CN106948461A - Integrated wellhead module device and modular multifunctional inspection shaft - Google Patents

Integrated wellhead module device and modular multifunctional inspection shaft Download PDF

Info

Publication number
CN106948461A
CN106948461A CN201710311004.5A CN201710311004A CN106948461A CN 106948461 A CN106948461 A CN 106948461A CN 201710311004 A CN201710311004 A CN 201710311004A CN 106948461 A CN106948461 A CN 106948461A
Authority
CN
China
Prior art keywords
wellhead module
wellhead
inspection shaft
cylinder
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710311004.5A
Other languages
Chinese (zh)
Other versions
CN106948461B (en
Inventor
王鲁平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710311004.5A priority Critical patent/CN106948461B/en
Publication of CN106948461A publication Critical patent/CN106948461A/en
Application granted granted Critical
Publication of CN106948461B publication Critical patent/CN106948461B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/024Manhole shafts or other inspection chambers; Snow-filling openings; accessories made of plastic material
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/027The bottom made of prefabricated segments

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to underground water supply and drainage systems technology field, it is a kind of integrated wellhead module device and modular multifunctional inspection shaft, it includes wellhead module, the outer wall of wellhead module is provided with the concrete bearing layer linked into an integrated entity with wellhead module, and adjustable height formula, which increases, is provided with the first space between the outer wall of cylinder and the inwall of wellhead module;Adjustable height formula, which increases, is provided with Second gap between the upper end of cylinder and the lower surface of cover seat of manhole.Present invention employs integrated wellhead module device so that wellhead module and concrete formation integrated steel tendon concrete structure, vehicle roll impact under will not separate;Adjustable height formula to increase and leave Second gap between the upper end of cylinder and the lower end of cover seat of manhole in wellhead module, when well lid is rolled impact, impulsive force will not be transferred to adjustable height formula and increase cylinder and well body, so that the service life and maintenance cycle of inspection shaft are longer, the sewage avoided in drainage pipeline is leaked into soil, it is more environmentally-friendly, road surface can also be avoided to cave in.

