CN104452856A - U-shaped drill - Google Patents

U-shaped drill Download PDF

Info

Publication number
CN104452856A
CN104452856A CN201410727014.3A CN201410727014A CN104452856A CN 104452856 A CN104452856 A CN 104452856A CN 201410727014 A CN201410727014 A CN 201410727014A CN 104452856 A CN104452856 A CN 104452856A
Authority
CN
China
Prior art keywords
shaped
bucket
disc
driving
steel column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410727014.3A
Other languages
Chinese (zh)
Other versions
CN104452856B (en
Inventor
刘玉秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yingshang Xiangsheng Construction Management Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410727014.3A priority Critical patent/CN104452856B/en
Publication of CN104452856A publication Critical patent/CN104452856A/en
Application granted granted Critical
Publication of CN104452856B publication Critical patent/CN104452856B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides a U-shaped drill. A first driving disc is arranged at the upper end of a first steel column, a third driving disc is arranged at the lower end of the first steel column, a plurality of support wheels are arranged on the left side of the first steel column, a plurality of support wheels are also arranged on the right side of the first steel column, a first chain consisting of a plurality of first chain boards is arranged outside the support wheels, the first driving disc and the third driving disc, a plurality of first buckets are arranged on the first chain, the first buckets are of bent flat board structures, one ends of the first buckets are fixed on the first chain, and the other ends of the first buckets are of sunk U-shaped structures; a second driving disc is arranged at the upper end of a second steel column, a fourth driving disc is arranged at the lower end of the second steel column, a plurality of support wheels are arranged on the left side of the second steel column, a plurality of support wheels are also arranged on the right side of the second steel column, a second chain consisting of a plurality of second chain boards is arranged outside the support wheels, the second driving disc and the fourth driving disc, a plurality of second buckets are arranged on the second chain, the second buckets are of bent flat board structures, one ends of the second buckets are fixed on the second chain, and the other ends of the second buckets are of protruding U-shaped structures.

Description

U-shaped auger
Technical field
The present invention relates to a kind of auger, particularly a kind of U-shaped auger of earth drilling.
Background technology
At present, the rig of underground hole-forming is all into a circular hole or becomes a square hole.
Summary of the invention
The present invention compensate for above shortcoming, provides a kind of U-shaped auger that can become U-shaped hole.
The present invention is achieved through the following technical solutions:
A kind of U-shaped auger, first steel column upper end is provided with first driving-disc, lower end is provided with the 3rd driving-disc, the first steel column left side is provided with several thrust wheel, and the right is also provided with several thrust wheel, and the outside of thrust wheel and the first driving-disc, the 3rd driving-disc is provided with one bar of first chain band be made up of multiple first carrier bar, first chain band is provided with many first buckets, first bucket is the slabbed construction of bending, and the first chain band is fixed in one end, and the other end is hollow U-shaped structure; Second steel column upper end is provided with second driving-disc, lower end is provided with 4 wheel driven Moving plate, the second steel column left side is provided with several thrust wheel, the right is also provided with several thrust wheel, the outside of thrust wheel and the second driving-disc, 4 wheel driven Moving plate is provided with one bar of second chain band be made up of multiple second carrier bar, and the second chain band is provided with many second buckets, and the second bucket is the slabbed construction of bending, the second chain band is fixed in one end, and the other end is outstanding U-shaped structure; The area of first bucket is identical with the area of second bucket, outstandingly on U-shaped and the second bucket hollow on the first bucket U-shapedly to match.
The present invention has following beneficial effect:
The present invention can manufacture U-shaped concrete pile wall.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated;
Fig. 1 is structural representation of the present invention;
Fig. 2 is A-A sectional view, B-B sectional view;
Fig. 3 is U-shaped stake overlap joint figure.
In figure: 1, the first driving-disc, the 2, second driving-disc, 3, first connecting rod, 4, the first steel wire tube, the 5, second steel wire tube, the 6, first steel pipe, 7, thrust wheel, the 8, second steel pipe, the 9, first bucket, 10, the second bucket, the 11, first carrier bar, the 12, second carrier bar, 13, the first steel column, the 14, second steel column, 15, second connecting rod, 16, the 3rd driving-disc, 17,4 wheel driven Moving plate.
Detailed description of the invention
Accompanying drawing is a kind of specific embodiment of the present invention, this embodiment first steel column 13 upper end is provided with first driving-disc 1, lower end is provided with the 3rd driving-disc 16, the first steel column left side is provided with several thrust wheel 7, the right is also provided with several thrust wheel, the outside of thrust wheel and the first driving-disc, the 3rd driving-disc is provided with one bar of first chain band be made up of multiple first carrier bar 11, first chain band is provided with many first buckets 9, first bucket is the slabbed construction of bending, the first chain band is fixed in one end, and the other end is hollow U-shaped structure; Second steel column 14 upper end is provided with second driving-disc 2, lower end is provided with 4 wheel driven Moving plate 17, the second steel column left side is provided with several thrust wheel, the right is also provided with several thrust wheel, the outside of thrust wheel and the second driving-disc, 4 wheel driven Moving plate is provided with one bar of second chain band be made up of multiple second carrier bar 12, and it is the slabbed construction of bending that the second chain band is provided with many second bucket 10, second buckets, the second chain band is fixed in one end, and the other end is outstanding U-shaped structure; The area of first bucket is identical with the area of second bucket, outstandingly on U-shaped and the second bucket hollow on the first bucket U-shapedly to match.
The main shaft of the main shaft of the first driving-disc and the second driving-disc links by first connecting rod 3, and the lower end of the lower end of the first steel column and the second steel column links by second connecting rod 15.
Be provided with the first steel pipe in first steel column, the first steel pipe upper end is provided with the first steel wire tube, is provided with the second steel pipe in the second steel column, and the second steel pipe upper end is provided with the second steel wire tube.
The specification of the first carrier bar is identical with quantity with the specification of quantity and the second carrier bar, and the quantity of the first bucket is identical with the quantity of the second bucket.
When the present invention works, first driving-disc, first chain band of the multiple first carrier bar composition of the 3rd driving-disc rotates forward, second driving-disc, second chain band reversion of the multiple second carrier bar composition of 4 wheel driven Moving plate, the hole wall on the left side scrapes out hollow U-shaped by the first bucket on the carrier bar of the left side first in moving upward, the hole wall on the right scrapes out outstanding U-shaped by the second bucket on the second carrier bar of the right in moving upward, pouring concrete becomes a U-shaped stake, be close to a U-shaped stake brill and dig No. two U-shaped holes, pouring concrete becomes No. two U-shaped stakes, continuous brill digs, pouring concrete becomes the concrete pile wall of U-shaped overlap joint.

Claims (1)

1. a U-shaped auger, first steel column (13) upper end is provided with first driving-disc (1), lower end is provided with the 3rd driving-disc (16), the first steel column left side is provided with several thrust wheel (7), the right is also provided with several thrust wheel, the outside of thrust wheel and the first driving-disc, the 3rd driving-disc is provided with one bar of first chain band be made up of multiple first carrier bar (11), first chain band is provided with many first buckets (9), first bucket is the slabbed construction of bending, the first chain band is fixed in one end, and the other end is hollow U-shaped structure; Second steel column (14) upper end is provided with second driving-disc (2), lower end is provided with 4 wheel driven Moving plate (17), the second steel column left side is provided with several thrust wheel, the right is also provided with several thrust wheel, the outside of thrust wheel and the second driving-disc, 4 wheel driven Moving plate is provided with one bar of second chain band be made up of multiple second carrier bar (12), and the second chain band is provided with many second buckets (10), and the second bucket is the slabbed construction of bending, the second chain band is fixed in one end, and the other end is outstanding U-shaped structure; The area of first bucket is identical with the area of second bucket, outstandingly on U-shaped and the second bucket hollow on first bucket U-shapedly to match, it is characterized in that: the hole wall on the left side scrapes out hollow U-shaped by the first bucket on the carrier bar of the left side first in moving upward, the hole wall on the right scrapes out outstanding U-shaped by the second bucket on the second carrier bar of the right in moving upward, pouring concrete becomes a U-shaped stake, be close to a U-shaped stake brill and dig No. two U-shaped holes, pouring concrete becomes No. two U-shaped stakes, the concrete pile wall that brill digs continuously, pouring concrete becomes U-shaped overlap joint.
CN201410727014.3A 2014-12-05 2014-12-05 U-shaped boring machine Active CN104452856B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410727014.3A CN104452856B (en) 2014-12-05 2014-12-05 U-shaped boring machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410727014.3A CN104452856B (en) 2014-12-05 2014-12-05 U-shaped boring machine

Publications (2)

Publication Number Publication Date
CN104452856A true CN104452856A (en) 2015-03-25
CN104452856B CN104452856B (en) 2016-11-30

Family

ID=52899556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410727014.3A Active CN104452856B (en) 2014-12-05 2014-12-05 U-shaped boring machine

Country Status (1)

Country Link
CN (1) CN104452856B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906830A (en) * 2017-04-06 2017-06-30 郑丹 A kind of oval foundation pit support plan
CN106930279A (en) * 2017-04-02 2017-07-07 刘玉兴 A kind of plate connects buckle pile making apparatus
CN106930346A (en) * 2017-04-26 2017-07-07 王晨 The production program of water seal curtain
CN106930270A (en) * 2017-04-02 2017-07-07 刘玉兴 A kind of embodiment of dumbbell interlocking piles
CN106930344A (en) * 2017-04-24 2017-07-07 卢兴书 The construction method of cylinder support pile
CN106930347A (en) * 2017-04-26 2017-07-07 刘玉香 A kind of section of two kinds of usages for oozing equipment
CN106948397A (en) * 2017-04-26 2017-07-14 王晨 Antiseepage wall equipment
CN107022998A (en) * 2017-05-24 2017-08-08 刘玉兴 A kind of manufacturing technology of joint interfix wall
CN107059851A (en) * 2017-05-04 2017-08-18 郑丹 A kind of apparatus and method for of stirring technique system stake
CN108868629A (en) * 2017-05-12 2018-11-23 周兆弟 Type chain broaching is sufficiently stirred in the soil body
CN113152464A (en) * 2021-04-30 2021-07-23 温州振华建设有限公司 Sediment device for cast-in-situ bored pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5244315A (en) * 1992-04-01 1993-09-14 Hokushin Kogyo Corporation Excavator for constructing underground continuous wall and underground continuous wall construction method
CN101736769A (en) * 2009-11-13 2010-06-16 张永忠 Double-chain saw slotting machine
CN102261092A (en) * 2011-02-11 2011-11-30 张永忠 Dual-drive chain-type slot sawing machine
CN102787621A (en) * 2012-08-15 2012-11-21 中铁三局集团有限公司 Continuous type groover
CN104179213A (en) * 2014-08-29 2014-12-03 张璐 Mud shoveling plate chain track grooving machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5244315A (en) * 1992-04-01 1993-09-14 Hokushin Kogyo Corporation Excavator for constructing underground continuous wall and underground continuous wall construction method
CN101736769A (en) * 2009-11-13 2010-06-16 张永忠 Double-chain saw slotting machine
CN102261092A (en) * 2011-02-11 2011-11-30 张永忠 Dual-drive chain-type slot sawing machine
CN102787621A (en) * 2012-08-15 2012-11-21 中铁三局集团有限公司 Continuous type groover
CN104179213A (en) * 2014-08-29 2014-12-03 张璐 Mud shoveling plate chain track grooving machine

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930279A (en) * 2017-04-02 2017-07-07 刘玉兴 A kind of plate connects buckle pile making apparatus
CN106930270A (en) * 2017-04-02 2017-07-07 刘玉兴 A kind of embodiment of dumbbell interlocking piles
CN106906830A (en) * 2017-04-06 2017-06-30 郑丹 A kind of oval foundation pit support plan
CN106930344A (en) * 2017-04-24 2017-07-07 卢兴书 The construction method of cylinder support pile
CN106930346A (en) * 2017-04-26 2017-07-07 王晨 The production program of water seal curtain
CN106930347A (en) * 2017-04-26 2017-07-07 刘玉香 A kind of section of two kinds of usages for oozing equipment
CN106948397A (en) * 2017-04-26 2017-07-14 王晨 Antiseepage wall equipment
CN107059851A (en) * 2017-05-04 2017-08-18 郑丹 A kind of apparatus and method for of stirring technique system stake
CN108868629A (en) * 2017-05-12 2018-11-23 周兆弟 Type chain broaching is sufficiently stirred in the soil body
CN107022998A (en) * 2017-05-24 2017-08-08 刘玉兴 A kind of manufacturing technology of joint interfix wall
CN113152464A (en) * 2021-04-30 2021-07-23 温州振华建设有限公司 Sediment device for cast-in-situ bored pile

Also Published As

Publication number Publication date
CN104452856B (en) 2016-11-30

Similar Documents

Publication Publication Date Title
CN104452856A (en) U-shaped drill
KR102097855B1 (en) Self reliance earth retaining construction method having prestress introduced of Double I Beam
CN102691302B (en) Concrete structure for supporting deep foundation pit
CN102425372A (en) Vibrato-drilling type punching drilling rig
CN104533292A (en) Back taper step-shaped pile, preparation method thereof and drilling tool
US9469959B2 (en) Full displacement pile tip and method for use
CN104878749B (en) Octagon soil cement pile-formation machine
CN204282429U (en) U-shaped auger
CN103306608A (en) Drill bit and drilling equipment
CN202417302U (en) Vibrating drilling type impact digging drilling machine
CN204827213U (en) Double dynamical head digs rig soon
CN103898918A (en) Combined supporting structure and construction method
CN106149686A (en) Underground makes wall telephone continuously
CN110952920A (en) Drilling device for square hole
CN206808018U (en) A kind tree pit-picker
JP2018178641A5 (en)
CN204125931U (en) Foundation pile structure
CN204691673U (en) A kind of subgrade mud protection churning driven
CN203782509U (en) Unfavorable geologic body deep cutting frame reinforcing structure
CN203626607U (en) Vehicle-mounted water circulation type movable piling machine
CN202510031U (en) Drill bit and drilling equipment
CN202324039U (en) Improved pneumatic slotting drill bit
CN205677539U (en) Cylinder grabs spiral guide sheet formula Spiral digging machine drill bit more
CN204212195U (en) Two-way bucket
CN205088673U (en) All casing drill sleeve pipe tool bit pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Bai Xuefeng

Inventor before: Liu Yuqiu

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161019

Address after: 400055 Banan District, Huaxi City, Chongqing Town Road Kok Village

Applicant after: Chongqing Lingyun Tools Co.,Ltd.

Address before: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Effective date of registration: 20161019

Address after: Tianhe District Tong East Road Guangzhou city Guangdong province 510665 B-101 No. 5, room B-118

Applicant after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: Ji'nan road 276800 in Shandong Province, Rizhao City Donggang District No. 277 Belvedere Garden

Applicant before: Liu Yuqiu

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200417

Address after: 401320 No. 249 Yunan Avenue, Banan District, Chongqing, 8-29

Patentee after: Chongqing Boshi Intellectual Property Service Co.,Ltd.

Address before: 400055 corner village, Huaxi Town, Banan District, Chongqing

Patentee before: Chongqing Lingyun Tools Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201222

Address after: 236200 Yangzhuang village, jiangdianzi Town, Yingshang County, Fuyang City, Anhui Province

Patentee after: Yingshang Yongan Plastics Co.,Ltd.

Address before: 401320 Banan District, Banan District, Chongqing, No. 8-29, Yu Nan Road, No. 8-29

Patentee before: Chongqing Boshi Intellectual Property Service Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230808

Address after: 236200 No. 266, Zhengzheng South Road, Shencheng Town, Yingshang County, Fuyang City, Anhui Province

Patentee after: Yingshang Xiangsheng Construction Management Co.,Ltd.

Address before: 236200 Yangzhuang village, jiangdianzi Town, Yingshang County, Fuyang City, Anhui Province

Patentee before: Yingshang Yongan Plastics Co.,Ltd.