CN106911752A - The method and apparatus for notifying user's going on line or off line - Google Patents
The method and apparatus for notifying user's going on line or off line Download PDFInfo
- Publication number
- CN106911752A CN106911752A CN201510982839.4A CN201510982839A CN106911752A CN 106911752 A CN106911752 A CN 106911752A CN 201510982839 A CN201510982839 A CN 201510982839A CN 106911752 A CN106911752 A CN 106911752A
- Authority
- CN
- China
- Prior art keywords
- ready
- user
- time
- active time
- getting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/50—Network services
- H04L67/535—Tracking the activity of the user
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/02—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
Abstract
The invention provides a kind of method and apparatus for notifying user's going on line or off line.Wherein, method includes:Receive including getting ID and when getting data ready of dotting time ready, set according to dotting time and get the corresponding newest active time of ID ready;If it is determined that getting ID correspondence user ready sends the notice of reaching the standard grade for getting ID correspondence user ready to reach the standard grade first, then;The all ID for having preserved are ranked up according to corresponding newest active time;All ID after for sequence, judge that active user identifies the offline condition whether corresponding newest active time meets setting according to clooating sequence successively, until the corresponding newest active time of certain ID is unsatisfactory for stopping judging during the offline condition;The ID of the offline condition is met for corresponding newest active time, the offline notice of ID correspondence user is sent.Queries of the present invention is smaller, and upper offline situation that can be much sooner to user is notified.
Description
Technical field
The present invention relates to network technique field, more particularly to a kind of method for notifying user's going on line or off line and
A kind of device of notice user's going on line or off line.
Background technology
With developing rapidly for network technology, all kinds of websites continue to bring out, for the ease of the maintenance of website,
Generally need to be monitored the online situation of website user, and trigger user reach the standard grade, offline notice.
But when online user number reaches ten thousand grades simultaneously, the monitoring to the online situation of website user will become one
Difficult thing.For example, online user sends heartbeat message to server, heartbeat is sent when first time
During information, represent that user reaches the standard grade, when the heartbeat message of the user is not received more than 3 eartbeat intervals
Judge user offline.If website platform currently there are 120 general-purpose families online, send once within every 10 seconds
Heartbeat, then server requirement reaches 120,000 QPS (QueryPer Second, query rate per second),
If common Web server (1000QPS) can just accept 120 groups of services of needs.
In the prior art, the heartbeat message of online user be recorded into number in the way of session (session)
According to storehouse, the corresponding session of the user is created when user reaches the standard grade, the user sends heartbeat letter again
Extend the life cycle of correspondence session during breath, when the heartbeat message without the user and by a timing
Between after, determine that the user is offline, and be automatically deleted the corresponding session of the user.But, above-mentioned side
Each user inquired about one by one in database is needed to correspond to the life cycle of session in method, queries is very
Greatly, cause to notify not in time the upper offline of user.
The content of the invention
In view of the above problems, it is proposed that the present invention overcomes above mentioned problem or at least portion to provide one kind
The dress of the method for the notice user's going on line or off line for solving the above problems with dividing and corresponding notice user's going on line or off line
Put.
According to one aspect of the present invention, there is provided a kind of method of notice user's going on line or off line, including:
Receive including getting ID and when getting data ready of dotting time ready, according to the dotting time
The corresponding newest active time of ID is got ready described in setting;
If it is determined that described get ID correspondence user ready to reach the standard grade first, then user's mark is got described in transmission ready
Know the notice of reaching the standard grade of correspondence user;
The all ID for having preserved are ranked up according to corresponding newest active time;
All ID after for sequence, active user's mark correspondence is judged according to clooating sequence successively
Newest active time whether meet the offline condition of setting, until certain ID is corresponding newest active
Time is unsatisfactory for stopping judging during the offline condition;
The ID of the offline condition is met for corresponding newest active time, user mark is sent
Know the offline notice of correspondence user.
Alternatively, it is described for sequence after all ID, judge current successively according to clooating sequence
Whether the corresponding newest active time of ID meets the offline condition of setting, until certain ID pair
The newest active time answered is unsatisfactory for stopping the step of judging during the offline condition, including:
All ID after for sequence, since the earliest ID of newest active time, press
Judge that active user identifies the difference of corresponding newest active time and current time successively according to clooating sequence
Whether given threshold is more than, until the difference of the corresponding newest active time of certain ID and current time
Stop judging during less than or equal to the given threshold.
Alternatively, received including getting ID and when getting data ready of dotting time ready described, according to
According to the dotting time set it is described get the corresponding newest active time of ID ready the step of before, and also
Including:
ID is divided into multiple groups, and is that every group of ID creates a corresponding independent process
Thread.
Alternatively, it is described to receive including getting ID and when getting data ready of dotting time, foundation ready
The dotting time set described in the step of get the corresponding newest active time of ID ready, including:Connect
Receive including getting ID and when getting data ready of dotting time ready, data forwarding to institute is got ready by described
State and get the corresponding independent process thread of ID ready, by the independent process thread according to the dotting time
The corresponding newest active time of ID is got ready described in setting;
The all ID for having preserved the are ranked up step according to corresponding newest active time
Suddenly, including:For every group of ID, respectively by each self-corresponding independent process thread according to corresponding
Newest active time is ranked up to this group of ID;
It is described for sequence after all ID, judge successively according to clooating sequence active user identify
The step of whether corresponding newest active time meets the offline condition of setting, including:For every group of sequence
ID afterwards, is judged currently successively by each self-corresponding independent process thread according to clooating sequence respectively
Whether the corresponding newest active time of ID meets the offline condition of setting.
Alternatively, it is described corresponding newest active according to ID is got ready described in dotting time setting
The step of time, including:
Determine whether to have preserved and described get ID ready;
If so, then by it is described get the corresponding newest active time of ID ready and be updated to described getting ready when
Between;
If it is not, getting ID ready described in then preserving, and the corresponding newest work of ID is got ready by described
Jump set of time is the dotting time.
Alternatively, it is described if it is determined that described get ID correspondence user ready to reach the standard grade first, then send institute
The step of the notifying of reaching the standard grade for getting ID correspondence user ready is stated, including:
Determine whether to have preserved and described get ID ready;
If so, get ID correspondence user described in then judging ready being got ready to reach the standard grade first, and described in transmission
The notice of reaching the standard grade of ID correspondence user.
