CN106930270A - A kind of embodiment of dumbbell interlocking piles - Google Patents
A kind of embodiment of dumbbell interlocking piles Download PDFInfo
- Publication number
- CN106930270A CN106930270A CN201710214996.XA CN201710214996A CN106930270A CN 106930270 A CN106930270 A CN 106930270A CN 201710214996 A CN201710214996 A CN 201710214996A CN 106930270 A CN106930270 A CN 106930270A
- Authority
- CN
- China
- Prior art keywords
- ring
- dumbbell
- stake
- shaped pile
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/16—Machines for digging other holes in the soil
- E02F5/20—Machines for digging other holes in the soil for vertical holes
Abstract
A kind of dumbbell interlocking piles embodiment, being related to the equipment of this scheme includes dumbbell sunk pile equipment and shaped pile system stake equipment;Manufacture dumbbell interlocking piles embodiment be:In design attitude, the stake of multiple dumbbells is vertically sunk into underground with dumbbell sunk pile equipment, at a distance of a distance for shaped pile between the adjacent dumbbell stake of each two, a shaped pile is manufactured respectively with shaped pile system stake equipment between the adjacent dumbbell stake of each two, make two recessed semicircles at each shaped pile or so two ends respectively to two external arcs together in the stake of left and right two ends dumbbell, form dumbbell stake and shaped pile locks together.
Description
Technical field
The present invention relates to a kind of embodiment of interlocking piles, particularly a kind of implementation of the dumbbell interlocking piles for manufacturing interlocking piles
Scheme.
Background technology
At present, the interlocking piles of other forms cannot be interlocked by dumbbell stake.
The content of the invention
The invention provides it is a kind of by dumbbell stake and shaped pile reciprocal interlocking dumbbell interlocking piles embodiment.
The present invention is achieved through the following technical solutions:
A kind of dumbbell interlocking piles embodiment, being related to the equipment of this scheme includes that dumbbell sunk pile equipment and the stake of shaped pile system set
It is standby.
Dumbbell stake is the pile body that section is dumbbell, is connected as one by a connecting plate between as two round stakes.
The structure of shaped pile system stake equipment includes:Lifting arm lower end is fixed with termination, and termination lower end is fixed with the first connecting plate,
First connecting plate lower end is fixed with the second connecting plate, and the second connecting plate fixes the top on the top of the second ring and the 4th ring;Second
The periphery of ring is provided with first ring, and the inner ring of the first ring fixes cingulum in first, and the outer ring of the first ring is consolidated
Fixed multiple recessed plectanes;The periphery of the 4th ring is provided with the 3rd ring, and the inner ring of the 3rd ring fixes cingulum in second,
Multiple recessed plectanes are fixed in the outer ring of the 3rd ring;A warehouse, warehouse are fixed in the bottom of the bottom of the second ring and the 4th ring
The first motor and the second motor are inside fixed with, the first driving wheel, the engagement of the first driving wheel are installed in the first axle of the first motor
Cingulum in first, is provided with the second driving wheel, cingulum in the second driving wheel engagement second on the second axle of the second motor;On warehouse
Portion sets a hopper.
The course of work of shaped pile system stake equipment is that the first motor drives the positive hour hands rotation of the first driving wheel, and first drives
Cingulum and the first ring timing pin rotate in wheel drive first, and the second motor drives the second driving wheel to rotate counterclockwise, and second drives
Driving wheel drives cingulum and the 3rd ring in second to rotate counterclockwise, the recessed plectane on recessed plectane and the 3rd ring in the first ring
In rotation cut the earth, earth material by hopper it is suitable for reading when, earth material is dropped in hopper, after hopper completely struggles against, by equipment pass through lifting arm
Mention outside stake holes, unload soil, after unsnatching, equipment is turned again in stake holes, continue to excavate, after the completion of, underwater concrete is poured into, manufacture
Go out two ends and be respectively provided with two shaped piles of recessed semicircle.
Manufacture dumbbell interlocking piles embodiment be:In design attitude, the stake of multiple dumbbells is hung down with dumbbell sunk pile equipment
It is straight to sink to underground, at a distance of a distance for shaped pile between the adjacent dumbbell stake of each two, in the adjacent dumbbell stake of each two
Between manufacture a shaped pile respectively with shaped pile system stake equipment, make two of each shaped pile or so two ends recessed semicircles difference pairings
In two external arcs of left and right two ends dumbbell stake, form dumbbell stake and shaped pile locks together.
The invention has the advantages that:
The present invention locks together the shaped pile that dumbbell stake and two ends are respectively provided with two recessed semicircles.
Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is the front view of shaped pile manufacturing equipment;
Fig. 2 is the rearview of shaped pile manufacturing equipment;
Fig. 3 is A-A views of Fig. 1;
Fig. 4 is B-B views of Fig. 1;
Fig. 5 is the sectional view that dumbbell stake is interlocked with shaped pile.
In figure:1st, lifting arm, 2, termination, the 3, first connecting plate, 4, warehouse, the 5, first ring, the 6, second ring, 7, recessed circle
Plate, 9, hopper, the 10, second connecting plate, 11, first axle, the 12, first driving wheel, the 13, the 3rd connecting plate, the 14, the 4th connecting plate, the 15, the 3rd
Ring, the 16, the 4th ring, the 17, second driving wheel, the 18, second axle, cingulum in 19, first, cingulum in 20, second, 21, first
Motor, the 22, second motor.
Specific embodiment
Accompanying drawing is a kind of specific embodiment of the invention, and the embodiment includes that dumbbell sunk pile equipment and the stake of shaped pile system set
It is standby.
Dumbbell stake is the pile body that section is dumbbell, is connected as one by a connecting plate between as two round stakes.
The structure of shaped pile system stake equipment includes:The lower end of lifting arm 1 is fixed with termination 2, and termination lower end is fixed with the first company
Plate 3, the first connecting plate lower end is fixed with the second connecting plate 10, and the second connecting plate is by the top of the second ring 6 and the top of the 4th ring 16
It is fixed;The periphery of the second ring is provided with first ring 5, and the inner ring of the first ring fixes cingulum 19, first in one first
Multiple recessed plectanes 7 are fixed in the outer ring of ring;The periphery of the 4th ring is provided with the 3rd ring 15, and the inner ring of the 3rd ring is fixed
Multiple recessed plectanes are fixed in cingulum 20 in second, the outer ring of the 3rd ring;The bottom of the second ring and the bottom of the 4th ring
A warehouse 4 is fixed, the first motor 21 and the second motor 22 are fixed with warehouse, is provided with the first axle 11 of the first motor
One driving wheel 12, cingulum in the first driving wheel engagement first, is provided with the second driving wheel 17, second on the second axle of the second motor
Cingulum in driving wheel engagement second;Warehouse top sets a hopper 9.
The left part of the left part of the second ring and the 4th ring is fixed by the 3rd connecting plate 13.
The right part of the right part of the second ring and the 4th ring is fixed by the 4th connecting plate 14.
The recessed plectane of the first ring is the semicircle of digging front edge of board vacancy one of rectangle.
The recessed plectane of the second ring is the semicircle of digging front edge of board vacancy one of rectangle.
The circular arc of the recessed plectane of shaped pile system stake equipment can be with the circular arc pairing of dumbbell stake pile body surface.
The course of work of shaped pile system stake device fabrication shaped pile is that the first motor drives the positive hour hands rotation of the first driving wheel
Turn, cingulum and the first ring timing pin rotate in the first drive wheel first, the second motor drives the second driving wheel counter-clockwise
Rotation, cingulum and the 3rd ring rotate counterclockwise in the second drive wheel second, recessed plectane and the 3rd circle in the first ring
Recessed plectane on ring is cut the earth in rotation, earth material by hopper it is suitable for reading when, earth material is dropped in hopper, after hopper completely struggles against, will be set
It is standby to be mentioned outside stake holes by lifting arm, soil is unloaded, after unsnatching, equipment is turned again in stake holes, continues to excavate, after the completion of, pour into water
Lower concrete, produces two ends and is respectively provided with two shaped piles of recessed semicircle.
Manufacture dumbbell interlocking piles embodiment be:In design attitude, the stake of multiple dumbbells is hung down with dumbbell sunk pile equipment
It is straight to sink to underground, at a distance of a distance for shaped pile between the adjacent dumbbell stake of each two, in the adjacent dumbbell stake of each two
Between manufacture a shaped pile respectively with shaped pile system stake equipment, make two of each shaped pile or so two ends recessed semicircles difference pairings
In two external arcs of left and right two ends dumbbell stake, form dumbbell stake and shaped pile locks together.
Claims (6)
1. a kind of embodiment of dumbbell interlocking piles, implementing equipment needed for this scheme includes dumbbell sunk pile equipment and shaped pile system
Stake equipment, it is characterised in that:
Dumbbell stake is the pile body that section is dumbbell, is connected as one by a connecting plate between as two round stakes;
The structure of shaped pile system stake equipment includes:Lifting arm(1)Lower end is fixed with termination(2), termination lower end is fixed with the first company
Plate(3), the first connecting plate lower end is fixed with the second connecting plate(10), the second connecting plate is by the second ring(6)Top and the 4th ring
(16)Top fix;The periphery of the second ring is provided with first ring(5), the inner ring of the first ring fixed in one first
Cingulum(19), multiple recessed plectanes are fixed in the outer ring of the first ring(7);The periphery of the 4th ring is provided with the 3rd ring(15),
The inner ring of the 3rd ring fixes cingulum in second(20), multiple recessed plectanes are fixed in the outer ring of the 3rd ring;Second ring
A warehouse is fixed in the bottom of bottom and the 4th ring(4), the first motor is fixed with warehouse(21)With the second motor(22), the
The first axle of one motor(11)On the first driving wheel is installed(12), cingulum in the first driving wheel engagement first, the second motor
Second driving wheel is installed on the second axle(17), cingulum in the second driving wheel engagement second;Warehouse top sets a hopper(9);
The course of work of shaped pile system stake device fabrication shaped pile is that the first motor drives the positive hour hands rotation of the first driving wheel, the
Cingulum and the first ring timing pin rotate in one drive wheel first, and the second motor drives the second driving wheel to rotate counterclockwise,
Cingulum and the 3rd ring rotate counterclockwise in second drive wheel second, on the recessed plectane and the 3rd ring in the first ring
Recessed plectane is cut the earth in rotation, earth material by hopper it is suitable for reading when, earth material is dropped in hopper, after hopper completely struggles against, equipment is passed through
Lifting arm is mentioned outside stake holes, unloads soil, and after unsnatching, equipment is turned again in stake holes, continues to excavate, after the completion of, pour into coagulation under water
Soil, produces two ends and is respectively provided with two shaped piles of recessed semicircle;
Manufacture dumbbell interlocking piles embodiment be:In design attitude, the stake of multiple dumbbells is vertically sunk with dumbbell sunk pile equipment
Enter underground, at a distance of a distance for shaped pile between the adjacent dumbbell stake of each two, used between the adjacent dumbbell stake of each two
Shaped pile system stake equipment manufactures a shaped pile respectively, makes two recessed semicircles at each shaped pile or so two ends respectively to together in a left side
Two external arcs of right two ends dumbbell stake, form dumbbell stake and shaped pile locks together.
2. the embodiment of a kind of dumbbell interlocking piles according to claim 1, it is characterised in that:The shaped pile system stake sets
The left part of the second standby ring and the left part of the 4th ring pass through the 3rd connecting plate(13)It is fixed.
3. the embodiment of a kind of dumbbell interlocking piles according to claim 1, it is characterised in that:The shaped pile system stake sets
The right part of the second standby ring and the right part of the 4th ring pass through the 4th connecting plate(14)It is fixed.
4. the embodiment of a kind of dumbbell interlocking piles according to claim 1, it is characterised in that:The shaped pile system stake sets
The recessed plectane of the first standby ring is the semicircle of digging front edge of board vacancy one of rectangle.
5. the embodiment of a kind of dumbbell interlocking piles according to claim 1, it is characterised in that:The shaped pile system stake sets
The recessed plectane of the second standby ring is the semicircle of digging front edge of board vacancy one of rectangle.
6. the embodiment of a kind of dumbbell interlocking piles according to claim 1, it is characterised in that:The shaped pile system stake sets
The circular arc of standby recessed plectane can be with the circular arc pairing of dumbbell stake pile body surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710214996.XA CN106930270A (en) | 2017-04-02 | 2017-04-02 | A kind of embodiment of dumbbell interlocking piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710214996.XA CN106930270A (en) | 2017-04-02 | 2017-04-02 | A kind of embodiment of dumbbell interlocking piles |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106930270A true CN106930270A (en) | 2017-07-07 |
Family
ID=59425003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710214996.XA Withdrawn CN106930270A (en) | 2017-04-02 | 2017-04-02 | A kind of embodiment of dumbbell interlocking piles |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106930270A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3660048B2 (en) * | 1996-04-05 | 2005-06-15 | 三和機材株式会社 | Continuous wall excavator |
CN104452856A (en) * | 2014-12-05 | 2015-03-25 | 刘玉秋 | U-shaped drill |
CN106088034A (en) * | 2016-07-06 | 2016-11-09 | 于洋 | Eye-splice built pile manufactures device |
CN106149686A (en) * | 2016-06-25 | 2016-11-23 | 宋姝娴 | Underground makes wall telephone continuously |
-
2017
- 2017-04-02 CN CN201710214996.XA patent/CN106930270A/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3660048B2 (en) * | 1996-04-05 | 2005-06-15 | 三和機材株式会社 | Continuous wall excavator |
CN104452856A (en) * | 2014-12-05 | 2015-03-25 | 刘玉秋 | U-shaped drill |
CN106149686A (en) * | 2016-06-25 | 2016-11-23 | 宋姝娴 | Underground makes wall telephone continuously |
CN106088034A (en) * | 2016-07-06 | 2016-11-09 | 于洋 | Eye-splice built pile manufactures device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205530256U (en) | Gear formula pile driver for civil engineering | |
CN106930270A (en) | A kind of embodiment of dumbbell interlocking piles | |
JP5773523B2 (en) | Construction device for on-site construction pile and construction method for on-site construction pile | |
CN105649529A (en) | Arc lock catch V-shaped pile manufacturing device | |
CN110206026B (en) | Deep-dune backfill pore-forming pile-forming method | |
JP2016132909A (en) | Construction device and construction method for on-site constructed pile | |
CN207701082U (en) | Drilling pipe device and drilling machine | |
CN107034937A (en) | Bore the technical scheme for digging standby construction diaphram wall | |
CN105421422A (en) | Semicircular locking-buckling equipment for pi-shaped piles and rectangular piles | |
CN106522480B (en) | Improved multifunctional drain pipe | |
CN105442574A (en) | Rectangular combined stirring drilling machine | |
CN106884450A (en) | A kind of excavating equipment | |
CN206635744U (en) | A kind of rigid joint manufacture device | |
CN206986936U (en) | A kind of Safety manhole cover | |
KR20110114400A (en) | Equipped with shoe concrete pile for desliming and method construction there of | |
CN111719551A (en) | Novel overlapped cast-in-place pile suitable for karst landform and construction method thereof | |
CN211370303U (en) | Drilling equipment is used in bored concrete pile construction among bridge construction | |
JP3031258U (en) | Excavator for soil cement wall construction | |
JP5748929B1 (en) | Construction method of on-site construction pile with spiral ridge | |
CN104452855B (en) | Deep hole excavator | |
CN204227540U (en) | Air-conditioner and indoor set thereof | |
JP2014141801A (en) | Pile penetration device | |
CN216664231U (en) | Well lid structure for municipal works | |
CN107034938A (en) | Runner groove milling equipment | |
CN105442572A (en) | Semicircular latching equipment for TT-shaped pile and rectangular pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170707 |