CN106914738A - Receiving device and air conditioner processing device with same - Google Patents

Receiving device and air conditioner processing device with same Download PDF

Info

Publication number
CN106914738A
CN106914738A CN201710196888.4A CN201710196888A CN106914738A CN 106914738 A CN106914738 A CN 106914738A CN 201710196888 A CN201710196888 A CN 201710196888A CN 106914738 A CN106914738 A CN 106914738A
Authority
CN
China
Prior art keywords
reception device
oil pipe
cleaning section
acceptance division
pipe line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710196888.4A
Other languages
Chinese (zh)
Inventor
陈义波
张玉全
李德灵
张秀峰
罗聪杰
许李海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Technology Research Institute Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Zhuhai Gree Intelligent Equipment Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Zhuhai Gree Intelligent Equipment Technology Research Institute Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201710196888.4A priority Critical patent/CN106914738A/en
Publication of CN106914738A publication Critical patent/CN106914738A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B5/00Cleaning by methods involving the use of air flow or gas flow
    • B08B5/02Cleaning by the force of jets, e.g. blowing-out cavities

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cleaning In General (AREA)

Abstract

The invention provides a receiving device and an air conditioner processing device with the same. The receiving device comprises a receiving part for receiving the workpiece to be processed; the cleaning part is arranged adjacent to the receiving part, or the cleaning part is connected with the receiving part; wherein the cleaning part is used for blowing air to the receiving part. The cleaning part is arranged on the receiving device or at a position adjacent to the receiving device, the receiving part of the receiving device is blown by the cleaning part, and chips generated on the receiving part can be blown away in time, so that the problem that the chips stay on the receiving part for a long time to influence the processing quality of the air conditioner is avoided. By adopting the technical scheme, the copper pipe can not be scratched when the copper pipe is installed on the evaporator and the condenser of the air conditioner, and the processing quality of the air conditioner is effectively improved.