Description

Integrated wellhead module device and modular multifunctional inspection shaft
Technical field
It is a kind of integrated wellhead module device and many work(of modular the present invention relates to underground water supply and drainage systems technology field Can inspection shaft.
Background technology
For Economization on land, on town road, many inspection shafts are typically provided with, vehicle passes through the well above inspection shaft Gai Shi, having to well lid, impulsive force can be transferred to walling crib, the borehole wall, well successively after certain pressure and impulsive force, well lid stress Under body and blow-off line, long duration of action, blow-off line can deform it is U-shaped, so as to form hollow area, sludge at inspection shaft Easily accumulated in well, block blow-off line, it is necessary to often carry out pipe-dredging maintenance, taken current road surface, reduce path link Line efficiency, wastes time and energy, and maintenance cost is high;In addition, for refitting road surface, cast-in-place formation well is built by laying bricks or stones again after inspection shaft backfill Wall, the borehole wall is laid cement after reaching a certain height, and walling crib is then sat on cement, the manhole cover in walling crib, due to fragment of brick, cement, Walling crib is not a kind of material, during use, and fragment of brick, cement, walling crib occur delamination, rock, damage, so as to cause well Build crooked, inspection shaft to collapse, potential safety hazard is brought to the current vehicle in road surface.
The content of the invention
The invention provides a kind of integrated wellhead module device and modular multifunctional inspection shaft, overcome above-mentioned existing The deficiency of technology, it can effectively solve the easy stress deformation of blow-off line at existing inspection shaft, form the problem of blocking, Yi Jijian The problem of easy crooked, inspection shaft of well lid for looking into well easily collapses, there is potential safety hazard.
The first technical scheme of the present invention is realized by following measures:A kind of integrated wellhead module device, Including wellhead module, wellhead module is in cylinder cartridge type, and the outer wall of wellhead module is provided with and mixing that wellhead module links into an integrated entity Solidifying soil supporting course, the outer wall top of wellhead module is provided with annular protrusion, and the outer wall bottom of wellhead module is provided with annular groove, well head Cover seat of manhole of the upper inside wall of module provided with annular.
Second of technical scheme of the present invention is realized by following measures:One kind includes above-mentioned integrated well head mould The modular multifunctional inspection shaft of block assembly, also increases cylinder and well body, the upper end open of well body, adjustable height including adjustable height formula The lower end socket joint that formula increases cylinder is fixedly mounted at the upper end open of well body, and the lower end inner wall of wellhead module is set in adjustable height Formula increases on the upper end outer wall of cylinder, and adjustable height formula increases empty provided with first between the outer wall of cylinder and the inwall of wellhead module Gap;Adjustable height formula, which increases, is provided with Second gap between the upper end of cylinder and the lower surface of cover seat of manhole.
Here is the further optimization and/or improvements to foregoing invention technical scheme:
Above-mentioned modular multifunctional inspection shaft also includes well lid, and well lid is located on cover seat of manhole and inside wellhead module;Well The bottom outer wall of body is provided with the circular door opening being connected with pipeline, arch door opening, circular hole or without hole flat board.
Above-mentioned well lid, wellhead module, adjustable height formula are increased cylinder, well body and are made of composite.
The bottom of above-mentioned well body is provided with the bottom with chute or flat bottom, and bottom is provided with slot, the lower end of well body It is fixed together in slot on insertion bottom and by adhesive.
Above-mentioned multiple wellhead modules can be superimposed socket joint up and down, and the lower end of each wellhead module is provided with annular plug, positioned at upper The wellhead module of side is inserted by annular plug in the cover seat of manhole of underlying wellhead module.
Above-mentioned wellhead module inwall, adjustable height formula increase an inwall, well body inwall and are respectively equipped with cat ladder mounting hole, cat ladder Maintenance cat ladder is installed in mounting hole;Or/and, well body is spliced by least two pieces jigsaw, is passed through between adjacent two pieces of jigsaw Joinery and its construction, adhesive or threaded fastener are fixedly installed togather.
Reasonable and compact in structure of the present invention, easy to use, which employs integrated wellhead module device so that wellhead module With concrete formation integrated steel tendon concrete structure, wellhead module and concrete bearing layer stress together, in rolling for vehicle It will not be separated under impact, the problem of solving that well lid is crooked, collapse at well head;Meanwhile, the modular multifunctional that the present invention is provided Inspection shaft, adjustable height formula increases the inside of the upper end insertion wellhead module of cylinder, and adjustable height formula increases upper end and the well head of cylinder Second gap is left in module between the lower end of cover seat of manhole, adjustable height formula increases between the outer wall of cylinder and the inwall of wellhead module The first gap is left, so, wellhead module increases cylinder with adjustable height formula and do not contacted actually, when well lid is rolled punching When hitting, impulsive force is transferred on roadbed by wellhead module, concrete bearing layer, and cylinder is increased without being transferred to adjustable height formula And well body, it would not naturally also be transferred to drainage pipeline, i.e. wellhead module and adjustable height formula increases and has certain slow between cylinder Distance is rushed, even if wellhead module understands downward elastic settlement after being rolled, adjustable height formula will not be also touched and increase cylinder, therefore, Employ after the technical scheme that the present invention is provided, what well lid was subject to, which rolls impact, will not be transferred to drainage pipeline, not result in The deformation and blocking of drainage pipeline, so that the sewage avoided in drainage pipeline is leaked into soil, it is to avoid soil and groundwater Pollution, it is more environmentally-friendly;Meanwhile, the sewage in drainage pipeline will not be leaked easily, and road surface can also be avoided to cave in, make passing road It is safer, reduce security risk;Modular multifunctional inspection shaft is firm in structure, easy construction, and technology maturation is corrosion-resistant, this The service life for allowing for inspection shaft is longer, and maintenance cycle is also longer, will not continually take road and carry out dredging maintenance, it is ensured that The coast is clear, save maintenance cost, with it is safe, laborsaving, easy, efficient the characteristics of.
Brief description of the drawings
Accompanying drawing 1 is the main view cross section structure diagram of the embodiment of the present invention one.
Accompanying drawing 2 is the overlooking the structure diagram of structure shown in accompanying drawing 1.
Accompanying drawing 3 is the main view cross section structure diagram of the embodiment of the present invention two.
Accompanying drawing 4 is the main structure diagram of structure shown in accompanying drawing 3.
Coding in accompanying drawing is respectively:1 is wellhead module, and 2 be concrete bearing layer, and 3 be annular protrusion, and 4 is recessed for annular Groove, 5 increase cylinder for adjustable height formula, and 6 be well body, and 7 be bottom, and 8 be cat ladder mounting hole, and 9 be cover seat of manhole, and 10 be arch door opening, a For Second gap.
Embodiment
The present invention is not limited by following embodiments, can technique according to the invention scheme and actual conditions it is specific to determine Embodiment.
In the present invention, for the ease of description, the description of the relative position relation of each part is according to Figure of description 3 Butut mode be described, such as:The position relationship of forward and backward, upper and lower, left and right etc. is the Butut according to Figure of description Direction is determined.
With reference to embodiment and accompanying drawing, the invention will be further described:
Embodiment one:As shown in accompanying drawing 1,2, the integrated wellhead module device includes wellhead module 1, and wellhead module 1 is in cylinder Cartridge type, the outer wall of wellhead module 1 is provided with outside the concrete bearing layer 2 linked into an integrated entity with wellhead module 1, wellhead module 1 Wall top is provided with annular protrusion 3, and the outer wall bottom of wellhead module 1, which is provided with annular groove 4, the upper inside wall of wellhead module 1, to be set There is the cover seat of manhole 9 of annular.For refitting road surface, inspection shaft is after backfill, and existing way is built by laying bricks or stones above well body The cast-in-place formation borehole wall, the borehole wall lays cement after reaching a certain height, wellhead module 1 is then laid on cement surface, in well head mould Well lid is covered on block 1, because fragment of brick, cement, walling crib are not a kind of materials, during use, walling crib, cement, fragment of brick exist Delamination occurs under the impact-rolling of vehicle, walling crib, cement and fragment of brick are separated, and easily occurred rocking, are damaged, well lid meeting Crooked, there is hollow, damaged situation in well head.The integrated wellhead module device that the present invention is provided is by wellhead module 1 and coagulation Native supporting course 2 is poured together, during site operation, is first well placed wellhead module 1, is then poured around wellhead module 1 Concrete, so as to form integrated steel tendon concrete structure, wellhead module 1 and concrete are connected, wellhead module 1 and coagulation Native supporting course 2 stress together, will not separate under impact, the globality of the integrated wellhead module device is more in being rolled for vehicle By force, compressive property more preferably, ensure that the integrality and service life of well head, well lid is hardly damaged significantly, and well head is not susceptible to hole Hollow and damaged situation, reduces situation about being collapsed at well head and occurs.Annular protrusion 3, annular groove 4 can increase wellhead module 1 The contact area of outer wall and concrete bearing layer 2 so that it is more firm that wellhead module 1 is connected with concrete bearing layer 2, is difficult Separation, improves the structural strength and service life of integrated wellhead module device.Annular protrusion 3 and annular groove 4 can make well It is even closer that mouth mold block 1 is combined with concrete bearing layer 2, strengthens the bearing capacity of wellhead module 1, structural strength is higher, no It is fragile.
Embodiment two:As shown in accompanying drawing 3,4, a kind of module of the integrated wellhead module device comprising described in embodiment one Formula multifunctional examining well, also increases cylinder 5 and well body 6 including adjustable height formula, and the upper end open of well body 6, adjustable height formula increases The lower end socket joint of cylinder 5 is fixedly mounted at the upper end open of well body 6, and the lower end inner wall of wellhead module 1 is set in adjustable height formula Increase on the upper end outer wall of cylinder 5, adjustable height formula, which increases, is provided with the first space between the outer wall of cylinder 5 and the inwall of wellhead module 1; Adjustable height formula, which increases, is provided with Second gap a between the upper end of cylinder 5 and the lower surface of cover seat of manhole 9.
Structure in the present invention in addition to integrated wellhead module device refer to Authorization Notice No. for CN203514481U, Patent name is the patent document of inspection shaft, and Authorization Notice No. is that CN204456203U, patent name are the special of inspection shaft Sharp document.
Existing inspection shaft builds the cast-in-place formation borehole wall by laying bricks or stones after backfill in well body, and the borehole wall lays water after reaching a certain height Mud, lays walling crib on cement, and well lid is arranged in walling crib, and such well lid, walling crib, cement, fragment of brick, well body 6 are Hard links, when When well lid is rolled impact by vehicle, impulsive force and pressure can be delivered to draining along well lid, walling crib, cement, fragment of brick, well body On pipeline, cause drainage pipeline deformation, block.The modular multifunctional inspection shaft that the present invention is provided, employs integrated well head Modular device so that wellhead module 1 and concrete formation integrated steel tendon concrete structure, wellhead module 1 and concrete bearing The stress together of layer 2, will not separate under impact in being rolled for vehicle, the problem of solving that well lid is crooked, collapse at well head;Meanwhile, The modular multifunctional inspection shaft that the present invention is provided, adjustable height formula increases the inside of the upper end insertion wellhead module 1 of cylinder 5, can Heighten formula and increase and Second gap a is left between the upper end of cylinder 5 and the lower end of cover seat of manhole 9 in wellhead module 1, adjustable height formula increases The first gap is left between the outer wall of high cylinder 5 and the inwall of wellhead module 1, so, wellhead module 1 increases cylinder with adjustable height formula 5 are not contacted actually, when well lid is rolled impact, and impulsive force is transmitted by wellhead module 1, concrete bearing layer 2 To roadbed, increase cylinder 5 and well body 6 without being transferred to adjustable height formula, would not naturally also be transferred to drainage pipeline, i.e. well Mouth mold block 1 and adjustable height formula have certain buffer distance between increasing cylinder 5, even if wellhead module 1 can downward bullet after being rolled Property sedimentation, will not also touch adjustable height formula increases cylinder 5, therefore, after employing the technical scheme that provides of the present invention, well lid What is be subject to rolls impact and will not be transferred to drainage pipeline, the deformation and blocking of drainage pipeline is not resulted in, so as to avoid draining Sewage in pipeline is leaked into soil, it is to avoid soil and groundwater pollutes, more environmentally-friendly;Meanwhile, the sewage in drainage pipeline It will not easily leak, road surface can also be avoided to cave in, make passing road safer, reduce security risk;Modular multifunctional Inspection shaft is firm in structure, easy construction, and technology maturation is corrosion-resistant, and the service life that this allows for inspection shaft is longer, maintenance cycle Also it is longer, it will not continually take road and carry out dredging maintenance, it is ensured that the coast is clear, save maintenance cost.
The meaning that adjustable height formula increases cylinder 5 be inspection shaft buried depth it is inadequate in the case of, increased with adjustable height formula Cylinder 5 is increased, and adjustable height formula increases cylinder 5 and is spliced by two panels jigsaw, and increasing cylinder 5 by adjustable height formula can be to inspection The buried depth for looking into well carries out coarse adjustment, carries out fine tuning to the buried depth of inspection shaft by wellhead module 1, inspection shaft and road surface are adjusted one In individual horizontal plane.
Here is the further optimization and/or improvements to foregoing invention technical scheme:
According to actual needs, above-mentioned modular multifunctional inspection shaft also includes well lid, and well lid is located on cover seat of manhole 9 and positioned at well Inside mouth mold block 1.As shown in accompanying drawing 3,4, the bottom outer wall of well body 6 is provided with the circular door opening being connected with pipeline, arch door opening 10th, circular hole or without hole flat board.Well lid is covered on wellhead module 1, a complete inspection shaft is formed.Enter in conventional discharge pipeline One end of inspection shaft is broken end, i.e., inside inspection shaft, and drainage pipeline is to disconnect, the drainage pipeline come out from inspection shaft One end is connected with inspection shaft, and the meaning of setting door opening is in well body 6 so that well body 6 is easy to be connected with drainage pipeline Or ride on drainage pipeline, whole drainage pipeline without disconnecting, can in inspection shaft insertion and mistake, the row in inspection shaft The upper end of waterpipe opens up the window of an observation and maintenance, in this manner it is ensured that the globality of drainage pipeline, is applied so as to reduce Work workload, it is ensured that sewage discharge is unobstructed;The interface of drainage pipeline is fewer, and globality is better, and mud blocks the probability occurred and got over It is small, the circulation efficiency of drainage pipeline is greatly improved, the both sides of the drainage pipeline in inspection shaft can fill some concrete, one It is that, in order to which drainage pipeline is fixed in inspection shaft, two be in order that drainage pipeline, inspection shaft are connected to become one by concrete Body, be during such soil shrinkage it is overall uniform sink, will not local subsidence, so as to reduce the probability of underground pipe network deformation.
As shown in accompanying drawing 3,4, above-mentioned well lid, wellhead module 1, adjustable height formula increase cylinder 5, well body 6 and use composite wood Material is made.Well lid of the present invention, wellhead module 1, adjustable height formula are increased cylinder 5, well body 6 and are all made of composite, and it has Corrosion-resistant, portable construction advantage, meanwhile, when vehicle rolls past tense from well lid, well lid band can be got up, when well lid is dropped back into When in wellhead module 1, traditional metal well lid, walling crib can send very loud strike note, and the well lid and wellhead module 1 of the present invention Sound is very small during shock, does not result in very harsh noise, therefore without interference with resident, to more environment-friendly.
As shown in accompanying drawing 3,4, the bottom of above-mentioned well body 6, which is provided with the bottom 7 with chute or flat bottom 7, bottom 7, to be set Have in the slot on slot, the lower end insertion bottom 7 of well body 6 and be fixed together by adhesive.
As shown in accompanying drawing 3,4, above-mentioned multiple wellhead modules 1 can be superimposed socket joint up and down, and the lower end of each wellhead module 1 is provided with Annular plug, wellhead module 1 above is inserted by annular plug in the cover seat of manhole 9 of underlying wellhead module 1.Well Mouth mold block 1 can be used with multiple socket joints of superposition up and down, can also be used alone, the buried depth of inspection shaft is entered by wellhead module 1 Row fine tuning, inspection shaft and road surface are adjusted in a horizontal plane.Existing inspection shaft is in backfill, and well head is opened wide, building waste, Workmen and equipment are easily dropped in inspection shaft, there is certain potential safety hazard, and the present invention, can be by when backfilling construction Adjustable height formula increases cylinder 5 and is enclosed within the upper end open of well body 6, and wellhead module 1 is enclosed within into adjustable height formula increases the upper of cylinder 5 End, well lid is covered on wellhead module 1, thus sealing is formd to well body 6, building waste, workmen and equipment will not Drop to inside well body 6, ensured construction safety, improve efficiency of construction.
As shown in accompanying drawing 3,4, the above-mentioned inwall of wellhead module 1, adjustable height formula increase the inwall of cylinder 5, the inwall of well body 6 and set respectively Have in cat ladder mounting hole 8, cat ladder mounting hole 8 and maintenance cat ladder is installed;Or/and, well body 6 is spliced by least two pieces jigsaw, It is fixedly installed togather between adjacent two pieces of jigsaw by joinery and its construction, adhesive or threaded fastener.The present invention is in well head mould The inwall of block 1, adjustable height formula increase the inwall of cylinder 5, the inwall of well body 6 and are fitted with overhauling cat ladder, are easy to checking maintenance personnel turnover inspection Well is looked into, the safety of checking maintenance personnel is ensured, efficiency of construction is improved.It can be connected between the jigsaw of well body 6 by joinery and its construction, It can be connected, can also be connected by threaded fastener by adhesive, connected mode variation will as long as meeting bonding strength Ask.
Above technical characteristic constitutes embodiments of the invention, and it has stronger adaptability and implementation result, can basis The non-essential technical characteristic of increase and decrease is actually needed, to meet the demand of different situations.
The use process of the embodiment of the present invention:
First, the hole body of inspection shaft has been excavated, well body 6 is then put into hole body and drainage pipeline is connected, then will be adjustable High formula increases the socket joint of cylinder 5 and is set at the upper end open of well body 6 and fixation, and well is installed in the upper end that adjustable height formula increases cylinder 5 Mouth mold block 1, well lid is installed in wellhead module 1, is then backfilled, is backfilling into after certain altitude, wellhead module 1 is carried upwards And be placed on roadbed, with roadbed formation one plane, the lower end and adjustable height formula for making cover seat of manhole 9 increase cylinder 5 upper end it Between leave Second gap a, this space can be adjusted according to road surface weight capacity, after the position adjustment of wellhead module 1 is good, The casting concrete formation concrete bearing layer 2 around wellhead module 1, wellhead module 1 and concrete bearing layer 2 form integration Reinforced concrete structure, can just come into operation by maintenance.

Claims (10)

1. a kind of integrated wellhead module device, it is characterised in that including wellhead module, wellhead module is in cylinder cartridge type, well head mould The outer wall of block is provided with the concrete bearing layer linked into an integrated entity with wellhead module, and the outer wall top of wellhead module is provided with convex annular Rise, the outer wall bottom of wellhead module is provided with annular groove, cover seat of manhole of the upper inside wall provided with annular of wellhead module.
2. a kind of modular multifunctional inspection shaft for including integrated wellhead module device as claimed in claim 1, its feature It is also to increase cylinder and well body, the upper end open of well body including adjustable height formula, the lower end socket joint that adjustable height formula increases cylinder is consolidated Dingan County is at the upper end open of well body, and the lower end inner wall of wellhead module is set in the upper end outer wall that adjustable height formula increases cylinder On, adjustable height formula, which increases, is provided with the first space between the outer wall of cylinder and the inwall of wellhead module;Adjustable height formula increases cylinder Second gap is provided between upper end and the lower surface of cover seat of manhole.
3. modular multifunctional inspection shaft according to claim 2, it is characterised in that modular multifunctional inspection shaft is also wrapped Well lid is included, well lid is located on cover seat of manhole and inside wellhead module;The bottom outer wall of well body is provided with what is be connected with pipeline Circular door opening, arch door opening, circular hole or without hole flat board.
4. modular multifunctional inspection shaft according to claim 3, it is characterised in that well lid, wellhead module, adjustable elevation Formula is increased cylinder, well body and is made of composite.
5. the modular multifunctional inspection shaft according to Claims 2 or 3 or 4, it is characterised in that the bottom of well body is provided with band The bottom of chute or flat bottom, the slot that bottom is provided with slot, the lower end insertion bottom of well body is interior and passes through gluing Agent is fixed together.
6. the modular multifunctional inspection shaft according to Claims 2 or 3 or 4, it is characterised in that multiple wellhead modules can on Lower superposition socket joint, the lower end of each wellhead module is provided with annular plug, and wellhead module above is inserted by annular plug In the cover seat of manhole of underlying wellhead module.
7. modular multifunctional inspection shaft according to claim 5, it is characterised in that multiple wellhead modules can be superimposed up and down Socket joint, the lower end of each wellhead module is provided with annular plug, under wellhead module above is located at by the insertion of annular plug In the cover seat of manhole of the wellhead module of side.
8. the modular multifunctional inspection shaft according to Claims 2 or 3 or 4, it is characterised in that wellhead module inwall, adjustable High formula, which increases an inwall, well body inwall and is respectively equipped with cat ladder mounting hole, cat ladder mounting hole, is provided with maintenance cat ladder;Or/and, Well body is spliced by least two pieces jigsaw, solid by joinery and its construction, adhesive or threaded fastener between adjacent two pieces of jigsaw Dingan County is fitted together.
9. modular multifunctional inspection shaft according to claim 5, it is characterised in that wellhead module inwall, adjustable height formula Increase an inwall, well body inwall and be respectively equipped with cat ladder mounting hole, cat ladder mounting hole and maintenance cat ladder is installed;Or/and, well body by At least two pieces jigsaw are spliced, and are fixedly mounted between adjacent two pieces of jigsaw by joinery and its construction, adhesive or threaded fastener Together.
10. the modular multifunctional inspection shaft according to claim 6 or 7, it is characterised in that wellhead module inwall, adjustable height Formula, which increases an inwall, well body inwall and is respectively equipped with cat ladder mounting hole, cat ladder mounting hole, is provided with maintenance cat ladder;Or/and, well Body is spliced by least two pieces jigsaw, is fixed between adjacent two pieces of jigsaw by joinery and its construction, adhesive or threaded fastener It is installed together.
CN201710311004.5A 2017-05-05 2017-05-05 Integrated wellhead module device and modular multifunctional inspection well Active CN106948461B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710311004.5A CN106948461B (en) 2017-05-05 2017-05-05 Integrated wellhead module device and modular multifunctional inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710311004.5A CN106948461B (en) 2017-05-05 2017-05-05 Integrated wellhead module device and modular multifunctional inspection well

