CN106930278A - 一种异型接头管用于支护桩咬合的方法 - Google Patents
一种异型接头管用于支护桩咬合的方法 Download PDFInfo
- Publication number
- CN106930278A CN106930278A CN201710281813.6A CN201710281813A CN106930278A CN 106930278 A CN106930278 A CN 106930278A CN 201710281813 A CN201710281813 A CN 201710281813A CN 106930278 A CN106930278 A CN 106930278A
- Authority
- CN
- China
- Prior art keywords
- pile
- joint pipe
- concrete
- classes
- occlusion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明公开了一种异型接头管用于支护桩咬合的方法,包括如下施工步骤:1)、先地进行平整、测量放线,在平整后的场地上浇筑导墙,浇注完成后钻机就位,移动钻机至正确位置,使钻机套管中心与导墙对应的孔位中心重合,钻进至设计孔深,并控制垂直度;2)、进行A1、A2咬合桩的成孔、和混凝土浇筑,分别在A1、A2咬合桩咬合部位安装异型接头管。完成相邻两个A类桩施工后再施工B类桩,B类桩成孔后进行钢筋笼下放安装和混凝土浇筑施工,按孔深配置砼导管,砼导管底部距孔底控制约0.3m左右;本发明采用异型接头管在支护桩素桩中预留孔,实现支护桩之间的咬合。
Description
技术领域
本发明涉及支护桩咬合领域,具体属于一种异型接头管用于支护桩咬合的方法。
背景技术
随着城市建设不断发展,咬合桩在深基坑中的应用越来越广泛,原有的咬合桩施工技术中对缓凝混凝土的时间要求比较高,一旦缓凝混凝土凝固,那么施工钢筋桩下切困难,可能无法完成整根桩的下切,或者产生素砼桩的断裂,导致施工进度缓慢、成本增加。为确保支护桩之间的咬合,在素桩浇筑施工时先在咬合部位安装接头管,混凝土初凝后拔出接头管,形成预留孔,利用接头管预留的空间作为荤桩钻孔导向,免去钻头切割掉相邻素桩相交部分的混凝土,这样既可实现桩间咬合,同时可降低成本。
发明内容
本发明的目的是提供一种异型接头管用于支护桩咬合的方法,采用异型接头管在支护桩中预留孔,实现支护桩之间的咬合。
本发明的技术方案如下:
一种异型接头管用于支护桩咬合的方法,包括如下施工步骤:
1)、先将场地进行平整、测量放线,在平整后的场地上浇筑导墙,浇注完成后钻机就位,移动钻机至正确位置,使钻机套管中心与导墙对应的孔位中心重合,钻进至设计孔深,并控制垂直度;
2)、先进行A类素桩(不配筋桩简称素桩,下同)咬合桩的成孔和混凝土浇筑施工,在浇筑混凝土前,分别在A类素桩咬合部位安装异型接头管,按孔深配置砼导管。A类素桩水下混凝土浇筑完成后,控制异型接头管起拔时间,及时拔起异型接头管,形成预留孔;
3)、按一定顺序和间隔,进行B类咬合桩的成孔、钢筋笼下放安装和混凝土浇筑施工,实现与两侧的A类咬合桩咬合。咬合桩混凝土浇筑采用塌落度18~22cm水下混凝土进行水下灌注成桩。
所述A、B类咬合桩咬合桩的成孔、混凝土浇筑等工序采用同一套设备、一个平台上完成(B类咬合桩清后增加钢筋笼安装工序)。
所述A类咬合桩的混凝土浇筑施工与异型接头管起拔施工应紧密配合,开浇3h开始微动,此后活动异型接头管的间隔时间不应超过30min,每次提升1~2cm,以破坏混凝土的黏结力。
本发明的有益技术效果如下:
1、在相邻A类素桩浇筑施工时先下设接头管,防止B类荤桩(配筋桩简称荤桩,下同)施工时切割相邻素桩相交部分的混凝土的不均匀性产生的偏斜。
2、采用的异型接头管有足够的强度和刚度,能满足混凝土在浇筑过程中不变形,同时要达到结构简单、施工方便、成本低的效果。
3、要准确控制接头管的拔管时间,保证A类素桩桩身的完整性,确保与B类荤桩实现无缝咬合。
附图说明
图1为本发明的施工示意图。
图2为本发明的异形接头管安装示意图。
图3为本发明的异形接头管连接结构示意图。
具体实施方式
参见附图,一种异型接头管用于支护桩咬合的方法,包括如下施工步骤:
1)、先将场地平整、测量放线,在平整后的场地上浇筑导墙。导墙砼强度满足要求后钻机就位,移动钻机至正确位置,使钻机套管中心与导墙对应的孔位中心重合,钻进至设计孔深,并控制垂直度;
2)、进行A1、A2咬合桩1、2的成孔、混凝土浇筑施工,分别在A1、A2咬合桩1、2咬合部位安装异形接头管4,按孔深配置混凝土导管5,再进行水下混凝土浇筑,完成单桩施工;
3)、在已完成两根素桩后,进行B咬合桩3的成孔、钢筋笼下放安装和混凝土浇筑施工,实现与两侧的A1、A2咬合桩1、2咬合。A类素桩与B类荤桩交替施工,形成互相咬合的支护结构。
4)、咬合桩混凝土浇筑采用塌落度18~20cm水下混凝土进行水下灌注成桩。A类素桩水下混凝土浇筑完成后,控制异形接头管起拔时间,A类素桩的混凝土浇筑施工与接头管起拔施工应紧密配合,开浇3h开始微动,此后活动异形接头管的间隔时间不应超过30min,每次提升1~2cm,以破坏混凝土的黏结力,及时拔起异型接头管,形成预留孔。
咬合桩施工工艺原理:
钻孔咬合桩,即采用机械钻孔施工,桩与桩之间相互咬合排列的一种支护结构,其中为一个A序素桩和一个B序配筋荤桩间隔,且互相咬合。施工时先施工两个A桩,后施工中间B桩,A桩浇筑施工时先在咬合部位下设接头管,接头管加工成设计咬合尺寸的异型,初凝后拔出接头管,相邻两个A桩完成施工后再施工B桩。B桩施工时,利用接头管预留的空间作为B桩钻孔导向,免去钻头切割相邻A桩相交部分的混凝土的不对称性及不均匀性产生的偏斜,保证了B桩的垂直度,同时B桩浇筑后也实现了A桩与B桩咬合。
计算异型管接头的尺寸:
根据设计方案确定咬合桩之间的咬合部分,提前预制好异型接头管的尺寸(图1中的加粗黑线部分为异型接头管)。
试验确定异型接头管的拔管时间和方法:
为了掌握接头管外各接触部位混凝土的实际龄期,必须详细掌握混凝土的浇筑情况,因此,施工前应绘制能够全面反映混凝土浇筑、导管提升、接头管起拔过程的记录表。该记录表上的既有各种施工数据,又有多条过程曲线,能直观地判断各部位混凝土的龄期、应该脱管的时间和实际脱管龄期。在施工中应及时、准确地记录施工过程。浇筑施工与拔管施工应紧密配合,浇筑速度不宜过慢。开浇3h开始微动,此后活动接头管的间隔时间不应超过30min,每次提升1~2cm,以破坏混凝土的黏接力。微动的时间不宜过早,也不宜过于频繁,否则对混凝土的凝结和孔壁稳定不利。当混凝土最后浇筑的混凝土龄期达到确定的脱管龄期后,即可逐根起拔接头管。
本发明的工作原理如下:
1、导墙浇筑:咬合桩的成孔、钢筋笼安装和混凝土浇筑都是在一套设备、一个平台上完成。因此,在平整后的场地上浇筑导墙,这有利于钻机的迅速就位和钻进过程中机械的稳定,提高钻孔的成孔精度和施工效率。
2、钻机就位:移动钻机至正确位置,使钻机套管中心与导墙对应的孔位中心重合。
3、钻进成孔:钻机就位后,钻进至设计孔深。过程中控制好垂直度。
4、下设接头管:在咬合部位安装接头管。
5、安装导管:按孔深配置砼导管,导管底部距孔底控制约0.3m左右。
6、混凝土浇筑:采用塌落度18~22cm水下混凝土进行水下灌注成桩。
7、起拔接头管:水下混凝土浇筑完成后,控制接头管起拔时间,及时拔起接头管,形成预留孔。起拔时间控制要求:保证起拔后接头管处的完整性,不能有坍塌现象。
Claims (3)
1.一种异型接头管用于支护桩咬合的方法,其特征在于,包括如下施工步骤:
1)、先将场地进行平整、测量放线,在平整后的场地上浇筑导墙,浇注完成后钻机就位,移动钻机至正确位置,使钻机套管中心与导墙对应的孔位中心重合,钻进至设计孔深,并控制垂直度;
2)、先进行A类素桩咬合桩的成孔和混凝土浇筑施工,在浇筑混凝土前,分别在A类素桩咬合部位安装异型接头管,按孔深配置砼导管,A类素桩水下混凝土浇筑完成后,控制异型接头管起拔时间,及时拔起异型接头管,形成预留孔;
3)、按一定顺序和间隔,进行B类咬合桩的成孔、钢筋笼下放安装和混凝土浇筑施工,实现与两侧的A类咬合桩咬合,咬合桩混凝土浇筑采用塌落度18~22cm水下混凝土进行水下灌注成桩。
2.根据权利要求1所述A、B类咬合桩咬合桩的成孔、混凝土浇筑等工序采用同一套设备、一个平台上完成(B类咬合桩清后增加钢筋笼安装工序)。
3.根据权利要求1所述A类咬合桩的混凝土浇筑施工与异型接头管起拔施工应紧密配合,开浇3h开始微动,此后活动异型接头管的间隔时间不应超过30min,每次提升1~2cm,以破坏混凝土的黏结力。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710281813.6A CN106930278A (zh) | 2017-04-26 | 2017-04-26 | 一种异型接头管用于支护桩咬合的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710281813.6A CN106930278A (zh) | 2017-04-26 | 2017-04-26 | 一种异型接头管用于支护桩咬合的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106930278A true CN106930278A (zh) | 2017-07-07 |
Family
ID=59436724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710281813.6A Pending CN106930278A (zh) | 2017-04-26 | 2017-04-26 | 一种异型接头管用于支护桩咬合的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106930278A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111472364A (zh) * | 2020-05-28 | 2020-07-31 | 中交一公局集团有限公司 | 施工方法及咬合桩施工装置 |
CN111719565A (zh) * | 2020-07-06 | 2020-09-29 | 深圳市君宁建筑有限公司 | 一种深基坑围护结构及其建造方法 |
CN113089652A (zh) * | 2021-02-23 | 2021-07-09 | 中铁十九局集团第三工程有限公司 | 咬合桩施工方法及加固结构 |
CN113445516A (zh) * | 2021-07-28 | 2021-09-28 | 深圳市金量建设科技有限公司 | 一种钻孔灌注式水泥土桩及其施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101328712A (zh) * | 2008-07-29 | 2008-12-24 | 上海市第二建筑有限公司 | 一种适用于软土及带障碍物土层中的咬合桩施工方法 |
RU2351710C1 (ru) * | 2007-10-16 | 2009-04-10 | Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") | Способ сооружения пакета буронабивных свай |
-
2017
- 2017-04-26 CN CN201710281813.6A patent/CN106930278A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2351710C1 (ru) * | 2007-10-16 | 2009-04-10 | Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") | Способ сооружения пакета буронабивных свай |
CN101328712A (zh) * | 2008-07-29 | 2008-12-24 | 上海市第二建筑有限公司 | 一种适用于软土及带障碍物土层中的咬合桩施工方法 |
Non-Patent Citations (4)
Title |
---|
中国公路学会桥梁和结构工程分会等: "《中国公路学会桥梁和结构工程分会2015年全国桥梁学术会议论文集》", 31 October 2015, 人民交通出版社 * |
北京市南水北调工程建设管理中心: "《北京市南水北调配套工程技术论文集》", 31 July 2013, 中国水利水电出版社 * |
王飞: "咬合桩质量控制措施", 《甘肃科技》 * |
秦建国: "用锁口管法施工钻孔咬合桩", 《山西建筑》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111472364A (zh) * | 2020-05-28 | 2020-07-31 | 中交一公局集团有限公司 | 施工方法及咬合桩施工装置 |
CN111719565A (zh) * | 2020-07-06 | 2020-09-29 | 深圳市君宁建筑有限公司 | 一种深基坑围护结构及其建造方法 |
CN113089652A (zh) * | 2021-02-23 | 2021-07-09 | 中铁十九局集团第三工程有限公司 | 咬合桩施工方法及加固结构 |
CN113445516A (zh) * | 2021-07-28 | 2021-09-28 | 深圳市金量建设科技有限公司 | 一种钻孔灌注式水泥土桩及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106930278A (zh) | 一种异型接头管用于支护桩咬合的方法 | |
CN107524142A (zh) | 一种泥浆护壁钻孔灌注桩施工方法 | |
CN204370431U (zh) | 一种咬合长短桩围护结构 | |
CN105256812B (zh) | 基坑预制装配式混凝土支撑结构及其施工方法 | |
CN103255764A (zh) | 一种振动沉管施工咬合桩的施工方法 | |
CN106930321B (zh) | 一种大直径顶管结合洞桩修建地下结构的施工方法 | |
CN108166483A (zh) | 钻孔灌注桩施工方法 | |
CN102653945A (zh) | 基础托换结构及其施工方法 | |
CN103321244A (zh) | 砂土地基既有建筑增设地下室的施工方法 | |
CN108532586A (zh) | 一种停车库用地下连续墙的施工方法 | |
CN107642041A (zh) | 超大直径空心群桩锚碇 | |
CN108385693B (zh) | 一种用于分期地下室支护的等代锚杆支护方法和支护体系 | |
CN101255691A (zh) | 全套管薄壁灌注桩施工方法及活动内模 | |
CN106869138A (zh) | 一种衡重式双排桩支护结构及其基坑开挖方法 | |
CN203080551U (zh) | 一种灌注桩与搅拌桩相咬合的竖向围护结构 | |
CN108824471A (zh) | 一种深水裸岩群桩基础及其施工方法 | |
CN107642040A (zh) | 超大直径空心群桩锚碇的施工方法碇 | |
CN207484290U (zh) | 超大直径空心群桩锚碇 | |
CN102220764B (zh) | 深基坑支护体系的施工方法 | |
CN110080779A (zh) | 隧道隧底溶洞处理施工方法 | |
CN207582471U (zh) | 一种设有深层预应力锚索的双排桩支护结构 | |
CN108360384A (zh) | 水下通道顶推施工方法 | |
CN104278680A (zh) | 一种五(六)轴搅拌桩与压灌桩相结合的围护结构及施工方法 | |
CN203334288U (zh) | 一种新型竖向基坑围护结构 | |
CN216108526U (zh) | 一种用于基坑支护的地下连续墙结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170707 |