According to another aspect of the present invention, there is provided a kind of device of notice user's going on line or off line, including:
Setup module, is suitable to receive including getting ID and when getting data ready of dotting time ready, according to
The corresponding newest active time of ID is got ready according to described in dotting time setting;
Reach the standard grade notification module, be suitable to if it is determined that described get ID correspondence user ready to reach the standard grade first, then
Get the notice of reaching the standard grade of ID correspondence user described in sending ready;
Order module, being suitable to all ID according to corresponding newest active time to having preserved is carried out
Sequence;
Determination module, all ID after being suitable to for sequence judge to work as successively according to clooating sequence
Whether the corresponding newest active time of preceding ID meets the offline condition of setting, until certain ID
Corresponding newest active time is unsatisfactory for stopping judging during the offline condition;
Offline notification module, is suitable to meet for corresponding newest active time the user of the offline condition
Mark, sends the offline notice of ID correspondence user.
Alternatively, the determination module, all ID after being particularly adapted to for sequence, from newest
The earliest ID of active time starts, and judges that active user's mark is corresponding successively according to clooating sequence
Whether newest active time is more than given threshold with the difference of current time, until certain ID is corresponding
Newest active time stops judging when being less than or equal to the given threshold with the difference of current time.
Alternatively, described device also includes:Grouping module, is suitable to for ID to be divided into multiple groups,
And be that every group of ID creates a corresponding independent process thread.
Alternatively, the setup module, is particularly adapted to receive including getting ID and dotting time ready
When getting data ready, get the data forwarding of getting ready ready ID corresponding independent process line to described
Journey, it is corresponding newest according to ID is got ready described in dotting time setting by the independent process thread
Active time;
The order module, is particularly adapted to for every group of ID, respectively by each self-corresponding independent
Reason thread is ranked up according to corresponding newest active time to this group of ID;
The determination module, is particularly adapted to for the ID after every group of sequence, respectively by each corresponding to
Independent process thread judge that active user identifies corresponding newest active time successively according to clooating sequence
Whether satisfaction setting offline condition.
Alternatively, the setup module, is particularly adapted to determine whether to have preserved and described gets ID ready;
If so, the corresponding newest active time of ID of getting ready then is updated into the dotting time;If
It is no, then get ID ready described in preservation, and the corresponding newest active time of ID is got ready by described
It is set to the dotting time.
Alternatively, the notification module of reaching the standard grade, is particularly adapted to determine whether to have preserved and described gets user's mark ready
Know;If so, get ID correspondence user described in then judging ready being got ready to reach the standard grade first, and described in transmission
The notice of reaching the standard grade of ID correspondence user.
The method and apparatus for notifying user's going on line or off line of the invention, getting ready for user is got ready receiving
During data, according to get ready dotting time in data set get ready ID it is corresponding it is newest enliven when
Between, judge that whether this gets ID correspondence user ready to reach the standard grade first, if then sending this gets user ready
The notice of reaching the standard grade of mark correspondence user;The all users for having preserved are marked according to corresponding newest active time
Knowledge is ranked up, for sequence after all ID, judge active user successively according to clooating sequence
The offline condition whether corresponding newest active time meets setting is identified, until certain ID is corresponding
Newest active time is unsatisfactory for stopping judging during offline condition, finally full for corresponding newest active time
The ID of foot lines part, sends the offline notice of ID correspondence user.It follows that
The present invention without being inquired about whole ID one by one, it is only necessary to the certain customers after sequence are identified into
Row judges, therefore queries is smaller, and upper offline situation that can be much sooner to user is led to
Know.
Described above is only the general introduction of technical solution of the present invention, of the invention in order to better understand
Technological means, and being practiced according to the content of specification, and in order to allow it is of the invention above-mentioned and
Other objects, features and advantages can become apparent, below especially exemplified by specific embodiment party of the invention
Formula.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, various other advantage and benefit for
Those of ordinary skill in the art will be clear understanding.Accompanying drawing is only used for showing the mesh of preferred embodiment
, and it is not considered as limitation of the present invention.And in whole accompanying drawing, with identical with reference to symbol
Number represent identical part.In the accompanying drawings:
The step of Fig. 1 shows a kind of method of according to embodiments of the present invention one notice user's going on line or off line is flowed
Cheng Tu;
The step of Fig. 2 shows a kind of method of according to embodiments of the present invention two notice user's going on line or off line is flowed
Cheng Tu;
The step of Fig. 3 shows a kind of method of according to embodiments of the present invention three notice user's going on line or off line is flowed
Cheng Tu;
Fig. 4 shows a kind of structural frames of the device of according to embodiments of the present invention four notice user's going on line or off line
Figure;
Fig. 5 shows a kind of structural frames of the device of according to embodiments of the present invention five notice user's going on line or off line
Figure.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although showing in accompanying drawing
The exemplary embodiment of the disclosure is shown, it being understood, however, that may be realized in various forms the disclosure
Without that should be limited by embodiments set forth here.Conversely, there is provided these embodiments are able to more
Thoroughly understand the disclosure, and can be by the complete technology for conveying to this area of the scope of the present disclosure
Personnel.
Embodiment one
Reference picture 1, shows a kind of method of according to embodiments of the present invention one notice user's going on line or off line
Flow chart of steps.The method of the present embodiment may include steps of:
Step 101, receives including getting ID and when getting data ready of dotting time ready, according to institute
State and get the corresponding newest active time of ID ready described in dotting time setting.
Current most business statistics data are dependent on browser end and get ready to complete, i.e., browser leads to
Crossing initiation and get request ready will get data is activation ready to server, and data are got ready by server record.It is so-called to beat
Point data is exactly the business datum of function point, such as when certain link in user's webpage clicking, to the link
Click information be exactly to get data ready.
In the present embodiment, it can be the heartbeat message that user sends to get data ready, wherein online for each
User sends once the heartbeat message of the user every Preset Time (such as 10s etc.).In getting data ready
Get ready ID and the dotting time that the user for getting data ready can be included sending (namely get data ready
The transmission time), be that settable to get ID ready corresponding newest active according to dotting time therein
Time.
Step 102, if it is determined that described get ID correspondence user ready to reach the standard grade first, then transmission is described
Get the notice of reaching the standard grade of ID correspondence user ready.
Receive get data ready when, can also to get ready ID correspondence user whether be to reach the standard grade first
Judged, to determine the need for sending the notice of reaching the standard grade for getting ID correspondence user ready, if headed by
It is secondary to reach the standard grade, then will send the notice of reaching the standard grade for getting ID correspondence user ready.
It should be noted that set according to the dotting time in above-mentioned steps 101 described getting user's mark ready
Know the process of corresponding newest active time, with step 102 if it is determined that described to get ID ready corresponding
The process that user gets the notice of reaching the standard grade of ID correspondence user ready to reach the standard grade first, then described in transmission does not have
Strict sequencing point, two processes are performed when receiving and getting data ready, and two processes can
Performed with priority, it is also possible to while performing.
The all ID for having preserved are ranked up by step 103 according to corresponding newest active time.
Each ID for having preserved corresponds to a newest active time, according to corresponding newest active
Time is ranked up to all ID for having preserved.Wherein, sequence can be ascending sort, also may be used
Think descending sort, the present embodiment is not any limitation as to this.
It should be noted that above-mentioned steps 101, there is no strict elder generation between step 102 and step 103
Afterwards order point, be all when condition is met perform.For example, step 101 and step 102 are to receive
Performed when data are got ready, step 103 can be performed after step 101, or in step
Performed, or according to the execution that imposes a condition after 102, such as execution in real time, or during according to setting
Between be spaced and perform (such as every 30s execution step 102), etc., the embodiment of the present invention is to this
It is not any limitation as.
Step 104, for sequence after all ID, judge current use successively according to clooating sequence
Family identifies the offline condition whether corresponding newest active time meets setting, until certain ID correspondence
Newest active time stop judging when being unsatisfactory for the offline condition.
The ID of the offline condition to meeting setting is only needed to be judged in said process, for
The ID that residue is unsatisfactory for offline condition need not be further continued for being judged, therefore without to all users
Mark is inquired about, and simply certain customers therein mark is judged, queries drops significantly
It is low.
Step 105, the ID of the offline condition is met for corresponding newest active time, hair
Give the offline notice of ID correspondence user.
According to the result of determination of step 104, offline condition is met for wherein corresponding newest active time
ID, it may be determined that corresponding user is offline for the ID, therefore can be directed to offline
User send its offline notice.
The embodiment of the present invention without being inquired about whole ID one by one, it is only necessary to the part after sequence
ID is judged, therefore queries is smaller, can much sooner to the upper offline of user
Situation is notified.
Embodiment two
Reference picture 2, shows a kind of method of according to embodiments of the present invention two notice user's going on line or off line
Flow chart of steps.The method of the present embodiment may include steps of:
Step 201, receiving thread is received includes the data of getting ready for getting ID and dotting time ready, and
Receive get data ready when, will get ready data is activation to treatment thread.
In the present embodiment, set that receiving thread is used to receiving user's transmission gets data ready, and sets treatment
Thread is used to perform subsequent treatment, can be in communication with each other between receiving thread and treatment thread, receiving thread
Receive get data ready when, will get ready data is activation to treatment thread.
Preferably, in the step 201 receiving thread receive get data ready when, data is activation will be got ready
Process to treatment thread can include:Receiving thread receive get data ready when, according to UDP (User
Datagram Protocol, UDP) will get ready data is activation to treatment thread.According to UDP
The transmission of data is carried out, the data transmission efficiency of inside can be effectively improved.
Preferably, in the step 201 receiving thread receive get data ready when, data is activation will be got ready
Process to treatment thread can be completed by Nginx servers.Nginx is the Web clothes of a lightweight
Business device, Reverse Proxy and Email (IMAP/POP3) proxy server, Nginx services
The performance of device is high, can improve treatment effeciency.
Step 202, treatment thread is corresponding most according to ID is got ready described in dotting time setting
New active time.
Getting data ready includes getting ready ID and dotting time, and treatment thread gets data ready receiving
Afterwards, set according to dotting time therein and get the corresponding newest active time of ID ready.
Preferably, the step 202 can include following sub-step:
Sub-step a1, it is determined whether get ID ready described in having preserved.If so, then performing sub-step
A2, if it is not, then performing sub-step a3.
Sub-step a2, by it is described get the corresponding newest active time of ID ready and be updated to described getting ready when
Between.
Sub-step a3, preserve described in get ID ready, and to get ID ready corresponding newest by described
Active time is set to the dotting time.
Multiple ID are preserved in server, this will be in the server preserved when certain user reaches the standard grade
The ID of user, namely in server preserve be the ID of the user that reached the standard grade before.It is each to use
Each to that should have newest active time, newest active time shows that the user of correspondence ID exists to family mark
Active state, namely the correspondence ID in the newest active time are in during the newest active time
User is online.Preferably, in the present embodiment can using Hash table set up ID and it is newest enliven when
Between between corresponding relation, can so realize more quickly inquiry.
Treatment thread is after receiving and getting data ready, it is determined whether preserved it is therein get ID ready,
With determine this get ready ID correspondence user whether be first send get ready data (namely whether before not
Reach the standard grade), if having preserved this gets ID ready, can directly by this, to get ID ready corresponding
Newest active time is updated to get the dotting time in data ready;If not preserving this gets ID ready,
Then first preserving this and getting ID ready (namely increases this and gets ID ready, show the use in the server
Reach the standard grade at family), and get this ready ID corresponding newest active time and be set to get ready beating in data
The point time.
Step 203, processes thread if it is determined that getting ID correspondence user ready to reach the standard grade first, then send
The notice of reaching the standard grade for getting ID correspondence user ready.
Whether treatment thread is to reach the standard grade to judge first to getting ID correspondence user ready, if it is determined that being
Reach the standard grade first, then treatment thread can send this and get ID correspondence ready to user's going on line or off line event interface
The notice of reaching the standard grade of user, by sending the notice of reaching the standard grade of user, can in time understand the situation of reaching the standard grade of user.
Preferably, the step 203 can include:Determine whether to have preserved and described get ID ready;If
It is then to judge that the ID of getting ready corresponds to user to reach the standard grade first, and gets user's mark described in transmission ready
Know the notice of reaching the standard grade of correspondence user, do not processed otherwise, namely ID correspondence is got ready without sending
The notice of reaching the standard grade of user.
It should be noted that it is suitable with the priority that step 203 is performed not limit step 202 in the present embodiment
Sequence, can first carry out step 202 and perform step 203 again, it is also possible to first carry out step 203 and perform step again
Rapid 202, can also be while performing step 202 and step 203 side by side.
Step 204, treatment thread is according to corresponding newest active time to all ID for having preserved
It is ranked up.
Wherein, sequence can be to carry out ascending sort according to newest active time, or according to newest
Active time carries out descending sort, and the present embodiment is not any limitation as to this.
Step 205, all ID after processing thread for sequence, sentences successively according to clooating sequence
Whether the corresponding newest active time of settled preceding ID meets the offline condition of setting, until certain user
Corresponding newest active time is identified to be unsatisfactory for stopping judging during the offline condition.
Preferably, offline condition as newest active time and the difference of current time can be set in the present embodiment
Value is more than given threshold.Therefore, the step 205 can include:All ID after for sequence,
Since the earliest ID of newest active time, judge that active user identifies successively according to clooating sequence
Whether corresponding newest active time is more than given threshold with the difference of current time, until certain ID
Corresponding newest active time stops sentencing when being less than or equal to the given threshold with the difference of current time
It is fixed.
Corresponding newest active time is more early, then it is bigger with the difference of current time, therefore the present embodiment
In since the earliest ID of corresponding newest active time judge, if the ID is corresponding
Newest active time is more than given threshold with the difference of current time, it is determined that meet offline condition, namely
The user of the ID may be offline, will now be judged continuing with next ID;
If the corresponding newest active time of the ID is less than or equal to setting threshold with the difference of current time
Value, it is determined that be unsatisfactory for offline condition, namely the user of the ID is not also offline, now due to this
It is corresponding most that the corresponding newest active time of ID below ID is later than the ID
New active time, therefore can directly determine that the corresponding newest active time of following ID is unsatisfactory for
Offline condition, namely the use of following ID is not also offline per family, therefore need not be further continued for being sentenced
It is disconnected.
For the specific time numerical value of above-mentioned given threshold, those skilled in the art are set according to practical experience
Any suitable numerical value, for example, could be arranged to 30s, 35s etc., to this and is not added with the present embodiment
To limit.
Step 206, treatment thread meets the user of the offline condition for corresponding newest active time
Mark, sends the offline notice of ID correspondence user.
After judgement by above-mentioned steps 205, treatment thread can obtain corresponding according to result of determination
Newest active time meets the ID of the offline condition, and determines the corresponding use of these ID
Family is offline, therefore treatment thread meets the user of the offline condition for corresponding newest active time
Mark, can send the offline notice of ID correspondence user to user's going on line or off line event interface.It is logical
The offline notice for sending user is crossed, the offline situation of user can be in time understood.
Preferably, in the present embodiment after above-mentioned steps 205, can also include:Treatment thread foundation
Result of determination counts the quantity of online user.After judgement by above-mentioned steps 205, can also foundation
Result of determination counts the quantity of online user, and the statistic processes can specifically include:It is right that treatment thread determines
The newest active time answered is unsatisfactory for the quantity of the ID of the offline condition, using the quantity as
The quantity of line user.Counted by the quantity to online user, can in time understand website current
Burden, is easy to maintenance, the upgrading of website.
The embodiment of the present invention without being inquired about whole ID one by one, it is only necessary to the part after sequence
ID is judged, therefore queries is smaller, can much sooner to the upper offline of user
Situation is notified.
Embodiment three
Reference picture 3, shows a kind of method of according to embodiments of the present invention three notice user's going on line or off line
Flow chart of steps.The method of the present embodiment may include steps of:
Step 301, is divided into multiple groups, and be that every group of ID creates a correspondence by ID
Independent process thread.
In the present embodiment, ID can be divided into multiple groups according to setting means, for specific
Dividing mode, those skilled in the art select any suitable mode, the present invention according to practical experience
Embodiment is not any limitation as to this.For example, ID 1~10000 can be divided into a group,
ID 10001~20000 is divided into a group, by that analogy, etc..
For every group of ID, a corresponding independent process thread, the independent process line can be created
Journey is mainly for the treatment of one group of corresponding dependent event of ID.
Step 302, receives including getting ID and when getting data ready of dotting time ready, will be described
Get data forwarding ready and get the corresponding independent process thread of ID ready to described.
Receiving including getting ID and when getting data ready of dotting time ready, it is first determined get use ready
Packet belonging to the mark of family, it is determined that after will get data forwarding ready to getting the corresponding independent process of ID ready
Thread, the corresponding independent process line that the ID being also in the packet got ready belonging to ID is created
Journey.
Step 303, by the corresponding independent process thread of ID of getting ready according to the dotting time
The corresponding newest active time of ID is got ready described in setting.
The corresponding independent process thread of ID is got ready after receiving and getting data ready, you can according to getting ready
Set of time gets the corresponding newest active time of ID ready, and use is got ready for being set according to dotting time
Family identifies the detailed process of corresponding newest active time, with reference to the phase of step 202 in above-described embodiment two
Description is closed, is no longer discussed in detail herein in the present embodiment.
Step 304, use is being got ready by the ID corresponding independent process thread of getting ready described in judgement
It is logical that family mark correspondence user gets reaching the standard grade for ID correspondence user ready described in when reaching the standard grade first, sending
Know.
For the detailed process of the step 304, with reference to the associated description of step 203 in above-described embodiment two
, no longer it is discussed in detail herein in the present embodiment.
Step 305, for every group of ID, respectively by each self-corresponding independent process thread according to right
The newest active time answered is ranked up to this group of ID.
For the sequencer procedure of each independent process thread, with reference to the correlation of step 204 in above-described embodiment two
Description, is no longer discussed in detail herein in the present embodiment.
Step 306, for the ID after every group of sequence, respectively by each self-corresponding independent process line
Journey judges that active user identifies whether corresponding newest active time meets setting according to clooating sequence successively
Offline condition, until the corresponding newest active time of certain ID is unsatisfactory for stopping during the offline condition
Only judge.
For the decision process of each independent process thread, with reference to the correlation of step 205 in above-described embodiment two
Description, is no longer discussed in detail herein in the present embodiment.
Step 307, for the ID after every group of sequence, respectively by each self-corresponding independent process line
Journey meets the ID of the offline condition for corresponding newest active time in the group, sends the use
The offline notice of family mark correspondence user.
Preferably, in the present embodiment after above-mentioned steps 306, can also include:For every group of sequence
ID afterwards, respectively should according to respective result of determination statistics by each self-corresponding independent process thread
The quantity of group online user, and statistics according to each separate threads determines the number of all on-line user
Amount.Each independent process thread obtains respective statistics (namely in each self-corresponding one group of ID
The quantity of online user) after, the statistics of each separate threads is added, the result obtained after addition is i.e.
It is the quantity of all on-line user.
In the present embodiment ID is divided into multiple groups, and multiple independent process threads are set and divided
The mode of the correlated process of the multiple groups of other places reason so that the treatment of air exercise point data much sooner, can hold
The QPS of load is higher.
For embodiment of the method, in order to be briefly described, therefore it is all expressed as a series of action group
Close, but those skilled in the art should know, and the embodiment of the present invention is not suitable by described action
The limitation of sequence, because according to the embodiment of the present invention, some steps can using other orders or simultaneously
Carry out.Secondly, those skilled in the art should also know, embodiment described in this description belongs to
Necessary to preferred embodiment, the involved action not necessarily embodiment of the present invention.
Example IV
Reference picture 4, shows a kind of device of according to embodiments of the present invention four notice user's going on line or off line
Structured flowchart.The device of the present embodiment can include such as lower module:
Setup module 401, is suitable to receive including getting ID and when getting data ready of dotting time ready,
The corresponding newest active time of ID is got ready according to described in dotting time setting;
Reach the standard grade notification module 402, be suitable to if it is determined that described get ID correspondence user ready to reach the standard grade first,
Get the notice of reaching the standard grade of ID correspondence user described in then sending ready;
Order module 403, is suitable to according to corresponding newest active time to all ID for having preserved
It is ranked up;
Determination module 404, all ID after being suitable to for sequence, sentences successively according to clooating sequence
Whether the corresponding newest active time of settled preceding ID meets the offline condition of setting, until certain user
Corresponding newest active time is identified to be unsatisfactory for stopping judging during the offline condition;
Offline notification module 405, is suitable to meet the offline condition for corresponding newest active time
ID, sends the offline notice of ID correspondence user.
The embodiment of the present invention without being inquired about whole ID one by one, it is only necessary to the part after sequence
ID is judged, therefore queries is smaller, can much sooner to the upper offline of user
Situation is notified.
Embodiment five
Reference picture 5, shows a kind of device of according to embodiments of the present invention five notice user's going on line or off line
Structured flowchart.The device of the present embodiment can include such as lower module:
Setup module 501, is suitable to receive including getting ID and when getting data ready of dotting time ready,
The corresponding newest active time of ID is got ready according to described in dotting time setting;
Reach the standard grade notification module 502, be suitable to if it is determined that described get ID correspondence user ready to reach the standard grade first,
Get the notice of reaching the standard grade of ID correspondence user described in then sending ready;
Order module 503, is suitable to according to corresponding newest active time to all ID for having preserved
It is ranked up;
Determination module 504, all ID after being suitable to for sequence, sentences successively according to clooating sequence
Whether the corresponding newest active time of settled preceding ID meets the offline condition of setting, until certain user
Corresponding newest active time is identified to be unsatisfactory for stopping judging during the offline condition;
Offline notification module 505, is suitable to meet the offline condition for corresponding newest active time
ID, sends the offline notice of ID correspondence user.
Preferably, the determination module, all ID after being particularly adapted to for sequence, from newest
The earliest ID of active time starts, and judges that active user's mark is corresponding successively according to clooating sequence
Whether newest active time is more than given threshold with the difference of current time, until certain ID is corresponding
Newest active time stops judging when being less than or equal to the given threshold with the difference of current time.
Preferably, the setup module, is particularly adapted to determine whether to have preserved and described gets ID ready;
If so, the corresponding newest active time of ID of getting ready then is updated into the dotting time;If
It is no, then get ID ready described in preservation, and the corresponding newest active time of ID is got ready by described
It is set to the dotting time.
Preferably, the notification module of reaching the standard grade, is particularly adapted to determine whether to have preserved and described gets user's mark ready
Know;If so, get ID correspondence user described in then judging ready being got ready to reach the standard grade first, and described in transmission
The notice of reaching the standard grade of ID correspondence user.
Preferably, the device of the present embodiment can also include:Grouping module 506, is suitable to ID
Multiple groups are divided into, and are that every group of ID creates a corresponding independent process thread.Accordingly,
The setup module, to be particularly adapted to receive and get data ready including get ID and dotting time ready
When, get the data forwarding of getting ready ready ID corresponding independent process thread to described, it is only by this
Vertical treatment thread gets the corresponding newest active time of ID ready according to described in dotting time setting;
The order module, is particularly adapted to for every group of ID, respectively by each self-corresponding independent process line
Journey is ranked up according to corresponding newest active time to this group of ID;The determination module, specifically
It is suitable to for the ID after every group of sequence, respectively by each self-corresponding independent process thread according to sequence
Order judges that active user identifies the offline condition whether corresponding newest active time meets setting successively.
The embodiment of the present invention without being inquired about whole ID one by one, it is only necessary to the part after sequence
ID is judged, therefore queries is smaller, can much sooner to the upper offline of user
Situation is notified.And the correlation of multiple groups is processed respectively by setting multiple independent process threads
The mode of process so that much sooner, the QPS that can be undertaken is higher for the treatment of air exercise point data.
For device embodiment, because it is substantially similar to embodiment of the method, so the ratio of description
Relatively simple, the relevent part can refer to the partial explaination of embodiments of method.
Provided herein algorithm and display not with any certain computer, virtual system or miscellaneous equipment
It is intrinsic related.Various general-purpose systems can also be used together with based on teaching in this.According to above
Description, the structure constructed required by this kind of system is obvious.Additionally, the present invention is not also directed to
Any certain programmed language.It is understood that, it is possible to use various programming languages realize described here
The content of invention, and the description done to language-specific above is to disclose optimal reality of the invention
Apply mode.
In specification mentioned herein, numerous specific details are set forth.It is to be appreciated, however, that
Embodiments of the invention can be put into practice in the case of without these details.In some instances,
Known method, structure and technology is not been shown in detail, so as not to obscure the understanding of this description.
Similarly, it will be appreciated that in order to simplify the disclosure and helping understand in each inventive aspect one
Individual or multiple, in above to the description of exemplary embodiment of the invention, each feature of the invention
Sometimes it is grouped together into single embodiment, figure or descriptions thereof.However, should be by
The method of the disclosure is construed to reflect following intention:I.e. the present invention for required protection requirement ratio is at each
The more features of feature being expressly recited in claim.More precisely, as following right will
As asking book to reflect, inventive aspect is all spies less than single embodiment disclosed above
Levy.Therefore, it then follows thus claims of specific embodiment are expressly incorporated in the specific embodiment party
Formula, wherein each claim are in itself as separate embodiments of the invention.
Those skilled in the art are appreciated that can be carried out to the module in the equipment in embodiment
Adaptively change and they are arranged in one or more equipment different from the embodiment.
Module or unit or component in embodiment can be combined into a module or unit or component, and
In addition multiple submodule or subelement or sub-component can be divided into.Except such feature and/or
Outside at least some in process or unit exclude each other, can be using any combinations to this explanation
All features disclosed in book (including adjoint claim, summary and accompanying drawing) and so disclosed
All processes or unit of any method or equipment are combined.Unless expressly stated otherwise, this theory
Each feature disclosed in bright book (including adjoint claim, summary and accompanying drawing) can be by offer phase
The alternative features of same, equivalent or similar purpose replace.
Although additionally, it will be appreciated by those of skill in the art that some embodiments described herein include
Some included features are rather than further feature, but the feature of different embodiments in other embodiments
Combination mean to be within the scope of the present invention and formed different embodiments.For example, under
In the claims in face, the one of any of embodiment required for protection can be in any combination
Mode is used.
All parts embodiment of the invention can realize with hardware, or with one or more
The software module run on reason device is realized, or is realized with combinations thereof.Those skilled in the art
It should be appreciated that can be realized using microprocessor or digital signal processor (DSP) in practice
Some of some or all parts in the equipment for notifying user's going on line or off line according to embodiments of the present invention
Or repertoire.The present invention is also implemented as the part for performing method as described herein
Or the equipment or program of device (for example, computer program and computer program product) of whole.This
Sample realizes that program of the invention can be stored on a computer-readable medium, or can have one
Or the form of multiple signals.Such signal can be downloaded from internet website and obtained, Huo Zhe
There is provided on carrier signal, or provided in any other form.
It should be noted that above-described embodiment the present invention will be described is limited rather than to the present invention
Make, and those skilled in the art can design without departing from the scope of the appended claims
Alternative embodiment.In the claims, any reference symbol being located between bracket should not be configured to
Limitations on claims.Word "comprising" do not exclude the presence of element not listed in the claims or
Step.Word "a" or "an" before element does not exclude the presence of unit as multiple
Part.The present invention can be by means of the hardware for including some different elements and by means of properly programmed
Computer is realized.If some in these devices in the unit claim for listing equipment for drying
Individual can be embodied by same hardware branch.Word first, second, and third
Using not indicating that any order.These words can be construed to title.
The invention discloses A1, a kind of method of notice user's going on line or off line, including:
Receive including getting ID and when getting data ready of dotting time ready, according to the dotting time
The corresponding newest active time of ID is got ready described in setting;
If it is determined that described get ID correspondence user ready to reach the standard grade first, then user's mark is got described in transmission ready
Know the notice of reaching the standard grade of correspondence user;
The all ID for having preserved are ranked up according to corresponding newest active time;
All ID after for sequence, active user's mark correspondence is judged according to clooating sequence successively
Newest active time whether meet the offline condition of setting, until certain ID is corresponding newest active
Time is unsatisfactory for stopping judging during the offline condition;
The ID of the offline condition is met for corresponding newest active time, user mark is sent
Know the offline notice of correspondence user.
A2, the method as described in A1, it is described for sequence after all ID, according to sort it is suitable
Sequence judges that active user identifies the offline condition whether corresponding newest active time meets setting successively, directly
Stop the step of judging when being unsatisfactory for the offline condition to the corresponding newest active time of certain ID,
Including:
All ID after for sequence, since the earliest ID of newest active time, press
Judge that active user identifies the difference of corresponding newest active time and current time successively according to clooating sequence
Whether given threshold is more than, until the difference of the corresponding newest active time of certain ID and current time
Stop judging during less than or equal to the given threshold.
A3, the method as described in A1, receive including getting ID and dotting time ready described
When getting data ready, the corresponding newest active time of ID is got ready according to described in dotting time setting
The step of before, also include:
ID is divided into multiple groups, and is that every group of ID creates a corresponding independent process
Thread.
A4, the method as described in A3, it is described to receive including getting beating for ID and dotting time ready
During point data, the corresponding newest active time of ID is got ready according to described in dotting time setting
Step, including:Receive including getting ID and when getting data ready of dotting time ready, beaten by described in
Point data be forwarded to it is described get the corresponding independent process thread of ID ready, by the independent process thread according to
The corresponding newest active time of ID is got ready according to described in dotting time setting;
The all ID for having preserved the are ranked up step according to corresponding newest active time
Suddenly, including:For every group of ID, respectively by each self-corresponding independent process thread according to corresponding
Newest active time is ranked up to this group of ID;
It is described for sequence after all ID, judge successively according to clooating sequence active user identify
The step of whether corresponding newest active time meets the offline condition of setting, including:For every group of sequence
ID afterwards, is judged currently successively by each self-corresponding independent process thread according to clooating sequence respectively
Whether the corresponding newest active time of ID meets the offline condition of setting.
A5, the method as described in A1, it is described to get ID ready according to described in dotting time setting
The step of corresponding newest active time, including:
Determine whether to have preserved and described get ID ready;
If so, then by it is described get the corresponding newest active time of ID ready and be updated to described getting ready when
Between;
If it is not, getting ID ready described in then preserving, and the corresponding newest work of ID is got ready by described
Jump set of time is the dotting time.
A6, the method as described in A1, it is described if it is determined that described get ID correspondence user ready for first
Reach the standard grade, then get the step of the notifying of reaching the standard grade of ID correspondence user described in transmission ready, including:
Determine whether to have preserved and described get ID ready;
If so, get ID correspondence user described in then judging ready being got ready to reach the standard grade first, and described in transmission
The notice of reaching the standard grade of ID correspondence user.
The invention also discloses B7, a kind of device of notice user's going on line or off line, including:
Setup module, is suitable to receive including getting ID and when getting data ready of dotting time ready, according to
The corresponding newest active time of ID is got ready according to described in dotting time setting;
Reach the standard grade notification module, be suitable to if it is determined that described get ID correspondence user ready to reach the standard grade first, then
Get the notice of reaching the standard grade of ID correspondence user described in sending ready;
Order module, being suitable to all ID according to corresponding newest active time to having preserved is carried out
Sequence;
Determination module, all ID after being suitable to for sequence judge to work as successively according to clooating sequence
Whether the corresponding newest active time of preceding ID meets the offline condition of setting, until certain ID
Corresponding newest active time is unsatisfactory for stopping judging during the offline condition;
Offline notification module, is suitable to meet for corresponding newest active time the user of the offline condition
Mark, sends the offline notice of ID correspondence user.
B8, the device as described in B7, the determination module, the institute after being particularly adapted to for sequence are useful
Family identifies, and since the earliest ID of newest active time, judges current successively according to clooating sequence
Whether the corresponding newest active time of ID is more than given threshold with the difference of current time, until certain
The corresponding newest active time of ID is less than or equal to the given threshold with the difference of current time
When stop judge.
B9, the device as described in B7, also include:
Grouping module, is suitable to for ID to be divided into multiple groups, and be that every group of ID creates one
Corresponding independent process thread.
B10, the device as described in B9, the setup module are particularly adapted to receive including getting use ready
Family identifies and when getting data ready of dotting time, gets the data forwarding of getting ready ready ID to described
Corresponding independent process thread, use is got ready by the independent process thread according to described in dotting time setting
Family identifies corresponding newest active time;
The order module, is particularly adapted to for every group of ID, respectively by each self-corresponding independent
Reason thread is ranked up according to corresponding newest active time to this group of ID;
The determination module, is particularly adapted to for the ID after every group of sequence, respectively by each corresponding to
Independent process thread judge that active user identifies corresponding newest active time successively according to clooating sequence
Whether satisfaction setting offline condition.
B11, the device as described in B7, the setup module are particularly adapted to determine whether to have preserved described
Get ID ready;If so, the corresponding newest active time of ID of getting ready then is updated into institute
State dotting time;If it is not, getting ID described in then preserving ready, and ID correspondence is got ready by described
Newest active time be set to the dotting time.
B12, the device as described in B7, the notification module of reaching the standard grade are particularly adapted to determine whether to have protected
ID is got ready described in depositing;If so, ID correspondence user is got described in then judging ready to reach the standard grade first,
And get the notice of reaching the standard grade of ID correspondence user described in sending ready.
Claims (10)
1. it is a kind of notify user's going on line or off line method, including:
Receive including getting ID and when getting data ready of dotting time ready, according to the dotting time
The corresponding newest active time of ID is got ready described in setting;
If it is determined that described get ID correspondence user ready to reach the standard grade first, then user's mark is got described in transmission ready
Know the notice of reaching the standard grade of correspondence user;
The all ID for having preserved are ranked up according to corresponding newest active time;
All ID after for sequence, active user's mark correspondence is judged according to clooating sequence successively
Newest active time whether meet the offline condition of setting, until certain ID is corresponding newest active
Time is unsatisfactory for stopping judging during the offline condition;
The ID of the offline condition is met for corresponding newest active time, user mark is sent
Know the offline notice of correspondence user.
2. the method for claim 1, it is characterised in that the institute for after sequence is useful
Family identifies, and judges that active user identifies whether corresponding newest active time meets successively according to clooating sequence
The offline condition of setting, until the corresponding newest active time of certain ID is unsatisfactory for the offline condition
When stop judge the step of, including:
All ID after for sequence, since the earliest ID of newest active time, press
Judge that active user identifies the difference of corresponding newest active time and current time successively according to clooating sequence
Whether given threshold is more than, until the difference of the corresponding newest active time of certain ID and current time
Stop judging during less than or equal to the given threshold.
3. the method for claim 1, it is characterised in that received including getting use ready described
Family is identified and when getting data ready of dotting time, and ID is got ready according to described in dotting time setting
Before the step of corresponding newest active time, also include:
ID is divided into multiple groups, and is that every group of ID creates a corresponding independent process
Thread.
4. method as claimed in claim 3, it is characterised in that
It is described to receive including getting ID and when getting data ready of dotting time ready, got ready described in
The step of getting the corresponding newest active time of ID described in set of time ready, including:Receive including
Get ID and when getting data ready of dotting time ready, get the data forwarding of getting ready ready use to described
Family identifies corresponding independent process thread, sets described according to the dotting time by the independent process thread
Get the corresponding newest active time of ID ready;
The all ID for having preserved the are ranked up step according to corresponding newest active time
Suddenly, including:For every group of ID, respectively by each self-corresponding independent process thread according to corresponding
Newest active time is ranked up to this group of ID;
It is described for sequence after all ID, judge successively according to clooating sequence active user identify
The step of whether corresponding newest active time meets the offline condition of setting, including:For every group of sequence
ID afterwards, is judged currently successively by each self-corresponding independent process thread according to clooating sequence respectively
Whether the corresponding newest active time of ID meets the offline condition of setting.
5. the method for claim 1, it is characterised in that described to be set according to the dotting time
Put described the step of get the corresponding newest active time of ID ready, including:
Determine whether to have preserved and described get ID ready;
If so, then by it is described get the corresponding newest active time of ID ready and be updated to described getting ready when
Between;
If it is not, getting ID ready described in then preserving, and the corresponding newest work of ID is got ready by described
Jump set of time is the dotting time.
6. the method for claim 1, it is characterised in that described if it is determined that described get user ready
Mark correspondence user gets the notice of reaching the standard grade of ID correspondence user ready to reach the standard grade first, then described in transmission
Step, including:
Determine whether to have preserved and described get ID ready;
If so, get ID correspondence user described in then judging ready being got ready to reach the standard grade first, and described in transmission
The notice of reaching the standard grade of ID correspondence user.
7. it is a kind of notify user's going on line or off line device, including:
Setup module, is suitable to receive including getting ID and when getting data ready of dotting time ready, according to
The corresponding newest active time of ID is got ready according to described in dotting time setting;
Reach the standard grade notification module, be suitable to if it is determined that described get ID correspondence user ready to reach the standard grade first, then
Get the notice of reaching the standard grade of ID correspondence user described in sending ready;
Order module, being suitable to all ID according to corresponding newest active time to having preserved is carried out
Sequence;
Determination module, all ID after being suitable to for sequence judge to work as successively according to clooating sequence
Whether the corresponding newest active time of preceding ID meets the offline condition of setting, until certain ID
Corresponding newest active time is unsatisfactory for stopping judging during the offline condition;
Offline notification module, is suitable to meet for corresponding newest active time the user of the offline condition
Mark, sends the offline notice of ID correspondence user.
8. device as claimed in claim 7, it is characterised in that the determination module, is particularly adapted to
All ID after for sequence, since the earliest ID of newest active time, according to row
Sequence order judge successively active user identify corresponding newest active time and current time difference whether
More than given threshold, until the corresponding newest active time of certain ID is less than with the difference of current time
Or stop judging during equal to the given threshold.
9. device as claimed in claim 7, it is characterised in that also include:
Grouping module, is suitable to for ID to be divided into multiple groups, and be that every group of ID creates one
Corresponding independent process thread.
10. device as claimed in claim 9, it is characterised in that
The setup module, to be particularly adapted to receive and get number ready including get ID and dotting time ready
According to when, the data forwarding of getting ready is got ready ID corresponding independent process thread to described, by this
Independent process thread according to the dotting time set described in get ready ID it is corresponding it is newest enliven when
Between;
The order module, is particularly adapted to for every group of ID, respectively by each self-corresponding independent
Reason thread is ranked up according to corresponding newest active time to this group of ID;
The determination module, is particularly adapted to for the ID after every group of sequence, respectively by each corresponding to
Independent process thread judge that active user identifies corresponding newest active time successively according to clooating sequence
Whether satisfaction setting offline condition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510982839.4A CN106911752A (en) | 2015-12-23 | 2015-12-23 | The method and apparatus for notifying user's going on line or off line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510982839.4A CN106911752A (en) | 2015-12-23 | 2015-12-23 | The method and apparatus for notifying user's going on line or off line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106911752A true CN106911752A (en) | 2017-06-30 |
Family
ID=59207443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510982839.4A Pending CN106911752A (en) | 2015-12-23 | 2015-12-23 | The method and apparatus for notifying user's going on line or off line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106911752A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107277624A (en) * | 2017-07-12 | 2017-10-20 | 北京潘达互娱科技有限公司 | Duration calculation method and its device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1722821A (en) * | 2004-07-14 | 2006-01-18 | 上海微小卫星工程中心 | Automatic collection and statistical method and system for TV audience rating |
CN101378326A (en) * | 2008-09-18 | 2009-03-04 | 中兴通讯股份有限公司 | Method for enquiring multicast user processing aging |
US20140372102A1 (en) * | 2013-06-18 | 2014-12-18 | Xerox Corporation | Combining temporal processing and textual entailment to detect temporally anchored events |
-
2015
- 2015-12-23 CN CN201510982839.4A patent/CN106911752A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1722821A (en) * | 2004-07-14 | 2006-01-18 | 上海微小卫星工程中心 | Automatic collection and statistical method and system for TV audience rating |
CN101378326A (en) * | 2008-09-18 | 2009-03-04 | 中兴通讯股份有限公司 | Method for enquiring multicast user processing aging |
US20140372102A1 (en) * | 2013-06-18 | 2014-12-18 | Xerox Corporation | Combining temporal processing and textual entailment to detect temporally anchored events |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107277624A (en) * | 2017-07-12 | 2017-10-20 | 北京潘达互娱科技有限公司 | Duration calculation method and its device |
CN107277624B (en) * | 2017-07-12 | 2020-08-07 | 北京潘达互娱科技有限公司 | Duration calculation method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2765550A1 (en) | Automatic detection of fraudulent ratings/comments related to an application store | |
US7996896B2 (en) | System for regulating host security configuration | |
CN106020948B (en) | A kind of process dispatch method and device | |
CN105072139B (en) | Recommend method and apparatus | |
CN108762911A (en) | Timing task management method, apparatus, computer equipment and storage medium | |
CN102984049B (en) | Customer group is carried out according to theme and divides client and method with information transmission | |
EP3136650B1 (en) | Method and system for optimizing network parameters to improve customer satisfaction of network content | |
CN109787827B (en) | CDN network monitoring method and device | |
CN107645562A (en) | Data transmission processing method, device, equipment and system | |
CN103684911B (en) | Website online user statistical method and device | |
CN105577799B (en) | A kind of fault detection method and device of data-base cluster | |
CN110135895A (en) | Advertisement placement method, device, equipment and storage medium | |
US20170149969A1 (en) | Electronic communication routing based data accuracy | |
CN107346272A (en) | The determination method and apparatus of dynamic heterogeneous redundant system | |
CN107888452A (en) | A kind of distributed website performance monitorings in 24 hours and Real-time Alarm method | |
CN104298565B (en) | A kind of method and device of initiating port | |
CN106911748A (en) | The method and apparatus of on-line user amount statistic | |
CN106790549A (en) | A kind of data-updating method and device | |
CN106911528A (en) | The method and apparatus of on-line user amount statistic | |
CN103279869A (en) | Method and device for determining information treatment targets | |
CN106533803A (en) | CPE (Customer Premise Equipment) configuration method and device based on TR069 protocol | |
CN105100216B (en) | A kind of multiple services monitoring method and device | |
CN110532157A (en) | Page monitoring method and device based on user behavior data | |
CN106327140A (en) | Method and device for monitoring data modification | |
CN104883705B (en) | A kind of the problem of data service is complained localization method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170630 |
|
RJ01 | Rejection of invention patent application after publication |