CN106930900A - It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment - Google Patents

It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment Download PDF

Info

Publication number
CN106930900A
CN106930900A CN201710082669.3A CN201710082669A CN106930900A CN 106930900 A CN106930900 A CN 106930900A CN 201710082669 A CN201710082669 A CN 201710082669A CN 106930900 A CN106930900 A CN 106930900A
Authority
CN
China
Prior art keywords
wind turbines
jack
unit
track
jacket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710082669.3A
Other languages
Chinese (zh)
Inventor
高宏飙
王健
罗雯雯
徐韦华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longyuan Offshore Wind Power Co Ltd
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Original Assignee
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Marine Longyuan Wind Power Generation Co Ltd filed Critical Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority to CN201710082669.3A priority Critical patent/CN106930900A/en
Publication of CN106930900A publication Critical patent/CN106930900A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0043Placing the offshore structure on a pre-installed foundation structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0091Offshore structures for wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Wind Motors (AREA)

Abstract

The present invention relates to a kind of offshore wind turbine installation method exempted from large lifting equipment, comprising:The jacket foundation setting of Wind turbines:Placement positioning mould bases, after 4 steel-pipe piles are squeezed into sea bed along 4 jiaos of guide thimbles of positioning die carrier are heavy successively, removes positioning die carrier;Wind turbines basis 4 jiaos of sleeves of jacket, alignment 4 steel-pipe piles of insertion, sinking enters sea bed;Wind turbines are installed:By the jack-up unit of attachment rail by refuting Wind turbines consolidation shed by the sea, by taking out the water ballast of jack-up unit, the track on jack-up unit deck is set to be docked completely with consolidation shed track;The interim pulley installed using the rack winch on jack-up unit, and on the basis of wind turbine generator jacket, Wind turbines are drawn to the first-class step of track on the basis of wind turbine generator jacket.Without large lifting equipment, using orbital docking, method is drawn in traction to the method, you can complete the installation of offshore wind farm unit.

Description

It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment
Technical field
The present invention relates to offshore wind farm technical field, and in particular to a kind of to exempt to be installed with the offshore wind turbine of large lifting equipment Method.
Background technology
Huge consumption and the severe contamination of environment with fossil energy, regenerative resource are more and more subject to the world each The concern of state, wind energy turns into most one of new energy of competitiveness.Compared to land wind-powered electricity generation, coastal waters wind-powered electricity generation is not only not take up soil money Source, and energy enrich, exert oneself stabilization, utilization rate it is high, it has also become the new direction of world's Wind Power Development.
Traditional coastal waters Wind turbines are installed, it is necessary to use large lifting equipment, such as large-scale floating crane or the large-scale extra large work of configuration The jack-up unit for hanging, the elevating capacity requirement to construction equipment is high, and available equipment is less, and constructive group takes height, and mesh Preceding domestic large-tonnage wind turbine installation vessel oceangoing ship lacks.
Therefore, coastal waters wind-powered electricity generation Wind turbines mounting cost is reduced, work efficiency is improved, need to solves to avoid using large lifting equipment Problem.
The content of the invention
It is an object of the invention to provide a kind of offshore wind turbine installation method for exempting to use large lifting equipment, the method is without big Heavy-duty hoisting equipment, using orbital docking, the dilatory method of traction, you can complete the installation of offshore wind farm unit.
In order to solve the problems existing in background technology, the present invention is to use following technical scheme:One kind is exempted from large-scale The offshore wind turbine installation method of heavy equipment, comprises the following steps:
First, the jacket foundation setting of Wind turbines:
Sea bed sweeps extra large leveling at a, coastal waters Wind turbines seat in the plane;
B, placement positioning mould bases, after 4 steel-pipe piles are squeezed into sea bed along 4 jiaos of guide thimbles of positioning die carrier are heavy successively, remove Positioning die carrier;
C, barge transport Wind turbines basis jacket to scene;
D, Wind turbines basis 4 jiaos of sleeves of jacket, alignment 4 steel-pipe piles of insertion, sinking enter sea bed;
E, successively Wind turbines basis 4 jiaos of sleeves of jacket and 4 steel-pipe pile spaces between, pour into a mould underwater grouting material Material, completes wind turbine generator jacket foundation construction;
2nd, Wind turbines are installed:
1st, harbour consolidation shed lays Wind turbines attachment rail by the sea;
2nd, Wind turbines assembly, Wind turbines coxopodite tower and mistake are completed on harbour consolidation shed Wind turbines attachment rail Section connection is crossed, changeover portion is bonded (but can be slid along track) in orbit by special tooling;
3rd, fixed stopping means, fixes Wind turbines in orbit;
4th, attachment rail (track model, gauge and the consolidation shed Wind turbines attachment rail on the deck of jack-up unit It is identical), and rack winch;
5th, by the jack-up unit of attachment rail by refuting Wind turbines consolidation shed by the sea, by the pressure for taking out jack-up unit Cabin water, makes the track on jack-up unit deck be docked completely with consolidation shed track;
6th, the stopping means that Wind turbines are fixed on track is unclamped;
7th, using the rack winch on jack-up unit, Wind turbines are drawn to the rail on jack-up unit deck plane On road;
8th, the stopping means on fixed jack-up unit track, makes Wind turbines be fixed on jack-up unit track;
9th, attachment rail (track model, gauge and the consolidation shed Wind turbines mounting rail on the basis of wind turbine generator jacket Road is identical);
10th, the jack-up unit equipped with Wind turbines reaches seat in the plane;
11st, after the completion of jack-up unit pitching pile, lifting jack-up unit hull, until jack-up unit deck upper rail with Track on the basis of wind turbine generator jacket is docked completely;
12nd, the stopping means that Wind turbines are fixed on jack-up unit track is unclamped;
13rd, the interim cunning installed using the rack winch on jack-up unit, and on the basis of wind turbine generator jacket Wheel, Wind turbines is drawn on the track on the basis of wind turbine generator jacket;
14th, the changeover portion for connecting Wind turbines coxopodite tower, is fixed on the basis of wind turbine generator jacket;
15th, the special tooling for bonding track, and wind turbine generator jacket basis upper rail are removed, Wind turbines peace is completed Dress.
After adopting the above technical scheme, the invention has the advantages that:
Without large lifting equipment, you can complete the installation exercise of whole Wind turbines, and operation on the sea operation is few, installs Simple and convenient, efficiency high, expense are low, operational security is good, for offshore wind farm Large scale construction provides guidance, are pushed away with stronger Wide value.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the step figure after the shipment of jacket basis in embodiment provided by the present invention;
Fig. 2 is to install positioning die carrier in embodiment provided by the present invention the step of figure;
Fig. 3 is figure the step of jacket basis is installed with positioning die carrier in embodiment provided by the present invention;
Fig. 4 be embodiment provided by the present invention in jack-up unit press close to the step of assembling seashore figure;
Fig. 5 be embodiment provided by the present invention in blower fan global transfer to jack-up unit the step of scheme;
Fig. 6 schemes to prepare the step of installing blower fan in embodiment provided by the present invention;