Publications (2)

Publication Number Publication Date
CN106948461A true CN106948461A (en) 2017-07-14
CN106948461B CN106948461B (en) 2023-05-30

Family

ID=59478260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710311004.5A Active CN106948461B (en) 2017-05-05 2017-05-05 Integrated wellhead module device and modular multifunctional inspection well

Country Status (1)

Country Link
CN (1) CN106948461B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047343A (en) * 2021-03-25 2021-06-29 苏州市水城市政园林工程有限公司 Multilayer modular inspection well and road synchronous construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2327298A1 (en) * 1998-04-09 1999-10-21 Peter Hagen Device for arranging shaft covers
CN2421329Y (en) * 2000-05-12 2001-02-28 刘光源 Environmental protection manhole shaft
CN203514481U (en) * 2013-09-13 2014-04-02 王鲁平 Inspection well
CN203808105U (en) * 2014-01-15 2014-09-03 青岛市城乡建设委员会 Prefabricated member-combined circular mouth inspection well
CN204456203U (en) * 2015-01-04 2015-07-08 王鲁平 Manhole
CN207144114U (en) * 2017-05-05 2018-03-27 王鲁平 Integrated wellhead module device and modular multifunctional inspection shaft

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2327298A1 (en) * 1998-04-09 1999-10-21 Peter Hagen Device for arranging shaft covers
CN2421329Y (en) * 2000-05-12 2001-02-28 刘光源 Environmental protection manhole shaft
CN203514481U (en) * 2013-09-13 2014-04-02 王鲁平 Inspection well
CN203808105U (en) * 2014-01-15 2014-09-03 青岛市城乡建设委员会 Prefabricated member-combined circular mouth inspection well
CN204456203U (en) * 2015-01-04 2015-07-08 王鲁平 Manhole
CN207144114U (en) * 2017-05-05 2018-03-27 王鲁平 Integrated wellhead module device and modular multifunctional inspection shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047343A (en) * 2021-03-25 2021-06-29 苏州市水城市政园林工程有限公司 Multilayer modular inspection well and road synchronous construction method

Also Published As

Publication number Publication date
CN106948461B (en) 2023-05-30

Similar Documents

Publication Publication Date Title
CN107938676B (en) Pile foundation construction method for penetrating through full-filling karst cave
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
US10030792B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN203729424U (en) Modified horseback-riding inspection well for top pipe construction
CN207892653U (en) Decompression hydrophobic structure suitable for Weathering-residual soil layer fissure zone
CN103938657B (en) Vibration isolation panel assembly in soil treatment engineering and construction technology thereof
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN105926391B (en) A kind of curb method for widening of existing railway roadbed
CN110219359A (en) A kind of Submersed type inspection well and its construction method
CN107816117A (en) A kind of large-scale pressure current box culvert is not cut off the water outer restorative procedure
CN106988334A (en) A kind of open caisson supporting construction and open caisson construction method
CN101575859B (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN109667262A (en) Karst water falling hole plugging structure and construction method thereof
CN207144114U (en) Integrated wellhead module device and modular multifunctional inspection shaft
CN101899831B (en) Active variable-stiffness leveling pile and construction method thereof
CN104674853A (en) Isolation trench
CN207094069U (en) A kind of water pipeline
CN212641468U (en) Pit-in-pit rapid construction structure
CN106948461A (en) Integrated wellhead module device and modular multifunctional inspection shaft
CN117449423A (en) Construction process for newly-built inspection well under state of maintaining water flowing state of existing pipeline
CN101886384A (en) Vacuum and dynamic compaction synchronization method
CN204326119U (en) A kind of pile-raft foundation float Structure
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant