CN106930521A - A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method - Google Patents

A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method Download PDF

Info

Publication number
CN106930521A
CN106930521A CN201710301494.0A CN201710301494A CN106930521A CN 106930521 A CN106930521 A CN 106930521A CN 201710301494 A CN201710301494 A CN 201710301494A CN 106930521 A CN106930521 A CN 106930521A
Authority
CN
China
Prior art keywords
suspension platform
head sheave
floating head
steel wire
stud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710301494.0A
Other languages
Chinese (zh)
Other versions
CN106930521B (en
Inventor
曹国华
白迎冬
朱真才
彭维红
花纯利
周公博
彭玉兴
李伟
冯世哲
刘善增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201710301494.0A priority Critical patent/CN106930521B/en
Publication of CN106930521A publication Critical patent/CN106930521A/en
Application granted granted Critical
Publication of CN106930521B publication Critical patent/CN106930521B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method, system includes suspension platform, is symmetrically arranged at the floating head sheave adjusting means of suspension platform top both sides, the outside of the floating head sheave adjusting means of both sides is correspondingly provided with middle head sheave and reel respectively, the suspending steel wire rope of head sheave and floating head sheave adjusting means in the middle of pile warp is wound with reel, the front end of suspending steel wire rope is fixed on suspension platform.The pinion rotation of stud end is driven using motor driver, the operation principle moved with nut is rotated using leading screw in ball-screw, the lifting of rocker piece is driven by the rotation of stud, and then drive head sheave to float, realize the adjustment of suspension platform pose, the tension force and length of suspending steel wire rope can be adjusted, so as to adjust inclination angle and the height of suspension platform.Its simple structure, easy to operate, easy installation and removal, regulation tension force is accurate, applied widely.

Description

A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method
Technical field
The present invention relates to a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system, it is particularly suited for suspention in parallel The adjustment of platform's position and pose, the tension adjustment and length adjustment of suspending steel wire rope.
Background technology
It is widely present in engineer applied field by four rope hangings, one parallel institution of platform, such as vertical is applied Four ropes of the interior construction suspension platform system of the suspension platform stable car system of work, chimney and the valuable spacecraft of field of aerospace are outstanding Crane system etc..The major function of rope hanging parallel institution is the lifting for realizing suspension platform in vertical direction, and ensures suspention Platform keeps horizontality in lifting process, and the steel wire rope tension distribution of suspention is more balanced.Because four steel wire ropes are by four Platform rope winding device independently drives, and asynchronous and suspension platform the barycenter bias of rope winding device rotary speed can all cause platform In lifting process run-off the straight, and existing most of suspension platforms in parallel all do not have pose adjustment mechanism, and this suspends in midair in parallel The stability and security of platform operation bring great hidden danger, and overthrow accident even occurs when serious.
The content of the invention
Technical problem:The invention aims to overcome deficiency of the prior art, there is provided a kind of simple structure, operation side Just ultra-deep construction vertical parallel connection suspension platform location regulating system that is accurate, saving energy consumption and method, are adjusted.
Technical scheme:Ultra-deep of the invention construction vertical parallel connection suspension platform location regulating system, including it is suspension platform, right Title is located at the floating head sheave adjusting means of suspension platform top both sides, and the outside of the floating head sheave adjusting means of both sides corresponds to respectively Middle head sheave and reel are provided with, the suspending steel wire rope of head sheave and floating head sheave adjusting means in the middle of pile warp is wound with reel, hanged The front end for hanging steel wire rope is fixed on suspension platform.
The floating head sheave adjusting means for being symmetrically arranged at suspension platform top both sides is 2-6.
Described floating head sheave adjusting means includes support frame, the symmetrical stud for setting in the top of support frame, counter weight device and Bearing block, the bottom of support frame is provided with the motor driver for driving stud to move up and down, spiral connection on described stud There is rocker piece, the bottom of stud is provided with the gear being connected with motor driver, a day wheel shaft, head sheave are provided with described bearing block Floating head sheave is provided with the middle part of axle, the two ends of day wheel shaft are connected with rocker piece.
Described counter weight device includes fixed pulley, counterweight armored rope, movable pulley and counterweight, and counterweight armored rope one end is fixed on On support frame, other end pile warp fixed pulley, movable pulley are connected further around after fixed pulley with counterweight, and fixed pulley is former and later two, It is horizontally fixed on the top of support frame.
The method of above-mentioned ultra-deep construction vertical parallel connection suspension platform location regulating system:To in floating head sheave adjusting means Motor driver drive signal, motor driver drives the gear both forward and reverse directions of stud end to rotate, so as to drive and spiral shell The rocker piece of post spiral connection moves up and down, and then drives floating head sheave to move up and down;When floating head sheave is moved upwards, suspention The tension force of steel wire rope becomes big, and length is reduced, and drives suspension platform to move upwards;When floating head sheave is moved downward, suspension wire The tension force of rope diminishes, and length increases, and drives suspension platform to move downward;By many compound actions of suspending steel wire rope, realize The pose adjustment of suspension platform;The load that suspension platform applies to stud is balanced using counter weight device, is reduced motor and is driven dress Put driving power.
Beneficial effect:The present invention adjusts the Tensity size and length of steel wire rope by the way of floating head sheave, can be outstanding Timely adjusted when hanging platform's position and pose run-off the straight, can effectively be eliminated the tilt phenomenon of suspension platform, can be effectively Ensure the stability and security of suspension platform operation;And safely and smoothly can carry out suspension operation using suspension platform.Its Simple structure, easy to adjust accurate, method is novel, applied widely, balances suspension platform using counter weight device and is applied to stud Plus load, reduce motor driver driving power, save energy consumption, with wide applicability.
Brief description of the drawings
Fig. 1 is suspension platform location regulating system overall structure diagram in parallel of the invention;
Fig. 2 is floating head sheave adjusting means structural representation of the invention;
Fig. 3 is counter weight device structural representation of the invention.
In figure:1- suspension platforms;2- reels;Head sheave in the middle of 3-;4- suspending steel wire ropes;5- floating head sheave adjusting meanss;5- 1- support frames;5-2- studs;5-3- floating head sheaves;5-4- counter weight devices;5-5- bearing blocks;5-6- days wheel shafts;5-7- rocker pieces; 5-8- motor drivers;5-4-1- fixed pulleys;5-4-2- counterweight armored ropes;5-4-3 movable pulleys;5-4-4- counterweights.
Specific embodiment
One embodiment of the present of invention is further described below in conjunction with the accompanying drawings:
As shown in figure 1, ultra-deep construction vertical parallel connection suspension platform location regulating system of the invention, mainly by suspension platform 1st, reel 2, middle head sheave 3, suspending steel wire rope 4 and floating head sheave adjusting means 5 are constituted;The described top both sides of suspension platform 1 Four floating head sheave adjusting meanss 5 are arranged with, according to practical situations, the floating of the top both sides of suspension platform 1 is symmetrically arranged at Dynamic head sheave adjusting means 5 is 2-6.The outside of four floating head sheave adjusting meanss 5 of both sides is correspondingly provided with middle head sheave 3 respectively With reel 2, the suspending steel wire rope 4 of head sheave 3 and floating head sheave adjusting means 5 in the middle of pile warp, suspending steel wire rope are wound with reel 2 4 front end is fixed on suspension platform 1, and four on suspension platform 1 piece suspending steel wire rope 4 is uniform, and the one end of suspending steel wire rope 4 is fixed On suspension platform 1, after the other end bypasses floating head sheave 5-3 tops and the middle top of head sheave 3, fixation is wrapped on reel 2, is rolled up The briquetting of steel wire rope spiral drum slot and the fixed fag end of suspending steel wire rope 4 is offered on cylinder 2.
As shown in Fig. 2 described floating head sheave adjusting means 5 includes support frame 5-1, stud 5-2, floating head sheave 5-3, matches somebody with somebody 5-4, bearing block 5-5, day wheel shaft 5-6, rocker piece 5-7 and motor driver 5-8 are put in refitting;The top of support frame 5-1 is symmetrical Stud 5-2, counter weight device 5-4 and bearing block 5-5 are provided with, the bottom of support frame 5-1 is provided with and drives what stud 5-2 moved up and down Motor driver 5-8, spiral is connected with rocker piece 5-7 on described stud 5-2, and the bottom of stud 5-2 is provided with drives with motor Dynamic device 5-8 connected gear, is provided with a day wheel shaft 5-6 in described bearing block 5-5, floating day is provided with the middle part of day wheel shaft 5-6 Wheel 5-3, the two ends of day wheel shaft 5-6 are connected with rocker piece 5-7.Stud 5-2 upper ends are connected with support frame 5-1 bearings, can be free Rotate, lower end is gear, drives it to rotate by motor driver 5-8;Rocker piece 5-7 be connected with stud 5-2 spirals, can go up Lower motion;Its wheel shaft 5-6 is arranged on the rocker piece 5-7 on both sides by bearing block 5-5;Floating head sheave 5-3 is fixedly mounted on day In the middle of wheel shaft 5-6, counter weight device 5-4 is symmetrically mounted on the floating head sheave 5-3 both sides on day wheel shaft 5-6.
As shown in figure 3, described counter weight device 5-4 includes fixed pulley 5-4-1, counterweight armored rope 5-4-2, movable pulley 5-4- 3 and counterweight 5-4-4, counterweight armored rope 5-4-2 one end are fixed on support frame 5-1, other end pile warp fixed pulley 5-4-1, dynamic cunning Wheel 5-4-3, is connected further around after fixed pulley 5-4-1 with counterweight 5-4-4, and fixed pulley 5-4-1 is former and later two, is horizontally fixed on The top of support frame 5-1.Two fixed pulley 5-4-1 are fixedly mounted on support frame 5-1, and movable pulley 5-4-3 is symmetrically installed on Floating head sheave 5-3 both sides on its wheel shaft 5-6, can be set two or four.Counterweight armored rope 5-4-2 one end is fixed on branch On support 5-1, after the other end bypasses movable pulley 5-4-3, upwards above fixed pulley 5-4-1 after, connection counterweight 5- downwards 4-4。
Ultra-deep construction vertical parallel connection suspension platform pose method of adjustment of the invention is as follows:
Drive the positive negative side of gear of stud 5-2 ends to motor driver 5-8 drive signals, motor driver 5-8 To rotation, so as to drive the rocker piece 5-7 being connected with stud 5-2 spirals to move up and down, and then floating head sheave 5-3 is driven to transport up and down It is dynamic;When floating head sheave 5-3 is moved upwards, the tension force of suspending steel wire rope 4 becomes big, and length is reduced, and drives suspension platform 1 to transport upwards It is dynamic;When floating head sheave 5-3 is moved downward, the tension force of suspending steel wire rope 4 diminishes, and length increases, and drives suspension platform 1 to transport downwards It is dynamic;By many compound actions of suspending steel wire rope 4, the pose adjustment of suspension platform 1 is realized;Put down using counter weight device 5-4 The load that weighing apparatus suspension platform 1 applies to stud 5-2, reduces motor driver 5-8 driving powers.

Claims (6)

1. a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system, it is characterised in that:It include suspension platform (1), It is symmetrically arranged at the floating head sheave adjusting means of suspension platform (1) top both sides(5), the floating head sheave adjusting means of both sides(5)'s Outside is correspondingly provided with middle head sheave respectively(3)And reel(2), reel(2)On be wound with head sheave in the middle of pile warp(3)With floating head sheave Adjusting means(5)Suspending steel wire rope(4), suspending steel wire rope(4)Front end be fixed on suspension platform (1).
2. a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system according to claim 1, it is characterised in that: The floating head sheave adjusting means for being symmetrically arranged at suspension platform (1) top both sides(5)It is 2-6.
3. a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system according to claim 1 and 2, its feature exists In:Described floating head sheave adjusting means(5)Including support frame(5-1), support frame(5-1)The symmetrical stud for setting in top(5- 2), counter weight device(5-4)And bearing block(5-5), support frame(5-1)Bottom be provided with driving stud(5-2)Move up and down Motor driver(5-8), described stud(5-2)Upper spiral is connected with rocker piece(5-7), stud(5-2)Bottom be provided with With motor driver(5-8)Connected gear, described bearing block(5-5)Inside it is provided with a day wheel shaft(5-6), day wheel shaft(5-6) Middle part be provided with floating head sheave(5-3), day wheel shaft(5-6)Two ends and rocker piece(5-7)It is connected.
4. a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system according to claim 3, it is characterised in that: Described counter weight device(5-4)Including fixed pulley(5-4-1), counterweight armored rope(5-4-2), movable pulley(5-4-3)And counterweight(5- 4-4), counterweight armored rope(5-4-2)One end is fixed on support frame(5-1)On, other end pile warp fixed pulley(5-4-1), movable pulley (5-4-3), further around through fixed pulley(5-4-1)Afterwards with counterweight(5-4-4)It is connected, fixed pulley(5-4-1)It is former and later two, level It is fixed on support frame(5-1)Top.
5. a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system according to claim 1, it is characterised in that: Reel(2)On offer steel wire rope spiral drum slot and fixed suspending steel wire rope(4)The briquetting of fag end.
6. the method for a kind of ultra-deep construction vertical parallel connection suspension platform location regulating system according to claim 1, it is special Levy and be:Give floating head sheave adjusting means(5)In motor driver(5-8)Drive signal, motor driver(5-8)Band Dynamic stud(5-2)The gear both forward and reverse directions of end are rotated, so as to drive and stud(5-2)The rocker piece of spiral connection(5-7)On Lower motion, and then drive floating head sheave(5-3)Move up and down;When floating head sheave(5-3)Upwards during motion, suspending steel wire rope(4) Tension force become big, length is reduced, and drives suspension platform(1)Motion upwards;When floating head sheave(5-3)When moving downward, steel is suspended in midair Cord(4)Tension force diminish, length increase, drive suspension platform(1)Move downward;By many suspending steel wire ropes(4)Group Cooperation is used, and realizes suspension platform(1)Pose adjustment;Use counter weight device(5-4)To balance suspension platform(1)To stud(5- 2)The load of applying, reduces motor driver(5-8)Driving power.
CN201710301494.0A 2017-05-02 2017-05-02 A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method Expired - Fee Related CN106930521B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710301494.0A CN106930521B (en) 2017-05-02 2017-05-02 A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710301494.0A CN106930521B (en) 2017-05-02 2017-05-02 A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method

Publications (2)

Publication Number Publication Date
CN106930521A true CN106930521A (en) 2017-07-07
CN106930521B CN106930521B (en) 2018-11-27

Family

ID=59430228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710301494.0A Expired - Fee Related CN106930521B (en) 2017-05-02 2017-05-02 A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method

Country Status (1)

Country Link
CN (1) CN106930521B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109987476A (en) * 2017-12-29 2019-07-09 梯阶电梯工程有限公司 Separate type cable slide guide device
CN111779252A (en) * 2020-07-14 2020-10-16 海南本源建筑安装工程有限公司 Multifunctional hanging basket platform for wall surface design of building engineering

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2308670Y (en) * 1997-07-22 1999-02-24 四川省隆昌县建筑机械厂 Self-lifting door type construction elevator
CN102661856A (en) * 2012-02-28 2012-09-12 中国矿业大学 Simulation experiment platform and experiment method for motion of cord suspension parallel mechanism
CN104374508A (en) * 2014-11-07 2015-02-25 中国矿业大学 Suspension rope and stable rope tension online detection device and method in vertical shaft construction
CN204402000U (en) * 2014-11-26 2015-06-17 朱震原 Can lateral displacement building external application hanging basket

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2308670Y (en) * 1997-07-22 1999-02-24 四川省隆昌县建筑机械厂 Self-lifting door type construction elevator
CN102661856A (en) * 2012-02-28 2012-09-12 中国矿业大学 Simulation experiment platform and experiment method for motion of cord suspension parallel mechanism
CN104374508A (en) * 2014-11-07 2015-02-25 中国矿业大学 Suspension rope and stable rope tension online detection device and method in vertical shaft construction
CN204402000U (en) * 2014-11-26 2015-06-17 朱震原 Can lateral displacement building external application hanging basket

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109987476A (en) * 2017-12-29 2019-07-09 梯阶电梯工程有限公司 Separate type cable slide guide device
CN109987476B (en) * 2017-12-29 2021-01-15 梯阶电梯工程有限公司 Separated cable guide sliding device
CN111779252A (en) * 2020-07-14 2020-10-16 海南本源建筑安装工程有限公司 Multifunctional hanging basket platform for wall surface design of building engineering
CN111779252B (en) * 2020-07-14 2021-11-05 海南本源建筑安装工程有限公司 Multifunctional hanging basket platform for wall surface design of building engineering

Also Published As

Publication number Publication date
CN106930521B (en) 2018-11-27

Similar Documents

Publication Publication Date Title
CN101962145A (en) Weight balancing device of elevator compensating bar structure
CN115676644B (en) Anti-swing outdoor portal crane
CN113911906A (en) Bridge gantry crane hanging bracket and use method thereof
CN106930521A (en) A kind of ultra-deep construction vertical parallel connection suspension platform location regulating system and method
CN215756065U (en) Quick hoist device of construction is contained to prefabricated box of bridge
CN214879790U (en) Movable arm tower crane
CN104891316A (en) Elevator balance weight device
CN208166419U (en) A kind of Architectural Equipment hanging apparatus
CN112875511A (en) Novel anti-swing device for lifting appliance
CN115057378B (en) Backward-tipping prevention device of tower crane
CN111392608A (en) Tower crane with function of adjusting lifting contact area
CN214879663U (en) Anti-swing crane trolley with cable guide device
CN214879724U (en) Suspension device for steel structure installation
JPH0192110A (en) Elevating carriage drive device for crane
CN214456383U (en) Hoisting frame structure for construction engineering construction
JP4079129B2 (en) Stacker crane
CN210763874U (en) Swing mechanism capable of finely adjusting angle of container spreader
CN106365058A (en) Portal crane for assembling motor with weight being above 100T
CN106081928A (en) Gantry container crane suspender tilting control method
CN220300239U (en) Shipbuilding gantry crane
CN209702043U (en) A kind of elevator overload detecting device
CN220502370U (en) Elevator compensation chain with improved guiding structure
CN218290117U (en) Triangle-shaped displacement hoist of adjustable steel suspender
CN218201856U (en) Bridge crane
CN216377219U (en) Novel electric double-beam European crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181127

Termination date: 20200502

CF01 Termination of patent right due to non-payment of annual fee