Fig. 7 is that jack-up unit deck upper rail is complete with track on the basis of jacket in embodiment provided by the present invention The step of full docking, schemes;
Fig. 8 be embodiment provided by the present invention in assembling the step of scheme;
The step of Fig. 9 after jack-up unit spud leg lifting in embodiment provided by the present invention to leave figure.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with specific embodiment The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the present invention, and It is not used in the restriction present invention.
This specific embodiment uses following technical scheme:It is a kind of to exempt from the offshore wind turbine installation side of large lifting equipment Method, comprises the following steps:
First, the jacket foundation setting of Wind turbines:
Sea bed sweeps extra large leveling at a, coastal waters Wind turbines seat in the plane;
B, placement positioning mould bases, after 4 steel-pipe piles are squeezed into sea bed along 4 jiaos of guide thimbles of positioning die carrier are heavy successively, remove Positioning die carrier;
C, barge transport Wind turbines basis jacket to scene;
D, Wind turbines basis 4 jiaos of sleeves of jacket, alignment 4 steel-pipe piles of insertion, sinking enter sea bed;
E, successively Wind turbines basis 4 jiaos of sleeves of jacket and 4 steel-pipe pile spaces between, pour into a mould underwater grouting material Material, completes wind turbine generator jacket foundation construction;
2nd, Wind turbines are installed:
1st, harbour consolidation shed lays Wind turbines attachment rail by the sea;
2nd, Wind turbines assembly, Wind turbines coxopodite tower and mistake are completed on harbour consolidation shed Wind turbines attachment rail Section connection is crossed, changeover portion is bonded (but can be slid along track) in orbit by special tooling;
3rd, fixed stopping means, fixes Wind turbines in orbit;
4th, attachment rail (track model, gauge and the consolidation shed Wind turbines attachment rail on the deck of jack-up unit It is identical), and rack winch;
5th, by the jack-up unit of attachment rail by refuting Wind turbines consolidation shed by the sea, by the pressure for taking out jack-up unit Cabin water, makes the track on jack-up unit deck be docked completely with consolidation shed track;
6th, the stopping means that Wind turbines are fixed on track is unclamped;
7th, using the rack winch on jack-up unit, Wind turbines are drawn to the rail on jack-up unit deck plane On road;
8th, the stopping means on fixed jack-up unit track, makes Wind turbines be fixed on jack-up unit track;
9th, attachment rail (track model, gauge and the consolidation shed Wind turbines mounting rail on the basis of wind turbine generator jacket Road is identical);
10th, the jack-up unit equipped with Wind turbines reaches seat in the plane;
11st, after the completion of jack-up unit pitching pile, lifting jack-up unit hull, until jack-up unit deck upper rail with Track on the basis of wind turbine generator jacket is docked completely;
12nd, the stopping means that Wind turbines are fixed on jack-up unit track is unclamped;
13rd, the interim cunning installed using the rack winch on jack-up unit, and on the basis of wind turbine generator jacket Wheel, Wind turbines is drawn on the track on the basis of wind turbine generator jacket;
14th, the changeover portion for connecting Wind turbines coxopodite tower, is fixed on the basis of wind turbine generator jacket;
15th, the special tooling for bonding track, and wind turbine generator jacket basis upper rail are removed, Wind turbines peace is completed Dress.
The present invention is without large lifting equipment, you can complete the installation exercise of whole Wind turbines, and operation on the sea operation Few, the simple and convenient, efficiency high of installation, expense are low, operational security is good, for offshore wind farm Large scale construction provides guidance, have Stronger promotional value.
Embodiment:
Step A:Fig. 1 is referred to, barge is transported to specified seat in the plane after harbour is by the shipment of jacket basis;
Step B:Fig. 2-Fig. 3 is referred to, positioning die carrier is installed, after 4 steel-pipe piles squeeze into constant depth, then remove positioning Mould bases;Then by transport to the jacket at seat in the plane, 4 jiaos of sleeves of jacket, alignment 4 steel-pipe piles of insertion, sinking enters sea bed, and Grouting material is poured to fix;
Step C:Fig. 4-Fig. 5 is referred to, cargo ship is pressed close to assemble harbour, using clamping device on ship, by what is installed Blower fan global transfer is to cargo ship;
Step D:Fig. 6 is referred to, jack-up unit transports at the seat in the plane that jacket foundation setting is finished blower fan, prepare peace Dress blower fan.
Step E:Fig. 7 is referred to, after jack-up unit pitching pile, lifting jack-up unit hull, until jack-up unit first Plate upper rail is docked completely with the track on the basis of wind turbine generator jacket.
Step F:Fig. 8 is referred to, using the rack winch on jack-up unit, and on the basis of wind turbine generator jacket The interim pulley installed, Wind turbines is drawn on the track on the basis of wind turbine generator jacket;Finally by Wind turbines bottom The changeover portion of section tower connection, is fixed on the basis of wind turbine generator jacket.
Step G:Fig. 9 is referred to, after assembling is finished, is left after cargo ship spud leg lifting.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be in other specific forms realized.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires to be limited rather than described above, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each implementation method is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Specification an as entirety, the technical scheme in each embodiment can also be formed into those skilled in the art through appropriately combined May be appreciated other embodiment.

