CN106933656A - Event execution method and device - Google Patents
Event execution method and device Download PDFInfo
- Publication number
- CN106933656A CN106933656A CN201511017166.5A CN201511017166A CN106933656A CN 106933656 A CN106933656 A CN 106933656A CN 201511017166 A CN201511017166 A CN 201511017166A CN 106933656 A CN106933656 A CN 106933656A
- Authority
- CN
- China
- Prior art keywords
- event
- resources
- time
- resource
- fund
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/466—Transaction processing
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of event execution method and device.Wherein, the method includes:Receive the first event and perform request, wherein, the first event performs request for asking to begin to use the first event-resources to perform the first event from the very first time;Second event resource in first event-resources is provided for perform the event-resources that second event is used in the second time;When reaching the 3rd time, second event resource is deducted out during the 3rd event-resources that obtain of the first event will be performed using the first event-resources during the very first time to the 3rd time, wherein, the 3rd time is earlier than or equal to the second time;When reaching the second time, second event is performed using the second event resource for deducting out.The present invention is solved using the relatively low technical problem of the event execution efficiency caused by existing event execution method.
Description
Technical field
The present invention relates to computer realm, in particular to a kind of event execution method and device.
Background technology
In currently available technology when some scheduled events are performed, generally require by multiple client
The multiple transfer that multiple accounts carry out event-resources could perform above-mentioned scheduled event.That is, pin
To above-mentioned scheduled event, conventional executive mode is:Needs are carried out repeatedly manually between multiple accounts
Transfer operation, which not only adds operation complexity, and also affects the scheduled event is held
Line efficiency.Additionally, performing the transfer of event-resources by this manual transfer operation, also exist and lose
The risk forgotten, so as to cause scheduled event not perform to schedule, it is unnecessary in turn result in
Loss.
For above-mentioned problem, effective solution is not yet proposed at present.
The content of the invention
A kind of event execution method and device are the embodiment of the invention provides, at least to solve using existing
Event execution method caused by the relatively low technical problem of event execution efficiency.
A kind of one side according to embodiments of the present invention, there is provided event execution method, including:Connect
Receive the first event and perform request, wherein, above-mentioned first event performs request for asking from the very first time
The first event-resources are begun to use to perform the first event;By the second event in above-mentioned first event-resources
Resource is provided for performing the event-resources that second event is used in the second time;In the 3rd time
It is above-mentioned by being performed using the first event-resources during the above-mentioned very first time to above-mentioned 3rd time during arrival
Above-mentioned second event resource is deducted out in the 3rd event-resources that first event is obtained, wherein, above-mentioned
Three times are earlier than or equal to above-mentioned second time;When reaching above-mentioned second time, above-mentioned deduction is used
The above-mentioned second event resource for going out performs above-mentioned second event.
Another aspect according to embodiments of the present invention, additionally provides a kind of event executing device, including:
First receiving unit, request is performed for receiving the first event, wherein, above-mentioned first event is performed please
Ask for asking to begin to use the first event-resources to perform the first event from the very first time;First sets single
Unit, for being provided for the second event resource in above-mentioned first event-resources to be held in the second time
The event-resources that row second event is used;Unit is deducted, for when reaching the 3rd time, will be upper
Above-mentioned first event is performed during stating the very first time to above-mentioned 3rd time using the first event-resources to obtain
To the 3rd event-resources in deduct out above-mentioned second event resource, wherein, above-mentioned 3rd time earlier than
Or equal to above-mentioned second time;First execution unit, for when reaching above-mentioned second time, using
The above-mentioned above-mentioned second event resource for deducting out performs above-mentioned second event.
In embodiments of the present invention, it is set to use by by the second event resource in the first event-resources
In the event-resources that are used of second event are performed in the second time, when reaching the 3rd time, will be from
Start from the very first time for performing the first event to during the 3rd time, using the first event-resources to perform
Second event resource is deducted out in the 3rd event-resources obtained after first event, is arrived with the second time
Up to when, use second event resource perform second event.Held so as to currently use the first event-resources in fact
Bales catch removes second event resource in the 3rd event-resources obtained after the event of row first, with second
Between when reaching, perform second event using second event resource, complete the automatic transfer of event-resources,
And the switching of multiple accounts need not be carried out, and simplifying the operation of execution event, that improves event performs effect
While rate, the loss caused by forgetting can also be avoided, it is ensured that event is performed on time.And then solve
Determine using the relatively low technical problem of the event execution efficiency caused by existing event execution method.
Additionally, by will first be used to perform the first event for performing the second event resource of second event,
To also the utilization rate of event-resources be improved, more incomes are obtained based on event-resources, ensure that use
Family interests it is maximized simultaneously, it is thus also avoided that second event inadequate resource is asked when performing second event
Topic.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the one of the application
Part, schematic description and description of the invention is used to explain the present invention, does not constitute to this hair
Bright improper restriction.In the accompanying drawings:
Fig. 1 is that the application scenarios of a kind of optional event execution method according to embodiments of the present invention are illustrated
Figure;
Fig. 2 is the flow chart of a kind of optional event execution method according to embodiments of the present invention;
Fig. 3 is the flow chart of the optional event execution method of another kind according to embodiments of the present invention;
Fig. 4 is the schematic diagram of a kind of optional event execution method according to embodiments of the present invention;
Fig. 5 is the flow chart of another optional event execution method according to embodiments of the present invention;
Fig. 6 is the schematic diagram of the optional event execution method of another kind according to embodiments of the present invention;
Fig. 7 is the schematic diagram of a kind of optional event executing device according to embodiments of the present invention;
Fig. 8 is the schematic diagram of the optional event executing device of another kind according to embodiments of the present invention;With
And
Fig. 9 is the schematic diagram that a kind of optional event according to embodiments of the present invention performs terminal.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the present invention
Accompanying drawing in embodiment, is clearly and completely described to the technical scheme in the embodiment of the present invention,
Obviously, described embodiment is only the embodiment of a part of the invention, rather than whole implementation
Example.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work
Under the premise of the every other embodiment that is obtained, should all belong to the scope of protection of the invention.
It should be noted that the term in description and claims of this specification and above-mentioned accompanying drawing
" first ", " second " etc. be for distinguishing similar object, without for describe specific order or
Precedence.It should be appreciated that the data for so using can be exchanged in the appropriate case, to retouch here
The embodiments of the invention stated can be with the order reality in addition to those for illustrating herein or describing
Apply.Additionally, term " comprising " and " having " and their any deformation, it is intended that covering is not arranged
His includes, for example, contain the process of series of steps or unit, method, system, product or
Equipment is not necessarily limited to those steps clearly listed or unit, but may include not list clearly
Or for these processes, method, product or other intrinsic steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of embodiment of event execution method, above-mentioned event is held
Row method can be, but not limited to be applied in application scenarios as shown in Figure 1.Terminal 102 receives first
Event performs request, wherein, the first event performs request for asking to begin to use the from the very first time
One event-resources perform the first event;Then terminal 102 provides the second event in the first event-resources
Source is provided for performing the event-resources that second event is used in the second time, is arrived in the 3rd time
Up to when, will during the very first time to the 3rd time using the first event-resources by network 104 to service
Device 106 deducts out second event resource in performing the 3rd event-resources that the first event is obtained, wherein,
3rd time is earlier than or equal to the second time;And when reaching the second time, use second for deducting out
Event-resources perform second event by network 104 to server 108.Alternatively, in the present embodiment
In, above-mentioned terminal can include but is not limited at least one of:Mobile phone, panel computer, notebook
Computer, PC.Alternatively, in the present embodiment, above-mentioned network can include but is not limited to following
At least one:Wide area network, Metropolitan Area Network (MAN), LAN.A kind of above-mentioned simply example, the present embodiment is to this
Any restriction is not done.
According to embodiments of the present invention, there is provided a kind of event execution method, as shown in Fig. 2 the method
Including:
S202, receive the first event performs request, wherein, the first event perform request be used for request from
The very first time begins to use the first event-resources to perform the first event;
S204, the second event resource in the first event-resources is provided for be performed in the second time
The event-resources that second event is used;
S206, when reaching the 3rd time, will use the first event during the very first time to the 3rd time
Resource deducts out second event resource in performing the 3rd event-resources that the first event is obtained, wherein, the
Three times are earlier than or equal to the second time;
S208, when reaching the second time, second event is performed using the second event resource for deducting out.
Alternatively, in the present embodiment, above-mentioned event execution method can be, but not limited to be applied to terminal
During being refunded automatically to server.For example, the client in terminal is receiving the first thing
After part performs request (such as request purchase finance product (such as monetary fund)), wherein, the first event
Request is performed for asking to begin to use the since the very first time time of monetary fund (such as buy)
One event-resources perform the first event (such as purchase monetary fund);By the first event-resources (as bought
The fund of monetary fund) in second event resource (as be used for refund fund) be provided for
Second time (such as the time of refunding) performs the event-resources that second event is used;Further,
Three times (time as obtained the total fund (such as mutual fund earnings) obtained after purchase monetary fund) arrive
Up to when, the first event will be performed using the first event-resources during the very first time to the 3rd time and obtained
In 3rd event-resources (as obtained the total fund (such as mutual fund earnings) obtained after purchase monetary fund)
Second event resource is deducted out, wherein, the 3rd time is earlier than or equal to the second time;In the second time
When (such as the time of refunding) reaches, perform second event using the second event resource for deducting out and (hold
Row is refunded).The 3rd event obtained from after using the first event-resources the first event of execution is realized to provide
Bales catch removes second event resource in source, when reaching the second time, is performed using second event resource
Second event, to complete the automatic transfer of event-resources, and need not carry out the switching of multiple accounts,
Simplify the operation of execution event, while improving the execution efficiency of event, can also avoid being made because of forgetting
Into loss, it is ensured that event is performed on time.Above-mentioned is only a kind of example, in the present embodiment, on
Stating event execution method can also be applied to transfer procedure, and the present embodiment is repeated no more to this.
It should be noted that in the present embodiment, due to performing the service of second event and the first event
Device is different, thus, at present in existing event implementation procedure, generally require between multiple accounts
Manual switching is carried out, so not only cumbersome, fault rate is higher, but also existed because forgetting is led
Cause the risk of loss.Different from existing event implementation procedure, in the embodiment of the present invention, by by
Second event resource in one event-resources is provided for being made in the second time execution second event
Event-resources, when reaching the 3rd time, by from starting to perform the very first time of the first event
During the 3rd time, the 3rd event-resources obtained after the first event are performed using the first event-resources
In deduct out second event resource, with when reaching the second time, the is performed using second event resource
Two events.So as to real first event-resources that currently use perform the 3rd event obtained after the first event money
Bales catch removes second event resource in source, when reaching the second time, to be held using second event resource
Row second event, completes the automatic transfer of event-resources, and need not carry out the switching of multiple accounts,
Simplify the operation of execution event, while improving the execution efficiency of event, can also avoid being made because of forgetting
Into loss, it is ensured that event is performed on time.Additionally, by by for performing the second of second event
Event-resources are first used to perform the first event, will also improve the utilization rate of event-resources, based on event money
Source obtains more incomes, ensure that user benefit it is maximized simultaneously, it is thus also avoided that perform the
The problem of second event inadequate resource during two events.
It is specific to be illustrated with reference to the example below, so that terminal to server is refunded automatically as an example.Eventually
After termination receives the purchase request of purchase monetary fund, wherein, the request is used to ask from the very first time
T1 begins to use fund (i.e. the first event-resources) the purchase monetary fund that the amount of money is K (to perform the
One event).As shown in figure 3, terminal 302 is held with fund server 304 and bank server 306
Following flow is gone:
S302, the amount of money that terminal 302 will be used in the fund of K the amount of money be set to for the fund of M
For performing used redrawing funds of refunding in the second time T2;
S304, terminal 302 buys money-capital to fund server 304;
S306, when the 3rd time T3 was reached, by fund server 304 in very first time T1 to the
During three time T3 amount for K the 3rd event-resources that obtain of fund purchase monetary fund (such as
The total fund P (such as mutual fund earnings) that obtains after purchase monetary fund) in deduct out the amount of money for M also
Money fund, obtains redrawing funds M, wherein, the 3rd time T3 is earlier than or equal to the second time T2;
S308, when the second time T2 is reached, using the amount of money for getting for M redrawing funds to
Bank server 306 performs refund.
It should be noted that in the present embodiment, being detained in the total fund that fund server 304 is obtained
Except the amount of money is remaining fund after the fund of K, can continue to stay in fund server 304 and buy goods
Coin fund, it is also possible in getting terminal simultaneously for the fund of K with the amount of money, in order to perform other things
Part, any restriction is not done to this in the present embodiment.
Alternatively, in the present embodiment, it is set to by the second event resource in the first event-resources
For before the second time performed the event-resources that are used of second event, including:Set according to event
The instruction for putting instruction sets configured information, wherein, configured information is used to indicate for the second time, performs the
Event-resources, second event that two events are used.For example, event sets instruction for indicating to set
Repayment schedule, then terminal is according to the bank account for indicating setting refund time, the refund amount of money and refund.
Alternatively, in the present embodiment, the second time can be including but not limited to:It is separated by same time
Multiple time points at interval.That is, set instruction according to above-mentioned event second event can be set
It is set to the disposable event for performing once, it is also possible to be set to the cycle sexual behavior performed according to predetermined period
Part.
If for example, repayment schedule indicate 15-10-1 to account A refund 1000 yuan, in 15-1-1
After purchase monetary fund, the refund event only when 15-10-1 is reached will perform once automatic refund,
Refunded 1000 yuan to account A.If additionally, repayment schedule indicates first day in monthly, 2016
To account B 500 yuan (such as housing loans) of refund, then after 15-1-1 purchase monetary funds, the refund
Often event performs once automatic refund, i.e., respectively by when first day monthly is reached from 2016
The moon refunds 500 yuan to account B.
It should be noted that in the present embodiment, the time that above-mentioned reception event sets instruction can wrap
Include but be not limited at least one of:Before first event that receives performs request, the first thing is being received
When part performs request, set after first event that receives performs request and by second event resource
It is for before the second time performed the event-resources that second event is used.For example, can hold
Repayment schedule is pre-set before row purchase monetary fund;Can also be when monetary fund be bought in display
Setting interface in directly set repayment schedule;Can also purchase monetary fund for a period of time after,
Need to set repayment schedule again when refunding.Any restriction is not done in the present embodiment to this.
Alternatively, in the present embodiment, before the 3rd time reached and by the first event-resources
In second event resource be provided for performing the event that is used of second event in the second time and provide
After source, performed obtained by the first event using the first event-resources during the very first time to current time
The 4th event-resources for arriving are more than second event resource, then be continuing with the 4th event-resources and perform first
Event;When the 4th event-resources are equal to second event resource, then stop performing the first event, wherein,
Current time earlier than or equal to the 3rd time, when current time was equal to for three time, the 3rd event money
Source is the 4th event-resources.
It should be noted that in the present embodiment, if performing the first event using the first event-resources
When the 4th event-resources for obtaining afterwards are equal to second event resource, then it represents that the 4th current event-resources
It has been not enough to perform second event, thus, will stop performing the first event, to ensure second event
Normal execution.For example, still so that terminal to server is refunded automatically as an example.If terminal is first used
The amount of money is the fund purchase monetary fund of K, but due to loss, the amount of money is being reduced always for the fund of K,
When remaining fund is equal to the redrawing funds that the amount of money is M after judging to buy monetary fund, then stop
Continue to buy money-capital, to ensure according to quantity perform refund on time when reaching the second time.
Alternatively, in the present embodiment, when reaching the 3rd time, by the very first time to the 3rd time
Period deducts out second in performing the 3rd event-resources that the first event is obtained using the first event-resources
Event-resources include:When the 3rd event-resources are not enough to deduct out second event resource, the 3rd is obtained
Difference between event-resources and second event resource;Obtained from other predetermined event-resources and met
5th event-resources of difference, and using the 3rd event-resources and the 5th event-resources as deducting out
Two event-resources.
It should be noted that in the present embodiment, being not enough to deduct out the second thing in the 3rd event-resources
During part resource, can obtain event-resources from other events to supplement the 3rd event-resources, so that second
When time reaches, second event can be normally performed.For example, providing loans to ensure that user can by acquisition
To continue executing with second event, the execution efficiency of event is further ensured.
The embodiment provided by the application, is set by by the second event resource in the first event-resources
It is set to for performing the event-resources that second event is used in the second time, when reaching the 3rd time,
, to during the 3rd time, the first event-resources are used by from starting to perform the very first time of the first event
Perform and deduct out second event resource in the 3rd event-resources obtained after the first event, with second
Between when reaching, use second event resource to perform second event.The first event money is currently used so as to real
Source performs after the first event in the 3rd event-resources that obtain bales catch except second event resource, with the
When two times reached, second event is performed using second event resource, complete the automatic of event-resources and turn
Shifting, and the switching of multiple accounts need not be carried out, by way of the operation of this simplified execution event,
The execution efficiency of event is improve, and then avoids the event caused by existing event execution method from performing
Less efficient problem.Additionally, in this way, the utilization rate of event-resources can also be improved,
Ensure that user benefit it is maximized simultaneously, it is to avoid event inadequate resource asks when performing event
Topic.
As a kind of optional scheme, the second event resource in the first event-resources is being set to use
In before the second time performed the event-resources that are used of second event, including:
S1, receives event and sets instruction;
S2, the event that sets sets the configured information indicated by instruction, wherein, configured information is used to indicate
Event-resources, second event that second time, execution second event are used.
Alternatively, in the present embodiment, above-mentioned event sets instruction and can be, but not limited to for setting the
Two events, that is to say, that instruction realization is set by event and sets up the first event-resources and second event
The association of resource, in order to when reaching the second time, can directly utilize the association set up automatic
Obtained from the first event-resources and be provided for performing the thing that second event is used in the second time
The second event resource of part resource performs second event, so as to realize that simplifying event performs operation, improves
The effect of event execution efficiency.
Alternatively, in the present embodiment, second event resource can also be set.It should be noted that
When second event resource is to quantify, only can set once;It is according to predetermined in second event resource
During Long-term change trend, for example, successively decrease according to predetermined ratio, then the change ratio can also be set.
For example, as shown in figure 4, still so that terminal to server is refunded automatically as an example.Boundary is being set
Face sets instruction according to the event for receiving, and sets configured information, for example, second event is refund thing
Part, it indicates that information is:Refund time (2015-10-1), the refund amount of money (10000 yuan), refund
Bank (bank H) and refund account (account A).
The embodiment provided by the application, the configured information for setting instruction setting by event is realized existing
Set up between first event-resources and second event resource and associated, in order to when reaching the second time,
Directly can be provided for the using automatic the acquisition from the first event-resources of the association set up
The second event resource that two times performed the event-resources that second event is used performs second event, from
And realize that simplifying event performs operation, improve the effect of event execution efficiency.
Used as a kind of optional scheme, above-mentioned reception event sets instruction to be included:
S1, before first event that receives performs request, receives event and sets instruction;Or
As shown in figure 5, before step S202 receives the execution request of the first event, step S502 is performed,
Reception event sets instruction.For example, still so that terminal to server is refunded automatically as an example.In terminal
Client on previously according to receive event set instruction set repayment schedule, receiving for purchasing
After buying the request of monetary fund, the incidence relation of mutual fund earnings and redrawing funds is resettled, so that directly
Automatic refund is realized by mutual fund earnings.
S2, when first event that receives performs request, receives event and sets instruction;Or
For example, still so that terminal to server is refunded automatically as an example.In selection purchase monetary fund S
When, the setting interface of monetary fund S will be shown in terminal, as shown in Figure 6.For example, including purchase
The principal amount (such as 20000 yuan) of monetary fund S, if perform set of time, in selection "Yes"
Afterwards, you can to receive event, instruction is set.
It should be noted that in the present embodiment, second event only includes an event, and the second thing
When part resource is quota, then can be with as shown in fig. 6, selection " confirmation ".Additionally, the second thing
Part can also include multiple events, the mutual fund earnings of monetary fund S can be associated with into multiple second
Event, so as to realize performing multiple repayment schedules by the mutual fund earnings of monetary fund S, shows at this
In example, setting interface will further show that the selection interface of the second event to be associated (is not shown in figure
Go out).So as to realize when first event that receives performs request, while setting repayment schedule.
S3, is provided for after first event that receives performs request and by second event resource
Before the second time performed the event-resources that second event is used, receive event and instruction is set.
That is, after monetary fund is bought for a period of time, it is interim as needed that repayment schedule is set.
For example, after purchase monetary fund 1 month, user have purchased a set of new house, but arrival is not needed again
The time of housing loan is given back, then terminal can receive the event setting request of interim transmission.
The embodiment provided by the application, can be received event and set instruction in different time, so that
The flexibility that setting event sets instruction is improve, Consumer's Experience is improved, is more convenient for user to grasp
Make.
As a kind of optional scheme, before the 3rd time reached and by the first event-resources
Second event resource be provided for performing the event-resources that are used of second event in the second time
Afterwards, including:
S1, is performed obtained by the first event during the very first time to current time using the first event-resources
The 4th event-resources for arriving are more than second event resource, then be continuing with the 4th event-resources and perform first
Event;When the 4th event-resources are equal to second event resource, then stop performing the first event, wherein,
Current time earlier than or equal to the 3rd time, when current time was equal to for three time, the 3rd event money
Source is the 4th event-resources.
It should be noted that in the present embodiment, if performing the first event using the first event-resources
When the 4th event-resources for obtaining afterwards are equal to second event resource, then it represents that the 4th current event-resources
It has been not enough to perform second event, thus, will stop performing the first event, to ensure second event
Normal execution.
For example, still so that terminal to server is refunded automatically as an example.If terminal elder generation amount is K
Fund purchase monetary fund, but due to loss, the amount of money is being reduced always for the fund of K.If working as
Preceding time t judges to buy the amount of money of monetary fund for the fund of K is reduced to remaining fund equal to the amount of money
For M redrawing funds when, then stop purchase money-capital, to ensure when the second time T2 is reached
Refund can according to quantity be performed on time, wherein, current time t earlier than or equal to from monetary fund obtain
3rd time T3 of mutual fund earnings.
The embodiment provided by the application, by judging to be used during the very first time to current time
Whether the 4th event-resources that the first event-resources perform obtained by the first event provide more than second event
Source, to determine to be to continue with using the 4th event-resources to perform the first event, is also off performing the first thing
Part, so that real when currently using the first event-resources and performing the first event, it can also be ensured that remaining the
Four event-resources are more than second event resource, and then second event is normally performed, it is to avoid second
Event is missed, to reach the effect of raising event execution efficiency.
As a kind of optional scheme, when reaching the 3rd time, by the very first time to the 3rd phase time
Between perform the 3rd event-resources that obtain of the first event using the first event-resources in deduct out the second thing
Part resource includes:
S1, if the 3rd event-resources are not enough to deduct out second event resource, obtains the 3rd event money
Difference between source and second event resource;
S2, obtains from other predetermined event-resources and meets the 5th event-resources of difference, and by the
Three event-resources and the 5th event-resources are used as the second event resource for deducting out.
It should be noted that in the present embodiment, the 3rd event-resources can always be used for execution first
Event, and when reaching the 3rd time, when the 3rd event-resources are not enough to deduct out second event resource,
Then can obtain event-resources from predetermined other events supplement the 3rd event-resources, so that when second
Between when reaching, can normally perform second event.
Alternatively, in the present embodiment, above-mentioned other predetermined event-resources can be included but is not limited to
At least one of:The current predetermined event money unrelated with the first event and second event for having stored
Source, the interim predetermined event-resources for obtaining.
For example, still so that terminal to server is refunded automatically as an example.If terminal elder generation amount is K
Fund purchase monetary fund, but due to loss, the amount of money is being reduced always for the fund of K.If working as
Preceding time t judges to buy the amount of money of monetary fund for the fund of K is reduced to remaining fund R less than gold
Volume is the redrawing funds of M, is caused when the 3rd time T3 is reached, and remaining fund R is not enough to deduct
Go out the redrawing funds that the amount of money is M, then can obtain the difference of M and R, and from predetermined sundry item
Obtained in the fund of (such as other finance products do not bound with refund) and meet difference (i.e. (M-R))
Fund, by remaining fund R and the fund from predetermined sundry item (such as other finance products)
In the amount of money that gets deducted as redrawing funds M for the fund sum of (M-R).So as to realize leading to
Cross to provide loans and ensure that user can continue executing with second event.
Again for example, still so that terminal to server is refunded automatically as an example.If judging in current time t
It is the refund of M to go out to buy the amount of money of monetary fund for the fund of K is reduced to remaining fund R less than the amount of money
Fund, causes when the 3rd time T3 is reached, and it is M's that remaining fund R is not enough to deduct out the amount of money
Redrawing funds, then can obtain the difference of M and R, and the notice of " Sorry, your ticket has not enough value " is sent to terminal
Message, after being supplemented with money by terminal check, realizes that obtain fund temporarily to terminal deducts as redrawing funds M.
So as to realize ensureing that user can continue executing with second event by providing loans.
The embodiment provided by the application, the is met by being obtained from other predetermined event-resources
5th event-resources of the difference between three event-resources and second event resource, to supplement the 3rd event
Resource, as the second event resource for deducting out, so as to further ensure the execution of second event,
Improve the efficiency of event execution.
It should be noted that for foregoing each method embodiment, in order to be briefly described, therefore by it all
A series of combination of actions is expressed as, but those skilled in the art should know, and the present invention is not received
The limitation of described sequence of movement, because according to the present invention, some steps can be using other sequentially
Or carry out simultaneously.Secondly, those skilled in the art should also know, reality described in this description
Apply example and belong to preferred embodiment, necessary to involved action and the module not necessarily present invention.
Through the above description of the embodiments, those skilled in the art can be understood that root
Method according to above-described embodiment can add the mode of required general hardware platform to realize by software, when
So can also be by hardware, but the former is more preferably implementation method in many cases.Based on such reason
Solution, the part that technical scheme substantially contributes to prior art in other words can be with soft
The form of part product is embodied, and the computer software product is stored in a storage medium (such as
ROM/RAM, magnetic disc, CD) in, including some instructions are used to so that a station terminal equipment (can
Being mobile phone, computer, server, or network equipment etc.) perform each embodiment institute of the invention
The method stated.
Embodiment 2
According to embodiments of the present invention, a kind of event for implementing above-mentioned event execution method is additionally provided
Performs device, as shown in fig. 7, the device includes:
1) the first receiving unit 702, request is performed for receiving the first event, wherein, the first event
Request is performed for asking to begin to use the first event-resources to perform the first event from the very first time;
2) the first setting unit 704, for the second event resource in the first event-resources to be set to
For performing the event-resources that second event is used in the second time;
3) unit 706 is deducted, for when reaching the 3rd time, by the very first time to the 3rd phase time
Between perform the 3rd event-resources that obtain of the first event using the first event-resources in deduct out the second thing
Part resource, wherein, the 3rd time is earlier than or equal to the second time;
4) the first execution unit 708, for when reaching the second time, using the second thing for deducting out
Part resource performs second event.
Alternatively, in the present embodiment, above-mentioned event is performed and can be, but not limited to be applied to terminal to clothes
During business device is refunded automatically.For example, client in terminal is held receiving the first event
After row request (such as request purchase finance product (such as monetary fund)), wherein, the first event is performed
Ask for asking to begin to use the first thing since the very first time (buying the time of monetary fund such as)
Part resource performs the first event (such as purchase monetary fund);By the first event-resources (such as purchase currency
The fund of fund) in second event resource (as be used for refund fund) be provided for second
Time (such as the time of refunding) performs the event-resources that second event is used;Further, at the 3rd
Between (as obtained the time of total fund (such as mutual fund earnings) obtained after purchase monetary fund) when reaching,
During the very first time to the 3rd time the first event is obtained the 3rd will be performed using the first event-resources
Deducted in event-resources (as obtained the total fund (such as mutual fund earnings) obtained after purchase monetary fund)
Go out second event resource, wherein, the 3rd time is earlier than or equal to the second time;The second time (such as
The refund time) when reaching, perform second event using the second event resource that deducts out and (perform also
Money).Realize from the 3rd event-resources obtained after the first event are performed using the first event-resources
Bales catch removes second event resource, when reaching the second time, second is performed using second event resource
Event, to complete the automatic transfer of event-resources, and need not carry out the switching of multiple accounts, in simplification
The operation of execution event, while improving the execution efficiency of event, can also avoid caused by forgetting
Loss, it is ensured that event is performed on time.Above-mentioned is only a kind of example, in the present embodiment, above-mentioned thing
Part is performed and can also be applied to transfer procedure, and the present embodiment is repeated no more to this.
