CN106931940A - The simulation laboratory test device of influence and grouting Controlling research of the piping to tunnel - Google Patents

The simulation laboratory test device of influence and grouting Controlling research of the piping to tunnel Download PDF

Info

Publication number
CN106931940A
CN106931940A CN201710202987.9A CN201710202987A CN106931940A CN 106931940 A CN106931940 A CN 106931940A CN 201710202987 A CN201710202987 A CN 201710202987A CN 106931940 A CN106931940 A CN 106931940A
Authority
CN
China
Prior art keywords
tunnel
piping
grouting
analogue means
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710202987.9A
Other languages
Chinese (zh)
Other versions
CN106931940B (en
Inventor
张治国
黄茂松
师敏之
王卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN201710202987.9A priority Critical patent/CN106931940B/en
Publication of CN106931940A publication Critical patent/CN106931940A/en
Application granted granted Critical
Publication of CN106931940B publication Critical patent/CN106931940B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/32Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring the deformation in a solid

Abstract

The simulation laboratory test device of influence and grouting Controlling research the present invention relates to a kind of piping to tunnel, is made up of model casing, tunnel-liner model, piping analogue means, grouting analogue means, multigroup strain gauge, displacement meter support and multiple displacement meters.Tunnel-liner model is the hollow aluminum pipe of segmentation, piping analogue means is constituted by filling out sand in plastic sheeting, by the generation for injecting the aqueous solution of certain volume to simulate piping phenomenon of osmosis, grouting analogue means includes and is constituted and be arranged in the two ends of piping analogue means by Grouting Pipe and grouting device, wherein tunnel outer wall posts multigroup strain gauge, to realize the strain measurement to tunnel;Displacement meter is fixed on displacement meter support, it is possible to achieve the measurement to the tunnel model top soil body and tunnel subsidence.Influence and the research of grouting improvement that the present invention can easily and effectively for Piping phenomenon to tunnel, for formulating safety for tunnel engineering crossing technology standard and there is important reference value for the improvement of Piping phenomenon.

Description

The simulation laboratory test device of influence and grouting Controlling research of the piping to tunnel
Technical field
The present invention relates to the tunnels mimic experimental rig in a kind of Urban Underground Space Excavation and underground structrue engineering, tool Body is related to the simulation laboratory test device of influence and grouting Controlling research of a kind of piping to tunnel.
Background technology
With the further development of Chinese Urbanization, Urban Underground track traffic is used as the most conveniently urban transportation System is also developed rapidly, and increasing river-crossing tunnel is built.In the middle of the process of constructing tunnel, because of supporting construction There is problem in joint treatment or precipitation is improper so as to the seepage that causes, piping accident often occur.Piping is in constructing tunnel Central shown problem is very serious, and all causes very serious loss to many engineerings.If accident can not Reason is clearly analyzed, and takes effective treatment measures, not only it cannot be guaranteed that the safety of constructing tunnel, serious also results in Tunnel is scrapped, and jeopardizes the safety of surrounding enviroment, results in greater loss.And in the polytechnic selection for the treatment of much to piping On, it is an effective and feasible method that grouting is administered.Therefore, the effect that influence and grouting of the piping to tunnel are administered how is estimated It is a key problem in constructing tunnel engineering.
Correlation scholar is mainly theoretical analysis, stochastic model, numerical simulation for influence of the piping to tunnel both at home and abroad Method and field monitoring method.Theoretical analysis method mostlys come from engineering experience, the empirical value obtained by statistical method, it is impossible to from The origin cause of formation of piping is analyzed in mechanism;The stochastic model also simply macroscopical a certain factor and process that describe piping generation, and The mechanism of generation can not comprehensively be explained;The method of numerical simulation is confined in the range of finite element modelling seepage flow, by seepage flow with Soil is isolated and come, it is impossible to consider the interaction of the soil body and seepage flow;The method of field monitoring be subject to dimensional effect, boundary condition and The influence of soil condition so that monitoring result can not accurate response actual condition.
The content of the invention
Present invention aim at above-mentioned the deficiencies in the prior art, propose that influence and grouting improvement of a kind of piping to tunnel are ground The simulation laboratory test device studied carefully, realizes Piping phenomenon to tunnel subsidence, and deformation, the research of stress, and observation grouting is administered Effect.
The technical solution adopted for the present invention to solve the technical problems is:Influence and grouting of a kind of piping to tunnel are administered The simulation laboratory test device of research, including model casing, tunnel-liner model, piping analogue means, grouting analogue means, multigroup Strain gauge, multiple LVDT displacement meters, the rectangle case that the model casing is made up of aluminum alloy materials are divided into upper and lower two parts, Its top surface is set to opening;The tunnel-liner model 2 is aluminum alloy hollow pipe, and longitudinal divisionses are positioned over model casing top half In sandy soils;The piping analogue means is the piping film that cartridge type plastic sheeting long is constituted, the U-shaped shape of piping film, and along longitudinal direction It is placed on model casing, Under-cross tunnel lining model, two ends are placed in earth's surface and vertical with earth's surface;The grouting analogue means is in piping The cartridge type plastic sheeting two ends long of analogue means set one group of grouting tubule, and the fluid injection that one end installation is provided with fluid injection magnetic valve is led Pipe, installs the sand discharge conduit for being provided with sand discharge liquid electromagnetic valve in other end horizontal direction;Multiple LVDT displacement meters pass through displacement respectively Meter support is fixed at the haunch of soil body surface and tunnel-liner model;Multiple strain gauges be respectively symmetrically ground be arranged in tunnel mould The vault of type and arch bottom.
Sand is filled up in advance in the piping film of the piping analogue means, the generation of Piping phenomenon is simulated by water filling, And by controlling the volume and speed of water filling, the generation of different degrees of Piping phenomenon can be simulated.
Injection slurry in the grouting analogue means is polyurethane solutions.
It is used to control the magnetic valve of slip casting to be used for balancing plastic foil external and internal pressure in the grouting analogue means, to ensure Fluid pressure is equal with extraneous soil pressure in film.
The grouting analogue means can the simulated grouting project situation administered, by controlling the speed of slip casting, slurry is matched somebody with somebody Composition and division in a proportion, grouting volume, so as to realize the response in tunnel and the soil body that the different grouting of comparative observation are administered under operating mode, is more had The grouting administering method of effect.
The beneficial effects of the invention are as follows:
The present invention compared with prior art, with following remarkable advantage:1st, this experiment test device can be made by hand, in phase Popularity is good in closing scientific research, and experimental test scheme has stronger autgmentability, can be further applicable to city shield tunnel and apply There is the phenomenons such as piping infiltration in work in tunnel in itself deformation effect research;2nd, the piping tunnels mimic device of this experiment can be with Piping phenomenon is preferably simulated to tunnel in itself and using the stratum settlement after grouting treatment, it is possible to more accurately measure existing Tunnel deformation influence;3rd, by controlling sand volumes size and flowing velocity in piping analogue means in this experiment, can be with The displacement deformation influence in tunnel under different Piping phenomenons is realized, so as to obtain a series of experimental data under different operating modes;4th, originally Can be existing to piping to realize different grouting situations by the slurries ratio of controlled grouting, filling speed, grouting position in experiment The regulation effect of elephant;5th, this experiment is first corrected before experiment to tunnel model whole body strain gauge, by curved up and down to tunnel The correction of square strain gauge and axle power strain gauge, tunnel moment of flexure and axle power everywhere when can go out model test with reverse, more comprehensively Reaction tunnel institute is affected.6th, the experimental study that Piping phenomenon influences on tunnel is carried out using this set simulating test device, can For Tunnel Engineering site operation provides good consulting and suggestion, certain theoretical ginseng is provided for formulating safety for tunnel engineering Examine.
