CN106908275A - Oil pipeline on-line period apparatus and method - Google Patents

Oil pipeline on-line period apparatus and method Download PDF

Info

Publication number
CN106908275A
CN106908275A CN201710103813.7A CN201710103813A CN106908275A CN 106908275 A CN106908275 A CN 106908275A CN 201710103813 A CN201710103813 A CN 201710103813A CN 106908275 A CN106908275 A CN 106908275A
Authority
CN
China
Prior art keywords
valve
branch road
sampling
sample
process valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710103813.7A
Other languages
Chinese (zh)
Inventor
张博春
聂中文
康鹏飞
陈硕
刘永帅
姜雨腾
孟未
赵晓鹰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Engineering Corp Design Branch
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Engineering Corp Design Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Engineering Corp Design Branch filed Critical China National Petroleum Corp
Priority to CN201710103813.7A priority Critical patent/CN106908275A/en
Publication of CN106908275A publication Critical patent/CN106908275A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/10Devices for withdrawing samples in the liquid or fluent state
    • G01N1/14Suction devices, e.g. pumps; Ejector devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/26Oils; Viscous liquids; Paints; Inks
    • G01N33/28Oils, i.e. hydrocarbon liquids
    • G01N33/2835Specific substances contained in the oils or fuels
    • G01N33/2847Water in oils

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Pathology (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Immunology (AREA)
  • Physics & Mathematics (AREA)
  • Hydrology & Water Resources (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention relates to a kind of oil pipeline on-line period device and method, the on-line period device is provided with one section of bypass on main pipeline, and the arrival end of the bypass connects sampling probe, and the sampling probe accesses main pipeline;Sampling pump is provided with the bypass and sampling loop and spray circuits is followed by sampling pump, the port of export of the spray circuits accesses main pipeline through nozzle, and the sampling loop replaces table sample, and remaining liq finally also imports main pipeline.The present invention is capable of achieving that reliable, real-time continuous, sample size be accurate, flow control in loop is accurate, is finally reached and obtains the requirement that representative sample, sampling process automation, system control precision.

Description

Oil pipeline on-line period apparatus and method
Technical field
The present invention relates to a kind of oil pipeline on-line period apparatus and method, belong to detection and the pipeline sampling system of quality Technical field.
Background technology
For oil pipeline on-line period technology, conventional process is manual manual sampling or on oil transportation main pipeline Bypass is drawn, and sampling pump and sampling equipment are set in bypass, then the mode for leading back injection main pipeline will be bypassed.
The shortcoming of this kind of sampler is:1st, it is not provided with mixing arrangement, it is impossible to ensure that liquid is sufficiently mixed in pipeline, obtains Sample may be under-represented;2nd, be not provided with sampling control system, it is impossible to realize to sampling system equipment state, power conditions, The monitoring of sampling loop flow velocity, sampling frequency;3rd, flow measurement is not carried out to sampling loop, to liquid stream in sampling loop whether just Chang Wufa judges;4th, because pipeline medium cleannes are not high, the impurity that the inside is contained is frequently occluded sampling pump, causes sampling pump Failure is damaged, cannot thus realize that on-line period is carried out continuously;5th, pump discharge pipeline easily produces backflow;6th, it is not provided with manually Sampler, the system failure cannot be sampled;7th, back-up circuit is not provided with, system easily produces failure;8th, it is not provided with sampling container Protection facility, easily produces sample to overflow peril;9th, it is not provided with cleaning interface, is unfavorable for system maintenance, easily pollutes sample Product;10th, temperature, pressure instrumentation are not provided with, lack the monitoring to loop process parameter;11st, flow control is not implemented, it is impossible to Realize that sampling loop flow follows main pipeline changes in flow rate;12nd, be not implemented in sampling rate and sample size and main pipeline flow into Ratio.
The content of the invention
To solve the above problems, operate oil pipeline on-line period it is an object of the invention to provide one kind and more they tend to mark Standardization, facilitation, scientific, automation, improve on-line period systematic sampling representativeness, accuracy, continuity, reliability and Security, facilitates the oil pipeline on-line period apparatus and method of operation maintenance, monitoring management, installation and transportation.
The purpose of the present invention is achieved through the following technical solutions:
A kind of oil pipeline on-line period device, it is integrated in sledge and loads onto, and one section of bypass is provided with main pipeline, described The arrival end of bypass connects sampling probe, and the sampling probe (1) stretches into main pipeline center to the position of main pipeline central lower 0.1D Put, D is the diameter of main pipeline;Sampling probe is sequentially connected in series process valve A and process valve B, the process valve B connect branch road The entrance of A and branch road B, the branch road A is identical with branch road B settings, and wherein branch road A is sequentially connected in series process valve C, pressure from entrance Table A, filter A, sampling pump A, pressure gauge B, process valve D and check valve A, the outlet of branch road A and branch road B merge into a pipe Road, and process valve G and process valve H is sequentially connected in series after joint, most access main pipeline through the nozzle afterwards;
The branch road A, it is other between the joint of branch road B and process valve G connect sampling loop, wherein, the sampling loop Process valve I, on-line densimeter and process valve K are sequentially connected in series from entrance, the process valve K connections branch road C's and branch road D Entrance;The branch road C is identical with the setting of branch road D, and wherein branch road C is sequentially connected in series process valve L, sampling control valve A from entrance With process valve M, branch road D from entrance be sequentially connected in series process valve N, sampling control valve B and process valve O;The branch road C and branch The outlet of road D merges into a pipeline, and pressure transmitter, temperature transmitter, flowmeter, cleaning are sequentially connected in series after joint Valve B, process valve Q and process valve R, finally import main pipeline;
Branch road C and branch road D respectively sampled control valve A and sampling control valve B to be connected together be pipeline E, the pipeline E's Entrance connection point liquid triple valve, connects sample reception tank A and sample reception tank B, the sample respectively after described point of liquid triple valve Product receiving tank A and sample reception tank B are respectively placed on weighing instrument A and weighing instrument B;
Sampling pump A, on-line densimeter, weighing instrument A, weighing instrument B, sampling control valve A, sampling control valve B, point liquid threeway Valve, pressure transmitter, temperature transmitter, flowmeter connect by instrument cable access controller, the controller through instrument cable Enter master control system.
Further, the nozzle is hollow straight tube, the bottom lock of the nozzle and is combined with main pipeline bottom, described It is empty that the outer wall of hollow straight tube is uniformly provided with several sprays.
Further, the other dynamic sampling valve of catcher between sampling probe and process valve A;
It is other between the entrance of the pipeline E and point liquid triple valve to connect relief valve.
Further,
It is other between process valve B and branch road A, branch road B inlet connections to meet purge valve A;
It is other between the entrance and process valve I of sampling loop to connect sewage draining valve.
Further,
Filter A both sides parallel connection differential pressure switch A, the differential pressure switch A is through instrument cable access controller;
Pipeline F parallel connection technology valves J, the process valve J that process valve I, on-line densimeter and process valve K are formed Emptying valve is connect by the junction exported with pipeline F;
The both sides of branch road C and branch road D is parallel with one section of bypass line, and the bypass line is provided with process valve P (16).
Further, process valve A and process valve B, it is single between process valve B and branch road A, branch road B inlet connections To between valve A and branch road A, the outlet joint of branch road B, between branch road A, the outlet joint of branch road B and process valve G, work Between skill valve G and process valve H, between the entrance and process valve I of sampling loop, process valve K and branch road C, branch road D Between inlet connection, between branch road C, branch road D outlet joint and pressure transmitter, between purge valve B and process valve Q, Electric tracing thermal insulation part is equipped between process valve Q and process valve R.
Further, the sampling pump B on the sampling pump A and branch road B uses frequency conversion centrifugal pump.
Further, the metal screen in the filter B on the filter A and branch road B is provided with magnetic absorption device.
A kind of method for carrying out on-line period based on above-mentioned oil pipeline on-line period device, comprises the following steps:
1) liquid enters via sampling probe and bypasses;
2) liquid into bypass carries out pressure detecting;
3) filtering and blowdown;
4) filter carries out pressure differential detection;
5) the sampled pump pressurization of liquid;
6) pressure detecting is carried out again;
7) sampling pump discharge accesses sample loop and spray circuits, and liquid is sprayed into main pipeline by the spray circuits port of export through nozzle Interior, the liquid into sampling loop proceeds following scheme;
8) blowdown;
9) online Density Detection;
10) it is vented;
11) sample is taken, and sample is retained;
12) remaining liquid successively be responsible for after pressure detecting, temperature detection, flow detection by last remittance after taking sample Road;
Wherein, step 4) in pressure differential detection, step 5) in sampling pump pressurization, step 9) in online Density Detection, Step 11) in sample retain relevant control, step 12) in pressure detecting, temperature detection, flow detection each signal is given To controller, the controller receives the signal of master control system.
Further, step 11) be:The two sampling control valves set by redundancy receive the signal open and close of controller Action, often acts the sample for once taking out fixed amount, and its frequency changes with the changes in flow rate of main pipeline, main pipeline flow signal From higher level's master control system;Sampling control valve parallel connection is followed by a point liquid triple valve, and the order that point liquid triple valve receives controller will Sample is divided into two sample reception tanks, and two sample reception tanks are all positioned on weighing instrument, and signal is uploaded and controlled by weighing instrument Device, the quantity that weight according to sample reception tank is obtained come judgement sample whether the liquid level of correct and sample reception tank, control accordingly The flow direction of system point liquid triple valve, completes to take sample, and sample is retained by above procedure.
Beneficial effects of the present invention are:
Can realize that oil pipeline on-line period is carried out continuously using on-line period device of the present invention, be represented with sampling Property, quantity accuracy, operation stability, simple operation, beneficial to maintenance in the future and maintenance etc. many-side advantage, realize sampling Also superior system remote detection and control are subjected to while system independent control.Pipe-line construction and operational management is set to more they tend to mark It is standardization, modularization, high efficiency, hommization, shortcut.
Oil pipeline using can be realized after on-line period device of the present invention it is reliable, easy for installation, connect in real time Continuous, sample size is accurate, flow control in loop is accurate, and reaches representative acquirement sample, sampling process automation, system Control precision requirement, it is ensured that sampling system it is continuous, stable, automatic, obtain representational sample in proportion.The dress Dynamic mixed function is installed, the fluid in the nozzle jet-action mixed charge road in main pipeline has been fitted into using pump discharge, really Protecting liquid stream in main pipeline can be well mixed under any flow velocity so that fully represent main pipeline into the liquid stream in sampling loop The property of interior liquid, it is to avoid sampling only represents local feature and do not possess representativeness.The device is provided with controller and can realize to taking Equipment in sample loop (pump, sampling control valve, point liquid triple valve) and operational factor (pressure, temperature, flow, sampling amount, density, Liquid level of sample reception tank etc.) monitor in real time;And can at any time receive the instruction of higher level's master control system;According in main pipeline Flow velocity improves or reduces sampling frequency;Ensure steady sampling system, safety, controlled operation.The device sampling loop is provided with flow Meter, the flow velocity of liquid in real-time detection loop, the flow velocity of liquid is controlled parameter with loop, by sampling control system control The rotating speed of variable frequency pump realizes in sampling loop flow rate of liquid in flow velocity real-time tracking main pipeline.The device is provided with the sampling of redundancy Pump, sample reception tank, sampling control valve, filter, it is ensured that system it is continuously available.The device is set with main pipeline junction Even if manual sampling valve can not work to ensure system, manual sampling operation can be also carried out.
The device fills outdoor design (controller is mounted remotely from the non-anti-explosion area at scene) by sledge, and its degree of protection is IP65, explosive-proof grade EXdIIBT4, fully meet open-air atmosphere and live requirement of explosion proof;Sample treatment and the sampling pump of conveying are adopted Frequency conversion centrifugal pump is used, the control of the flow velocity and pressure to bypass and sampling loop, the requirement for making it meet standard is realized;In device Porch sampling pump before be provided with redundant filter, it is ensured that the stability and reliability of the continuous operation of sampling pump;Taking Sample pump discharge sets liquid level during check valve prevents bypass duct and backflow occurs;Butterworth Hatch is respectively provided with the import and export of device, Cleaning uses external medium cleaning way, and structure arrangement is easy to process and is cleaned, and is capable of achieving not turning off maintenance in the case of main pipeline; Equipped with related emptying, blowdown pipeline and valve in sampling loop, blowdown, shut-off can be carried out to the pipeline and equipment in device And emission treatment, it is easy to daily maintenance and maintenance;Temperature transmitter, pressure transmitter, flowmeter are provided with sampling loop, it is real When monitoring sampling loop temperature, pressure, flow, it is ensured that sampling carry out under reasonable conditions;It is provided with sample reception tank Weighing-appliance, for when the liquid level superelevation alarm in device, while whether accurate monitor sample size in tank obtains;It is provided with safety Bleeder valve, when superpressure reach safety valve release value when, safety valve action, to sample reception loop and connect sample reception tank implement Safeguard protection;Pipeline and equipment in device are provided with constant temperature electrical heating and Insulation, it is ensured that the stream in on-line period device Body is not protected from environmental, enables the device in outdoor stable operation.Differential pressure switch is set before and after filter is used for sample train The running status of system detection filter, judges whether filter blocks.
The present invention is applied to oil pipeline on-line period.This automatic sampling system is used for domestic project, major technique first Index exceedes domestic best level, has reached international same period advanced level.Inherently improve the acquirement of pumped (conveying) medium sample Representativeness, reduces trade dispute;Do not influenceed by Oil Production technique and transport oil condition change;It is not affected by human factors;Reduce The labour intensity of operating personnel.The technique of use, equipment, material and structure technology are advanced, design document component content and depth Meet the requirements.Advanced with high content of technology, processing performance, technological process rationally, the pressure loss is not produced, different tube diameters are applicable And any range of flow.Good environmental benefit, economic benefit and social benefit are generated after the system self-operating, well Meet the requirement built, produce and use, overall economic efficiency is significantly improved than the same type project being completed, and operation can By, stabilization, efficiently, safety.
Brief description of the drawings
Fig. 1 is the structural representation of oil pipeline on-line period device of the present invention;
Wherein, 1- sampling probes, the manual sampling valves of 2-, 3- process valves A, 4,7,17,26,29,34,40,53,58,60- Electric tracing thermal insulation part, 5- process valves B, 6- purge valve A, 8- bypass, 9- process valves C, 10- pressure gauge A, 11- filter A, 12- differential pressure switch A, 13- sampling pump A, 14- pressure gauge B, 15- process valve D, 16- check valve A, 18- process valve E, 19- Pressure gauge C20- filter Bs, 21- differential pressure switches B, 22- sampling pump B, 23- pressure gauge D, 24- process valve F25- check valve B, 27- purge valves B, 28- process valve G, 30- process valve H, 31- nozzle 32- sampling loops, 33- sewage draining valves, 35- technique valves Door I, 36- on-line densimeters, 37- process valves J, 38- process valve K, 39- emptying valve, 41- process valves L, 42- sampling Control valve A, 43- process valve M, 44- process valve N, 45- sampling control valve B, 46- process valve O, 47- point liquid triple valve, 48- relief valves, 49- sample reception tank A, 50- sample reception tank B, 51- weighing instrument A, 52- weighing instrument B, 54- process valves P, 55- pressure transmitter, 56- temperature transmitters, 57- flowmeters, 59- process valves Q, 61- process valve R, 62,63,64, 65th, 66,67,68,69,70,71,72,73,76- instrument cables, 74- controllers, 75- master control systems, 77- spray circuits.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the present invention, not For limiting the present invention.
A kind of oil pipeline on-line period device, as shown in figure 1, being provided with one section of bypass 8, the bypass on main pipeline 8 arrival end connects sampling probe 1, and the sampling probe 1 stretches into main pipeline center to the interval position of main pipeline central lower 0.1D Put, wherein, D is the diameter of main pipeline, can so avoid influence of the tube wall to flow velocity and moisture content, and the sample of extraction is most represented Property.Sampling probe 1 is sequentially connected in series process valve A3 and process valve B5, and other catcher is dynamic between sampling probe 1 and process valve A3 Sampling valve 2, the process valve B5 connects the entrance of branch road A and branch road B, and the branch road A is identical with branch road B settings, superfluous each other It is remaining, wherein branch road A from entrance be sequentially connected in series process valve C9, pressure gauge A10, filter A11, sampling pump A13, pressure gauge B14, Process valve D15 and check valve A16, branch road B are sequentially connected in series process valve E18, pressure gauge C19, filter B 20, take from entrance Sample pump B22, pressure gauge D23, process valve F24 and check valve B25, filter A11 both sides parallel connection differential pressure switch A12, filter B20 both sides parallel connection differential pressure switch B21, the differential pressure switch A12, differential pressure switch B21 are through instrument cable access controller 74.Work It is other between skill valve B5 and branch road A, branch road B inlet connections to meet purge valve A6.The outlet of branch road A and branch road B merges into one Pipeline, and process valve G28 and process valve H30 is sequentially connected in series after joint, most access main pipeline through the nozzle 31 afterwards.
The branch road A, it is other between the joint of branch road B and process valve G28 connect sampling loop 32, wherein, the sampling Loop 32 is sequentially connected in series process valve I35, on-line densimeter 36 and process valve K38, the process valve K38 connections from entrance The entrance of branch road C and branch road D.Wherein, it is other between the entrance of sampling loop 32 and process valve I35 to connect sewage draining valve 33.Technique Pipeline F parallel connection technology the valves J37, the process valve J37 that valve I35, on-line densimeter 36 and process valve K38 are formed with Emptying valve 39 is connect by the junction of pipeline F outlets.The branch road C is identical with the setting of branch road D, is mutually redundant, wherein branch road C Process valve L41, sampling control valve A42 and process valve M43, branch road D are sequentially connected in series from entrance be sequentially connected in series technique from entrance Valve N44, sampling control valve B45 and process valve O46;The outlet of the branch road C and branch road D merges into a pipeline, and Pressure transmitter 55, temperature transmitter 56, flowmeter 57, purge valve B27, process valve Q59 and work are sequentially connected in series after joint Skill valve R61, finally imports main pipeline.The both sides of branch road C and branch road D is parallel with one section of bypass line, on the bypass line It is provided with process valve P16.
It is pipeline E that branch road C and branch road D are connected together after sampled control valve A42 and sampling control valve B45 respectively, described The entrance connection point liquid triple valve 47 of pipeline E, connects sample reception tank A49 and sample connects respectively after described point of liquid triple valve 47 Closed cans B50, the sample reception tank A49 and sample reception tank B50 are respectively placed on weighing instrument A51 and weighing instrument B52.Sampling Medium is extracted the equipment that juxtaposition is changed in sample receiver by control valve A42 and sampling control valve B45, full-bore design, complete Taken in section, variable frequency control, high-frequency action (30 times/min), it is ensured that meet that frequency is proportional to flow, unit sample Quantity obtains accurate.Sample reception tank A49 and sample reception tank B50 use full-closed structure, with fast connecting joint, safety Bleeder valve, material are the pressure vessel of stainless steel.It is other between the entrance of the pipeline E and point liquid triple valve 47 to connect relief valve 48。
Sampling pump A13, on-line densimeter 36, weighing instrument A51, weighing instrument B52, sampling control valve A42, sampling control valve B45, point liquid triple valve 47, pressure transmitter 55, temperature transmitter 56, flowmeter 57 by instrument cable access controller 74, The controller 74 accesses master control system through instrument cable.Flowmeter 57 selects mass flowmenter, and the degree of accuracy is high, and inside can not Dynamic component reduces maintenance workload, long lifespan, and can realize real-time dynamic pressure by the pressure transmitter 55 in sampling loop Compensation.Controller 74 is on-line period device " brain ", with multiple function:Cryptoguard;Monitoring sampling loop temperature, pressure The parameters such as power, flow, sample reception tank liquid level;Control sampling frequency, it is ensured that proportional to main pipeline flow;Control frequency conversion centrifugation Revolution speed, reaches flow, the purpose of pressure in control sampling loop;Control the flow direction of liquid separatnig valve;Equipment and power supply status monitoring, Fault alarm;Communicated with higher level's master control system, receive higher level's master control system order and open, stop sampler, received and monitor The flow status of main pipeline;And sampler parameter is uploaded into higher level's master control system.
The nozzle 31 is the hollow high intensity straight tube of bottom lock, is uniformly provided with along the outer wall of the hollow straight tube some Individual spray is empty, and the straight tube straight cutting main pipeline bottom makes whole pipeline beneficial to the effect by bottom deposit water etc. by pumping out liquid Section reaches and is sufficiently mixed, it is ensured that it is in office why not profit flow velocity, viscosity, density under it is unaffected;The bottom of the nozzle 31 Combined closely with main pipeline bottom, to resist the moment of flexure caused by Peak Flow Rate in main pipeline, and bear to trigger because of vortex Vibrations.
Between process valve A3 and process valve B5, process valve B5 and branch road A, branch road B inlet connections, check valve Between A16 and branch road A, the outlet joint of branch road B, between branch road A, the outlet joint of branch road B and process valve G28, work Between skill valve G28 and process valve H30, between the entrance and process valve I35 of sampling loop 32, process valve K38 with branch Between road C, the inlet connection of branch road D, branch road C, branch road D outlet joint and pressure transmitter 55 between, purge valve B27 with Between process valve Q59, electric tracing thermal insulation part is equipped between process valve Q59 and process valve R61.
Sampling pump B22 on the sampling pump A13 and branch road B uses frequency conversion centrifugal pump, by controller control frequency conversion from The rotating speed of heart pump, reaches control sampling loop flow velocity and the strong and weak purpose of injection.
Before the filter A11 and the redundancy of filter B 20 are arranged on sampling pump, it is provided with the metal screen in filter Magnetic absorption device, can well adsorb the metallic residue and particle in institute's pumped (conveying) medium, it is ensured that filter and sampling pump it is steady Run and extend its service life calmly.
All pipelines of oil pipeline on-line period device of the present invention and all devices of installation are integrated in sledge dress On, pressure rating meets the requirement of design pressure.
Process valve I35, process valve J37, process valve K38, process valve L41, process valve M43, process valve N44, process valve O46, process valve P54 select 1 " 300#ANSI RF ball valves;
Process valve D15 and process valve F24 selects 3 " 300#ANSI RF ball valves;
Process valve C9, process valve E18, process valve G28 and process valve H30 select 4 " 300#ANSI RF ball valves;
Process valve A3 and process valve B5 selects 6 " 300#ANSI RF ball valves;
Check valve A16 and check valve B25 selects 3 " 300#ANSI RF swing type check valves;
Process valve R61 selects 1 " 300#ANSI RF stop valves;
Sampling pump A13 and sampling pump B22 selects frequency conversion centrifugal pump, and entrance is that 4 " 300#ANSI RF, it is 3 " 300# to export ANSI RF, maximum stream flow 400GPM, 380/3/60HZ;
" 300#ANSI RF basket filters, swing type bolt is fast from 4 " × 8 " × 4 for filter A11 and filter B 20 Speed opens closure;
Flowmeter 57 selects " the 300#ANSI RF mass flowmenters of Rosement 1;
Sampling control valve A42 selects 1 with sampling control valve A45, and " the electro-hydraulic bypasses of 300#ANSI RF 210 sample control valve;
Relief valve 48 is from SS-4R3A types 1/4, and " pipe connects angle-style bleeder valve;
Sample reception tank A49 and sample reception tank A50 selects portable example receiving tank, maximum size:5GAL;
Liquid triple valve 47 is divided to be made up of following sections:Changing Direction Type valve ferrule fitting SS-43-GXF4-51-SR, threeway Ball valve, spring return actuator and Changing Direction Type magnetic valve;
What on-line densimeter 36 was selected is " the 300#ANSI RF liquid densimeters of type 1 of Solartron 7845;
Pressure gauge A9, pressure gauge B15, pressure gauge C18, pressure gauge D24 selected ranges are that " internal thread connects for 0-50Bar, 1/2 The pressure display unit for connecing;
Differential pressure switch A12 and differential pressure switch B21 is from the differential pressure switch with display function;
Pressure transmitter 55 and temperature transmitter 56 are from the product of Rosement;
Control computer of the controller 74 from the models of OMNI 6000.After whole sampler sledge dress production and processing is finished Anti-corrosion, the antirust treatment of correlation need be made, all of process pipelines and equipment do electric tracing and isothermal holding.
Oil pipeline on-line period method is carried out based on on-line period device described above, is comprised the following steps:
1) one section of bypass is provided with main pipeline, the arrival end of the bypass connects sampling probe, and the sampling probe connects Enter main pipeline, liquid enters bypass via sampling probe;
2) liquid into bypass carries out pressure detecting by pressure gauge;
3) liquid after pressure detecting is filtered and blowdown by filter;
4) filter two ends are parallel with pressure difference switch, and carry out pressure differential detection;
5) sampling pump, the sampled pump pressurization of liquid are connected to after filter;
6) sampling pump discharge is provided with pressure gauge, and pressure detecting is carried out again;
7) sampling pump discharge accesses sample loop and spray circuits, and liquid is sprayed into main pipeline by the spray circuits port of export through nozzle Interior, the liquid into sampling loop proceeds following scheme:
8) blowdown;
9) online Density Detection;
10) it is vented;
11) sample is taken, and sample is retained;