It should be noted that in the present embodiment, due to performing the service of second event and the first event
Device is different, thus, at present in existing event implementation procedure, generally require between multiple accounts
Manual switching is carried out, so not only cumbersome, fault rate is higher, but also existed because forgetting is led
Cause the risk of loss.Different from existing event implementation procedure, in the embodiment of the present invention, by by
Second event resource in one event-resources is provided for being made in the second time execution second event
Event-resources, when reaching the 3rd time, by from starting to perform the very first time of the first event
During the 3rd time, the 3rd event-resources obtained after the first event are performed using the first event-resources
In deduct out second event resource, with when reaching the second time, the is performed using second event resource
Two events.So as to real first event-resources that currently use perform the 3rd event obtained after the first event money
Bales catch removes second event resource in source, when reaching the second time, to be held using second event resource
Row second event, completes the automatic transfer of event-resources, and need not carry out the switching of multiple accounts,
Simplify the operation of execution event, while improving the execution efficiency of event, can also avoid being made because of forgetting
Into loss, it is ensured that event is performed on time.Additionally, by by for performing the second of second event
Event-resources are first used to perform the first event, will also improve the utilization rate of event-resources, based on event money
Source obtains more incomes, ensure that user benefit it is maximized simultaneously, it is thus also avoided that perform the
The problem of second event inadequate resource during two events.
It is specific to be illustrated with reference to the example below, so that terminal to server is refunded automatically as an example.Eventually
After termination receives the purchase request of purchase monetary fund, wherein, the request is used to ask from the very first time
T1 begins to use fund (i.e. the first event-resources) the purchase monetary fund that the amount of money is K (to perform the
One event).As shown in figure 3, terminal 302 is held with fund server 304 and bank server 306
Following flow is gone:
S302, the amount of money that terminal 302 will be used in the fund of K the amount of money be set to for the fund of M
For performing used redrawing funds of refunding in the second time T2;
S304, terminal 302 buys money-capital to fund server 304;
S306, when the 3rd time T3 was reached, by fund server 304 in very first time T1 to the
During three time T3 amount for K the 3rd event-resources that obtain of fund purchase monetary fund (such as
The total fund P (such as mutual fund earnings) that obtains after purchase monetary fund) in deduct out the amount of money for M also
Money fund, obtains redrawing funds M, wherein, the 3rd time T3 is earlier than or equal to the second time T2;
S308, when the second time T2 is reached, using the amount of money for getting for M redrawing funds to
Bank server 306 performs refund.
It should be noted that in the present embodiment, being detained in the total fund that fund server 304 is obtained
Except the amount of money is remaining fund after the fund of K, can continue to stay in fund server 304 and buy goods
Coin fund, it is also possible in getting terminal simultaneously for the fund of K with the amount of money, in order to perform other things
Part, any restriction is not done to this in the present embodiment.
Alternatively, in the present embodiment, it is set to by the second event resource in the first event-resources
For before the second time performed the event-resources that are used of second event, including:Set according to event
The instruction for putting instruction sets configured information, wherein, configured information is used to indicate for the second time, performs the
Event-resources, second event that two events are used.For example, event sets instruction for indicating to set
Repayment schedule, then terminal is according to the bank account for indicating setting refund time, the refund amount of money and refund.
Alternatively, in the present embodiment, the second time can be including but not limited to:It is separated by same time
Multiple time points at interval.That is, set instruction according to above-mentioned event second event can be set
It is set to the disposable event for performing once, it is also possible to be set to the cycle sexual behavior performed according to predetermined period
Part.
If for example, repayment schedule indicate 15-10-1 to account A refund 1000 yuan, in 15-1-1
After purchase monetary fund, the refund event only when 15-10-1 is reached will perform once automatic refund,
Refunded 1000 yuan to account A.If additionally, repayment schedule indicates first day in monthly, 2016
To account B 500 yuan (such as housing loans) of refund, then after 15-1-1 purchase monetary funds, the refund
Often event performs once automatic refund, i.e., respectively by when first day monthly is reached from 2016
The moon refunds 500 yuan to account B.
It should be noted that in the present embodiment, the time that above-mentioned reception event sets instruction can wrap
Include but be not limited at least one of:Before first event that receives performs request, the first thing is being received
When part performs request, set after first event that receives performs request and by second event resource
It is for before the second time performed the event-resources that second event is used.For example, can hold
Repayment schedule is pre-set before row purchase monetary fund;Can also be when monetary fund be bought in display
Setting interface in directly set repayment schedule;Can also purchase monetary fund for a period of time after,
Need to set repayment schedule again when refunding.Any restriction is not done in the present embodiment to this.
Alternatively, in the present embodiment, before the 3rd time reached and by the first event-resources
In second event resource be provided for performing the event that is used of second event in the second time and provide
After source, performed obtained by the first event using the first event-resources during the very first time to current time
The 4th event-resources for arriving are more than second event resource, then be continuing with the 4th event-resources and perform first
Event;When the 4th event-resources are equal to second event resource, then stop performing the first event, wherein,
Current time earlier than or equal to the 3rd time, when current time was equal to for three time, the 3rd event money
Source is the 4th event-resources.
It should be noted that in the present embodiment, if performing the first event using the first event-resources
When the 4th event-resources for obtaining afterwards are equal to second event resource, then it represents that the 4th current event-resources
It has been not enough to perform second event, thus, will stop performing the first event, to ensure second event
Normal execution.For example, still so that terminal to server is refunded automatically as an example.If terminal is first used
The amount of money is the fund purchase monetary fund of K, but due to loss, the amount of money is being reduced always for the fund of K,
When remaining fund is equal to the redrawing funds that the amount of money is M after judging to buy monetary fund, then stop
Continue to buy money-capital, to ensure according to quantity perform refund on time when reaching the second time.
Alternatively, in the present embodiment, when reaching the 3rd time, by the very first time to the 3rd time
Period deducts out second in performing the 3rd event-resources that the first event is obtained using the first event-resources
Event-resources include:When the 3rd event-resources are not enough to deduct out second event resource, the 3rd is obtained
Difference between event-resources and second event resource;Obtained from other predetermined event-resources and met
5th event-resources of difference, and using the 3rd event-resources and the 5th event-resources as deducting out
Two event-resources.
It should be noted that in the present embodiment, being not enough to deduct out the second thing in the 3rd event-resources
During part resource, can obtain event-resources from other events to supplement the 3rd event-resources, so that second
When time reaches, second event can be normally performed.For example, providing loans to ensure that user can by acquisition
To continue executing with second event, the execution efficiency of event is further ensured.
