CN106920008A CN201710113432.7A CN201710113432A CN106920008A CN 106920008 A CN106920008 A CN 106920008A CN 201710113432 A CN201710113432 A CN 201710113432A CN 106920008 A CN106920008 A CN 106920008A
Authority
CN
China
Prior art keywords
particle
neural network
wind power
method based
swarm optimization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710113432.7A
Other languages
Chinese (zh)
Inventor
陈阿莲
袁鲍蕾
张承慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201710113432.7A priority Critical patent/CN106920008A/en
Publication of CN106920008A publication Critical patent/CN106920008A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/02Neural networks
    • G06N3/08Learning methods
    • G06N3/084Backpropagation, e.g. using gradient descent
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Biophysics (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Biomedical Technology (AREA)
  • Primary Health Care (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Molecular Biology (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network, (1):It is particle that weights in BP neural network and threshold value are compiled, and is initialized;(2):Train the difference of acquired results and desired value as fitness function using BP neural network, calculate each particle fitness value;(3):The fitness value of each particle is compared with individual optimal particle, global optimum's particle is obtained;(4):Update particle rapidity and position;(5):Judge whether gained global optimum particle meets end condition, if meeting setting end condition, stop computing output best initial weights threshold value, otherwise return to step (2) interative computation;(6):The best initial weights threshold value for utilizing (5) to obtain connects input layer, hidden layer and the output layer of BP neural network, and wind power prediction result is obtained according to BP neural network prediction of result.Convergence rate faster, high precision, and be difficult to be absorbed in local extremum.

Description

A kind of wind power forecasting method based on Modified particle swarm optimization BP neural network
Technical field
The present invention relates to new energy PREDICTIVE CONTROL, more particularly to a kind of wind based on Modified particle swarm optimization BP neural network Electrical power Forecasting Methodology.
Background technology
Wind energy as a kind of regenerative resource, with it is pollution-free, do not need fuel, be not take up the advantages such as arable land, increasingly Paid close attention to by people, reserves are also very huge, counted according to related data, the radiation energy from outer space is 1.5* every year 1018KWh, therein 2.5%, i.e. 3.8*1016The energy of kWh produces about 4.3*l0 by Atmospheric Absorptionl2The wind energy of kWh.I The wind energy content that state can actually develop is 2.53 hundred million kW, occupies the 7.8% of the total wind energy resources of 10m height layers.
The semi-annual report of WWEA's issue points out that global Wind Power Generation Industry increases installation 63013MW, year for 2015 newly Degree growth rate of market is up to 22%.American market whole year reaches 8.6GW, and Germany exceedes is expected, and 6GW is increased newly, including 2.3GW Marine project.To the end of the year in 2015, the accumulative installed capacity of global wind-powered electricity generation reached 432419MW, and accumulative annual growth reaches 17%.At the same time, by 2015, used as the first big country of wind-power electricity generation installed capacity, China's wind-powered electricity generation adds up installed capacity 145.1GW is reached, single year wind power generation capacity accounts for the 3.3% of whole generated energy up to 186,300,000,000 kilowatt hours.
With the increasingly maturation of wind power technology, the continuous reduction of its operating cost, wind-power electricity generation presents powerful increasing The impetus long, the also constantly increase of proportion in electric power market demand, and the negative effect of Wind Power Generation on Power System is also therewith Highlight.Because wind energy has stronger intermittence, randomness and uncontrollability, wind power also has larger fluctuation, and this will Badly influence the safe and stable operation of power system.Wind-power electricity generation power is predicted, can be changed into unknown, it is known that having Effect mitigates the influence that such electricity generation system accesses power network, improves the utilization rate of regenerative resource, obtains bigger economic benefit.Cause This, carry out Wind power forecasting to study and step up its precision of prediction is a great far-reaching job.
BP neural network (Back Propagation Neural Network, BPNN) is with its good Nonlinear Mapping Ability, adaptive learning ability, are widely used in the generating prediction of the electricity generation systems such as wind-force, yet with being substantially for BP algorithm Gradient descent method, makes it not ideal enough with the aspect of precision two in the speed of service.
The content of the invention
The purpose of the present invention is exactly to solve the above problems, there is provided one kind is based on Modified particle swarm optimization BP neural network Wind power forecasting method, predict the outcome with more preferable nonlinear fitting ability, faster convergence rate and Geng Gao's is pre- Precision is surveyed, and is difficult to be absorbed in local optimum.
To achieve these goals, the present invention is adopted the following technical scheme that:
A kind of wind power forecasting method based on Modified particle swarm optimization BP neural network, comprises the following steps:
Step (1):It is particle that weights in BP neural network and threshold value are compiled, and it is initialized;
Step (2):With BP neural network training to the wind power prediction output result and wind-powered electricity generation obtained by training set training The difference of power desired value calculates each particle fitness value as fitness function;
Step (3):The fitness value of each particle is compared with individual optimal particle, global optimum's particle is obtained;
Step (4):Particle rapidity and position are updated according to preset rules;
Step (5):Judge whether gained global optimum particle meets setting end condition, if meeting setting end condition, Then stop computing output best initial weights threshold value, otherwise return to step (2) interative computation;
Step (6):The best initial weights threshold value connection input layer of BP neural network that is obtained using step (5), hidden layer with Output layer, wind power prediction result is obtained according to BP neural network prediction of result.
Initialization content includes particle populations scale, initial position and initial velocity in the step (1).
Fitness function is in the step (2):
In formula:OkIt is k-th wind power desired output of node, ykIt is the k-th wind power prediction output of node.
In the step (3) if each particle fitness value better than it is individual it is optimal if the particle is set to it is individual optimal, Again by individuality it is optimal be compared with global optimum, if be better than global optimum if the particle is set to global optimum.
The formula of particle rapidity renewal foundation is as follows in the step (4):
vi(t+1)=ω vi(t)+c1r1(pb(t)-xi(t))+c2r2(pg(t)-xi(t))
In formula:viT () is the speed of i-th particle in the t times iteration;xiY () is i-th particle in the t times iteration Position;ω is inertia weight;c1、c2Respectively the cognitive learning factor and social learning's factor;r1With r2For between [0,1] Random number, pgT () is the individual optimal value in the t times iteration;pgT () is the global optimum in the t times iteration.
c1、c2Value be c1=c2=2.
The formula of particle position renewal institute foundation is as follows in the step (4):
xi(t+1)=xi(t)+vi(t+1)
In formula:xi(t+1) it is the position of i-th particle in the t+1 times iteration.
Wherein ω is defined as follows:
Wherein n is total number of particles, and α is [0,1] interval random number, ft(Xi) for the t time iteration when i-th particle correspondingly Fitness value, ft(Xbest) for the t times iteration when the corresponding fitness value of optimal particle.
Input layer is determined by input data in the step (6), input layer can select prediction time it is previous when Carve, the wind power value at preceding two moment and first three moment.
The selection of node in hidden layer is determined by below equation in the step (6):
Wherein m is input layer number, and q is output layer nodes, and a makes up the number or amount for examination, and span is 1~10.
The present invention will improve particle cluster algorithm and is combined with BP neural network Power Output for Wind Power Field is predicted, improvement The situation of particle cluster algorithm fitness value as obtained by each iteration judges the speed and step-length of next particle search, improves effect Rate and precision, it is to avoid it is absorbed in local optimum, with the weights and threshold of the optimizing ability optimization neural network for improving particle cluster algorithm Value, achieves predicting the outcome better than BP neural network.
Beneficial effects of the present invention:
The present invention with can Automatic adjusument weight improve particle cluster algorithm substitute BP neural network in by gradient decline Error function to adjust weight threshold, can rapidly search best initial weights threshold value, improving particle cluster algorithm can then avoid It is absorbed in local extremum in searching process, has using being predicted the outcome obtained by prediction algorithm of the invention preferably non-linear The precision of prediction of capability of fitting, faster convergence rate and Geng Gao.