12) remaining liquid successively be responsible for after pressure detecting, temperature detection, flow detection by last remittance after taking sample Road;
Wherein, step 4) in pressure differential detection, step 5) in sampling pump pressurization, step 9) in online Density Detection, Step 11) in sample retain relevant control, step 12) in pressure detecting, temperature detection, flow detection each signal is given To controller, the controller receives the signal of higher level's control system.
Be provided with manual sampling valve at bypass import, when bypass failure cannot automatic sampling when, in step 1) after carry out it is artificial Sampling.
Bypass at import and sampling loop exit is equipped with purge valve, purge valve is bypassed with the use of periodic cleaning at two And sampling loop.
Step 5) in the sampled pump of liquid be forced through parallel redundancy setting two sampling pumps realize.
Step 8) in blowdown by be arranged on sampling loop entrance sewage draining valve realize, while the sewage draining valve set In the minimum point of sampling loop.
Step 10) in exhaust realized by setting the emptying valve of sampling loop peak, and manually control.
Step 11) be:The signal open and close that the two sampling control valves set by redundancy receive controller are acted, and are often moved Make the sample of once taking-up fixed amount, its frequency changes with the changes in flow rate of main pipeline, and main pipeline flow signal comes from higher level Master control system;Sampling control valve parallel connection is followed by a point liquid triple valve, and be divided into for sample by the order that point liquid triple valve receives controller In two sample reception tanks, two sample reception tanks are all positioned on weighing instrument, and signal is uploaded controller by weighing instrument, according to sample Whether the weight of product receiving tank carrys out correct and sample reception tank the liquid level of quantity of judgement sample acquirement, and control accordingly divides a liquid threeway The flow direction of valve, completes to take sample, and sample is retained by above procedure.
In the present embodiment, the method using on-line period device on-line period of the present invention is laggard in flood-pot experiment process Row sampling calibrating, it is as follows:
Water filling
A) connection valve, filter, pressure gauge, pipeline, pump, stream are passed through in the upstream of sampler before Autosampler operation The equipment such as gauge, to the water that dose known amounts are injected in main pipeline.
B) water decanting point away from sampling system upstream element, while need to be by the mixing equipment of sampling system.
C) water injection rate generally accounts for the 1-5% of main pipeline rate-of flow at the appointed time, because this project system is doing The injection rate of the big needs of output oil amount is just big during experiment, and cannot be separated after injection water, passed through on the premise of technical feasibility with customs, Commodity inspection is consulted, and it is 0.6% or so of pipe throughput rate that injected water volume is adjusted to.
D) water injection time is no less than 1 hour, to gather the water filling sample of abundance.
E) water is injected from pipeline bottom with certain speed, and other mixing can not be produced to make in injection process to product With.The velocity attitude of water filling is identical with the speed of medium in main pipeline and direction.
F) flowmeter accuracy of measurement water volume is better than ± 2%.
Calibrating
Sampling calibrating carried out under conditions of worst, respectively before testing, test in, test after collect 3 samples. Operation sampler collects the sample of 1 hour before water filling, then regathers the sample of 1 hour in the injecting process, when all water fillings are situated between Matter is by after sampler, then operates the sample that sampler receives 1 hour, it is determined that before testing with test after water in sample contain Amount, no more than 0.1% between two moisture content values obtained by test.Eventually through water content in the sample that analytical sampling is obtained The performance of whole sampling system is judged with the uniformity of injection water content, this is a percentage value, and the value exists It is the highest level of the degree of accuracy generally acknowledged in the world within 0.05%.The automatic sampling system degree of accuracy of this project is checked through water filling This rank is reached.
The automatic sampling system of this Project design is as follows through flood-pot experiment verification result:Water content is through analysis in crude oil 0.0504% (sampling analysis), one hour water injection rate percentage of water filling (water for being measured according to flowmeter and defeated that is 0.6267% Oil mass is calculated), it is 0.6684% to obtain water content by sampling analysis in test process, final sampling analysis and reality The deviation of water injection rate is -0.0087% (0.6684-0.6267-0.0504), and this meets the requirement of international standard highest level.This is System is stable by the use more than 8 years, and since putting into operation, sampling 10L or so, operates more than 10000 times daily daily, Often act primary sample 1mL.
This example improves credibility, accuracy, repeatability, the stability of on-line period system through on probation, beneficial in the future Safeguard, many-sided advantage such as maintenance, and compact conformation, simple, convenient transportation is installed, it is possible to achieve outdoor sledge installing is put, and is saved Floor space and operation operation room are saved.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of oil pipeline on-line period device, it is integrated in sledge and loads onto, it is characterised in that one section is provided with main pipeline Bypass (8), the arrival end of the bypass (8) connects sampling probe (1), and the sampling probe (1) stretches into main pipeline center to supervisor The position of road central lower 0.1D, D is the diameter of main pipeline;Sampling probe (1) is sequentially connected in series process valve A (3) and technique valve Door B (5), the process valve B (5) connects the entrance of branch road A and branch road B, and the branch road A is identical with branch road B settings, wherein propping up Road A is sequentially connected in series process valve C (9), pressure gauge A (10), filter A (11), sampling pump A (13), pressure gauge B from entrance (14), process valve D (15) and check valve A (16), the outlet of branch road A and branch road B merges into a pipeline, and after joint Process valve G (28) and process valve H (30) is sequentially connected in series, most main pipeline is accessed through the nozzle (31) afterwards;
It is other between the branch road A, the joint of branch road B and process valve G (28) to connect sampling loop (32), wherein, the sampling Loop (32) is sequentially connected in series process valve I (35), on-line densimeter (36) and process valve K (38), the technique valve from entrance Door K (38) connects the entrance of branch road C and branch road D;The branch road C is identical with the setting of branch road D, wherein branch road C from entrance successively Concatenation process valve L (41), sampling control valve A (42) and process valve M (43), branch road D are sequentially connected in series process valve N from entrance (44), sampling control valve B (45) and process valve O (46);The outlet of the branch road C and branch road D merges into a pipeline, and Pressure transmitter (55), temperature transmitter (56), flowmeter (57), purge valve B (27), process valve are sequentially connected in series after joint Q (59) and process valve R (61), finally imports main pipeline;
It is pipeline E, the pipe that sampled control valve A (42) of branch road C and branch road D difference and sampling control valve B (45) are connected together The entrance connection point liquid triple valve (47) of line E, sample reception tank A (49) and sample are connected after described point of liquid triple valve (47) respectively Product receiving tank B (50), the sample reception tank A (49) and sample reception tank B (50) are respectively placed in weighing instrument A (51) and weigh On instrument B (52);
Sampling pump A (13), on-line densimeter (36), weighing instrument A (51), weighing instrument B (52), sampling control valve A (42), sampling control Valve B (45) processed, point liquid triple valve (47), pressure transmitter (55), temperature transmitter (56), flowmeter (57) are by instrument cable Access controller (74), the controller (74) accesses master control system (75) through instrument cable.
2. oil pipeline on-line period device according to claim 1, it is characterised in that the nozzle (31) is hollow straight Pipe, the bottom lock of the nozzle (31) and is combined with main pipeline bottom, is uniformly provided with along the outer wall of the hollow straight tube some Individual spray is empty.
3. oil pipeline on-line period device according to claim 1, it is characterised in that sampling probe (1) and technique valve The other dynamic sampling valve (2) of catcher between door A (3);
It is other between the entrance of the pipeline E and point liquid triple valve (47) to connect relief valve (48).
4. oil pipeline on-line period device according to claim 1, it is characterised in that
It is other between process valve B (5) and branch road A, branch road B inlet connections to meet purge valve A (6);
It is other between the entrance and process valve I (35) of sampling loop (32) to connect sewage draining valve (33).
5. oil pipeline on-line period device according to claim 1, it is characterised in that
Filter A (11) both sides parallel connection differential pressure switch A (12), the differential pressure switch A (12) is through instrument cable access controller (74);
Pipeline F parallel connection technology valves J (37) that process valve I (35), on-line densimeter (36) and process valve K (38) are formed, Emptying valve (39) is connect by the process valve J (37) and the junction of pipeline F outlets;
The both sides of branch road C and branch road D is parallel with one section of bypass line, and the bypass line is provided with process valve P (16).
6. oil pipeline on-line period device according to claim 1, it is characterised in that process valve A (3) and technique valve Door B (5), between process valve B (5) and branch road A, branch road B inlet connections, check valve A (16) and branch road A, the outlet of branch road B Between joint, between branch road A, the outlet joint of branch road B and process valve G (28), process valve G (28) and process valve Between H (30), between the entrance and process valve I (35) of sampling loop (32), process valve K (38) and branch road C, branch road D Between inlet connection, between branch road C, branch road D outlet joint and pressure transmitter (55), purge valve B (27) and technique valve Between door Q (59), electric tracing thermal insulation part is equipped between process valve Q (59) and process valve R (61).
7. oil pipeline on-line period device according to claim 1, it is characterised in that the sampling pump A (13) and branch Sampling pump B (22) on the B of road uses frequency conversion centrifugal pump.
8. oil pipeline on-line period device according to claim 1, it is characterised in that the filter A (11) and branch The metal screen in filter B (20) on the B of road is provided with magnetic absorption device.
9. the method for carrying out on-line period based on the oil pipeline on-line period device described in claim any one of 1-8, it is special Levy and be, comprise the following steps:
1) liquid enters via sampling probe and bypasses;
2) liquid into bypass carries out pressure detecting;
3) filtering and blowdown;
4) filter carries out pressure differential detection;
5) the sampled pump pressurization of liquid;
6) pressure detecting is carried out again;
7) sampling pump discharge accesses sample loop and spray circuits, and the spray circuits port of export is sprayed into main pipeline liquid through nozzle, Liquid into sampling loop proceeds following scheme;
8) blowdown;
9) online Density Detection;
10) it is vented;
11) sample is taken, and sample is retained;
12) remaining liquid finally imports main pipeline after pressure detecting, temperature detection, flow detection successively after taking sample;
Wherein, step 4) in pressure differential detection, step 5) in sampling pump pressurization, step 9) in online Density Detection, step 11) sample in retains relevant control, step 12) in pressure detecting, temperature detection, flow detection signal is each delivered into control Device processed, the controller receives the signal of master control system.
10. oil pipeline on-line period method according to claim 9, it is characterised in that step 11) be:By redundancy The two sampling control valves for setting receive the signal open and close action of controller, often act the sample for once taking out fixed amount, and it is frequently Rate changes with the changes in flow rate of main pipeline, and main pipeline flow signal comes from higher level's master control system;After sampling control valve parallel connection A point liquid triple valve is connect, be divided into sample in two sample reception tanks by the order for being divided to liquid triple valve to receive controller, and two samples connect Closed cans is all positioned on weighing instrument, and signal is uploaded controller by weighing instrument, and the weight according to sample reception tank takes come judgement sample Whether correct and sample reception tank the liquid level of quantity, the flow direction of control point liquid triple valve accordingly, by above procedure completion Sample is taken, and sample is retained.
CN201710103813.7A 2017-02-24 2017-02-24 Oil pipeline on-line period apparatus and method Withdrawn CN106908275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710103813.7A CN106908275A (en) 2017-02-24 2017-02-24 Oil pipeline on-line period apparatus and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710103813.7A CN106908275A (en) 2017-02-24 2017-02-24 Oil pipeline on-line period apparatus and method

Publications (1)

Publication Number Publication Date
CN106908275A true CN106908275A (en) 2017-06-30

Family

ID=59208737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710103813.7A Withdrawn CN106908275A (en) 2017-02-24 2017-02-24 Oil pipeline on-line period apparatus and method

Country Status (1)

Country Link
CN (1) CN106908275A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106908276A (en) * 2017-02-24 2017-06-30 中国石油天然气集团公司 A kind of oil pipeline on-line period method
CN108444759A (en) * 2018-04-28 2018-08-24 济南热力集团有限公司 A kind of water-coal-slurry sampler and sampling method
CN114894561A (en) * 2022-04-28 2022-08-12 苏州西热节能环保技术有限公司 Mixed sampling measurement structure with ash removal function and working method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106908276A (en) * 2017-02-24 2017-06-30 中国石油天然气集团公司 A kind of oil pipeline on-line period method
CN108444759A (en) * 2018-04-28 2018-08-24 济南热力集团有限公司 A kind of water-coal-slurry sampler and sampling method
CN114894561A (en) * 2022-04-28 2022-08-12 苏州西热节能环保技术有限公司 Mixed sampling measurement structure with ash removal function and working method thereof

Similar Documents

Publication Publication Date Title
CN106908276A (en) A kind of oil pipeline on-line period method
CN104976518B (en) A kind of submerged pipeline leakage monitoring system
CN106769219A (en) A kind of oil pipeline on-line period detection means
US9746358B2 (en) Ballast water treatment monitoring system
CN106908275A (en) Oil pipeline on-line period apparatus and method
CN207486445U (en) A kind of pipeline sequentially-fed contaminated product experimental provision
CN206945356U (en) Oil pipeline on-line period device
CN209276181U (en) A kind of Intelligent medicine adding device
CN202349591U (en) Calibration device of liquefied natural gas (LNG) dispenser
CN208588686U (en) Online nytron water content of matter and pure oil density analyze skid system
CN108507834A (en) A kind of pulp density on-line real-time measuremen device and method
CN106840769A (en) Oil pipeline on-line period device
CN107748149B (en) Online oily sewage detection device and detection method based on ultraviolet fluorescence method
CN107796794B (en) Online oily sewage detection method based on ultraviolet fluorescence method
CN206670974U (en) A kind of oil pipeline on-line period detection means
CN102012255A (en) Automatic control system for oil well tipping bucket measurement
CN206945357U (en) A kind of oil pipeline on-line period device
CN204881741U (en) Device and measurement system cool down
CN207163748U (en) Liquid product intermittent sampling device
CN207866395U (en) Flow control system for heat meter calibration
CN107589101B (en) Online oily sewage detection device based on ultraviolet fluorescence method
CN107101852B (en) Gas pipeline automatic sampling system integration skid-mounted unit
CN204007805U (en) The online caliberating device of a kind of LNG filling machine
CN207408304U (en) Online oily wastewater detection device based on ultraviolet fluorescence method
CN209210378U (en) A kind of Mobile automatic charging action of chemicals tank car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170630

WW01 Invention patent application withdrawn after publication