The embodiment provided by the application, is set by by the second event resource in the first event-resources
It is set to for performing the event-resources that second event is used in the second time, when reaching the 3rd time,
, to during the 3rd time, the first event-resources are used by from starting to perform the very first time of the first event
Perform and deduct out second event resource in the 3rd event-resources obtained after the first event, with second
Between when reaching, use second event resource to perform second event.The first event money is currently used so as to real
Source performs after the first event in the 3rd event-resources that obtain bales catch except second event resource, with the
When two times reached, second event is performed using second event resource, complete the automatic of event-resources and turn
Shifting, and the switching of multiple accounts need not be carried out, by way of the operation of this simplified execution event,
The execution efficiency of event is improve, and then avoids existing event from performing caused event execution efficiency
Relatively low problem.Additionally, in this way, the utilization rate of event-resources can also be improved, protecting
Demonstrate,proved user benefit it is maximized simultaneously, it is to avoid the problem of event inadequate resource when performing event.
As a kind of optional scheme, also include:
1) the second receiving unit, for being set to by the second event resource in the first event-resources
For before the second time performed the event-resources that second event is used, receiving event and setting instruction;
2) the second setting unit, the configured information indicated by instructing is set for setting event, wherein,
Configured information is used to indicate for the second time, performs event-resources, second event that second event is used.
Alternatively, in the present embodiment, above-mentioned event sets instruction and can be, but not limited to for setting the
Two events, that is to say, that instruction realization is set by event and sets up the first event-resources and second event
The association of resource, in order to when reaching the second time, can directly utilize the association set up automatic
Obtained from the first event-resources and be provided for performing the thing that second event is used in the second time
The second event resource of part resource performs second event, so as to realize that simplifying event performs operation, improves
The effect of event execution efficiency.
For example, as shown in figure 4, still so that terminal to server is refunded automatically as an example.Boundary is being set
Face sets instruction according to the event for receiving, and sets configured information, for example, second event is refund thing
Part, it indicates that information is:Refund time (2015-10-1), the refund amount of money (10000 yuan), refund
Bank (bank H) and refund account (account A).
The embodiment provided by the application, the configured information for setting instruction setting by event is realized existing
Set up between first event-resources and second event resource and associated, in order to when reaching the second time,
Directly can be provided for the using automatic the acquisition from the first event-resources of the association set up
The second event resource that two times performed the event-resources that second event is used performs second event, from
And realize that simplifying event performs operation, improve the effect of event execution efficiency.
Used as a kind of optional scheme, the second receiving unit includes:
1) the first receiver module, for before first event that receives performs request, reception event to set
Put instruction;Or
As shown in figure 5, before step S202 receives the execution request of the first event, step S502 is performed,
Reception event sets instruction.For example, still so that terminal to server is refunded automatically as an example.In terminal
Client on previously according to receive event set instruction set repayment schedule, receiving for purchasing
After buying the request of monetary fund, the incidence relation of mutual fund earnings and redrawing funds is resettled, so that directly
Automatic refund is realized by mutual fund earnings.
2) the second receiver module, for when first event that receives performs request, receiving event and setting
Instruction;Or
For example, still so that terminal to server is refunded automatically as an example.In selection purchase monetary fund S
When, the setting interface of monetary fund S will be shown in terminal, as shown in Figure 6.For example, including purchase
The principal amount (such as 20000 yuan) of monetary fund S, if perform set of time, in selection "Yes"
Afterwards, you can to receive event, instruction is set.
It should be noted that in the present embodiment, second event only includes an event, and the second thing
When part resource is quota, then can be with as shown in fig. 6, selection " confirmation ".Additionally, the second thing
Part can also include multiple events, the mutual fund earnings of monetary fund S can be associated with into multiple second
Event, so as to realize performing multiple repayment schedules by the mutual fund earnings of monetary fund S, shows at this
In example, setting interface will further show that the selection interface of the second event to be associated (is not shown in figure
Go out).So as to realize when first event that receives performs request, while setting repayment schedule.
3) the 3rd receiver module, for performing request in first event that receives after and by second
Event-resources were provided for before the second time performed the event-resources that second event is used, and were connect
Receipts event sets instruction.
That is, after monetary fund is bought for a period of time, it is interim as needed that repayment schedule is set.
For example, after purchase monetary fund 1 month, user have purchased a set of new house, but arrival is not needed again
The time of housing loan is given back, then terminal can receive the event setting request of interim transmission.
The embodiment provided by the application, can be received event and set instruction in different time, so that
The flexibility that setting event sets instruction is improve, Consumer's Experience is improved, is more convenient for user to grasp
Make.
As a kind of optional scheme, also include:
1) the second execution unit, for before the 3rd time reached and by the first event-resources
In second event resource be provided for performing the event that is used of second event in the second time and provide
After source, performed obtained by the first event using the first event-resources during the very first time to current time
The 4th event-resources for arriving are more than second event resource, then be continuing with the 4th event-resources and perform first
Event;When the 4th event-resources are equal to second event resource, then stop performing the first event, wherein,
Current time earlier than or equal to the 3rd time, when current time was equal to for three time, the 3rd event money
Source is the 4th event-resources.
It should be noted that in the present embodiment, if performing the first event using the first event-resources
When the 4th event-resources for obtaining afterwards are equal to second event resource, then it represents that the 4th current event-resources
It has been not enough to perform second event, thus, will stop performing the first event, to ensure second event
Normal execution.
For example, still so that terminal to server is refunded automatically as an example.If terminal elder generation amount is K
Fund purchase monetary fund, but due to loss, the amount of money is being reduced always for the fund of K.If working as
Preceding time t judges to buy the amount of money of monetary fund for the fund of K is reduced to remaining fund equal to the amount of money
For M redrawing funds when, then stop purchase money-capital, to ensure when the second time T2 is reached
Refund can according to quantity be performed on time, wherein, current time t earlier than or equal to from monetary fund obtain
3rd time T3 of mutual fund earnings.
The embodiment provided by the application, by judging to be used during the very first time to current time
Whether the 4th event-resources that the first event-resources perform obtained by the first event provide more than second event
Source, to determine to be to continue with using the 4th event-resources to perform the first event, is also off performing the first thing
Part, so that real when currently using the first event-resources and performing the first event, it can also be ensured that remaining the
Four event-resources are more than second event resource, and then second event is normally performed, it is to avoid second
Event is missed, to reach the effect of raising event execution efficiency.
As a kind of optional scheme, as shown in figure 8, deduct unit 706 including:
1) the first acquisition module 802, for being not enough to deduct out second event money in the 3rd event-resources
During source, the difference between the 3rd event-resources and second event resource is obtained;
2) the second acquisition module 804, difference is met for being obtained from other predetermined event-resources
5th event-resources, and using the 3rd event-resources and the 5th event-resources as the second event for deducting out
Resource.
It should be noted that in the present embodiment, the 3rd event-resources can always be used for execution first
Event, and when reaching the 3rd time, when the 3rd event-resources are not enough to deduct out second event resource,
Then can obtain event-resources from predetermined other events supplement the 3rd event-resources, so that when second
Between when reaching, can normally perform second event.
Alternatively, in the present embodiment, above-mentioned other predetermined event-resources can be included but is not limited to
At least one of:The current predetermined event money unrelated with the first event and second event for having stored
Source, the interim predetermined event-resources for obtaining.
For example, still so that terminal to server is refunded automatically as an example.If terminal elder generation amount is K
Fund purchase monetary fund, but due to loss, the amount of money is being reduced always for the fund of K.If working as
Preceding time t judges to buy the amount of money of monetary fund for the fund of K is reduced to remaining fund R less than gold
Volume is the redrawing funds of M, is caused when the 3rd time T3 is reached, and remaining fund R is not enough to deduct
Go out the redrawing funds that the amount of money is M, then can obtain the difference of M and R, and from predetermined sundry item
Obtained in the fund of (such as other finance products do not bound with refund) and meet difference (i.e. (M-R))
Fund, by remaining fund R and the fund from predetermined sundry item (such as other finance products)
In the amount of money that gets deducted as redrawing funds M for the fund sum of (M-R).So as to realize leading to
Cross to provide loans and ensure that user can continue executing with second event.
Again for example, still so that terminal to server is refunded automatically as an example.If judging in current time t
It is the refund of M to go out to buy the amount of money of monetary fund for the fund of K is reduced to remaining fund R less than the amount of money
Fund, causes when the 3rd time T3 is reached, and it is M's that remaining fund R is not enough to deduct out the amount of money
Redrawing funds, then can obtain the difference of M and R, and the notice of " Sorry, your ticket has not enough value " is sent to terminal
Message, after being supplemented with money by terminal check, realizes that obtain fund temporarily to terminal deducts as redrawing funds M.
So as to realize ensureing that user can continue executing with second event by providing loans.
The embodiment provided by the application, the is met by being obtained from other predetermined event-resources
5th event-resources of the difference between three event-resources and second event resource, to supplement the 3rd event
Resource, as the second event resource for deducting out, so as to further ensure the execution of second event,
Improve the efficiency of event execution.
Embodiment 3
According to embodiments of the present invention, a kind of event for implementing above-mentioned event execution method is additionally provided
Terminal is performed, as shown in figure 9, the terminal includes:
1) communication interface 902, are set to the first event of reception and perform request, wherein, the first event is held
Row request is for asking to begin to use the first event-resources to perform the first event from the very first time;
2) memory 904, are connected with communication interface 902, are set to the first event-resources of storage, the
Two event-resources;
3) processor 906, are connected with communication interface 902 and memory 904, are set to the first thing
Second event resource in part resource is provided for performing what second event was used in the second time
Event-resources;When reaching the 3rd time, the first event will be used during the very first time to the 3rd time
Resource deducts out second event resource in performing the 3rd event-resources that the first event is obtained, wherein, the
Three times are earlier than or equal to the second time;When reaching the second time, the second event for deducting out is used
Resource performs second event.
Alternatively, during the specific example in the present embodiment may be referred to above-described embodiment 1 and embodiment 2
Described example, the present embodiment will not be repeated here.
Embodiment 4
Embodiments of the invention additionally provide a kind of storage medium.Alternatively, in the present embodiment, deposit
Storage media is arranged to storage for performing the program code of following steps:
S1, first event of reception performs request, wherein, the first event performs request is used for request from the
One time began to use the first event-resources to perform the first event;
S2, the second event resource in the first event-resources is provided for perform the in the second time
The event-resources that two events are used;
S3, when reaching the 3rd time, will be provided during the very first time to the 3rd time using the first event
Second event resource is deducted out in source in performing the 3rd event-resources that the first event is obtained, wherein, the 3rd
Time is earlier than or equal to the second time;
S4, when reaching the second time, second event is performed using the second event resource for deducting out.
Alternatively, in the present embodiment, above-mentioned storage medium can be included but is not limited to:USB flash disk, only
Read memory (ROM, Read-Only Memory), random access memory (RAM, Random
Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with Jie of store program codes
Matter.
Alternatively, during the specific example in the present embodiment may be referred to above-described embodiment 1 and embodiment 2
Described example, the present embodiment will not be repeated here.
The embodiments of the present invention are for illustration only, and the quality of embodiment is not represented.
If integrated unit in above-described embodiment using realize in the form of SFU software functional unit and as
Independent production marketing or when using, can store in the storage medium that above computer can read.
Based on such understanding, what technical scheme substantially contributed to prior art in other words
The all or part of part or the technical scheme can be embodied in the form of software product, the meter
Calculation machine software product is stored in storage medium, including some instructions are used to so that one or more is calculated
Machine equipment (can be personal computer, server or network equipment etc.) performs each implementation of the present invention
The all or part of step of example methods described.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, certain reality
The part for not having to describe in detail in example is applied, the associated description of other embodiment is may refer to.
In several embodiments provided herein, it should be understood that disclosed client, can
Realize by another way.Wherein, device embodiment described above be only it is schematical,
The division of such as described unit, only a kind of division of logic function, can have in addition when actually realizing
Dividing mode, such as multiple units or component can combine or be desirably integrated into another system,
Or some features can be ignored, or do not perform.Another, shown or discussed coupling each other
Close or direct-coupling or communication connection can be by some interfaces, the INDIRECT COUPLING of unit or module or
Communication connection, can be electrical or other forms.
It is described as separating component illustrate unit can be or may not be it is physically separate,
The part shown as unit can be or may not be physical location, you can with positioned at a ground
Side, or can also be distributed on multiple NEs.Can according to the actual needs select therein
Some or all of unit realizes the purpose of this embodiment scheme.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit
In, or unit be individually physically present, it is also possible to two or more units are integrated in
In one unit.Above-mentioned integrated unit can both be realized in the form of hardware, it would however also be possible to employ soft
The form of part functional unit is realized.
The above is only the preferred embodiment of the present invention, it is noted that for the art
For those of ordinary skill, under the premise without departing from the principles of the invention, some improvement can also be made
And retouching, these improvements and modifications also should be regarded as protection scope of the present invention.
Claims (12)
1. a kind of event execution method, it is characterised in that including:
Receive the first event and perform request, wherein, first event performs request for asking
The first event-resources are begun to use to perform the first event from the very first time;
Second event resource in first event-resources was provided in the second time
Perform the event-resources that second event is used;
When reaching the 3rd time, will be during the very first time to the 3rd time using the
One event-resources are performed and deduct out in the 3rd event-resources that first event is obtained described the
Two event-resources, wherein, the 3rd time is earlier than or equal to second time;
When reaching second time, held using the second event resource for deducting out
The row second event.
2. method according to claim 1, it is characterised in that described by first event money
Second event resource in source is provided for performing what second event was used in the second time
Before event-resources, including:
Reception event sets instruction;
The event is set the configured information indicated by instructing is set, wherein, the configured information
For indicating second time, performing event-resources that the second event used, described
Second event.
3. method according to claim 2, it is characterised in that the reception event sets instruction bag
Include:
Before the first event execution request is received, receive the event and instruction is set;Or
When the first event execution request is received, receive the event and instruction is set;Or
Set after receiving first event and performing request and by the second event resource
It is set to for performing the event-resources that the second event is used in second time
Before, receive the event and instruction is set.
