is installed, second layer flower is installed according to this step The petal furred ceiling component 240 of lobed furred ceiling component 230, third layer, notes the sequence of construction of every petal, from top to bottom, from inner Installed to outer principle.
Plastic tube 221a is wrapped up in step 3, the end of every petal.
Step 4, the setting maintenance packway 301 below the petal furred ceiling component 240 of third layer, overhaul the upper berth water chestnut of packway 301 Shape expanded metal lath 301a.
Step 5, installation T5 fluorescent tubes.Specifically, woodwork plate is set on steel joist, and T5 tube supports are arranged on woodwork plate On, adjacent lamp tube joint, in order to avoid adjacent joint produces shade in same position, should not influence attractive in appearance in same position.
Step 6, installation fire prevention film 300.Can be A grades of fire prevention films, it is specifically, first, each to each main joist, secondary joist Node is handled, and weld seam is polished flat, and checks whether each main joist, secondary joist have what unsuitable A grades of fire prevention film was installed Situation;Secondly, before A grades of fire prevention films are installed, it should clear up A grades of fire prevention films and dust and spot on steel joist;Then, with special A grades of fire prevention film tensionings are inserted into keel framework notch with flat chisel, impact gun homogeneous heating deploys A grades of fire prevention films.
Step 7, cleaning fire prevention film 300.Can be A grades of fire prevention films, specifically, after installing, with clean towel A grades Fire prevention film cleaning is clean, and itself has electrostatic-proof function, so its surface is will not to be infected with dust.
The furred ceiling structure 10 that the present embodiment is provided is applied to all types of industries place, commercial location, office space, amusement The various heteropetalous ceiling systems in a variety of places such as place, physical culture place, hotel, hospital, school, commercial club, technique Simply, easy installation and removal, high recycling rate is safe and reliable, the cost-effective and duration.With lightweight, with coloured silk it is abundant, Nondiscolouring, various shapes, high-end and atmospheric, extremely strong waterproof antimildew function, be flooded after be not in it is water stain with breed bacteria and Cleaning and quick and easy for installation, factory's concentrated processing, job site monolithic petal integral hoisting, shortening duration.In addition, people's dead-wood Material consumption is less, free from environmental pollution, recycles by force, improves economic benefit.
A kind of furred ceiling structure 10 provided in an embodiment of the present invention, the furred ceiling structure 10 include multiple suspension rods with And petal ceiling structure.One end of the multiple suspension rod is used to be fixedly connected on lighting roof, the other end with it is described petal Ceiling structure is connected.The furred ceiling structure 10 also includes fire prevention film 300, and the fire prevention film 300 is arranged at described petal On ceiling structure.It is quick for installation, possess waterproof antimildew function by setting fire prevention film 300 on petal ceiling structure.
Second embodiment
The embodiments of the invention provide a kind of building structure, the building structure includes lighting roof, pendent lamp and above-mentioned day Flower ceiling structure 10.The lighting roof is connected with the pendent lamp, the furred ceiling structure 10 respectively.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the building of foregoing description The specific work process of structure, may be referred to the corresponding process in foregoing furred ceiling constructive embodiment, will not be repeated here.
The embodiments of the invention provide a kind of building structure, the building structure includes lighting roof, pendent lamp and furred ceiling Structure 10.The lighting roof is connected with the pendent lamp, the furred ceiling structure 10 respectively.It is quick and easy for installation, do not pollute ring Border, improve economic benefit.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of furred ceiling structure, it is characterised in that the furred ceiling structure includes multiple suspension rods and petal furred ceiling Structure, one end of the multiple suspension rod is used to be fixedly connected on lighting roof, and the other end is connected with the petal ceiling structure, The furred ceiling structure also includes fire prevention film, and the fire prevention film is arranged on the petal ceiling structure.
2. furred ceiling structure according to claim 1, it is characterised in that the petal ceiling structure includes at least one Individual petal furred ceiling component, at least one described petal furred ceiling component includes the petal furred ceiling component of first layer, described first The petal furred ceiling component of layer includes multiple first main joists and multiple first secondary joists, and the multiple first main joist splices each other In petal, the multiple first secondary joist be sequentially connected on the multiple first main joist and first secondary joist axle To direction and the first main joist axial direction the first predetermined angle of formation, arranged in a ring, the multiple suspension rod includes many Individual first suspension rod, one end of each first suspension rod is connected with first secondary joist, and the other end is respectively used for the company of fixation The bottom of the steel construction of lighting roof is connected to, correspondingly, the fire prevention film is arranged on first secondary joist.
3. furred ceiling structure according to claim 2, it is characterised in that at least one described petal furred ceiling component is also Including the petal furred ceiling component of the second layer, the internal diameter of the petal furred ceiling component of the second layer is hung more than the first layer is petal The internal diameter of top component, the petal furred ceiling component of the second layer includes multiple second main joists and multiple second secondary joists, described Multiple second main joists splice in petal each other, and the multiple second secondary joist is sequentially connected to the multiple second main joist The axial direction of upper and described second secondary joist and the second main joist axial direction the second predetermined angle of formation, are arranged in a ring Row, the multiple suspension rod also includes multiple second suspension rods, and one end of each second suspension rod is connected with second secondary joist, The other end is respectively used for being fixedly connected on the lower end of the steel construction of lighting roof, correspondingly, and the fire prevention film is also provided at described On second secondary joist.
4. furred ceiling structure according to claim 3, it is characterised in that the end of first main joist, described The end of two main joists is enclosed with plastic tube.
5. furred ceiling structure according to claim 3, it is characterised in that the furred ceiling structure also includes otic placode, One end of first suspension rod is connected by the otic placode with first secondary joist, and the other end is respectively used for being fixedly connected on The lower end of the steel construction of lighting roof.
6. furred ceiling structure according to claim 3, it is characterised in that the furred ceiling structure also includes carpenter It is provided with the woodwork plate, the woodwork plate and pacifies on plate, tube support, first main joist, second main joist Equipped with the tube support, the tube support is used to install fluorescent tube.
7. furred ceiling structure according to claim 3, it is characterised in that first main joist, first time dragon Bone, second main joist, second secondary joist, first suspension rod, second suspension rod are coating steel pipe.
8. furred ceiling structure according to claim 1, it is characterised in that the furred ceiling structure also includes maintenance horse Road, the maintenance packway is arranged at the lower end of the petal ceiling structure.
9. furred ceiling structure according to claim 8, it is characterised in that be provided with rhombic steel plate on the maintenance packway Net.
10. a kind of building structure, it is characterised in that the building structure includes lighting roof, pendent lamp and as claim 1-9 is any Furred ceiling structure described in, the lighting roof is connected with the pendent lamp, the furred ceiling structure respectively.
CN201710332055.6A 2017-05-11 2017-05-11 Furred ceiling structure and building structure Pending CN106948538A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710332055.6A CN106948538A (en) 2017-05-11 2017-05-11 Furred ceiling structure and building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710332055.6A CN106948538A (en) 2017-05-11 2017-05-11 Furred ceiling structure and building structure

Publications (1)

Publication Number Publication Date
CN106948538A true CN106948538A (en) 2017-07-14

Family

ID=59478630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710332055.6A Pending CN106948538A (en) 2017-05-11 2017-05-11 Furred ceiling structure and building structure

Country Status (1)

Country Link
CN (1) CN106948538A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107832548A (en) * 2017-11-24 2018-03-23 巧夺天宫(深圳)科技有限公司 Circle logical furred ceiling design system, its method, electronic equipment and computer program
CN110258895A (en) * 2019-06-10 2019-09-20 中国建筑第八工程局有限公司 Silk ball moulding furred ceiling and its construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201574507U (en) * 2009-05-19 2010-09-08 湖南望新建设集团股份有限公司 Soft film ceiling mounting structure
RU120674U1 (en) * 2012-05-25 2012-09-27 Алексей Алексеевич Сатаров PROFILE FOR INSTALLATION OF MULTILEVEL STRETCH CEILING
CN202899506U (en) * 2012-11-10 2013-04-24 苏州金螳螂建筑装饰股份有限公司 Ceiling with light-transmission flexible film
CN103835424A (en) * 2014-02-12 2014-06-04 苏州金螳螂建筑装饰股份有限公司 Soft film suspended ceiling
CN203795693U (en) * 2014-04-17 2014-08-27 苏州苏明装饰股份有限公司 Suspended ceiling structure for luminescence membrane
CN105464276A (en) * 2016-01-06 2016-04-06 浙江解放装饰工程有限公司 Multistage suspended ceiling
CN105908891A (en) * 2016-06-01 2016-08-31 苏州恒品建筑装饰有限公司 Novel suspended ceiling
CN205840090U (en) * 2016-06-23 2016-12-28 深圳市盛朗艺术设计有限公司 A kind of access hole structure of furred ceiling
CN207525965U (en) * 2017-05-11 2018-06-22 中国建筑第二工程局有限公司 Furred ceiling structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201574507U (en) * 2009-05-19 2010-09-08 湖南望新建设集团股份有限公司 Soft film ceiling mounting structure
RU120674U1 (en) * 2012-05-25 2012-09-27 Алексей Алексеевич Сатаров PROFILE FOR INSTALLATION OF MULTILEVEL STRETCH CEILING
CN202899506U (en) * 2012-11-10 2013-04-24 苏州金螳螂建筑装饰股份有限公司 Ceiling with light-transmission flexible film
CN103835424A (en) * 2014-02-12 2014-06-04 苏州金螳螂建筑装饰股份有限公司 Soft film suspended ceiling
CN203795693U (en) * 2014-04-17 2014-08-27 苏州苏明装饰股份有限公司 Suspended ceiling structure for luminescence membrane
CN105464276A (en) * 2016-01-06 2016-04-06 浙江解放装饰工程有限公司 Multistage suspended ceiling
CN105908891A (en) * 2016-06-01 2016-08-31 苏州恒品建筑装饰有限公司 Novel suspended ceiling
CN205840090U (en) * 2016-06-23 2016-12-28 深圳市盛朗艺术设计有限公司 A kind of access hole structure of furred ceiling
CN207525965U (en) * 2017-05-11 2018-06-22 中国建筑第二工程局有限公司 Furred ceiling structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107832548A (en) * 2017-11-24 2018-03-23 巧夺天宫(深圳)科技有限公司 Circle logical furred ceiling design system, its method, electronic equipment and computer program
CN110258895A (en) * 2019-06-10 2019-09-20 中国建筑第八工程局有限公司 Silk ball moulding furred ceiling and its construction method

Similar Documents

Publication Publication Date Title
CN109614723A (en) A kind of comprehensive construction method based on BIM technology
CN205688642U (en) A kind of large space ceiling decoration supporting construction
CN110440429B (en) Subway arched roof ventilating pipeline assembling construction method
CN110512790B (en) High and large space multi-curvature suspended ceiling structure and construction method thereof
CN102864936A (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN106948538A (en) Furred ceiling structure and building structure
CN105298124A (en) Large-span double-curved-surface tree-shadow-shaped ceiling structure and construction method thereof
CN207525965U (en) Furred ceiling structure
CN109826082B (en) Construction method for installing decorative structure in multi-tower combined space of cable-stayed bridge
CN205477339U (en) A cage ladder that is used for steel construction factory building shingle nail to install
CN203794440U (en) Assembled roofing color plate lifting frame
CN109098338A (en) A kind of assembled abnormity structural system of roof and its construction method
CN105735477A (en) Latticed shell unit block and manufacturing method thereof
CN109555257B (en) Combined supporting and hanging rod type suspended ceiling and construction method
CN205805152U (en) Tool-type temporary construction fence
CN103821336B (en) A kind of fixed high-altitude long-span construction operation platform of rope and construction method thereof
CN110778094A (en) High-altitude large-span dragline net operating platform and construction method
CN107675827A (en) The method that indoor mineral wool board carries out quick furred ceiling
CN114232802A (en) Steel structure dome latticed shell structure and sectional construction method thereof
CN102777703A (en) Assembly type light pipeline hanger
CN113356452A (en) Construction method of hyperboloid arc-shaped suspended ceiling
CN207110429U (en) Roofing attaching beam formula hanging basket mechanism arrangement
CN217232553U (en) Cylindrical-shaped light well
CN104372957B (en) A kind of flagpole construction method of installation at architectural reserving hole channel
CN216616500U (en) Electromechanical smart integrated supporting system of adorning of annular corridor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170714

RJ01 Rejection of invention patent application after publication