Brief description of the drawings
Fig. 1 is BP neural network structural representation;
Fig. 2 is the flow chart of Modified particle swarm optimization BP algorithm;
Fig. 3 is that BP neural network predicts wind power;
Fig. 4 is that particle cluster algorithm Optimized BP Neural Network predicts wind power;
Fig. 5 predicts wind power to improve particle cluster algorithm Optimized BP Neural Network;
Fig. 6 is three kinds of absolute error contrasts of model;
Fig. 7 is applied to convergence during BP networks for standard particle colony optimization algorithm;
Fig. 8 is applied to convergence during BP networks for Modified particle swarm optimization algorithm.
Specific embodiment
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
The problem that pin prior art is present, the present invention proposes a kind of wind-powered electricity generation based on Modified particle swarm optimization BP neural network Power forecasting method, compared with the BP neural network prediction algorithm of standard particle group's optimization, proposes the prediction of optimal prediction model Result has the precision of prediction of more preferable nonlinear fitting ability, faster convergence rate and Geng Gao, and is difficult to be absorbed in part most It is excellent, the validity and practicality of MATLAB simulating, verifyings carried algorithm of the invention and model.
Artificial neural network is to the simulation of biological nervous system based on bionics.It is similar with biological nervous system, people There is substantial amounts of neuron and complete neutral net, the input of each neuron connected and composed by complicated in artificial neural networks The single output of correspondence, so as to carry out distributed parallel information processing, while neutral net also has the energy of study and self adaptation Power.With the various demands of engineering, scholars have pointed out various neural network models, and wherein back propagation network is that BP networks are Propose various artificial network's models in most typically, most widely used one kind, it have good non-linear mapping capability, from Adaptive learning ability, is well suited for the generating prediction of the electricity generation systems such as wind-force.
As shown in figure 1, BP neural network is general by up of three layers, including:Input layer, hidden layer, output layer, wherein being input into Layer has m node, and hidden layer has n node, and output layer has q node, ωmnAnd ωnqRespectively input layer and hidden layer it Between, the connection weight between hidden layer and output layer, bnAnd bqThreshold value respectively between each node layer of hidden layer and output layer.
If one group of input vector is X=(x1,x2,…xm), output layer output vector is Y=(y1,y2,…yq), expect defeated Outgoing vector is O=(o1,o2,…oq).BP neural network workflow is as follows:
Neutral net is trained first, the process of training is divided into the positive transmission of information and two mistakes of error back propagation Journey, has for the positive transmission of information:
N-th node input of hidden layer has:
It exports expression formula:
Wherein f (hn) for hidden layer excitation function (excitation function is set to Sigmoid type functions here) be used for describe Relation between layers, the input of q-th node of output layer:
It exports expression formula:
When the reality output of neutral net is inconsistent with desired output or error is more than setting value, BP neural network will Error back propagation is shared to all units of each layer, by the error signal amendment each unit weights and threshold value of each layer unit, Traditional BP neural network adjusts weight threshold using the error function declined by gradient, for K training sample, error function It is as follows:
(D is w to the correction of each weight thresholdmn、wnq、bn、bqIt is referred to as)
When the error of network output is reduced in claimed range or reaches study number of times set in advance, training stops.
It is worth noting that, the BP neural network for determining model, its input layer and output layer nodes it has been determined that And hidden layer neuron start node number then needs rule of thumb equation below to determine, then incrementally increased using " trial and error procedure " and Reduce hidden layer node number and cause that the error of neutral net is minimum, it is final to determine.
Wherein the span of a is 1~10.
Particle swarm optimization algorithm (Particle Swarm Optimization, PSO) by Dr.Eberhart with Dr.Kennedy proposes that its basic thought is, from RANDOM SOLUTION, to look for by the cooperation between personal and group in nineteen ninety-five The optimal solution realized with information sharing.When with PSO solving-optimizing problems, the random particle of algorithm initialization a group is each Individual particle has speed and a position of oneself, and particle updates speed and the position of oneself by each iteration, each particle according to Two simply rules update its speed and position respectively:
1) the preferred plan movement that particle finds in itself is followed, individual optimal value is thus obtained;
2) particle behaved oneself best in all particles is followed, global optimum is thus obtained.Calculated according to particle position The fitness value of particle, so as to weigh the quality of the particle, by this method, all of particle reaches globally optimal solution.
I-th speed of particle is as follows with location updating formula:
vi(t+1)=ω vi(t)+c1r1(pb(t)-xi(t))+c2r2(pg(t)-xi(t))
xi(t+1)=xi(t)+vi(t+1)
In formula:viT () is the speed of i-th particle in the t times iteration;ω is inertia weight;c1、c2It is respectively cognitive Studying factors and social learning's factor, typically take c1=c2=2;r1With r2It is the random number between [0,1];pgT () changes for the t times Individual optimal value in generation;pgT () is the global optimum in the t times iteration.
Wherein, the size of ω determines that particle is more biased towards in global search or Local Search, c1Determine particle to certainly The degree that body is relied on, c2Determine particle to the global degree for relying on.
The present invention carry Modified particle swarm optimization algorithm (Modified Particle Swarm Optimization, MPSO):Particle cluster algorithm is mainly characterized by that principle is simple, and parameter is few, and convergence rate is very fast, it is easy to accomplish, but it is present such as Easily be absorbed in locally optimal solution and the defect such as be difficult to jump out, currently the improvement of particle cluster algorithm is concentrated mainly on allow inertia weight ω with Iterations linearly reduces, and which makes following improvement to particle cluster algorithm according to the defect of population:
Wherein, ωmaxminThe respectively maxima and minima of inertia weight, t is current iteration number of times, and T is maximum Iterations.
This improvement makes particle search step-length increase with iterations and progressively reduce, and can to a certain extent avoid grain Son is absorbed in local extremum, but is once absorbed in and remains difficult to jump out, and in this algorithm ω change only and iterations linear correlation, The optimization problem with complex nonlinear variation characteristic can not be better adapted to.For this present invention is proposed below according to fitness value The particle cluster algorithm of adjustment:
Wherein n is total number of particles, ft(Xi) for the t times iteration when the corresponding fitness value of i-th particle, ft(Xbest) be Optimal particle corresponding fitness value during the t times iteration.
K in formulatFor judging i-th dispersion degree of particle fitness value in the t times iteration, KtIt is bigger to illustrate this Particle gets over diverging in iteration, smaller, illustrates in current iteration that particle is got over and levels off to optimal particle.ωtWith e as the truth of a matter, using Kt With Kt-1Ratio as reference, understand ω can be so limited in [0,1] by the character of exponential function it is interval, in order that particle Group's algorithm is more efficient, and in global search, step-length is bigger, is added in formulaWherein α is [0,1] interval random number, is widened ω scopes are interval to [0,1.5].
For ωtIf, Kt>Kt-1, i.e. Kt/Kt-1>1 the t times iteration of explanation dissipates relative to the t-1 times, now Kt/Kt-1 The bigger ω of ratiotSmaller, i.e., step-size in search is smaller, and population is got over and is intended to Local Search;If Kt<Kt-1, i.e. Kt/Kt-1<1 is said Bright the t times iteration restrains relative to the t-1 times, now Kt/Kt-1The smaller ω of ratiotBigger, i.e., step-size in search is bigger, and population is got over It is intended to global search.This causes that ω is not to reduce with the increase of iterations simply, but is adapted to according to specific function Angle value determines.Adopt the particle cluster algorithm convergence rate after improving in this way to accelerate, and be difficult to be absorbed in local extremum.
BP neural network is existed and was learnt using the error function adjustment connection weight ω and threshold value b declined by gradient Journey convergence rate is slow, network training is easily absorbed in local extremum, the structure of network is difficult to determine, network generalization is it is difficult to ensure that wait Defect.Regarding to the issue above, BP neural network and improvement particle cluster algorithm are combined herein, uses particle swarm optimization algorithm generation Improve the performance of BP algorithm for the parameter of the gradient descent method training neutral net in BP algorithm, make it be difficult to be absorbed in part Minimum, strengthens generalization ability, reaches the purpose of optimization network.
As shown in Fig. 2 a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network, specific steps It is as follows:
Step (1):It is particle that weights in BP neural network and threshold value are compiled, and it is initialized, in initialization Appearance includes particle populations scale, initial position and initial velocity;
Step (2):Train the difference of acquired results and desired value as fitness function using BP neural network, calculate each grain Sub- fitness value;
Step (3):The fitness value of each particle is compared with individual optimal particle, will if optimal better than individuality The particle is set to individual optimal, then is compared individuality is optimal with global optimum, sets the particle if global optimum is better than It is global optimum;
Step (4):According to Policy Updates particle rapidity and position;
Step (5):Judge whether gained global optimum particle meets end condition, if satisfaction imposes a condition, stop fortune Calculate output optimum results, otherwise return to step (2) interative computation;
Step (6):Input layer, hidden layer and the output of BP neural network are connected using the best initial weights threshold value of above-mentioned acquisition Layer, result is obtained according to BP neural network prediction of result.
Below emulating proof:
In order to prove the validity of put forward algorithm, herein by taking the wind power plant of state electricity Jinan Changqing as an example, using MATLAB language Algorithm routine is write, three kinds of forecast models are constructed respectively:BP neural network forecast model, particle cluster algorithm optimization BP nerve nets Network forecast model (PSO-BP), improves particle cluster algorithm Optimized BP Neural Network forecast model (MPSO-BP), to the one section time Interior wind power output power is predicted emulation.From when power sample is for state's electricity Jinan Changqing wind power plant 1 day zero January in 2015, Data to following 72 hours every collection in 15 minutes once.Network is trained using preceding 260 data, 28 afterwards Data are used for predicting that i.e. 260 groups of training sample, test sample sum K is 28 groups, and by experimental debugging, hidden layer finally determines It is 8 nodes.It is 2000 wherein to set BP networks maximum frequency of training, training precision 0.002, learning rate 0.01.To prediction The performance evaluation of result uses mean absolute error MAPE, root-mean-square error MSE and degree of correlation R2
Wherein ESS is regression sum of square, and TSS is overall quadratic sum.
Tri- kinds of models of BP, PSO-BP, MPSO-BP are emulated respectively, three kinds of such as Fig. 3 respectively that predict the outcome of model, Shown in Fig. 4, Fig. 5.Fig. 6 is three kinds of contrasts of model absolute error.Fig. 7 and Fig. 8 show respectively particle when being applied to BP networks The convergence of the particle cluster algorithm after group's algorithm and improvement.Three kinds of each results for running 20 times of model are as shown in table 1.
The interpretation of result of 1 three kinds of table model running 20 times
Fig. 3 is the result that BP neural network Forecasting Methodology is predicted to wind power, can be calculated its average absolute mistake Difference MAPE is 0.0507, and root-mean-square error MSE is 0.0692, and prediction curve is with the degree of fitting R2 of desired output curve 0.8980;Fig. 4 is the result being predicted using particle cluster algorithm Optimized BP Neural Network method, can be calculated its average absolute Error MAPE is 0.0327, and root-mean-square error MSE is 0.0469, and prediction curve is with the degree of fitting R2 of desired output curve 0.9655;Fig. 5 is the result being predicted using modified particle swarm optiziation Optimized BP Neural Network method, can be calculated it and puts down Equal absolute error MAPE is 0.0248, and root-mean-square error MSE is 0.0346, the degree of fitting R2 of prediction curve and desired output curve It is 0.9809.Obviously, the result for optimizing prediction using modified particle swarm optiziation Optimized BP Neural Network is better than population The result that algorithm optimization BP neural network is predicted with single BP neural network.Calculated using improved population as can be seen from Figure 6 The result that method Optimized BP Neural Network optimizes prediction is overall relative to other two kinds of errors smaller, more steadily.And pass through Fig. 7 The improvement particle cluster algorithm for being carried herein is then illustrated with the contrast of Fig. 8 relative to basic particle group algorithm convergence rate faster. By table 1 it can also be seen that be used for multiple times modified particle swarm optiziation Optimized BP Neural Network optimize the result of prediction relative to Other two kinds more stable.
Although above-mentioned be described with reference to accompanying drawing to specific embodiment of the invention, not to present invention protection model The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need the various modifications made by paying creative work or deformation still within protection scope of the present invention.

Claims (10)

1. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network, it is characterized in that, including following step Suddenly:
Step (1):It is particle that weights in BP neural network and threshold value are compiled, and it is initialized;
Step (2):With BP neural network training to the wind power prediction output result and wind power obtained by training set training The difference of desired value calculates each particle fitness value as fitness function;
Step (3):The fitness value of each particle is compared with individual optimal particle, global optimum's particle is obtained;
Step (4):Particle rapidity and position are updated according to preset rules;
Step (5):Judge whether gained global optimum particle meets setting end condition, if meeting setting end condition, stop Only computing exports best initial weights threshold value, otherwise return to step (2) interative computation;
Step (6):The best initial weights threshold value obtained using step (5) connects input layer, hidden layer and the output of BP neural network Layer, wind power prediction result is obtained according to BP neural network prediction of result.
2. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 1, it is special Levy and be, initialization content includes particle populations scale, initial position and initial velocity in the step (1).
3. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 1, it is special Levy and be, fitness function is in the step (2):
f t = &Sigma; k = 1 K a b s ( o k - y k )
In formula:OkIt is k-th desired output of node, ykIt is the k-th prediction output of node.
4. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 1, it is special Levy and be, in the step (3) if each particle fitness value better than it is individual it is optimal if the particle is set to it is individual optimal, then By individuality it is optimal be compared with global optimum, if be better than global optimum if the particle is set to global optimum.
5. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 1, it is special Levy and be, the formula of particle rapidity renewal foundation is as follows in the step (4):
vi(t+1)=ω vi(t)+c1r1(pb(t)-xi(t))+c2r2(pg(t)-xi(t))
In formula:viT () is the speed of i-th particle in the t times iteration;xiT () is the position of i-th particle in the t times iteration Put;ω is inertia weight;c1、c2Respectively the cognitive learning factor and social learning's factor;r1With r2For random between [0,1] Number, pgT () is the individual optimal value in the t times iteration;pgT () is the global optimum in the t times iteration.
6. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 5, it is special Levy and be, c1、c2Value be c1=c2=2.
7. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 5, it is special Levy and be, the formula of particle position renewal institute foundation is as follows in the step (4):
xi(t+1)=xi(t)+vi(t+1)
In formula:xi(t+1) it is the position of i-th particle in the t+1 times iteration.
8. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 5, it is special Levy and be, wherein being defined as follows to ω:
&omega; t = 1 2 &alpha; + e - K t / K t - 1
K t = 1 n &Sigma; i = 1 n ( f t ( X i ) - f t ( X b e s t ) ) 2
Wherein n is total number of particles, and α is [0,1] interval random number, ft(Xi) for the t time iteration when i-th particle is corresponding fits Answer angle value, ft(Xbest) for the t times iteration when the corresponding fitness value of optimal particle.
9. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 1, it is special Levy and be, input layer is determined by input data in the step (6).
10. a kind of wind power forecasting method based on Modified particle swarm optimization BP neural network as claimed in claim 1, it is special Levy and be, the selection of node in hidden layer is determined by below equation in the step (6):
n = m + q + a
Wherein m is input layer number, and q is output layer nodes, and a makes up the number or amount for examination, and span is 1~10.
CN201710113432.7A 2017-02-28 2017-02-28 A kind of wind power forecasting method based on Modified particle swarm optimization BP neural network Pending CN106920008A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710113432.7A CN106920008A (en) 2017-02-28 2017-02-28 A kind of wind power forecasting method based on Modified particle swarm optimization BP neural network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710113432.7A CN106920008A (en) 2017-02-28 2017-02-28 A kind of wind power forecasting method based on Modified particle swarm optimization BP neural network

Publications (1)

Publication Number Publication Date
CN106920008A true CN106920008A (en) 2017-07-04

Family

ID=59454346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710113432.7A Pending CN106920008A (en) 2017-02-28 2017-02-28 A kind of wind power forecasting method based on Modified particle swarm optimization BP neural network

Country Status (1)

Country Link
CN (1) CN106920008A (en)

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107665315A (en) * 2017-10-31 2018-02-06 上海应用技术大学 A kind of based role suitable for Hadoop and the access control method trusted
CN108364071A (en) * 2018-02-06 2018-08-03 南京国电南自电网自动化有限公司 A kind of adaptive modeling wind power prediction method based on genetic programming algorithm
CN108665112A (en) * 2018-05-16 2018-10-16 东华大学 Photovoltaic fault detection method based on Modified particle swarm optimization Elman networks
CN108711874A (en) * 2018-01-22 2018-10-26 南京理工大学 A kind of electric vehicle participates in the power consumption control strategy process of public building routine peak regulation
CN109002942A (en) * 2018-09-28 2018-12-14 河南理工大学 A kind of short-term load forecasting method based on stochastic neural net
CN109118384A (en) * 2018-07-16 2019-01-01 湖南优利泰克自动化系统有限公司 A kind of Wind turbines healthy early warning method
CN109308518A (en) * 2018-09-13 2019-02-05 北京理工大学 A kind of monitoring system and its smoothing parameter optimization method based on probabilistic neural network
CN109472041A (en) * 2018-09-10 2019-03-15 江苏大学 A kind of double-suction pump impeller optimization method based on improvement particle swarm algorithm
CN109559797A (en) * 2018-10-31 2019-04-02 青岛大学附属医院 A kind of haemodialysis rehabilitation exercise training method and system, terminal
CN109886471A (en) * 2019-01-22 2019-06-14 中国大唐集团科学技术研究院有限公司火力发电技术研究院 Fired power generating unit load distribution method based on neural network and intelligent optimization algorithm
CN110210657A (en) * 2019-05-22 2019-09-06 国网冀北电力有限公司 A kind of power of fan prediction technique, system and computer storage medium based on single machine model
CN110533484A (en) * 2019-09-05 2019-12-03 四川长虹电器股份有限公司 A kind of product Method for Sales Forecast method based on PCA and improved BP
CN110794308A (en) * 2019-11-07 2020-02-14 交控科技股份有限公司 Method and device for predicting train battery capacity
CN111047002A (en) * 2019-11-22 2020-04-21 浙江工业大学 BP neural network-based straightening stroke prediction method
WO2020082973A1 (en) * 2018-10-22 2020-04-30 新智数字科技有限公司 Load prediction method and apparatus based on neural network
CN111489021A (en) * 2020-03-31 2020-08-04 黑龙江大学 Beet yield prediction method based on particle swarm optimization BP neural network
CN111814826A (en) * 2020-06-08 2020-10-23 武汉理工大学 Rapid detection and rating method for residual energy of retired power battery
CN111930844A (en) * 2020-08-11 2020-11-13 罗忠明 Financial prediction system based on block chain and artificial intelligence
CN112368903A (en) * 2018-07-05 2021-02-12 乌本产权有限公司 Method for feeding electrical power into a power supply network
CN112489733A (en) * 2020-12-14 2021-03-12 郑州轻工业大学 Octane number loss prediction method based on particle swarm algorithm and neural network
CN112580855A (en) * 2020-11-27 2021-03-30 国网上海市电力公司 Cable group steady-state temperature rise prediction method based on self-adaptive variation PSO-BP neural network
CN112819189A (en) * 2019-11-15 2021-05-18 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Wind power output prediction method based on historical predicted value
CN112926767A (en) * 2021-01-27 2021-06-08 天津大学 Annular fog flow gas phase apparent flow velocity prediction method based on particle swarm BP neural network
CN113095477A (en) * 2021-03-17 2021-07-09 西安理工大学 Wind power prediction method based on DE-BP neural network
CN113139606A (en) * 2021-04-27 2021-07-20 上海联创设计集团股份有限公司 Heating and ventilation fan fault detection method and system based on artificial intelligence algorithm
CN113486601A (en) * 2021-09-07 2021-10-08 国网江西省电力有限公司电力科学研究院 Feeder voltage calculation method and device based on CPSO-BP optimization model
CN113553270A (en) * 2021-07-28 2021-10-26 浙江网商银行股份有限公司 Target object determination method and device
CN113570120A (en) * 2021-07-07 2021-10-29 上海电机学院 Wind power prediction method and device based on improved particle swarm optimization
CN113723534A (en) * 2021-09-02 2021-11-30 南京润内克西信息科技有限公司 Urban raise dust on-line monitoring system based on BP neural network
CN114819313A (en) * 2022-04-15 2022-07-29 南通大学 Wind power prediction method based on improved PSO (particle swarm optimization) optimized double-weight neural network
CN117074437A (en) * 2023-10-11 2023-11-17 青岛金诺德科技有限公司 Nondestructive testing method and application thereof in recovery of lithium battery of new energy automobile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104361393A (en) * 2014-09-06 2015-02-18 华北电力大学 Method for using improved neural network model based on particle swarm optimization for data prediction
CN105223241A (en) * 2015-09-18 2016-01-06 南京信息工程大学 A kind of compensation method of humidity sensor
CN106022471A (en) * 2016-05-12 2016-10-12 大连海事大学 Wavelet neural network model ship rolling real-time prediction method based on particle swarm optimization algorithm

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104361393A (en) * 2014-09-06 2015-02-18 华北电力大学 Method for using improved neural network model based on particle swarm optimization for data prediction
CN105223241A (en) * 2015-09-18 2016-01-06 南京信息工程大学 A kind of compensation method of humidity sensor
CN106022471A (en) * 2016-05-12 2016-10-12 大连海事大学 Wavelet neural network model ship rolling real-time prediction method based on particle swarm optimization algorithm

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李操: "基于IPSO-BP神经网络模型的风电功率预测研究", 《万方数据HTTP://WWW.WANFANGDATA.COM.CN/DETAILS/DETAIL.DO?_TYPE=DEGREE&ID=Y3022004》 *
董现等: "基于参数相关性和混合神经网络的结构随机灵敏度分析方法", 《建筑结构学报》 *

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107665315B (en) * 2017-10-31 2020-12-15 上海应用技术大学 Role and trust-based access control method suitable for Hadoop
CN107665315A (en) * 2017-10-31 2018-02-06 上海应用技术大学 A kind of based role suitable for Hadoop and the access control method trusted
CN108711874A (en) * 2018-01-22 2018-10-26 南京理工大学 A kind of electric vehicle participates in the power consumption control strategy process of public building routine peak regulation
CN108711874B (en) * 2018-01-22 2021-05-28 南京理工大学 Power utilization control strategy method for electric vehicle participating in conventional peak regulation of public building
CN108364071A (en) * 2018-02-06 2018-08-03 南京国电南自电网自动化有限公司 A kind of adaptive modeling wind power prediction method based on genetic programming algorithm
CN108665112A (en) * 2018-05-16 2018-10-16 东华大学 Photovoltaic fault detection method based on Modified particle swarm optimization Elman networks
CN112368903A (en) * 2018-07-05 2021-02-12 乌本产权有限公司 Method for feeding electrical power into a power supply network
CN109118384A (en) * 2018-07-16 2019-01-01 湖南优利泰克自动化系统有限公司 A kind of Wind turbines healthy early warning method
CN109472041A (en) * 2018-09-10 2019-03-15 江苏大学 A kind of double-suction pump impeller optimization method based on improvement particle swarm algorithm
CN109308518B (en) * 2018-09-13 2021-09-10 北京理工大学 Monitoring system based on probabilistic neural network and smoothing parameter optimization method thereof
CN109308518A (en) * 2018-09-13 2019-02-05 北京理工大学 A kind of monitoring system and its smoothing parameter optimization method based on probabilistic neural network
CN109002942A (en) * 2018-09-28 2018-12-14 河南理工大学 A kind of short-term load forecasting method based on stochastic neural net
WO2020082973A1 (en) * 2018-10-22 2020-04-30 新智数字科技有限公司 Load prediction method and apparatus based on neural network
CN109559797A (en) * 2018-10-31 2019-04-02 青岛大学附属医院 A kind of haemodialysis rehabilitation exercise training method and system, terminal
CN109886471A (en) * 2019-01-22 2019-06-14 中国大唐集团科学技术研究院有限公司火力发电技术研究院 Fired power generating unit load distribution method based on neural network and intelligent optimization algorithm
CN110210657A (en) * 2019-05-22 2019-09-06 国网冀北电力有限公司 A kind of power of fan prediction technique, system and computer storage medium based on single machine model
CN110533484A (en) * 2019-09-05 2019-12-03 四川长虹电器股份有限公司 A kind of product Method for Sales Forecast method based on PCA and improved BP
CN110794308A (en) * 2019-11-07 2020-02-14 交控科技股份有限公司 Method and device for predicting train battery capacity
CN112819189A (en) * 2019-11-15 2021-05-18 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Wind power output prediction method based on historical predicted value
CN111047002A (en) * 2019-11-22 2020-04-21 浙江工业大学 BP neural network-based straightening stroke prediction method
CN111047002B (en) * 2019-11-22 2023-04-07 浙江工业大学 BP neural network-based alignment stroke prediction method
CN111489021A (en) * 2020-03-31 2020-08-04 黑龙江大学 Beet yield prediction method based on particle swarm optimization BP neural network
CN111814826A (en) * 2020-06-08 2020-10-23 武汉理工大学 Rapid detection and rating method for residual energy of retired power battery
CN111814826B (en) * 2020-06-08 2022-06-03 武汉理工大学 Rapid detection and rating method for residual energy of retired power battery
CN111930844B (en) * 2020-08-11 2021-09-24 肖岩 Financial prediction system based on block chain and artificial intelligence
CN111930844A (en) * 2020-08-11 2020-11-13 罗忠明 Financial prediction system based on block chain and artificial intelligence
CN112580855A (en) * 2020-11-27 2021-03-30 国网上海市电力公司 Cable group steady-state temperature rise prediction method based on self-adaptive variation PSO-BP neural network
CN112489733A (en) * 2020-12-14 2021-03-12 郑州轻工业大学 Octane number loss prediction method based on particle swarm algorithm and neural network
CN112926767A (en) * 2021-01-27 2021-06-08 天津大学 Annular fog flow gas phase apparent flow velocity prediction method based on particle swarm BP neural network
CN113095477A (en) * 2021-03-17 2021-07-09 西安理工大学 Wind power prediction method based on DE-BP neural network
CN113095477B (en) * 2021-03-17 2024-02-09 西安理工大学 Wind power prediction method based on DE-BP neural network
CN113139606A (en) * 2021-04-27 2021-07-20 上海联创设计集团股份有限公司 Heating and ventilation fan fault detection method and system based on artificial intelligence algorithm
CN113570120A (en) * 2021-07-07 2021-10-29 上海电机学院 Wind power prediction method and device based on improved particle swarm optimization
CN113553270A (en) * 2021-07-28 2021-10-26 浙江网商银行股份有限公司 Target object determination method and device
CN113723534A (en) * 2021-09-02 2021-11-30 南京润内克西信息科技有限公司 Urban raise dust on-line monitoring system based on BP neural network
CN113486601A (en) * 2021-09-07 2021-10-08 国网江西省电力有限公司电力科学研究院 Feeder voltage calculation method and device based on CPSO-BP optimization model
CN114819313A (en) * 2022-04-15 2022-07-29 南通大学 Wind power prediction method based on improved PSO (particle swarm optimization) optimized double-weight neural network
CN117074437A (en) * 2023-10-11 2023-11-17 青岛金诺德科技有限公司 Nondestructive testing method and application thereof in recovery of lithium battery of new energy automobile
CN117074437B (en) * 2023-10-11 2024-01-12 青岛金诺德科技有限公司 Nondestructive testing method and application thereof in recovery of lithium battery of new energy automobile

