CN106930521B - A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method - Google Patents

A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method Download PDF

Info

Publication number
CN106930521B
CN106930521B CN201710301494.0A CN201710301494A CN106930521B CN 106930521 B CN106930521 B CN 106930521B CN 201710301494 A CN201710301494 A CN 201710301494A CN 106930521 B CN106930521 B CN 106930521B
Authority
CN
China
Prior art keywords
suspension platform
head sheave
floating head
stud
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710301494.0A
Other languages
Chinese (zh)
Other versions
CN106930521A (en
Inventor
曹国华
白迎冬
朱真才
彭维红
花纯利
周公博
彭玉兴
李伟
冯世哲
刘善增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201710301494.0A priority Critical patent/CN106930521B/en
Publication of CN106930521A publication Critical patent/CN106930521A/en
Application granted granted Critical
Publication of CN106930521B publication Critical patent/CN106930521B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Abstract

The invention discloses a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and methods, system includes suspension platform, the floating head sheave regulating device for being symmetrically arranged at two sides above suspension platform, it respectively corresponds on the outside of the floating head sheave regulating device of two sides equipped with intermediate head sheave and reel, the suspending steel wire rope of head sheave and floating head sheave regulating device among pile warp is wound on reel, the front end of suspending steel wire rope is fixed on suspension platform.The gear rotation of stud end is driven using motor driver, utilize the mobile working principle of lead screw rotation in ball-screw and nut, the lifting of rocker piece is driven by the rotation of stud, and then head sheave is driven to float, realize the adjustment of suspension platform pose, the tension and length of adjustable suspending steel wire rope, to adjust inclination angle and the height of suspension platform.Its structure is simple, easy to operate, easy for assemble or unload, and adjusting tension is accurate, applied widely.

Description

A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method
Technical field
The present invention relates to a kind of ultra-deep construction vertical parallel connection suspension platform location regulating systems, are particularly suitable for suspention in parallel The adjustment of platform's position and pose, the tension adjustment and length adjustment of suspending steel wire rope.
Background technique
The parallel institution by four rope hangings, one platform is widely present in engineer application field, as vertical is applied Construct in the suspension platform stable car system of work, chimney suspension platform system and the valuable spacecraft of field of aerospace four ropes it is outstanding Crane system etc..The major function of rope hanging parallel institution is lifting of the realization suspension platform in vertical direction, and guarantees suspention Platform keeps horizontality in lifting process, and the steel wire rope tension distribution of suspention is more balanced.Since four wirerope are by four Platform rope winding device independently drives, and asynchronous and suspension platform the mass center bias of rope winding device rotation speed can all lead to platform In lifting process run-off the straight, and existing most of suspension platforms in parallel all do not have pose adjustment mechanism, this is to suspention in parallel The stability of platform operation and safety bring great hidden danger, and overthrow accident even occurs when serious.
Summary of the invention
Technical problem:The invention aims to overcome deficiency in the prior art, provide that a kind of structure is simple, operation side Just, ultra-deep construction vertical parallel connection suspension platform location regulating system that is accurate, saving energy consumption and method are adjusted.
Technical solution:Ultra-deep of the invention is constructed vertical parallel connection suspension platform location regulating system, including suspension platform, right Claim the floating head sheave regulating device for being located at two sides above suspension platform, is respectively corresponded on the outside of the floating head sheave regulating device of two sides Equipped with intermediate head sheave and reel, it is wound with the suspending steel wire rope of head sheave and floating head sheave regulating device among pile warp on reel, hangs The front end for hanging wirerope is fixed on suspension platform.
The floating head sheave regulating device for being symmetrically arranged at two sides above suspension platform is 2-6.
The floating head sheave regulating device includes support frame, stud that the top of support frame is symmetrically set, counter weight device and Bearing block, the lower part of support frame are equipped with the motor driver that driving stud moves up and down, spiral connection on the stud There is rocker piece, the bottom end of stud is equipped with the gear being connected with motor driver, is equipped with day wheel shaft, head sheave in the bearing block The middle part of axis is equipped with floating head sheave, and the both ends of day wheel shaft are connected with rocker piece.
The counter weight device includes fixed pulley, counterweight armored rope, movable pulley and counterweight, and counterweight armored rope one end is fixed on On support frame, other end pile warp fixed pulley, movable pulley are connected further around after fixed pulley in counterweight, and fixed pulley is former and later two, It is horizontally fixed on the top of support frame.
The method of above-mentioned ultra-deep construction vertical parallel connection suspension platform location regulating system:To in floating head sheave regulating device Motor driver driving signal, motor driver drives the gear both forward and reverse directions rotation of stud end, thus drive and spiral shell The rocker piece of column spiral connection moves up and down, and then floating head sheave is driven to move up and down;When floating head sheave moves upwards, suspention The tension of wirerope becomes larger, and length is reduced, and suspension platform is driven to move upwards;When floating head sheave moves downward, suspension wire The tension of rope becomes smaller, and length increases, and suspension platform is driven to move downward;By the compound action of more suspending steel wire ropes, realize The pose of suspension platform adjusts;The load that suspension platform applies to stud is balanced using counter weight device, reduces motor driven dress Set driving power.
Beneficial effect:The present invention adjusts the Tensity size and length of wirerope by the way of floating head sheave, can be outstanding It is timely adjusted when hanging platform's position and pose run-off the straight, can effectively eliminate the tilt phenomenon of suspension platform, it can be effectively Guarantee the stability and safety of suspension platform operation;And suspension operation safely and smoothly can be carried out using suspension platform.Its Structure is simple, and easy to adjust accurate, method is novel, applied widely, and suspension platform is balanced using counter weight device and is applied to stud The load added reduces motor driver driving power, saves energy consumption, has wide applicability.
Detailed description of the invention
Fig. 1 is suspension platform location regulating system overall structure diagram in parallel of the invention;
Fig. 2 is floating head sheave regulating device structural schematic diagram of the invention;
Fig. 3 is counter weight device structural schematic diagram of the invention.
In figure:1- suspension platform;2- reel;Head sheave among 3-;4- suspending steel wire rope;5- floating head sheave regulating device;5- 1- support frame;5-2- stud;5-3- floating head sheave;5-4- counter weight device;5-5- bearing block;5-6- days wheel shafts;5-7- rocker piece; 5-8- motor driver;5-4-1- fixed pulley;5-4-2- counterweight armored rope;5-4-3 movable pulley;5-4-4- counterweight.
Specific embodiment
One embodiment of the present of invention is further described with reference to the accompanying drawing:
The vertical parallel connection suspension platform location regulating system as shown in Figure 1, ultra-deep of the invention is constructed, mainly by suspension platform 1, reel 2, intermediate head sheave 3, suspending steel wire rope 4 and floating head sheave regulating device 5 are constituted;The 1 top two sides of suspension platform Four floating head sheave regulating devices 5 are symmetrically arranged with, according to practical situations, are symmetrically arranged at the floating of 1 top two sides of suspension platform Dynamic head sheave regulating device 5 is 2-6.The outside of four floating head sheave regulating devices 5 of two sides is respectively corresponded equipped with intermediate head sheave 3 With reel 2, the suspending steel wire rope 4 of head sheave 3 and floating head sheave regulating device 5 among pile warp, suspending steel wire rope are wound on reel 2 4 front end is fixed on suspension platform 1, and four on suspension platform 1 piece suspending steel wire rope 4 is uniformly distributed, and 4 one end of suspending steel wire rope is fixed On suspension platform 1, around above floating head sheave 5-3 and behind 3 top of intermediate head sheave, fixation is wrapped on reel 2 other end, is rolled up The briquetting of wirerope spiral rope groove and fixed 4 rope end of suspending steel wire rope is offered on cylinder 2.
As shown in Fig. 2, the floating head sheave regulating device 5 includes support frame 5-1, stud 5-2, floating head sheave 5-3, matches 5-4, bearing block 5-5, day wheel shaft 5-6, rocker piece 5-7 and motor driver 5-8 are set in refitting;The top of support frame 5-1 is symmetrical Equipped with stud 5-2, counter weight device 5-4 and bearing block 5-5, the lower part of support frame 5-1 is equipped with what driving stud 5-2 moved up and down Spiral is connected with rocker piece 5-7 on motor driver 5-8, the stud 5-2, and the bottom end of stud 5-2 is equipped with drives with motor Dynamic device 5-8 connected gear, the bearing block 5-5 is interior to be equipped with day wheel shaft 5-6, and the middle part of day wheel shaft 5-6 is equipped with floating day 5-3 is taken turns, the both ends of day wheel shaft 5-6 are connected with rocker piece 5-7.The upper end stud 5-2 is connect with support frame 5-1 bearing, can be free Rotation, lower end is gear, and device 5-8 is driven by motor and drives its rotation;Rocker piece 5-7 connect with stud 5-2 spiral, can on Lower movement;Its wheel shaft 5-6 is mounted on the rocker piece 5-7 on both sides by bearing block 5-5;Floating head sheave 5-3 is fixedly mounted on day Among wheel shaft 5-6, counter weight device 5-4 is symmetrically mounted on the both sides floating head sheave 5-3 on day wheel shaft 5-6.
As shown in figure 3, the counter weight device 5-4 includes fixed pulley 5-4-1, counterweight armored rope 5-4-2, movable pulley 5-4- The one end 3 and counterweight 5-4-4, counterweight armored rope 5-4-2 is fixed on support frame 5-1, other end pile warp fixed pulley 5-4-1, dynamic cunning 5-4-3 is taken turns, is connected further around after fixed pulley 5-4-1 in counterweight 5-4-4, fixed pulley 5-4-1 is former and later two, is horizontally fixed on The top of support frame 5-1.Two fixed pulley 5-4-1 are fixedly mounted on support frame 5-1, and movable pulley 5-4-3 is symmetrically installed on The both sides floating head sheave 5-3 on its wheel shaft 5-6, settable two or four.The one end counterweight armored rope 5-4-2 is fixed on branch On support 5-1, after the other end bypasses movable pulley 5-4-3, upwards after the upper surface of fixed pulley 5-4-1, counterweight 5- is connected downwards 4-4。
Ultra-deep construction vertical parallel connection suspension platform pose method of adjustment of the invention is as follows:
Motor driver 5-8 driving signal is given, motor driver 5-8 drives the positive negative side of gear of the end stud 5-2 To rotation, so that the rocker piece 5-7 connecting with stud 5-2 spiral be driven to move up and down, and then floating head sheave 5-3 or more fortune is driven It is dynamic;When floating head sheave 5-3 is moved upwards, the tension of suspending steel wire rope 4 becomes larger, and length is reduced, and suspension platform 1 is driven to transport upwards It is dynamic;When floating head sheave 5-3 is moved downward, the tension of suspending steel wire rope 4 becomes smaller, and length increases, and suspension platform 1 is driven to transport downwards It is dynamic;By the compound action of more suspending steel wire ropes 4, the pose adjustment of suspension platform 1 is realized;It is put down using counter weight device 5-4 The load that the suspension platform 1 that weighs applies to stud 5-2, reduces motor driver 5-8 driving power.

Claims (5)

  1. The vertical parallel connection suspension platform location regulating system 1. a kind of ultra-deep is constructed, it is characterised in that:It include suspension platform (1), It is symmetrically arranged at the floating head sheave regulating device of two sides above suspension platform (1)(5), the floating head sheave regulating device of two sides(5)'s Outside is respectively corresponded equipped with intermediate head sheave(3)And reel(2), reel(2)On be wound with head sheave among pile warp(3)With floating head sheave Regulating device(5)Suspending steel wire rope(4), suspending steel wire rope(4)Front end be fixed on suspension platform (1);
    The floating head sheave regulating device(5)Including support frame(5-1), support frame(5-1)The stud that symmetrically sets of top(5- 2), counter weight device(5-4)And bearing block(5-5), support frame(5-1)Lower part be equipped with driving stud(5-2)It moves up and down Motor driver(5-8), the stud(5-2)Upper spiral is connected with rocker piece(5-7), stud(5-2)Bottom end be equipped with With motor driver(5-8)Connected gear, the bearing block(5-5)It is interior to be equipped with day wheel shaft(5-6), day wheel shaft(5-6) Middle part be equipped with floating head sheave(5-3), day wheel shaft(5-6)Both ends and rocker piece(5-7)It is connected.
  2. The vertical parallel connection suspension platform location regulating system 2. a kind of ultra-deep according to claim 1 is constructed, it is characterised in that: The floating head sheave regulating device for being symmetrically arranged at two sides above suspension platform (1)(5)It is 2-6.
  3. The vertical parallel connection suspension platform location regulating system 3. a kind of ultra-deep according to claim 1 is constructed, it is characterised in that: The counter weight device(5-4)Including fixed pulley(5-4-1), counterweight armored rope(5-4-2), movable pulley(5-4-3)And counterweight(5- 4-4), counterweight armored rope(5-4-2)One end is fixed on support frame(5-1)On, other end pile warp fixed pulley(5-4-1), movable pulley (5-4-3), further around through fixed pulley(5-4-1)Afterwards and in counterweight(5-4-4)It is connected, fixed pulley(5-4-1)It is horizontal for former and later two It is fixed on support frame(5-1)Top.
  4. The vertical parallel connection suspension platform location regulating system 4. a kind of ultra-deep according to claim 1 is constructed, it is characterised in that: Reel(2)On offer wirerope spiral rope groove and fixed suspending steel wire rope(4)The briquetting of rope end.
  5. 5. a kind of method of ultra-deep construction vertical parallel connection suspension platform location regulating system according to claim 1, special Sign is:Give floating head sheave regulating device(5)In motor driver(5-8)Driving signal, motor driver(5-8)Band Dynamic stud(5-2)The gear both forward and reverse directions of end rotate, thus drive and stud(5-2)The rocker piece of spiral connection(5-7)On Lower movement, and then drive floating head sheave(5-3)It moves up and down;When floating head sheave(5-3)When moving upwards, suspending steel wire rope(4) Tension become larger, length reduce, drive suspension platform(1)It moves upwards;When floating head sheave(5-3)When moving downward, steel is suspended in midair Cord(4)Tension become smaller, length increase, drive suspension platform(1)It moves downward;Pass through more suspending steel wire ropes(4)Group Cooperation is used, and realizes suspension platform(1)Pose adjustment;Use counter weight device(5-4)To balance suspension platform(1)To stud(5- 2)The load of application reduces motor driver(5-8)Driving power.
CN201710301494.0A 2017-05-02 2017-05-02 A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method Expired - Fee Related CN106930521B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710301494.0A CN106930521B (en) 2017-05-02 2017-05-02 A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710301494.0A CN106930521B (en) 2017-05-02 2017-05-02 A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method

Publications (2)

Publication Number Publication Date
CN106930521A CN106930521A (en) 2017-07-07
CN106930521B true CN106930521B (en) 2018-11-27

Family

ID=59430228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710301494.0A Expired - Fee Related CN106930521B (en) 2017-05-02 2017-05-02 A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method

Country Status (1)

Country Link
CN (1) CN106930521B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109987476B (en) * 2017-12-29 2021-01-15 梯阶电梯工程有限公司 Separated cable guide sliding device
CN111779252B (en) * 2020-07-14 2021-11-05 海南本源建筑安装工程有限公司 Multifunctional hanging basket platform for wall surface design of building engineering

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2308670Y (en) * 1997-07-22 1999-02-24 四川省隆昌县建筑机械厂 Self-lifing gate type construction elevator
CN102661856A (en) * 2012-02-28 2012-09-12 中国矿业大学 Simulation experiment platform and experiment method for motion of cord suspension parallel mechanism
CN104374508A (en) * 2014-11-07 2015-02-25 中国矿业大学 Suspension rope and stable rope tension online detection device and method in vertical shaft construction
CN204402000U (en) * 2014-11-26 2015-06-17 朱震原 Can lateral displacement building external application hanging basket

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2308670Y (en) * 1997-07-22 1999-02-24 四川省隆昌县建筑机械厂 Self-lifing gate type construction elevator
CN102661856A (en) * 2012-02-28 2012-09-12 中国矿业大学 Simulation experiment platform and experiment method for motion of cord suspension parallel mechanism
CN104374508A (en) * 2014-11-07 2015-02-25 中国矿业大学 Suspension rope and stable rope tension online detection device and method in vertical shaft construction
CN204402000U (en) * 2014-11-26 2015-06-17 朱震原 Can lateral displacement building external application hanging basket

Also Published As

Publication number Publication date
CN106930521A (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN106930521B (en) A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method
CN101962145A (en) Weight balancing device of elevator compensating bar structure
US10118811B2 (en) Eccentric loading adjusting mechanism and method for parallel suspension platform
CN103248826A (en) T-type two-dimensional cableway camera system
CN115676644B (en) Anti-swing outdoor portal crane
CN102627227A (en) Method and device for movement of suspended object in three-dimensional space
CN102303821B (en) Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope
CN214879790U (en) Movable arm tower crane
CN111392608A (en) Tower crane with function of adjusting lifting contact area
CN214879724U (en) Suspension device for steel structure installation
CN105439017A (en) Crane
CN214879663U (en) Anti-swing crane trolley with cable guide device
CN212532037U (en) Lifting appliance anti-shaking structure of bridge crane
CN201864409U (en) Novel suspension device for elevator car
CN205312938U (en) Crane equipped with travelable counterweight unit
CN106365058A (en) Portal crane for assembling motor with weight being above 100T
CN203255939U (en) Universal adjustable type hoist high-place operation platform
CN206799061U (en) Crane braking device
CN108203044B (en) Elevator device
CN104140041A (en) Electric hoist double-beam crane
CN214456383U (en) Hoisting frame structure for construction engineering construction
CN218290117U (en) Triangle-shaped displacement hoist of adjustable steel suspender
CN112875511A (en) Novel anti-swing device for lifting appliance
CN104386599A (en) Balancing weight moving and clamping device for tower crane
CN207713021U (en) Elevating mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181127

Termination date: 20200502

CF01 Termination of patent right due to non-payment of annual fee