Description

Reception device and the air-conditioner processing unit (plant) with it
Technical field
The present invention relates to air-conditioner device processing technique field, in particular to a kind of reception device and with it Air-conditioner processing unit (plant).
Background technology
In the prior art, it is necessary to the evaporator that will be molded during the evaporator to air-conditioner and condenser are processed Being delivered in reception device with condenser carries out expander roll operation processing.In the prior art, evaporator and condenser processed During chip is easily piled up in reception device so that easily cause that copper pipe produces cut during copper pipe is installed so that The crudy of evaporator and condenser is have impact on, evaporator and the low problem of condenser crudy is caused.
The content of the invention
It is existing to solve it is a primary object of the present invention to provide a kind of reception device and air-conditioner processing unit (plant) with it There is the low problem of air-conditioner crudy in technology.
To achieve these goals, according to an aspect of the invention, there is provided a kind of reception device, including:Acceptance division, Acceptance division is used to receive workpiece to be added;Cleaning section, cleaning section is disposed adjacent with acceptance division, or, cleaning section is connected with acceptance division Connect;Wherein, cleaning section is used to be blown to acceptance division.
Further, cleaning section is movably arranged on acceptance division.
Further, cleaning section includes:Air blowing pipeline, the first end of air blowing pipeline is connected with source of the gas, air blowing pipeline Second end is connected with acceptance division, and the second end of air blowing pipeline offers multiple inflatable mouths.
Further, air blowing pipeline is multiple, and multiple air blowing pipelines are arranged side by side.
Further, cleaning section also includes:Oil pipe line is blown, the first end for blowing oil pipe line is connected with accumulator, blows oil pipe Second end on road is connected with acceptance division, blows oil pipe line and is set independently of each other with air blowing pipeline, blows oil pipe line for to be added Workpiece blows oil.
Further, cleaning section also includes:Oil pipe line is blown, the first end for blowing oil pipe line is connected with accumulator, blows oil pipe Second end on road is selectively connected with air blowing pipeline, blows oil pipe line for carrying out blowing oil to workpiece to be added.
Further, it is multiple to blow oil pipe line, and multiple is blown at least one of oil pipe line and blows the second end of oil pipe line and opens up There is multiple to blow hydraulic fluid port.
Further, hydraulic fluid port is blown positioned at the top of inflatable mouth.
Further, acceptance division includes:Received block, received block is multiple, and multiple received blocks are used to receive workpiece to be added, One-to-one cleaning section is provided with multiple received blocks, multiple received blocks are arranged in a vertical direction, or, multiple received block edges Horizontal direction is arranged.
Further, reception device includes support bar, and multiple received blocks include:First received block;Second received block, support One end of bar is connected with the first received block, and the second received block is arranged on support bar and is located at the top of the first received block.
Further, reception device includes:Guide rail, guide rail is connected with acceptance division, and cleaning section is movably disposed in be led On rail.
Further, reception device includes:Drive division, drive division is arranged on acceptance division, and drive division is connected with cleaning section Connect, drive division can drive cleaning section to be moved back and forth along the length direction of guide rail.
According to another aspect of the present invention, there is provided a kind of air-conditioner processing unit (plant), including reception device, reception device is Above-mentioned reception device, reception device is used to receive the evaporator and/or condenser of air-conditioner.
Apply the technical scheme of the present invention, cleaning is set on the reception device or at the position adjacent with reception device Portion, is blown using the cleaning section to the acceptance division of reception device, and the chip that will timely can be produced on acceptance division is timely Blow away, it is to avoid chip rests on the problem impacted to the crudy of air-conditioner on acceptance division for a long time.Using the skill Art scheme, enables to when the evaporator to air-conditioner and condenser install copper pipe, and copper pipe will not produce cut, effectively carry The crudy of air-conditioner high.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing a further understanding of the present invention, of the invention to show Meaning property and its illustrates, for explaining the present invention, not constitute inappropriate limitation of the present invention embodiment.In the accompanying drawings:
Fig. 1 shows the structural representation at the first visual angle of the embodiment of reception device of the invention;
Fig. 2 shows the structural representation at the second visual angle of the embodiment of the reception device in Fig. 1;
Fig. 3 shows the mplifying structure schematic diagram at A in Fig. 2;
Fig. 4 shows the structural representation at the 3rd visual angle of the embodiment of the reception device in Fig. 1.
Wherein, above-mentioned accompanying drawing is marked including the following drawings:
10th, acceptance division;11st, received block;111st, the first received block;112nd, the second received block;20th, cleaning section;21st, gas blow pipe Road;211st, inflatable mouth;22nd, oil pipe line is blown;221st, hydraulic fluid port is blown;30th, support bar;40th, guide rail;50th, drive division;60th, sliding block.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative Be also intended to include plural form, additionally, it should be understood that, when in this manual use term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
It should be noted that term " first ", " in the description and claims of this application and above-mentioned accompanying drawing Two " it is etc. for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so using Term can exchange in the appropriate case, so that presently filed embodiment described herein for example can be with except herein Order beyond those of diagram or description is implemented.Additionally, term " comprising " and " having " and their any deformation, it is intended that Be cover it is non-exclusive include, for example, containing process, method, system, product or the equipment of series of steps or unit not Be necessarily limited to those steps or the unit clearly listed, but may include not list clearly or for these processes, side Method, product or other intrinsic steps of equipment or unit.
For the ease of description, space relative terms can be used herein, such as " ... on ", " ... top ", " in ... upper surface ", " above " etc., for describing such as a device shown in the figure or feature and other devices or spy The spatial relation levied.It should be appreciated that space relative terms are intended to comprising the orientation except device described in figure Outside different azimuth in use or operation.If for example, the device in accompanying drawing is squeezed, be described as " in other devices To be positioned as " under other devices or construction after the device of part or construction top " or " on other devices or construction " Side " or " under other devices or construction ".Thus, exemplary term " ... top " can include " ... top " and " in ... lower section " two kinds of orientation.The device can also other different modes positioning (being rotated by 90 ° or in other orientation), and And respective explanations are made to the relative description in space used herein above.
Now, the illustrative embodiments according to the application are more fully described with reference to the accompanying drawings.However, these are exemplary Implementation method can be implemented by many different forms, and should not be construed to be limited solely to embodiment party set forth herein Formula.It should be appreciated that thesing embodiments are provided so that disclosure herein is thoroughly and complete, and these are shown The design of example property implementation method is fully conveyed to those of ordinary skill in the art, in the accompanying drawings, for the sake of clarity, it is possible to expand The big thickness of layer and region, and make identical device is presented with like reference characters, thus they are retouched by omitting State.
With reference to shown in Fig. 1 to Fig. 4, a kind of embodiments in accordance with the present invention, there is provided reception device.
Specifically, as shown in figure 1, the reception device includes acceptance division 10 and cleaning section 20.Acceptance division 10 is treated for reception Workpiece.Cleaning section 20 is disposed adjacent with acceptance division 10.Or, cleaning section 20 is connected with acceptance division 10.Wherein, cleaning section 20 For being blown to acceptance division 10.
In the present embodiment, cleaning section is set on the reception device or at the position adjacent with reception device, using this Cleaning section is blown to the acceptance division of reception device, and the chip that will timely can be produced on acceptance division blows away in time, it is to avoid Chip rests on the problem impacted to the crudy of air-conditioner on acceptance division for a long time.Using the technical scheme, energy It is enough to cause that copper pipe produce cut, be effectively improved air-conditioning when the evaporator to air-conditioner and condenser install copper pipe The crudy of device.
Preferably, as shown in Fig. 2 cleaning section 20 is movably arranged on acceptance division 10.So setting can be effectively Chip on acceptance division is blown out in time.
As shown in Figures 2 and 3, cleaning section 20 includes air blowing pipeline 21.The first end of air blowing pipeline 21 is connected with source of the gas, Second end of air blowing pipeline 21 is connected with acceptance division 10, and the second end of air blowing pipeline 21 offers multiple inflatable mouths 211.So Setting can be effectively increased the blowing speeds of air blowing pipeline 21, can blow away the chip of heavier-weight on acceptance division.
In order to the purging in the comprehensive receipts portion that achieved a butt joint without dead angle, air blowing pipeline 21 can be set to multiple, it is many Individual air blowing pipeline 21 is arranged side by side.So setting enables to air-flow to be purged towards same direction, it is to avoid cause multiple sources of the gas The situation that purging direction is different and interferes.
In order that obtaining more smooth when to condenser and evaporator processing copper pipe, the cleaning section 20 also includes blowing oil pipe line 22.The first end for blowing oil pipe line 22 is connected with accumulator, and the second end for blowing oil pipe line 22 is connected with acceptance division 10, blows oil pipe Road 22 is set independently of each other with air blowing pipeline 21, blows oil pipe line 22 for blowing oil to workpiece to be added.
According to another embodiment of the application, cleaning section 20 also includes blowing oil pipe line 22, blows the first end of oil pipe line 22 Be connected with accumulator, the second end for blowing oil pipe line 22 is selectively connected with air blowing pipeline 21, blow oil pipe line 22 for Workpiece to be added carries out blowing oil.Can realize blowing oil i.e. in the present embodiment, at the export pipeline of the cleaning section 20 or blow, so Setting can avoid the problem of the pipeline increase cost for setting excessive.
As shown in figure 3, the processing of the air-conditioner device in order to meet different volumes, will can blow oil pipe line 22 be set to it is many Individual, multiple is blown at least one of oil pipe line 22 and blows the second end of oil pipe line 22 and offers multiple and blow hydraulic fluid port 221.
Preferably due to during carrying out blowing oil to air-conditioner device, the oil body for some drops, in order to keep away Exempt from oil body waste, inflatable mouth is arranged on the lower section for blowing hydraulic fluid port so that inflatable mouth can be carried out again to the skyborne oil body that drops Secondary purging, can efficiently avoid the waste of oil body, save financial cost.