Brief description of the drawings
Fig. 1 is simulating test device schematic diagram in the model casing in embodiment of the invention;
Fig. 2 is piping and grouting simulation schematic device of the present invention in embodiment;
Fig. 3 is foil gauge position view on the tunnel in embodiment of the invention;
Fig. 4 is displacement meter arrangement schematic diagram of the present invention in embodiment.
Specific embodiment
Below in conjunction with the accompanying drawings, the present invention is described in further detail by a preferred embodiment.
First, 2, one, the tunnel-liner model of a model casing 1, piping analogue means, a grouting simulation are made Device.
Fig. 1 is simulating test device schematic diagram in the model casing in embodiment of the invention, as shown in figure 1, outside model casing 1 Shape is in cuboid, and interior space dimension is 800 mm × 500 mm × 500 mm(Length × width × height), it is 15 mm by 5 thickness Aluminium alloy plate splicing composition.Tunnel-liner model 2 is four sections of hollow aluminium alloy pipes 3, and external diameter is 80 mm, and internal diameter is 70 mm, Wall thickness is 5 mm, and axial segmentation length is 100 mm.Lining model section external diameter 100 mm, the mm of internal diameter 70.
Fig. 2 is piping analogue means and grouting simulation schematic device of the present invention in embodiment.As shown in Fig. 2 pipe Analogue means is gushed, it is U-shaped along placed longitudinally, Under-cross tunnel inside to fill out sand, two ends are placed in earth's surface and vertical with earth's surface;
The piping film 5 of piping analogue means for a diameter of 8 mm cartridge type plastic sheeting long, by the two ends of piping film 5 be placed in earth's surface and It is vertical with earth's surface, arrange 1 perfusing hole, 6,1 liquid receiving mouth 7.Grouting analogue means is thin in the cartridge type plastics long of piping analogue means Film two ends, set 1 group of grouting tubule, and the injection catheter 8 for being provided with fluid injection magnetic valve is installed in one end, pacifies in other end horizontal direction It is equiped with the sand discharge conduit 9 of sand discharge liquid electromagnetic valve.Wherein note, draining solenoid valve are universal models, and injection catheter and discharge opeing are led Pipe external diameter is 5 mm, and wall thickness is 1 mm;Note, discharging tube external diameter are 10 mm, and wall thickness is 2 mm.
Fig. 3 show foil gauge location arrangements figure.Model body outer wall 16 foil gauges of stickup, wherein foil gauge 37,38, 39,40,41,42,43,44 are attached to tunnel arch bottom, and foil gauge 45,46,47,48,49,50,51,52 is attached at tunnel vault, Homonymy foil gauge is spaced 50mm, wherein foil gauge 37, and 44,45,52 respectively apart from tunnel edge 25mm.
Start to sand is inserted in model casing, when soil thickness is filled to 140mm, that is, complete subbase soil, be put into pipe Gush model 5 so that piping model least significant end center line overlaps with model casing axis, and make piping model 5 vertical with soil layer holding, Ensure the leakage of piping two-port in native table and vertical with earth's surface.
Continue to banket up to thickness up to 200mm, that is, complete tunnel subjacent bed soil, tunnel-liner model 2 is put into sand table Layer.So that tunnel model center line overlaps with model casing axis.
Continue to banket until thickness reaches 350mm, that is, completion of banketing.Now edpth of tunnel 40mm, piping device depth is 200mm.Whole LVDT displacement meters are fixed on tunnel haunch and soil body ground surface by displacement meter support, and make each LVDT Move meter to keep straight up, horizontal direction is fixed, and vertical direction can be adjusted.
Fig. 4 is displacement meter support schematic diagram of the present invention in embodiment.As shown in figure 4, displacement meter 11,14,17,20, 23,26,29,32,35, soil body ground surface is fixed on, displacement meter 10,13,16,19,22,25,28,31,34 is fixed on Tunnel Right At the haunch of side, displacement meter 12,15,18,21,24,27,30,33,36 is fixed at the haunch of tunnel left side, whole displacement meter upper ends It is fixed on displacement meter support 4.Each displacement meter interval 40mm is evenly arranged at soil body ground surface and haunch, both end of which displacement Meter 22,23,24,34,35,36 is apart from tunnel face 40mm apart from case side 90mm.LVDT displacement meters end is bonded with adhesive plaster respectively In the grittiness soil body and tunnel-liner outer surface.In the present embodiment, displacement meter is used for tunnel-liner outer surface and soil body ground surface Longitudinal Settlement measurement, it specifically measures numerical value and can be obtained by external displacement data Acquisition Instrument.
During experiment, first by provisions for grouting 6 to injecting a small amount of water in piping device so that Piping phenomenon occurs.Period Observed and recorded each meter reading.(Can be by controlling the volume of injected water volume, speed controls different degrees of Piping phenomenon Occur);Then, the injection slurry of grouting device 6 is begun through, husky liquid is reclaimed by liquid receiving device 7, period observed and recorded each instrument Meter reading, and reading when occurring with piping is analyzed.Furthermore it is possible to the speed of slip casting is controlled, the match ratio of slurry, Grouting volume, so as to realize the tunnel under the different grouting operating modes of comparative observation.The dependent variable of soil body sedimentation value and tunnel, to Obtain more efficiently grouting administering method.
Embodiments of the present invention are illustrated above, but the present invention is not limited thereto, can also without departing from Suitably changed in the range of main points of the invention.
The simulation laboratory test device of influence and grouting Controlling research of the above embodiment of the present invention by piping to tunnel, Can obtain the influence of tunnel subsidence deformation under different Piping phenomenons, and the strain value in tunnel, longitudinal direction are heavy after grouting is administered The technique effect of depreciation and soil body ground surface Longitudinal Settlement value.

Claims (5)

1. a kind of simulation laboratory test device of influence and grouting Controlling research of piping to tunnel, including model casing(1), tunnel Lining model(2), piping analogue means, grouting analogue means, multigroup strain gauge, multiple LVDT displacement meters, it is characterised in that:Institute State model casing(1)The rectangle case being made up of aluminum alloy materials, is divided into upper and lower two parts, and its top surface is set to opening;The tunnel Road lining model(2)It is aluminum alloy hollow pipe, longitudinal divisionses are positioned in the sandy soils of model casing top half;The piping mould It is the piping film that cartridge type plastic sheeting long is constituted to intend device(5), piping film(5)U-shaped shape, and along placed longitudinally in model casing, Under-cross tunnel lining model(2), two ends are placed in earth's surface and vertical with earth's surface;The grouting analogue means is in piping analogue means Cartridge type plastic sheeting two ends long set one group of grouting tubule, and the injection catheter for being provided with fluid injection magnetic valve is installed in one end(8), the other end The sand discharge conduit for being provided with sand discharge liquid electromagnetic valve is installed in horizontal direction(9);Multiple LVDT displacement meters pass through displacement meter support respectively It is fixed at the haunch of soil body surface and tunnel-liner model;Multiple strain gauges are respectively symmetrically the arch for being arranged in tunnel model on ground Top and arch bottom.
2. the simulation laboratory test device of influence of the piping according to claim 1 to tunnel and grouting Controlling research, its It is characterised by:The piping film of the piping analogue means(5)It is interior to fill up sand in advance, the hair of Piping phenomenon is simulated by water filling It is raw, and by controlling the volume and speed of water filling, the generation of different degrees of Piping phenomenon can be simulated.
3. the simulation laboratory test device of influence of the piping according to claim 1 to tunnel and grouting Controlling research, its It is characterised by:Injection slurry in the grouting analogue means is polyurethane solutions.
4. the simulation laboratory test device of influence of the piping according to claim 1 to tunnel and grouting Controlling research, its It is characterised by:It is used to control the magnetic valve of slip casting to be used for balancing plastic foil external and internal pressure in the grouting analogue means, to protect Fluid pressure is equal with extraneous soil pressure in card film.
5. influence according to any described piping of claim 1-4 to tunnel and the simulation laboratory test dress of grouting Controlling research Put, it is characterised in that:It is described grouting analogue means can simulated grouting administer project situation, by controlling the speed of slip casting, slurry The match ratio of body, grouting volume, so as to realize the response in tunnel and the soil body that the different grouting of comparative observation are administered under operating mode, is obtained More efficiently grouting administering method.
CN201710202987.9A 2017-03-30 2017-03-30 The simulation laboratory test device of influence and be in the milk Controlling research of the piping to tunnel Active CN106931940B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710202987.9A CN106931940B (en) 2017-03-30 2017-03-30 The simulation laboratory test device of influence and be in the milk Controlling research of the piping to tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710202987.9A CN106931940B (en) 2017-03-30 2017-03-30 The simulation laboratory test device of influence and be in the milk Controlling research of the piping to tunnel

Publications (2)

Publication Number Publication Date
CN106931940A true CN106931940A (en) 2017-07-07
CN106931940B CN106931940B (en) 2019-03-05

Family

ID=59425345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710202987.9A Active CN106931940B (en) 2017-03-30 2017-03-30 The simulation laboratory test device of influence and be in the milk Controlling research of the piping to tunnel

Country Status (1)

Country Link
CN (1) CN106931940B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110954676A (en) * 2019-12-03 2020-04-03 同济大学 Visual test device for simulating shield tunneling existing tunnel construction
CN116067845A (en) * 2022-11-23 2023-05-05 山东大学 Test device and method for monitoring disturbance of stratum grouting to tunnel structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071943A (en) * 2010-12-13 2011-05-25 上海大学 Centrifugal experimental simulation testing device for surface subsidence induced by city shield tunnel construction
CN103115788A (en) * 2012-11-20 2013-05-22 上海理工大学 Indoor model experience device with existing tunnel affected by double subway construction
CN104880396A (en) * 2015-05-26 2015-09-02 上海大学 Soil body two-direction seepage model device under external load action and testing method
CN105928486A (en) * 2016-05-02 2016-09-07 北京工业大学 Test apparatus and method for measuring neighborhood rain sewage pipeline deformation caused by tunnel construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071943A (en) * 2010-12-13 2011-05-25 上海大学 Centrifugal experimental simulation testing device for surface subsidence induced by city shield tunnel construction
CN103115788A (en) * 2012-11-20 2013-05-22 上海理工大学 Indoor model experience device with existing tunnel affected by double subway construction
CN104880396A (en) * 2015-05-26 2015-09-02 上海大学 Soil body two-direction seepage model device under external load action and testing method
CN105928486A (en) * 2016-05-02 2016-09-07 北京工业大学 Test apparatus and method for measuring neighborhood rain sewage pipeline deformation caused by tunnel construction

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
ZHIGUO ZHANG ET,AL.: "Boundary element model for analysis of the mechanical behavior of existing pipelines subjected to tunneling-induced deformations", 《CAMNUTERS AND GEOTECHNICS》 *
于小娟 等: "《土力学》", 31 January 2012, 国防工业出版社 *
付厚利 等: "《地下工程施工技术》", 31 January 2016, 武汉大学出版社 *
刘贞飞: "海底管道冲刷及波浪力试验研究", 《中国优秀硕士学位论文全文数据库基础科技辑》 *
贾春兰: "管涌试验模型研究进展综述", 《新疆水利》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110954676A (en) * 2019-12-03 2020-04-03 同济大学 Visual test device for simulating shield tunneling existing tunnel construction
CN110954676B (en) * 2019-12-03 2021-06-29 同济大学 Visual test device for simulating shield tunneling existing tunnel construction
CN116067845A (en) * 2022-11-23 2023-05-05 山东大学 Test device and method for monitoring disturbance of stratum grouting to tunnel structure
CN116067845B (en) * 2022-11-23 2024-02-23 山东大学 Test device and method for monitoring disturbance of stratum grouting to tunnel structure

Also Published As

Publication number Publication date
CN106931940B (en) 2019-03-05

Similar Documents

Publication Publication Date Title
CN103558044B (en) The indoor model test device that shield tunnel mortar depositing construction affects neighboring piles
Qiu et al. Failure behavior investigation of loess metro tunnel under local-high-pressure water environment
CN103115788B (en) The indoor model test device that existing tunnel affects by two-wire subway work
CN103996348B (en) The cross-over tunnel construction indoor model test device on operation tunnel impact up and down
CN109297810A (en) A kind of simulation deep formation anchor rod drawing experimental rig and test method
CN107330191A (en) The Numerical Analysis methods of Groundwater iron shield tunnel construction influence
CN106018736B (en) Urban Underground pipeline seepage triggers the experimental rig of surface collapse
CN204142710U (en) The test unit of tunnel surrounding landslide under simulated rainfall and seepage action of ground water
CN104989411A (en) Liquefaction discriminating device and method of pipe piece surrounding saturated sand caused by shield construction
CN113586069A (en) Indoor test device for simulating shield water-rich stratum synchronous grouting construction technology and using method thereof
CN206470116U (en) A kind of experimental rig for simulating the lower basement bottom board stress of artesian water effect
Shan et al. Semi-automatic construction of pile-supported subgrade adjacent to existing railway
CN103866736A (en) Physical simulation testing system and method for influences of mine earthquake on coal mine underground reservoir
CN106814179A (en) The test method of fluid structurecoupling analog simulation experimental rig
CN106931940A (en) The simulation laboratory test device of influence and grouting Controlling research of the piping to tunnel
CN115470550A (en) Method for calculating uplift displacement of lower horizontal tunnel caused by excavation of layered foundation pit
CN212568764U (en) Induced grouting experimental model for saturated fine sand layer
Jiang et al. Experimental study on the migration regularity of sand outside a large, deep-water, open caisson during sinking
CN206907330U (en) A kind of goaf filling analogue experiment installation
CN103176220A (en) Tunnel water pressure model test method
CN104215425B (en) A kind of re-fill method of packed type karst passage system
CN106643649B (en) Device and method for measuring deep settlement and pore water pressure of soil body
Fang et al. Model test and numerical simulation on the invert heave behaviour of high-speed railway tunnels with rainstorm
CN109870477A (en) A kind of the frost heave monomer and its detection method of non-contact detection soil
CN207215815U (en) A kind of analog simulation experiment shelf of unconsolidated formation traveling angle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant