CN106930289B - A kind of noiseless broken pile device and broken pile method - Google Patents

A kind of noiseless broken pile device and broken pile method Download PDF

Info

Publication number
CN106930289B
CN106930289B CN201710144494.4A CN201710144494A CN106930289B CN 106930289 B CN106930289 B CN 106930289B CN 201710144494 A CN201710144494 A CN 201710144494A CN 106930289 B CN106930289 B CN 106930289B
Authority
CN
China
Prior art keywords
annular conduit
transverse annular
injection pipe
liquid injection
broken pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710144494.4A
Other languages
Chinese (zh)
Other versions
CN106930289A (en
Inventor
李洪江
童立元
刘松玉
哈斯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201710144494.4A priority Critical patent/CN106930289B/en
Publication of CN106930289A publication Critical patent/CN106930289A/en
Application granted granted Critical
Publication of CN106930289B publication Critical patent/CN106930289B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of noiseless broken pile device and broken pile methods, described device includes vertical liquid injection pipe, transverse annular conduit, inner catheter and diverter, more than two lateral liquid outlets are evenly distributed on the inside of transverse annular conduit, the lower end liquid outlet of vertical liquid injection pipe is connected to by grafting valve with the inlet of transverse annular conduit, the lateral liquid outlet of transverse annular conduit is connected to by diverter and grafting valve with the inlet of inner catheter, is evenly arranged with unidirectional spray hole on the tube wall of transverse annular conduit and inner catheter, along axial direction and length direction.Noiseless broken pile, high-efficiency environment friendly, easily operated and popularization and use may be implemented in noiseless broken pile device provided by the invention and broken pile method.

Description

A kind of noiseless broken pile device and broken pile method
Technical field
The present invention relates to construction, pile foundation engineering technique more particularly to pile foundation abolish with construction environment control problem, Specifically a kind of noiseless broken pile device and broken pile method.
Background technique
Pile foundation is all kinds of most common foundation patterns of engineering buildings or structures, with bearing capacity is high, stability is good, place The advantages that adaptable.The important function for playing support superstructure is driven underground in pile foundation, and superstructure then stands on pile foundation On the absolute altitude of top surface.With high-rise, the construction of super high-rise building and urban underground space exploitation, the designed elevation of pile foundation is often At several meters even more than ten meters of below ground.And construction project construction when, pile foundation often squeezes into below ground in advance, then into Row excavation of foundation pit just needs to break pile foundation that is extra, being higher by designed elevation when excavation arrives Pile Foundations Design absolute altitude.Tradition Broken pile technology be using dedicated broken pile machine, under vibratory impulse, by pile body concrete disintegrating, concrete is then truncated in broken pile machine Internal reinforcing bar, the pile body for being higher by designed elevation is removed.This broken pile method often generates great vibration noise and building Disintegrating slag, and inefficiency pollute environment.
Soundless cracking agent (referred to as: SCA) is that a kind of Novel static developed the external seventies is crushed reagent, the eighties Since, Research Institute of Building Materials Industry, State Bureau of Building Materials Industry, China and some enterprises research and develop success in succession, have commercially produced Using.SCA is tuned into slurry with water, is poured in the drilling of rock or concrete, can generate powerful expansion under room temperature effect Power has the advantages that be perfectly safe, is pollution-free, vibrationless so that it is broken so that concrete and rock is generated cracking.Although noiseless broken Broken dose is widely used for the fields such as dismantling concrete building and exploitation cutting marble, granite, but does not have one kind also so far The special device and its application case that noiseless broken pile is carried out using soundless cracking agent.
Summary of the invention
Goal of the invention: for the broken pile problem of pile foundation after excavation of foundation pit, the present invention provides a kind of noiseless broken pile device and broken Piling method, by introducing soundless cracking agent to overcome the deficiencies of existing technologies.
Technical solution: to achieve the above object, the technical solution adopted by the present invention are as follows:
A kind of noiseless broken pile device, including vertical liquid injection pipe, transverse annular conduit, inner catheter and diverter, transverse annular More than two lateral liquid outlets are evenly distributed on the inside of conduit, the lower end liquid outlet of vertical liquid injection pipe passes through grafting valve and transverse direction The inlet of ring duct is connected to, and the lateral liquid outlet of transverse annular conduit passes through the feed liquor of diverter and grafting valve and inner catheter Mouth connection, is evenly arranged with unidirectional spray hole on the tube wall of transverse annular conduit and inner catheter, along axial direction and length direction, Unidirectional spray hole only allows soundless cracking agent liquid to flow outwardly from inner cavity of pipe, does not allow other liquid inflow pipe inner cavities; The inner catheter realizes the freely up and down rotation of relatively transverse ring duct by diverter.
Specifically, the diverter includes catheter and pairs of reset spring, two end connectors of the catheter It is connected to respectively with the lateral liquid outlet of transverse annular conduit and corresponding grafting valve inlet, pairs of reset spring is arranged in drain The upper and lower sides of hose: when nature, catheter position is horizontal, two reset spring stress balances;Catheter is turned under Qu Shi, the tension of top reset spring are greater than the tension of lower section reset spring;When catheter is bent upwards, lower section reset spring Tension be greater than top reset spring tension.It is interior when carrying out concrete grouting construction to drilling due to the presence of diverter Conduit can rotate down, and avoid influencing pile body construction;When concrete grouting is completed in drilling, inner catheter can restore horizontal, Convenient for the later period soundless cracking agent accurately can be injected in predetermined position;Use catheter, it can be ensured that soundless cracking agent can It circulates in the cavity, is also convenient for inner catheter and restores horizontal position.
Specifically, being uniformly distributed on the inside of the transverse annular conduit there are four lateral liquid outlet, four inner catheters are at cross Distribution.
Specifically, the unidirectional spray hole is check valve-type structure, is wound and closed using adhesive tape, and it is close to be wrapped with tied silk It is real.
Specifically, the vertical liquid injection pipe uses the low-pressure fluid conveying steel pipe of diameter 35mm, wall thickness 2mm;The transverse direction Ring duct uses reinforcement PC hose, diameter 20mm, wall thickness 2mm;The inner catheter is conveyed using the low-pressure fluid of diameter 20mm Steel pipe, wall thickness 1mm.
Specifically, using screwed connection when the vertical liquid injection pipe spreading overlaps, screwed connection length is greater than 15mm.
A kind of broken pile method using above-mentioned noiseless broken pile device, includes the following steps:
Step1: installing vertical liquid injection pipe, by vertical liquid injection pipe directly with iron wire binding in the main reinforcement of steel reinforcement cage, vertically Liquid injection pipe 200mm or more above ground level;When vertical liquid injection pipe needs spreading to overlap, upper and lower two vertical liquid injection pipes are connected using screw thread It connects;
Step2: diverter is connected on transverse annular conduit, then by lateral loops by installation transverse annular conduit first Shape catheter placement is then connected to transverse annular conduit and vertical fluid injection using grafting valve in the expected truncation elevation location of steel reinforcement cage Pipe, after checking that unidirectional spray hole is effective, after transverse annular conduit is integrally wrapped up with sandbag with iron wire binding on steel reinforcement cage;
Step3: installation inner catheter is connected to inner catheter and transverse annular conduit using grafting valve, checks unidirectional spray hole Validity;
Step4: checking, rotatably, and vertical liquid injection pipe is examined successively in the validity and inner catheter for checking diverter With the binding fixing of transverse annular conduit;
Step5: decentralization steel reinforcement cage is transferred to noiseless broken pile device in drilling in company with steel reinforcement cage, together after decentralization The upper end liquid inlet for blocking vertical liquid injection pipe avoids falling into sundries when construction and causing line clogging;
Step6: note concrete grout injects concrete grout into drilling, forms pile body;
Step7: injection soundless cracking agent, when absolute altitude is truncated in excavation of foundation pit to pile foundation, releases vertical according to construction speed The closure of liquid injection pipe upper end liquid inlet injects soundless cracking agent into vertical liquid injection pipe by high-pressure pump, passes through unidirectional spray hole It flows into concrete;
Step8: broken pile, after concrete spalling failure, will the peripheral reinforcing bar truncation in part, then with mechanical external force by upper section Pile body is integrally abolished.
The utility model has the advantages that noiseless broken pile device provided by the invention and broken pile method, solve long-standing broken pile construction Strong noise, inefficiencies problem;Soundless cracking agent is injected inside concrete by way of pre-buried pipeline by the method for the present invention, is reached To the purpose of reduction concrete strength, the environmental protection of whole operation processing efficient and without special broken pile machinery, installation method is simple, fits It quickly grasps and applies in engineering staff.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of noiseless broken pile device of the invention and its installation;
Fig. 2 is that sandbag wraps up transverse annular conduit schematic diagram;
Fig. 3 is inner catheter arrangement schematic diagram;
Fig. 4 is inner catheter dynamic rotation schematic diagram;
Fig. 5 is broken pile method implementation flow chart of the invention.
Specific embodiment
The present invention will be further explained with reference to the accompanying drawing.
As shown in Figure 1 be a kind of noiseless broken pile device, including vertical liquid injection pipe 1, transverse annular conduit 2, inner catheter 3 and turn To device 6, the inside of transverse annular conduit 2 is uniformly distributed there are four lateral liquid outlet, and the lower end liquid outlet of vertical liquid injection pipe 1 passes through Grafting valve 5 is connected to the inlet of transverse annular conduit 2, and the lateral liquid outlet of transverse annular conduit 2 passes through diverter 6 and grafting Valve 5 is connected to the inlet of inner catheter 3, on the tube wall of transverse annular conduit 2 and inner catheter 3, equal along axial direction and length direction It is evenly arranged with unidirectional spray hole 4;The inner catheter 3 realizes freely up and down turning for relatively transverse ring duct 2 by diverter 6 It is dynamic.
The diverter 6 includes catheter 11 and pairs of reset spring 12, two end connectors of the catheter 11 It is connected to respectively with the lateral liquid outlet of transverse annular conduit 2 and corresponding 5 entrance of grafting valve, the pairs of setting of reset spring 12 exists The upper and lower sides of catheter 11: when nature, 11 position of catheter is horizontal, two 12 stress balances of reset spring;Drain When hose 11 is bent downwardly, the tension of top reset spring 12 is greater than the tension of lower section reset spring 12;Catheter 11 is upward When bending, the tension of lower section reset spring 12 is greater than the tension of top reset spring 12.
In the implementation process of this case, entire noiseless broken pile device is embedded to the design truncation position of pile foundation in advance, with steel reinforcement cage 8 It transfers in drilling together.The vertical liquid injection pipe 1 is bound in the main reinforcement 9 of steel reinforcement cage 8 with iron wire 10, on vertical liquid injection pipe 1 Preferably 200mm above ground level is held, and the upper end liquid inlet of vertical liquid injection pipe 1 is blocked in advance, in order to avoid fallen into construction miscellaneous Object causes line clogging.The transverse annular conduit 2 is reinforcement PC hose, is placed in the bottom end of vertical liquid injection pipe 1, thereon uniformly It is provided with unidirectional spray hole 4 and is fixed on the side wall of steel reinforcement cage 8 with iron wire 10 after entire transverse annular conduit 2 is wrapped up with sandbag 7.Institute It states inner catheter 3 to connect by grafting valve 5 with transverse annular conduit 2, four inner catheters 3 form " ten " font, are uniformly provided with thereon Unidirectional spray hole 4, every inner catheter 3 are freely up and down rotated by the realization of diverter 6.Soundless cracking agent under a certain pressure from When vertical liquid injection pipe 1 injects, liquid is introduced into transverse annular conduit 2, is penetrated by the unidirectional spray hole 4 of transverse annular conduit 2 Sandbag 7 penetrates on the outside of pile body in concrete, while partially liq injects coagulation inside pile body along the unidirectional spray hole 4 of inner catheter 3 It is common to weaken pile body concrete strength in soil.When pile foundation is excavated to specified truncation absolute altitude, first truncation part periphery reinforcing bar, then Upper section pile body can be integrally truncated by mechanical external force.Specific implementation step is as follows:
Step1: installing vertical liquid injection pipe 1, and vertical liquid injection pipe 1 is directly bound with iron wire 10 to the main reinforcement 9 in steel reinforcement cage 8 On, vertical liquid injection pipe 1 200mm or more above ground level;When vertical liquid injection pipe 1 needs spreading to overlap, upper and lower two vertical liquid injection pipes 1 Using screwed connection;
Step2: diverter 6 is connected on transverse annular conduit 2 by installation transverse annular conduit 2 first, then will be lateral Ring duct 2 is placed in the expected truncation elevation location of steel reinforcement cage 8, is then connected to transverse annular conduit 2 and perpendicular using grafting valve 5 To liquid injection pipe 1, after checking unidirectional spray hole 4 effectively, will be bound after the whole package with sandbag 7 of transverse annular conduit 2 with iron wire 10 On steel reinforcement cage 8;
Step3: installation inner catheter 3 is connected to inner catheter 3 and transverse annular conduit 2 using grafting valve 5, checks unidirectional hydrojet The validity in hole 4;
Step4: checking, rotatably, and vertical fluid injection is examined successively in the validity and inner catheter 3 for checking diverter 6 The binding fixing of pipe 1 and transverse annular conduit 2;
Step5: decentralization steel reinforcement cage 8 transfers to noiseless broken pile device in drilling in company with steel reinforcement cage 8 together, and decentralization terminates The upper end liquid inlet of vertical liquid injection pipe 1 is blocked afterwards;
Step6: note concrete grout injects concrete grout into drilling, forms pile body;
Step7: injection soundless cracking agent, when absolute altitude is truncated in excavation of foundation pit to pile foundation, releases vertical according to construction speed The closure of 1 upper end liquid inlet of liquid injection pipe injects soundless cracking agent into vertical liquid injection pipe 1 by high-pressure pump, passes through unidirectional hydrojet Hole 4 flows into concrete;
Step8: broken pile, after concrete spalling failure, will the peripheral reinforcing bar truncation in part, then with mechanical external force by upper section Pile body is integrally abolished.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (6)

1. a kind of noiseless broken pile device, it is characterised in that: including vertical liquid injection pipe (1), transverse annular conduit (2), inner catheter (3) With diverter (6), more than two lateral liquid outlets are evenly distributed on the inside of transverse annular conduit (2), vertical liquid injection pipe (1) Lower end liquid outlet is connected to by grafting valve (5) with the inlet of transverse annular conduit (2), and the transverse direction of transverse annular conduit (2) goes out Liquid mouth is connected to by diverter (6) and grafting valve (5) with the inlet of inner catheter (3), in transverse annular conduit (2) and inner catheter (3) unidirectional spray hole (4) are evenly arranged on tube wall, along axial direction and length direction;The inner catheter (3) is by diverter (6) the freely up and down rotation of relatively transverse ring duct (2) is realized;
The diverter (6) includes catheter (11) and pairs of reset spring (12), the both ends of the catheter (11) Connector is connected to the lateral liquid outlet of transverse annular conduit (2) and corresponding grafting valve (5) entrance respectively, pairs of reset spring (12) upper and lower sides in catheter (11) are arranged: when nature, catheter (11) position is horizontal, two reset springs (12) stress balance;When catheter (11) is bent downwardly, the tension of top reset spring (12) is greater than lower section reset spring (12) tension;When catheter (11) is bent upwards, the tension of lower section reset spring (12) is greater than top reset spring (12) Tension.
2. noiseless broken pile device according to claim 1, it is characterised in that: on the inside of the transverse annular conduit (2) uniformly Distribution is there are four lateral liquid outlet, and four inner catheters (3) are at cross distribution.
3. noiseless broken pile device according to claim 1, it is characterised in that: the unidirectional spray hole (4) is check valve-type Structure is wound using adhesive tape and is closed, and it is closely knit to be wrapped with tied silk.
4. noiseless broken pile device according to claim 1, it is characterised in that: the vertical liquid injection pipe (1) uses diameter The low-pressure fluid conveying steel pipe of 35mm, wall thickness 2mm;The transverse annular conduit (2) uses reinforcement PC hose, diameter 20mm, wall Thick 2mm;The inner catheter (3) uses the low-pressure fluid conveying steel pipe of diameter 20mm, wall thickness 1mm.
5. noiseless broken pile device according to claim 1, it is characterised in that: when vertical liquid injection pipe (1) spreading overlaps Using screwed connection, screwed connection length is greater than 15mm.
6. a kind of broken pile method using noiseless broken pile device described in claim 1, characterized by the following steps:
Step1: installing vertical liquid injection pipe (1), the master by vertical liquid injection pipe (1) directly with iron wire (10) binding in steel reinforcement cage (8) On muscle (9), vertical liquid injection pipe (1) 200mm or more above ground level;When vertical liquid injection pipe (1) needs spreading to overlap, upper and lower two perpendicular Screwed connection is used to liquid injection pipe (1);
Step2: diverter (6) is connected on transverse annular conduit (2) by installation transverse annular conduit (2) first, then will be horizontal It is placed in the expected truncation elevation location of steel reinforcement cage (8) to ring duct (2), is then connected to transverse annular using grafting valve (5) Transverse annular conduit (2) after checking unidirectional spray hole (4) effectively, is integrally used sandbag (7) by conduit (2) and vertical liquid injection pipe (1) After package with iron wire (10) binding on steel reinforcement cage (8);
Step3: installation inner catheter (3) is checked unidirectional using grafting valve (5) connection inner catheter (3) and transverse annular conduit (2) The validity of spray hole (4);
Step4: checking, rotatably, and vertical fluid injection is examined successively in the validity and inner catheter (3) for checking diverter (6) Manage the binding fixing of (1) and transverse annular conduit (2);
Step5: decentralization steel reinforcement cage (8) transfers to noiseless broken pile device in drilling in company with steel reinforcement cage (8) together, and decentralization terminates The upper end liquid inlet of vertical liquid injection pipe (1) is blocked afterwards;
Step6: note concrete grout injects concrete grout into drilling, forms pile body;
Step7: injection soundless cracking agent releases vertical fluid injection when absolute altitude is truncated in excavation of foundation pit to pile foundation according to construction speed The closure for managing (1) upper end liquid inlet injects soundless cracking agent into vertical liquid injection pipe (1) by high-pressure pump, passes through unidirectional hydrojet Hole (4) flows into concrete;
Step8: broken pile, after concrete spalling failure, will the peripheral reinforcing bar truncation in part, then with mechanical external force by upper section pile body Entirety is abolished.
CN201710144494.4A 2017-03-10 2017-03-10 A kind of noiseless broken pile device and broken pile method Active CN106930289B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710144494.4A CN106930289B (en) 2017-03-10 2017-03-10 A kind of noiseless broken pile device and broken pile method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710144494.4A CN106930289B (en) 2017-03-10 2017-03-10 A kind of noiseless broken pile device and broken pile method

Publications (2)

Publication Number Publication Date
CN106930289A CN106930289A (en) 2017-07-07
CN106930289B true CN106930289B (en) 2019-03-12

Family

ID=59432127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710144494.4A Active CN106930289B (en) 2017-03-10 2017-03-10 A kind of noiseless broken pile device and broken pile method

Country Status (1)

Country Link
CN (1) CN106930289B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2800444C1 (en) * 2023-03-05 2023-07-21 Акционерное общество "Производственное объединение "Возрождение" (АО "ПО "Возрождение") Method for dismantling bored pile heads

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677952A (en) * 2018-05-28 2018-10-19 中水电第十工程局(郑州)有限公司 A kind of CFG pile heads pre-cut device and its construction method
CN108532598B (en) * 2018-05-30 2020-06-30 张显 Concrete pile head breaker
CN113304845B (en) * 2021-05-17 2022-11-04 新疆宏远辰峰混凝土制品有限责任公司 Concrete crusher and crushing method thereof
CN115305929B (en) * 2022-01-21 2024-05-24 长沙理工大学 Slope treatment and greening auxiliary mechanism for urban external traffic development

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59228523A (en) * 1983-06-10 1984-12-21 Tobishima Kensetsu Kk Treatment work for pile head
JPS6047119A (en) * 1983-08-22 1985-03-14 Mitsuhiro Ishii Vibration and noise-free breaking of head of cast-in-place pile
JPS62153419A (en) * 1985-12-25 1987-07-08 Masaaki Ishikawa Treating work for head of pile
CN102425159A (en) * 2011-08-31 2012-04-25 浙江大学城市学院 Pile cutting construction method of bored concrete pile
CN103088832A (en) * 2013-02-21 2013-05-08 北京鑫实路桥建设有限公司 Annular type impact method for digging rock at bottom of drilled pile shaft
CN103774667A (en) * 2013-11-22 2014-05-07 福州伟业成进出口贸易有限公司 Soundless cracking agent for building pile chopping and using method of soundless cracking agent for building pile chopping
CN103924584A (en) * 2014-03-14 2014-07-16 浙江新邦建设有限公司 Cast-in-situ bored pile construction method
CN104404950A (en) * 2014-11-20 2015-03-11 李京财 Construction method for steel bar isolated dust-free oriented self-breaking pile head
CN204343285U (en) * 2014-11-13 2015-05-20 中交隧道工程局有限公司 A kind of pile foundation pile crown entirety abolishes structure
CN104631460A (en) * 2015-01-15 2015-05-20 中铁十局集团建筑工程有限公司 Girdling splitting type integral pile breaking method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59228523A (en) * 1983-06-10 1984-12-21 Tobishima Kensetsu Kk Treatment work for pile head
JPS6047119A (en) * 1983-08-22 1985-03-14 Mitsuhiro Ishii Vibration and noise-free breaking of head of cast-in-place pile
JPS62153419A (en) * 1985-12-25 1987-07-08 Masaaki Ishikawa Treating work for head of pile
CN102425159A (en) * 2011-08-31 2012-04-25 浙江大学城市学院 Pile cutting construction method of bored concrete pile
CN103088832A (en) * 2013-02-21 2013-05-08 北京鑫实路桥建设有限公司 Annular type impact method for digging rock at bottom of drilled pile shaft
CN103774667A (en) * 2013-11-22 2014-05-07 福州伟业成进出口贸易有限公司 Soundless cracking agent for building pile chopping and using method of soundless cracking agent for building pile chopping
CN103924584A (en) * 2014-03-14 2014-07-16 浙江新邦建设有限公司 Cast-in-situ bored pile construction method
CN204343285U (en) * 2014-11-13 2015-05-20 中交隧道工程局有限公司 A kind of pile foundation pile crown entirety abolishes structure
CN104404950A (en) * 2014-11-20 2015-03-11 李京财 Construction method for steel bar isolated dust-free oriented self-breaking pile head
CN104631460A (en) * 2015-01-15 2015-05-20 中铁十局集团建筑工程有限公司 Girdling splitting type integral pile breaking method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2800444C1 (en) * 2023-03-05 2023-07-21 Акционерное общество "Производственное объединение "Возрождение" (АО "ПО "Возрождение") Method for dismantling bored pile heads

Also Published As

Publication number Publication date
CN106930289A (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN106930289B (en) A kind of noiseless broken pile device and broken pile method
CN202370525U (en) Post grouting construction structure of shaft wall of weathering bed rock section of return air vertical shaft
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN101498220B (en) Vertical shaft working surface artesian flow sand layer slurry protecting rotary spraying grouting process
CN201310362Y (en) Installing device of high pressure water burst drill hole bore pipe
CN105155550A (en) Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN105541214A (en) Pocket type separated strata grouting material for controlling surface subsidence, preparation and grouting method thereof
CN107687171A (en) Diaphram wall double pump post-grouting device and construction method
CN101492917B (en) Hollow anchor stock circulating pressure slip casting construction method and special slip casting system thereof
CN102011591A (en) Grouting process for working surface of deep well
CN204185845U (en) A kind of water-proof pile board wall supporting and protection structure
CN206110124U (en) Bored concrete pile stake end post grouting device
CN104929565A (en) Double-layered grouting guide pipe
CN112252348A (en) Design and construction method of U-shaped grouting body waterproof layer structure based on foundation pit
CN107059844A (en) A kind of quick pile splicing structure, prefabricated pile and method
CN204627527U (en) A kind of double-deck grouting pipe
CN114370275A (en) Bedrock bolting-grouting impervious supporting structure and construction method thereof
CN108414134A (en) A kind of embedded device and its installation method of lock pump building bottom plate osmometer
CN207964155U (en) A kind of embedded device of lock pump building bottom plate osmometer
CN211816292U (en) Sand-flow prevention device for water-rich sand layer anchor rod construction
CN204591208U (en) A kind of double-deck grouting pipe
CN110685453B (en) Loess cave dwelling anti-seismic reinforcing method based on water glass injection
CN106013143A (en) Anchor rod for underground engineering anti-floating system construction and construction method
CN111549794A (en) Miniature supporting method and miniature pile supporting structure suitable for soft foundation treatment
CN205530252U (en) Recoverable soil nail steel reinforcing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant