CN106909740B - 一种油气储运站场总图土方工程量的计算方法及计算装置 - Google Patents
一种油气储运站场总图土方工程量的计算方法及计算装置 Download PDFInfo
- Publication number
- CN106909740B CN106909740B CN201710119267.6A CN201710119267A CN106909740B CN 106909740 B CN106909740 B CN 106909740B CN 201710119267 A CN201710119267 A CN 201710119267A CN 106909740 B CN106909740 B CN 106909740B
- Authority
- CN
- China
- Prior art keywords
- dimensional
- earthwork
- design platform
- civil3d
- calculating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- Architecture (AREA)
- Computer Graphics (AREA)
- Civil Engineering (AREA)
- Remote Sensing (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Processing Or Creating Images (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119267.6A CN106909740B (zh) | 2017-03-02 | 2017-03-02 | 一种油气储运站场总图土方工程量的计算方法及计算装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119267.6A CN106909740B (zh) | 2017-03-02 | 2017-03-02 | 一种油气储运站场总图土方工程量的计算方法及计算装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106909740A CN106909740A (zh) | 2017-06-30 |
CN106909740B true CN106909740B (zh) | 2020-04-17 |
Family
ID=59186082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710119267.6A Active CN106909740B (zh) | 2017-03-02 | 2017-03-02 | 一种油气储运站场总图土方工程量的计算方法及计算装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106909740B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107679337A (zh) * | 2017-10-20 | 2018-02-09 | 浙江煤炭测绘院 | 一种工程测量中不规则土方计算的方法 |
CN108549765B (zh) * | 2018-04-12 | 2022-01-18 | 北京市市政工程设计研究总院有限公司 | 在Civil3D中利用要素线进行道路纵断设计的方法 |
CN109145429B (zh) * | 2018-08-14 | 2023-10-13 | 黑龙江省水利水电勘测设计研究院 | 土方工程量的计算方法及计算土方工程量的装置 |
CN109190239B (zh) * | 2018-08-29 | 2022-12-09 | 中铁九局集团第六工程有限公司 | 既有曲线在civil3d中建立线路中线模型的方法 |
CN110728752A (zh) * | 2019-10-21 | 2020-01-24 | 西南交通大学 | 一种公路三维地形场景模型的构建方法 |
CN112648974B (zh) * | 2020-12-29 | 2022-11-22 | 数字港湾科技(湖北)有限公司 | 一种基于航摄三维影像数据的工程量测算方法 |
CN114818039A (zh) * | 2021-12-14 | 2022-07-29 | 四川蓉信开工程设计有限公司 | 一种基于Revit模型的造价提量方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101487262A (zh) * | 2009-03-02 | 2009-07-22 | 中交第三航务工程勘察设计院有限公司 | 天然软土地基抛石回填工程量分析计算方法 |
CN106097450A (zh) * | 2016-06-21 | 2016-11-09 | 武汉瑞得信息工程有限责任公司 | 一种等高线生成方法及装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9726750B2 (en) * | 2013-08-26 | 2017-08-08 | Specialty Electrical, Llc | Method and apparatus for multi-mode tracking and display of personnel locations in a graphical model |
-
2017
- 2017-03-02 CN CN201710119267.6A patent/CN106909740B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101487262A (zh) * | 2009-03-02 | 2009-07-22 | 中交第三航务工程勘察设计院有限公司 | 天然软土地基抛石回填工程量分析计算方法 |
CN106097450A (zh) * | 2016-06-21 | 2016-11-09 | 武汉瑞得信息工程有限责任公司 | 一种等高线生成方法及装置 |
Non-Patent Citations (4)
Title |
---|
3D laser scanning and GPS technology for landslide earthwork volume estimation;Jia-Chong Du 等;《Automation in Construction》;20061221;第657-663页 * |
Civil 3D与Infraworks三维在总图专业中的应用;李震 等;《油气储运》;20160630;第35卷(第6期);第648-652页 * |
Distortion Surface Model for Airfield Surface;Guangyuan Li;《2009 Second International Conference on Information and Computing Science》;20090522;第4卷;第34-37页 * |
三维总图设计理论及其应用研究;张圆;《中国优秀硕士学位论文全文数据库信息科技辑》;20091115;第2009年卷(第11期);第I138-1372页 * |
Also Published As
Publication number | Publication date |
---|---|
CN106909740A (zh) | 2017-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106909740B (zh) | 一种油气储运站场总图土方工程量的计算方法及计算装置 | |
CN109191581B (zh) | 一种基于bim技术的道路工程土方量高精度计算方法 | |
CN105279792B (zh) | 基于地形曲面的铁路路基排水bim设计方法 | |
CN109508508B (zh) | 一种露天矿山治理勘查设计方法 | |
CN101509382B (zh) | 一种隧道勘察方法 | |
CN111191307B (zh) | 一种基于bim+gis技术的土方工程虚拟施工方法 | |
CN107330140A (zh) | 基于bim技术实现变电站快速竖向布置的方法 | |
CN112100715A (zh) | 一种基于三维倾斜摄影技术的土方优化方法及系统 | |
CN111428306A (zh) | 一种道路精细化设计方法 | |
CN106934111A (zh) | 一种基于地形数据的工程三维实体建模方法及其建模装置 | |
CN111667569B (zh) | 一种基于Rhino及Grasshopper的三维实景土方可视化精准测算方法 | |
CN111595403B (zh) | 一种基于点云测量技术的工程土方计量方法 | |
CN113256809A (zh) | 一种基于bim的海底沉管隧道基槽的工程土方量计算方法 | |
CN113235655B (zh) | 海底沉管隧道基槽分土质工程土方量计算方法 | |
CN113204825A (zh) | 一种基于bim技术的城市园林景观竖向设计方法 | |
CN106023311B (zh) | 提高三维地形生成精度的方法 | |
CN111353681A (zh) | 一种基于bim技术的场地内土石工程量高精度计算方法 | |
Tanoli et al. | 3D design modeling application in machine guidance system for earthwork operations | |
CN110411422A (zh) | 基于bim的施工便道的规划方法 | |
CN113946980B (zh) | 一种大型露天矿开挖工程台阶土石方量计算方法及系统 | |
CN110222462B (zh) | 海底挖沟工程预测方法、装置及服务器 | |
CN104931015A (zh) | 基于dtm数据模型的横断面自动成图系统与方法 | |
CN215715684U (zh) | 挖掘机作业引导系统 | |
CN115909091A (zh) | 一种基于无人机三维扫描实景建模的土方量计算方法 | |
CN113868728A (zh) | 一种基于Bentley软件的挖方填方工程数量计算方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 100007 Beijing Xicheng District six laying Kang Applicant after: CHINA NATIONAL PETROLEUM Corp. Applicant after: CHINA PETROLEUM PIPELINE ENGINEERING Co.,Ltd. Applicant after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp. Address before: 100007 Beijing Xicheng District six laying Kang Applicant before: China National Petroleum Corp. Applicant before: CHINA PETROLEUM PIPELINE ENGINEERING Co.,Ltd. Applicant before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp. |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200317 Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No. Applicant after: CHINA NATIONAL PETROLEUM Corp. Applicant after: CHINA PETROLEUM PIPELINE ENGINEERING Co.,Ltd. Applicant after: CHINA PETROLEUM PIPELINE ENGINEERING Corp. Address before: 100007 Beijing Xicheng District six laying Kang Applicant before: CHINA NATIONAL PETROLEUM Corp. Applicant before: CHINA PETROLEUM PIPELINE ENGINEERING Co.,Ltd. Applicant before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |