CN106936127B - 一种线路负荷回归分析与预测方法及系统 - Google Patents
一种线路负荷回归分析与预测方法及系统 Download PDFInfo
- Publication number
- CN106936127B CN106936127B CN201710113178.0A CN201710113178A CN106936127B CN 106936127 B CN106936127 B CN 106936127B CN 201710113178 A CN201710113178 A CN 201710113178A CN 106936127 B CN106936127 B CN 106936127B
- Authority
- CN
- China
- Prior art keywords
- transformer
- route
- data
- large user
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 34
- 238000000611 regression analysis Methods 0.000 title claims description 22
- 238000012549 training Methods 0.000 claims abstract description 47
- 238000004458 analytical method Methods 0.000 claims abstract description 22
- 238000012360 testing method Methods 0.000 claims abstract description 9
- 238000012512 characterization method Methods 0.000 claims description 6
- 241001269238 Data Species 0.000 claims description 5
- 238000010276 construction Methods 0.000 claims description 5
- 238000010937 topological data analysis Methods 0.000 claims description 5
- 238000012098 association analyses Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 claims description 4
- 238000007637 random forest analysis Methods 0.000 claims description 4
- 238000005070 sampling Methods 0.000 claims description 3
- 238000004590 computer program Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000012545 processing Methods 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 238000004422 calculation algorithm Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000009466 transformation Effects 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000013480 data collection Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (14)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710113178.0A CN106936127B (zh) | 2017-02-28 | 2017-02-28 | 一种线路负荷回归分析与预测方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710113178.0A CN106936127B (zh) | 2017-02-28 | 2017-02-28 | 一种线路负荷回归分析与预测方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106936127A CN106936127A (zh) | 2017-07-07 |
CN106936127B true CN106936127B (zh) | 2019-05-24 |
Family
ID=59424044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710113178.0A Active CN106936127B (zh) | 2017-02-28 | 2017-02-28 | 一种线路负荷回归分析与预测方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106936127B (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107453376B (zh) * | 2017-07-17 | 2020-06-23 | 国网江西省电力公司电力科学研究院 | 一种台区负荷数据采集点的确定方法及装置 |
JP6833660B2 (ja) * | 2017-11-08 | 2021-02-24 | 株式会社東芝 | 信頼度監視システム、信頼度評価方法、及びプログラム |
CN110363326B (zh) * | 2019-05-31 | 2022-02-11 | 广东电网有限责任公司 | 一种电网110kV线路短期负荷曲线预测方法 |
CN110348596B (zh) * | 2019-05-31 | 2022-02-11 | 广东电网有限责任公司 | 一种电网220kV主变短期负荷曲线预测方法 |
CN111382906B (zh) * | 2020-03-06 | 2024-02-27 | 南京工程学院 | 一种电力负荷预测方法、系统、设备和计算机可读存储介质 |
CN111612233A (zh) * | 2020-05-13 | 2020-09-01 | 云南电网有限责任公司电力科学研究院 | 一种配电网线路重跳影响因素重要性得分获取方法及装置 |
CN111930802A (zh) * | 2020-08-01 | 2020-11-13 | 青岛鼎信通讯股份有限公司 | 一种基于Lasso解析的反窃电分析方法 |
CN112448479B (zh) * | 2020-11-16 | 2023-07-04 | 贵州电网有限责任公司 | 一种变压器负载状况综合判别方法 |
CN112448478B (zh) * | 2020-11-16 | 2023-07-04 | 贵州电网有限责任公司 | 一种变压器负载管控方法 |
CN112529250B (zh) * | 2020-11-16 | 2023-06-30 | 贵州电网有限责任公司 | 一种变压器负载状况综合监控方法 |
CN112414462A (zh) * | 2020-11-16 | 2021-02-26 | 贵州电网有限责任公司 | 一种变压器负载状况监控中多级异常数据处理方法 |
CN113569904B (zh) * | 2021-06-10 | 2024-06-21 | 国电南瑞科技股份有限公司 | 母线接线类型辨识方法、系统、存储介质及计算设备 |
CN114243695B (zh) * | 2021-12-17 | 2023-09-15 | 中国矿业大学(北京) | 一种基于双向长短时记忆神经网络的电力负荷预测方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60106325A (ja) * | 1983-11-11 | 1985-06-11 | 株式会社日立製作所 | 負荷予想方法 |
CN105631483B (zh) * | 2016-03-08 | 2019-03-12 | 国家电网公司 | 一种短期用电负荷预测方法及装置 |
-
2017
- 2017-02-28 CN CN201710113178.0A patent/CN106936127B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106936127A (zh) | 2017-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106936127B (zh) | 一种线路负荷回归分析与预测方法及系统 | |
Cui et al. | Enhance high impedance fault detection and location accuracy via $\mu $-PMUs | |
WO2023115842A1 (zh) | 一种数据驱动的离线在线一体化配电网仿真系统及方法 | |
CN105069690B (zh) | 一种电网运行数据处理方法 | |
CN105894172B (zh) | 一种基于营配融合的联合停电研判方法 | |
CN105787089B (zh) | 一种配电网规划基础数据集成方法 | |
CN109145957A (zh) | 基于大数据的配电网异常指标的识别与处理方法及装置 | |
WO2016000341A1 (zh) | 基于cim模型的跨区域供电范围搜索方法及其系统 | |
CN103872681A (zh) | 一种基于主配网一体化的在线实时合环方法 | |
CN105976262B (zh) | 一种基于厂站粒度的电网模型版本共享方法 | |
CN109857885B (zh) | 基于scd文件的智能变电站主接线图自动生成方法 | |
CN114565779B (zh) | 一种低压台区户变拓扑辨识方法及系统 | |
CN106130781B (zh) | 基于配电网拓扑模型的变压器故障累积效应评估方法 | |
CN101930481A (zh) | 生成描述指定时间段内电网变化的cim模型的方法和系统 | |
CN106372747A (zh) | 基于随机森林的台区合理线损率估计方法 | |
CN106339800A (zh) | 一种基于Graphx的大电网快速拓扑分析的方法 | |
Shin et al. | Spatiotemporal load-analysis model for electric power distribution facilities using consumer meter-reading data | |
Ray et al. | Hybrid methodology for short-term load forecasting | |
CN107729939A (zh) | 一种面向新增电网资源的cim模型扩展方法及装置 | |
CN108053095A (zh) | 一种电能质量扰动事件特征提取方法及系统 | |
CN108665181A (zh) | 一种配电网可靠性的评估方法和装置 | |
CN110445939A (zh) | 容量资源的预测方法及装置 | |
CN113852204A (zh) | 一种于数字孪生的变电站三维全景监视系统及方法 | |
CN111178679A (zh) | 一种基于聚类算法和网络搜索的相位识别方法 | |
CN109726880B (zh) | 一种输电线路参数合理性评估方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Co-patentee after: NARI Group Corp. Patentee after: State Grid Corporation of China Co-patentee after: NARI INFORMATION AND COMMUNICATION TECHNOLOGY Co. Co-patentee after: STATE GRID ANHUI ELECTRIC POWER Co. Co-patentee after: STATE GRID GANSU ELECTRIC POWER Co. Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Co-patentee before: NARI Group CORPORATION STATE GRID ELECTRIC POWER INSTITUTE Patentee before: State Grid Corporation of China Co-patentee before: NARI INFORMATION AND COMMUNICATION TECHNOLOGY Co. Co-patentee before: STATE GRID ANHUI ELECTRIC POWER Co. Co-patentee before: STATE GRID GANSU ELECTRIC POWER Co. |
|
CP01 | Change in the name or title of a patent holder |