As shown in Figure 1 and Figure 4, acceptance division 10 includes received block 11.Received block 11 is multiple, and multiple received blocks 11 are used to Workpiece to be added is received, one-to-one cleaning section 20 is provided with multiple received blocks 11, the vertically cloth of multiple received blocks 11 Put, or, multiple received blocks 11 are arranged in the horizontal direction.So setting can effectively increase receiving station, effectively improve The processing efficiency of the reception device.
Further, reception device includes support bar 30, and multiple received blocks 11 include that the first received block 111 and second is received Seat 112.One end of support bar 30 is connected with the first received block 111, and the second received block 112 is arranged on support bar 30 and is located at The top of the first received block 111.So setting can be effectively saved the floor space of reception device.
As shown in figure 3, reception device includes guide rail 40.Guide rail 40 is connected with acceptance division 10, and cleaning section 20 is movably It is arranged on guide rail 40.Specifically, cleaning section 20 is arranged on guide rail 40 by sliding block 60, is so set and is enabled to according to need The purge position of cleaning section 20 is adjusted, the practicality of the reception device is effectively improved.
Reception device includes drive division 50.Drive division 50 is arranged on acceptance division 10, and drive division 50 is connected with cleaning section 20 Connect, drive division 50 can drive cleaning section 20 to be moved back and forth along the length direction of guide rail 40.Preferably, drive division 50 can be without bar Cylinder.So setting enables to the cleaning section 20 to realize adjust automatically, and cleaning can be effectively increased using Rodless cylinder The accuracy of the automatic adjusting position of portion 20.
Reception device in above-described embodiment can be also used for air-conditioner device processing technique field, i.e., of the invention On the other hand, there is provided a kind of air-conditioner processing unit (plant).The air-conditioner processing unit (plant) includes reception device, and reception device is above-mentioned Reception device in embodiment, reception device is used to receive the evaporator and/or condenser of air-conditioner.Specifically, reception dress Put including acceptance division 10 and cleaning section 20.Acceptance division 10 is used to receive workpiece to be added.Cleaning section 20 is disposed adjacent with acceptance division 10. Or, cleaning section 20 is connected with acceptance division 10.Wherein, cleaning section 20 is used to be blown to acceptance division 10.In the present embodiment, exist Cleaning section is set in reception device or at the position adjacent with reception device, using the cleaning section to the acceptance division of reception device Blown, the chip that will timely can be produced on acceptance division blows away in time, it is to avoid chip rests on acceptance division for a long time On the problem that is impacted to the crudy of air-conditioner.Using the technical scheme, enable in the evaporator to air-conditioner When installing copper pipe with condenser, copper pipe will not produce cut, be effectively improved the crudy of air-conditioner.
Preferably, cleaning section is set on the reception device, the acceptance division of reception device is blown using the cleaning section, The chip that will timely can be produced on acceptance division is blown away in time, it is to avoid chip is rested on acceptance division to air-conditioner for a long time The problem that impacts of crudy.Using the technical scheme, enable to pacify in the evaporator to air-conditioner and condenser During dress copper pipe, copper pipe will not produce cut, be effectively improved the crudy of air-conditioner.To air-conditioner evaporator and condensation During the copper pipe processing of device, received block needs to keep clean, so can cause do not have cut on copper pipe when expander roll, But particulate matter etc. is might have on received block, causes some flaws on copper pipe.In order to solve the above problems, in the upper of received block End and lower end are respectively provided with gas blow pipe, and for blowing, upper end is additionally provided with blows oil pipe, and being blown so before expander roll can cause expander roll Smoothly.Using Rodless cylinder, determine gas blow pipe or blow oil pipe.Gas blow pipe blows oil pipe and can be slidably arranged on guide rail.
According to another embodiment of the application, the air-conditioning processing unit (plant) can be arranged to:Cleaning section 20 includes Blow oil pipe line 22, the first end for blowing oil pipe line 22 is connected with accumulator, blow the second end of oil pipe line 22 selectively with air blowing Pipeline 21 is connected, and blows oil pipe line 22 for carrying out blowing oil to workpiece to be added.I.e. in the present embodiment, the outlet of the cleaning section 20 Can realize blowing oil at road or blow, the problem of the pipeline increase cost that can avoid setting excessive is so set.I.e. can be with One is drawn respectively from accumulator and air storage chamber and blows oil pipe and a gas blow pipe, then this is being blown into oil pipe and gas blow pipe is accumulated A piece pipeline, valve is set in junction, Air blowing valve, closing is opened when needing to blow and blows fuel tap door, when needing to blow oil Opening blows fuel tap door, closes Air blowing valve.
Than that described above, in addition it is also necessary to which explanation is " one embodiment ", " another implementation spoken of in this manual Example ", " embodiment " etc., specific features, structure or the feature for referring to being described with reference to the embodiment are included in the application summary Property description at least one embodiment in.It is not necessarily to refer to same reality that statement of the same race occur in multiple places in the description Apply example.Furthermore, it is understood that when describing specific features, structure or a feature with reference to any embodiment, what is advocated is knot Other embodiment is closed also to fall within the scope of the present invention realizing this feature, structure or feature.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, and does not have the portion described in detail in certain embodiment Point, may refer to the associated description of other embodiment.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (13)