Claims (1)

1. it is a kind of to exempt from, with the offshore wind turbine installation method of large lifting equipment, to comprise the following steps:
(1), the jacket foundation setting of Wind turbines:
A sea bed sweeps extra large leveling at (), coastal waters Wind turbines seat in the plane;
B (), placement positioning mould bases, after 4 steel-pipe piles are squeezed into sea bed along 4 jiaos of guide thimbles of positioning die carrier are heavy successively, removes fixed Position mould bases;
C (), barge transport Wind turbines basis jacket to scene;
D (), Wind turbines basis 4 jiaos of sleeves of jacket, alignment 4 steel-pipe piles of insertion, sinking enter sea bed;
(e), successively Wind turbines basis 4 jiaos of sleeves of jacket and 4 steel-pipe pile spaces between, pour into a mould underwater grouting material, Complete wind turbine generator jacket foundation construction;
(2), Wind turbines are installed:
(1), harbour consolidation shed lays Wind turbines attachment rail by the sea;
(2) Wind turbines assembly, Wind turbines coxopodite tower and transition, are completed on harbour consolidation shed Wind turbines attachment rail Section connection, changeover portion is bonded in orbit by special tooling;
(3), fixed stopping means, fixes Wind turbines in orbit;
(4), the attachment rail on the deck of jack-up unit, and rack winch;
(5), by the jack-up unit of attachment rail by refuting Wind turbines consolidation shed by the sea, by the ballasting for taking out jack-up unit Water, makes the track on jack-up unit deck be docked completely with consolidation shed track;
(6) stopping means that Wind turbines are fixed on track, is unclamped;
(7), using the rack winch on jack-up unit, Wind turbines are drawn to the track on jack-up unit deck plane On;
(8), the stopping means on fixed jack-up unit track, makes Wind turbines be fixed on jack-up unit track;
(9), the attachment rail on the basis of wind turbine generator jacket, track model, gauge and consolidation shed Wind turbines attachment rail It is identical;
(10), the jack-up unit equipped with Wind turbines reaches seat in the plane;
(11), after the completion of jack-up unit pitching pile, lifting jack-up unit hull, until jack-up unit deck upper rail and wind Track on the basis of group of motors jacket is docked completely;
(12) stopping means that Wind turbines are fixed on jack-up unit track, is unclamped;
(13) the interim pulley installed, using the rack winch on jack-up unit, and on the basis of wind turbine generator jacket, Wind turbines are drawn on the track on the basis of wind turbine generator jacket;
(14), the changeover portion for connecting Wind turbines coxopodite tower, is fixed on the basis of wind turbine generator jacket;
(15) special tooling for bonding track, and wind turbine generator jacket basis upper rail, are removed, Wind turbines peace is completed Dress.
CN201710082669.3A 2017-02-16 2017-02-16 It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment Withdrawn CN106930900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710082669.3A CN106930900A (en) 2017-02-16 2017-02-16 It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710082669.3A CN106930900A (en) 2017-02-16 2017-02-16 It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment

Publications (1)

Publication Number Publication Date
CN106930900A true CN106930900A (en) 2017-07-07

Family

ID=59424070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710082669.3A Withdrawn CN106930900A (en) 2017-02-16 2017-02-16 It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment

Country Status (1)

Country Link
CN (1) CN106930900A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108639252A (en) * 2018-05-21 2018-10-12 大连理工大学 A kind of harbour of Large marine wind turbine is integrally floating to hold in the palm shipment method
CN113090470A (en) * 2021-04-13 2021-07-09 保利长大工程有限公司 Installation method of offshore wind turbine
CN117773440A (en) * 2024-02-26 2024-03-29 广州文船重工有限公司 Movable inner container tool for wind power jacket

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4436454A (en) * 1980-12-23 1984-03-13 Ateliers Et Chantiers De Bretagne-Abc Device for positioning an off-shore platform on its support structure
GB2327970A (en) * 1997-04-29 1999-02-10 Kvaerner Oil & Gas Ltd Method of installing a tower
WO2003093584A1 (en) * 2002-05-01 2003-11-13 Marine Structure Consultants (Msc) B.V. Method and vessel for manipulating an offshore construction
CN101793106A (en) * 2009-12-29 2010-08-04 郝钲声 Installing mechanism of intertidal belt wind generator upright post without crane and operation method thereof
CN102191767A (en) * 2010-03-04 2011-09-21 第一建设机工股份有限公司 Deck-liftable operation platform and construction method for marine wind power generation facility
CN110159490A (en) * 2019-05-27 2019-08-23 江苏科技大学 A kind of offshore wind generating transport installation ship

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4436454A (en) * 1980-12-23 1984-03-13 Ateliers Et Chantiers De Bretagne-Abc Device for positioning an off-shore platform on its support structure
GB2327970A (en) * 1997-04-29 1999-02-10 Kvaerner Oil & Gas Ltd Method of installing a tower
WO2003093584A1 (en) * 2002-05-01 2003-11-13 Marine Structure Consultants (Msc) B.V. Method and vessel for manipulating an offshore construction
CN101793106A (en) * 2009-12-29 2010-08-04 郝钲声 Installing mechanism of intertidal belt wind generator upright post without crane and operation method thereof
CN102191767A (en) * 2010-03-04 2011-09-21 第一建设机工股份有限公司 Deck-liftable operation platform and construction method for marine wind power generation facility
CN110159490A (en) * 2019-05-27 2019-08-23 江苏科技大学 A kind of offshore wind generating transport installation ship

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108639252A (en) * 2018-05-21 2018-10-12 大连理工大学 A kind of harbour of Large marine wind turbine is integrally floating to hold in the palm shipment method
CN108639252B (en) * 2018-05-21 2019-08-09 大连理工大学 A kind of harbour of Large marine blower is integrally floating to hold in the palm shipment method
CN113090470A (en) * 2021-04-13 2021-07-09 保利长大工程有限公司 Installation method of offshore wind turbine
CN113090470B (en) * 2021-04-13 2022-07-12 保利长大工程有限公司 Installation method of offshore wind turbine
CN117773440A (en) * 2024-02-26 2024-03-29 广州文船重工有限公司 Movable inner container tool for wind power jacket
CN117773440B (en) * 2024-02-26 2024-04-19 广州文船重工有限公司 Movable inner container tool for wind power jacket

Similar Documents

Publication Publication Date Title
KR101013789B1 (en) Method of establishing Sea wind power generator and apparatus thereof
CN101538844B (en) Construction method for building large-scale offshore wind farm with depth more than 2m
CN109056684A (en) The split type jacket structure of Large marine platform and its installation method of the installation of support method are floated suitable for shallow sea water
CN106697189A (en) Installation method for float-dragging method offshore type ocean booster station
CN103925172B (en) Integral mounting method for tension leg type offshore floating wind turbine
CN102079476A (en) Fan-holding equipment and mobile waterborne platform
CN205044921U (en) Multi -functional marine construction is from peaceful platform
CN101837929B (en) Operation method for lifting fan for barge in shoal area
CN209178967U (en) The split type jacket structure of Large marine platform of support method installation is floated suitable for shallow sea water
CN102936888B (en) Self-installation type offshore booster station structure and installation method thereof
CN112726548B (en) Construction method for split jacket foundation of deep-open sea converter station
CN106930900A (en) It is a kind of to exempt from the offshore wind turbine installation method of large lifting equipment
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
US10422311B2 (en) Hydroelectricity generating unit capturing marine current energy
CN108626078A (en) A kind of offshore wind turbine Spar types buoyant foundation barge helps fortune to help dress technique
CN103010413A (en) Working method for hoisting draught fan by barge
CN203186548U (en) Self-elevating heavy installation boat
CN201941953U (en) Marine combined floating wind power generation platform
CN207791078U (en) For reservoir or the floating support dismounting structure of the wind turbine in lake
CN208085949U (en) A kind of floating wind turbine and TLP platforms transport installation integrated ship
CN105221346B (en) Marine mobile wind power system
CN201971133U (en) Bottom-supported blower installation platform
CN209636843U (en) Offshore wind turbine suction bucket jacket large-diameter pile composite foundation
CN106976526A (en) Carrier is installed in the transportation installation method of pedestal and transport to ultra-large type offshore blower fan under water
CN108639252A (en) A kind of harbour of Large marine wind turbine is integrally floating to hold in the palm shipment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20170707