4. method according to claim 1, it is characterised in that before the 3rd time reaches,
And be provided in the second time by the second event resource in first event-resources
After the event-resources that execution second event is used, including:
During the very first time to current time institute is performed using first event-resources
The 4th event-resources obtained by the first event are stated more than the second event resource, then continues to make
First event is performed with the 4th event-resources;Institute is equal in the 4th event-resources
When stating second event resource, then stop performing first event, wherein, the current time
Earlier than or equal to the 3rd time, when the current time is equal to three time, institute
The 3rd event-resources are stated for the 4th event-resources.
5. method according to claim 1, it is characterised in that described when reaching the 3rd time,
During the very first time to the 3rd time described the will be performed using the first event-resources
Deducting out the second event resource in the 3rd event-resources that one event is obtained includes:
If the 3rd event-resources are not enough to deduct out the second event resource, institute is obtained
State the difference between the 3rd event-resources and the second event resource;
The 5th event-resources for meeting the difference are obtained from other predetermined event-resources, and
Using the 3rd event-resources and the 5th event-resources as second thing for deducting out
Part resource.
6. method according to any one of claim 1 to 5, it is characterised in that when described second
Between include:It is separated by multiple time points at same time interval.
7. a kind of event executing device, it is characterised in that including:
First receiving unit, request is performed for receiving the first event, wherein, first thing
Part performs request for asking to begin to use the first event-resources to perform the first thing from the very first time
Part;
First setting unit, for the second event resource in first event-resources to be set
It is for performing the event-resources that second event is used in the second time;
Unit is deducted, for when reaching the 3rd time, by the very first time to the described 3rd
During time the 3rd event-resources that first event is obtained are performed using the first event-resources
In deduct out the second event resource, wherein, the 3rd time is earlier than or equal to described
Two times;
First execution unit, for when reaching second time, is deducted out using described
The second event resource performs the second event.
8. device according to claim 7, it is characterised in that including:
Second receiving unit, in the second event money by first event-resources
Source was provided for before the second time performed the event-resources that second event is used, and was received
Event sets instruction;
Second setting unit, the configured information indicated by instructing is set for setting the event,
Wherein, the configured information is used to indicate second time, the execution second event to be made
Event-resources, the second event.
9. device according to claim 8, it is characterised in that second receiving unit includes:
First receiver module, for before the first event execution request is received, receiving institute
State event and instruction is set;Or
Second receiver module, for when the first event execution request is received, receiving described
Event sets instruction;Or
3rd receiver module, for after receiving first event and performing request and in general
The second event resource is provided for performing the second event institute in second time
Before the event-resources for using, receive the event and instruction is set.
10. device according to claim 7, it is characterised in that including:
Second execution unit, for before the 3rd time reaches and by described first
Second event resource in event-resources is provided for performing second event institute in the second time
After the event-resources for using, described first is used during the very first time to current time
The 4th event-resources that event-resources perform obtained by first event are more than second thing
Part resource, then be continuing with the 4th event-resources and perform first event;Described
When four event-resources are equal to the second event resource, then stop performing first event, its
In, the current time is equal to institute earlier than or equal to the 3rd time in the current time
When stating for three time, the 3rd event-resources are the 4th event-resources.
11. devices according to claim 7, it is characterised in that the deduction unit includes:
First acquisition module, for being not enough to deduct out described second in the 3rd event-resources
During event-resources, the difference between the 3rd event-resources and the second event resource is obtained;
Second acquisition module, the difference is met for being obtained from other predetermined event-resources
The 5th event-resources, and using the 3rd event-resources and the 5th event-resources as button
The second event resource removed out.
12. device according to any one of claim 7 to 11, it is characterised in that described second
Time includes:It is separated by multiple time points at same time interval.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511017166.5A CN106933656A (en) | 2015-12-29 | 2015-12-29 | Event execution method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511017166.5A CN106933656A (en) | 2015-12-29 | 2015-12-29 | Event execution method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106933656A true CN106933656A (en) | 2017-07-07 |
Family
ID=59441452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511017166.5A Pending CN106933656A (en) | 2015-12-29 | 2015-12-29 | Event execution method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106933656A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1908982A (en) * | 2005-08-03 | 2007-02-07 | 冯世道 | Method and apparatus for automatic producing investment using loan terminal |
US20070260537A1 (en) * | 2006-05-02 | 2007-11-08 | Brian Stone | Method and system for extending credit with automated repayment |
CN104361487A (en) * | 2014-10-29 | 2015-02-18 | 中国建设银行股份有限公司 | Method and device of inter-bank automatic repayment of credit card |
CN104616141A (en) * | 2014-11-27 | 2015-05-13 | 深圳市腾讯计算机系统有限公司 | Information processing method and payment platform |
CN105096195A (en) * | 2014-05-08 | 2015-11-25 | 陈衡 | Account money amount processing method and system based on internet application platform |
-
2015
- 2015-12-29 CN CN201511017166.5A patent/CN106933656A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1908982A (en) * | 2005-08-03 | 2007-02-07 | 冯世道 | Method and apparatus for automatic producing investment using loan terminal |
US20070260537A1 (en) * | 2006-05-02 | 2007-11-08 | Brian Stone | Method and system for extending credit with automated repayment |
CN105096195A (en) * | 2014-05-08 | 2015-11-25 | 陈衡 | Account money amount processing method and system based on internet application platform |
CN104361487A (en) * | 2014-10-29 | 2015-02-18 | 中国建设银行股份有限公司 | Method and device of inter-bank automatic repayment of credit card |
CN104616141A (en) * | 2014-11-27 | 2015-05-13 | 深圳市腾讯计算机系统有限公司 | Information processing method and payment platform |
Non-Patent Citations (1)
Title |
---|
中国工会财会: "玩转余额理财,实现一钱两用", 《中国工会财会》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107197010B (en) | Content delivery method, electronic equipment based on e-book and computer storage media | |
US8249552B1 (en) | Pre and post-paid service plan manager | |
CN109087190A (en) | A kind of financing loan method and apparatus | |
US20090006217A1 (en) | Effecting an electronic payment | |
CN111523870B (en) | Order data processing method and device and computer equipment | |
CN106022759A (en) | Electronic payment method supporting multiple accounts | |
CN108805550A (en) | A kind of pre-payment exchange management method and pre-payment trade management device | |
EP2761559A1 (en) | System and method for joint use of gift codes and coupon codes | |
JP6923541B2 (en) | Sales profit distribution system and method | |
CN109636380A (en) | Expense treating method and apparatus | |
CN110415123A (en) | Financial product recommended method, device and equipment and computer storage medium | |
CN106998314A (en) | Account exchange method and device | |
CN110874728A (en) | Online payment system, online payment method, device, medium and server | |
CN109829811A (en) | Loan method and loan device | |
CN106933655A (en) | Event execution method and device | |
CN106933656A (en) | Event execution method and device | |
WO2014011688A1 (en) | Creditor offers for taking a user debt | |
CN110275769A (en) | Business data processing method and its equipment, storage medium, application server | |
CN109727119A (en) | A kind of refund strategy-generating method and device | |
CN107122963B (en) | Payment method and equipment | |
CN107437175A (en) | A kind of processing method and platform for integrating transaction | |
CN106657058A (en) | Event resource allocation method and device | |
CN108156206A (en) | A kind of data transfering method, server, client and system | |
CN113095814A (en) | Multi-channel combined payment method and device | |
CN112184248A (en) | Card organization payment refusal bill data processing method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170707 |