1. a kind of reception device, it is characterised in that including:
Acceptance division (10), the acceptance division (10) is for receiving workpiece to be added;
Cleaning section (20), the cleaning section (20) is disposed adjacent with the acceptance division (10), or, the cleaning section (20) and institute Acceptance division (10) is stated to be connected;
Wherein, the cleaning section (20) to the acceptance division (10) for blowing.
2. reception device according to claim 1, it is characterised in that the cleaning section (20) is movably arranged at described On acceptance division (10).
3. reception device according to claim 2, it is characterised in that the cleaning section (20) includes:
Air blowing pipeline (21), the first end of the air blowing pipeline (21) is connected with source of the gas, and the second of the air blowing pipeline (21) End is connected with the acceptance division (10), and the second end of the air blowing pipeline (21) offers multiple inflatable mouths (211).
4. reception device according to claim 3, it is characterised in that the air blowing pipeline (21) is multiple, it is multiple described Air blowing pipeline (21) is arranged side by side.
5. the reception device according to any one of claim 3, it is characterised in that the cleaning section (20) also includes:
Oil pipe line (22) is blown, the first end for blowing oil pipe line (22) is connected with accumulator, it is described to blow the of oil pipe line (22) Two ends are connected with the acceptance division (10), and the oil pipe line (22) that blows is set independently of each other with the air blowing pipeline (21), The oil pipe line (22) that blows to the workpiece to be added for blowing oil.
6. reception device according to claim 3, it is characterised in that the cleaning section (20) also includes:
Oil pipe line (22) is blown, the first end for blowing oil pipe line (22) is connected with accumulator, it is described to blow the of oil pipe line (22) Two ends are selectively connected with the air blowing pipeline (21), and the oil pipe line (22) that blows to the workpiece to be added for being blown Oil.
7. reception device according to claim 5, it is characterised in that the oil pipe line (22) that blows is multiple, it is multiple described Blow at least one of oil pipe line (22) second end for blowing oil pipe line (22) and offer multiple and blow hydraulic fluid port (221).
8. reception device according to claim 7, it is characterised in that the hydraulic fluid port (221) that blows is positioned at the inflatable mouth (211) top.
9. reception device according to claim 1, it is characterised in that the acceptance division (10) includes:
Received block (11), the received block (11) is multiple, and multiple received blocks (11) are used to receive the workpiece to be added, The one-to-one cleaning section (20) is provided with multiple received blocks (11), the multiple received block (11) is along vertical side To arrangement, or, the multiple received block (11) is arranged in the horizontal direction.
10. reception device according to claim 9, it is characterised in that the reception device includes support bar (30), multiple The received block (11) includes:
First received block (111);
Second received block (112), one end of the support bar (30) is connected with first received block (111), and described second Received block (112) is arranged on the support bar (30) and positioned at the top of first received block (111).
11. reception devices according to claim 2, it is characterised in that the reception device includes:
Guide rail (40), the guide rail (40) is connected with the acceptance division (10), and the cleaning section (20) is movably disposed in On the guide rail (40).
12. reception devices according to claim 11, it is characterised in that the reception device includes:
Drive division (50), the drive division (50) is arranged on the acceptance division (10), the drive division (50) and the cleaning Portion (20) is connected, and the drive division (50) can drive the cleaning section (20) back and forth to be transported along the length direction of the guide rail (40) It is dynamic.
A kind of 13. air-conditioner processing unit (plant)s, including reception device, it is characterised in that the reception device is claim 1 to 12 Any one of reception device, the reception device is used to receive the evaporator and/or condenser of the air-conditioner.
CN201710196888.4A 2017-03-28 2017-03-28 Receiving device and air conditioner processing device with same Pending CN106914738A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710196888.4A CN106914738A (en) 2017-03-28 2017-03-28 Receiving device and air conditioner processing device with same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710196888.4A CN106914738A (en) 2017-03-28 2017-03-28 Receiving device and air conditioner processing device with same

Publications (1)

Publication Number Publication Date
CN106914738A true CN106914738A (en) 2017-07-04

Family

ID=59461429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710196888.4A Pending CN106914738A (en) 2017-03-28 2017-03-28 Receiving device and air conditioner processing device with same

Country Status (1)

Country Link
CN (1) CN106914738A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108554926A (en) * 2017-11-30 2018-09-21 珠海格力智能装备有限公司 Blowing dust removal mechanism and pipe expander with same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201175713Y (en) * 2008-03-13 2009-01-07 重庆宗申发动机制造有限公司 Integration chip-blowing washer
CN201613260U (en) * 2009-12-11 2010-10-27 攀钢集团钢铁钒钛股份有限公司 Surface purging device for steel plates and steel plate cutter
CN104339141A (en) * 2014-10-29 2015-02-11 格力电器(合肥)有限公司 Pipe penetrating workbench
CN205904165U (en) * 2016-08-09 2017-01-25 谭均银 Rifle is mixed to aqueous vapor
CN206898706U (en) * 2017-03-28 2018-01-19 珠海格力智能装备技术研究院有限公司 Receiving device and air conditioner processing device with same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201175713Y (en) * 2008-03-13 2009-01-07 重庆宗申发动机制造有限公司 Integration chip-blowing washer
CN201613260U (en) * 2009-12-11 2010-10-27 攀钢集团钢铁钒钛股份有限公司 Surface purging device for steel plates and steel plate cutter
CN104339141A (en) * 2014-10-29 2015-02-11 格力电器(合肥)有限公司 Pipe penetrating workbench
CN205904165U (en) * 2016-08-09 2017-01-25 谭均银 Rifle is mixed to aqueous vapor
CN206898706U (en) * 2017-03-28 2018-01-19 珠海格力智能装备技术研究院有限公司 Receiving device and air conditioner processing device with same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108554926A (en) * 2017-11-30 2018-09-21 珠海格力智能装备有限公司 Blowing dust removal mechanism and pipe expander with same
CN108554926B (en) * 2017-11-30 2024-04-02 珠海格力智能装备有限公司 Blowing dust removing mechanism and tube expander with same

Similar Documents

Publication Publication Date Title
CN102636315B (en) Helium-filling vacuum leakage detection system for outdoor unit of air conditioner
CN206898706U (en) Receiving device and air conditioner processing device with same
CN106914738A (en) Receiving device and air conditioner processing device with same
CN108760181A (en) Air conditioner helium detection line
CN105486055A (en) Air drying device for copper radiator
CN202539128U (en) Heavy rail scale purging and collecting device
CN105127169B (en) A kind of factory building dedusting is to flow cooling system
CN102974626B (en) High-efficiency and high-strength air cooling method and device of high-speed wire rod
CN206717672U (en) Gilled radiator outer surface peener
CN105020820A (en) Dedusting and cooling system for workshop
CN102374821B (en) Rectification and guidance combined forced air cooling multi-tube cooler
Perz et al. Impact of network expansions on energy losses in compressed air
CN206847338U (en) A kind of baking box provided with cooling device
CN218200974U (en) Auxiliary bag collecting device for substrate glass
CN206440141U (en) Ring packaged air conditioner group and central cooler
CN218903027U (en) Pipe pulling workshop with proper environment
CN109500081A (en) A kind of Water-fog dusting apparatus for shape rolling mill
CN202137208U (en) Mechanical ventilating cooling device for hot rolling coil yards
CN208485300U (en) Special engineering plastics multistage sorting collection device
CN206373134U (en) Automatic dust removing apparatus
CN103453702B (en) Automatic vacuumizing device and automatic vacuumizing method
CN110396859B (en) Blowing paper-leading device for producing special paper
CN216432246U (en) Glass cooling mechanism
CN110594245B (en) Vortex ventilation device for limited space
CN206935010U (en) A kind of airlock product experiment test system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170704