Similar Documents

Publication Publication Date Title
CN106920008A (en) A kind of wind power forecasting method based on Modified particle swarm optimization BP neural network
Yang et al. A novel competitive swarm optimized RBF neural network model for short-term solar power generation forecasting
Zhang et al. A comprehensive wind speed prediction system based on Monte Carlo and artificial intelligence algorithms
Liu et al. Short-term photovoltaic power prediction on modal reconstruction: A novel hybrid model approach
CN107316099A (en) Ammunition Storage Reliability Forecasting Methodology based on particle group optimizing BP neural network
CN107704875A (en) Based on the building load Forecasting Methodology and device for improving IHCMAC neutral nets
CN104636985A (en) Method for predicting radio disturbance of electric transmission line by using improved BP (back propagation) neural network
CN104820877A (en) Photovoltaic system generation power prediction method based on cloud adaptive PSO-SNN
Tian et al. Variable frequency wind speed trend prediction system based on combined neural network and improved multi-objective optimization algorithm
CN114784823A (en) Micro-grid frequency control method and system based on depth certainty strategy gradient
Ning et al. GA-BP air quality evaluation method based on fuzzy theory.
CN109858665A (en) Photovoltaic short term power prediction technique based on Feature Selection and ANFIS-PSO
Wen et al. Forecasting the annual household electricity consumption of Chinese residents using the DPSO-BP prediction model
Liu et al. Wind power short-term forecasting based on LSTM neural network with dragonfly algorithm
CN116454863A (en) Optimal weight determining method of wind power combination prediction model based on improved hawk optimization algorithm
CN115995810A (en) Wind power prediction method and system considering weather fluctuation self-adaptive matching
CN109408896B (en) Multi-element intelligent real-time monitoring method for anaerobic sewage treatment gas production
Zhao et al. Super short term combined power prediction for wind power hydrogen production
CN106786499A (en) Based on the short-term wind power forecast method for improving AFSA optimizations ELM
CN117132132A (en) Photovoltaic power generation power prediction method based on meteorological data
CN116865343A (en) Model-free self-adaptive control method, device and medium for distributed photovoltaic power distribution network
CN116681154A (en) Photovoltaic power calculation method based on EMD-AO-DELM
Ren et al. Time series prediction based on echo state network tuned by divided adaptive multi-objective differential evolution algorithm
CN110532057A (en) A kind of resource usage amount prediction technique of container
Yin et al. Quantum-inspired distributed policy-value optimization learning with advanced environmental forecasting for real-time generation control in novel power systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170704