CN106904357A - A kind of breakage-proof formula geotechnical investigation soil sample storage box - Google Patents
A kind of breakage-proof formula geotechnical investigation soil sample storage box Download PDFInfo
- Publication number
- CN106904357A CN106904357A CN201710149627.7A CN201710149627A CN106904357A CN 106904357 A CN106904357 A CN 106904357A CN 201710149627 A CN201710149627 A CN 201710149627A CN 106904357 A CN106904357 A CN 106904357A
- Authority
- CN
- China
- Prior art keywords
- casing
- hole
- soil sample
- breakage
- storage box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D25/00—Details of other kinds or types of rigid or semi-rigid containers
- B65D25/02—Internal fittings
- B65D25/10—Devices to locate articles in containers
- B65D25/107—Grooves, ribs, or the like, situated on opposed walls and between which the articles are located
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D25/00—Details of other kinds or types of rigid or semi-rigid containers
- B65D25/20—External fittings
- B65D25/22—External fittings for facilitating lifting or suspending of containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D25/00—Details of other kinds or types of rigid or semi-rigid containers
- B65D25/28—Handles
- B65D25/2802—Handles fixed, i.e. non-swingable, handles
- B65D25/2826—Handles fixed, i.e. non-swingable, handles provided on a local area of the upper (top) wall, e.g. U-shaped
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D55/00—Accessories for container closures not otherwise provided for
- B65D55/02—Locking devices; Means for discouraging or indicating unauthorised opening or removal of closure
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D81/00—Containers, packaging elements, or packages, for contents presenting particular transport or storage problems, or adapted to be used for non-packaging purposes after removal of contents
- B65D81/02—Containers, packaging elements, or packages, for contents presenting particular transport or storage problems, or adapted to be used for non-packaging purposes after removal of contents specially adapted to protect contents from mechanical damage
- B65D81/05—Containers, packaging elements, or packages, for contents presenting particular transport or storage problems, or adapted to be used for non-packaging purposes after removal of contents specially adapted to protect contents from mechanical damage maintaining contents at spaced relation from package walls, or from other contents
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
The present invention relates to geotechnical investigation technical field, and disclose a kind of breakage-proof formula geotechnical investigation soil sample storage box, including casing, the upper surface of the casing left plate is hinged with top cover, the top cover lower surface is fixedly connected with fixture block away from the side of casing, the front of the fixture block offers first through hole, and draw-in groove is offered at the top of the casing right flank, opens up fluted at the top of the casing right flank.The breakage-proof formula geotechnical investigation soil sample storage box, by setting fixed block, article putting groove, fixed plate, third through-hole and Sponge protection layer, the test tube of soil sample will be placed with to be inserted along article putting groove along third through-hole, article putting groove is fixed to the bottom of test tube, third through-hole at the top of test tube to being fixed, dual fixation, make fixation more steady, coordinate Sponge protection layer simultaneously, preventing the bottom land collision in bumpy sections test tube bottom and article putting groove causes test tube damaged, the effect for preventing test tube damaged has been reached, it is safer.
Description
Technical field
The present invention relates to geotechnical investigation technical field, specially a kind of breakage-proof formula geotechnical investigation soil sample is preserved
Case.
Background technology
As the cities such as high ferro, subway, light rail, skyscraper have stable political situation the developing rapidly of Intercity Transportation engineering, engineering construction pair
The all requirements of engineering technology also more and more higher.The engineering geology situation of construction area, be related to engineering selected routes it is excellent with
And the selection of respective design parameter.Geotechnical investigation work is broadly divided into interior page and two parts of field operation, prospective design personnel
Need according to laboratory test results, practicable design parameter of rock soil is proposed with reference to field note and in-situ test.Indoor examination
Test higher to the sampling quality requirement of scene probing, it is guarantee test knot that scene takes undisturbed and disturbs small and change of moisture content small
The important indicator of fruit accuracy.
To be placed with after the reagent bottle of soil sample is sealed with wax usually using sampling storage box at present and preserved, so as to reduce soil sample
Change, however be mostly inside sampling storage box in the market only in the middle part of sampling cabinet placement fixed mount to being placed with soil sample
Test tube is fixed, but on some rugged roads, because storage box jolts, test tube is ejected fixed mount, causes test tube
Breakage, soil sample exposes the accuracy for influenceing experimental result in atmosphere, has had a strong impact on the experiment matter of geotechnical engineering investigation work
Amount.
The content of the invention
(One)The technical problem of solution
In view of the shortcomings of the prior art, the invention provides a kind of breakage-proof formula geotechnical investigation soil sample storage box, solve
Soil sample preserves the problem of test tube cracky in storage box.
(Two)Technical scheme
To achieve the above object, the present invention provides following technical scheme:A kind of breakage-proof formula geotechnical investigation soil sample storage box,
Including casing, the upper surface of the casing left plate is hinged with top cover, and the top cover lower surface is fixed away from the side of casing and connected
Fixture block is connected to, the front of the fixture block offers first through hole, draw-in groove, the casing are offered at the top of the casing right flank
Open up fluted at the top of right flank, the side inwall of the groove offers the second through hole of connection draw-in groove one side, described
The inside of the second through hole is plugged with kelly, and the surface that the kelly is located inside grooves one end is fixedly connected with connector, described
Connector passes groove and is fixedly connected with the one side of the push-and-pull block on the outside of groove, the casing away from one end of kelly
The bottom surface of inner chamber is fixedly connected with fixed block, and the upper surface of the fixed block offers article putting groove, the middle part of the cabinets cavity
The surface for being provided with fixed plate offers third through-hole, and the back side of the casing is provided with brace.
Preferably, the diameter of the kelly and the diameter of first through hole are identical.
Preferably, handle is installed in the middle part of the upper surface of the top cover.
Preferably, the diameter of the article putting groove and the diameter of third through-hole are identical, and article putting groove axle center and third through-hole
The center of circle be located at same straight line.
Preferably, the inwall of the article putting groove is fixedly connected with Sponge protection layer.
Preferably, the back side of the casing is provided with cushion, and the brace is located at the outside of cushion.
Preferably, the bottom surface of the casing is provided with universal wheel.
(Three)Beneficial effect
Compared with prior art, the invention provides a kind of breakage-proof formula geotechnical investigation soil sample storage box, possessing following has
Beneficial effect:
1st, breakage-proof formula geotechnical investigation soil sample storage box, by setting fixed block, article putting groove, fixed plate, third through-hole
With Sponge protection layer, the test tube of soil sample will be placed with along third through-hole insertion article putting groove, article putting groove is consolidated to the bottom of test tube
Fixed, to being fixed at the top of test tube, dual fixation makes to fix more steady to third through-hole, while coordinating Sponge protection layer, prevents
Cause test tube damaged in the bottom land collision of bumpy sections test tube bottom and article putting groove, reach the effect for preventing test tube damaged, more
Plus safety.
2nd, the breakage-proof formula geotechnical investigation soil sample storage box, by setting the setting to kelly and first through hole, can
It is stuck to carry out to top cover, prevent the interior object of casing from dropping, by setting handle, opening top cover is more facilitated, while
Coordinate universal wheel, casing movement can be pulled in flat road surface, carry casing and more facilitate, by article putting groove and threeway
The restriction in hole, allows test tube to insert article putting groove along third through-hole, so as to be fixed to test tube, by setting brace and buffering
Layer, changes the portable situation of conventional casing, can liberate both hands with worn on the back, and carries and more facilitate, and simultaneous buffering layer can be with
Prevent casing from being rubbed with the back of people, cause people's back injuries.
Brief description of the drawings
Fig. 1 is structure front view of the present invention;
Fig. 2 is structure rearview of the present invention;
Fig. 3 is the schematic enlarged-scale view of A shown in Fig. 1;
Fixed-block-architecture (FBA) front elevational view shown in Fig. 4 bitmaps 1.
In figure:1 casing, 2 top covers, 3 fixture blocks, 4 first through hole, 5 draw-in grooves, 6 grooves, 7 second through holes, 8 kellies, 9 connectors,
10 push-and-pull blocks, 11 fixed blocks, 12 article putting grooves, 13 fixed plates, 14 third through-holes, 15 braces, 16 handles, 17 Sponge protections layer, 18
Cushion, 19 universal wheels.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Refer to Fig. 1-4, a kind of breakage-proof formula geotechnical investigation soil sample storage box, including casing 1, the bottom surface of casing 1
Universal wheel 19 is installed, the upper surface of the left plate of casing 1 is hinged with top cover 2, handle is provided with the middle part of 2 upper surfaces of top cover
16, the lower surface of top cover 2 is fixedly connected with fixture block 3 away from the side of casing 1, and the front of fixture block 3 offers first through hole 4, casing 1
Draw-in groove 5 is offered at the top of right flank, fluted 6 are opened up at the top of the right flank of casing 1, the side inwall of groove 6 offers company
Second through hole 7 of the logical one side of draw-in groove 5, the inside of the second through hole 7 is plugged with kelly 8, diameter and the first through hole 4 of kelly 8
Diameter is identical, and the surface that kelly 8 is located at the inside one end of groove 6 is fixedly connected with connector 9, the one end of connector 9 away from kelly 8
Pass groove 6 and be fixedly connected with the one side of the push-and-pull block 10 positioned at the outside of groove 6, the bottom surface of the inner chamber of casing 1 is fixedly connected
The upper surface for having fixed block 11, fixed block 11 offers article putting groove 12, and the inwall of article putting groove 12 is fixedly connected with Sponge protection layer
17, the surface that fixed plate 13 is provided with the middle part of the inner chamber of casing 1 offers third through-hole 14, the diameter of article putting groove 12 and threeway
The diameter in hole 14 is identical, and the axle center of article putting groove 12 is located at same straight line with the center of circle of third through-hole 14, and the back side of casing 1 is installed
The back side for having brace 15, casing 1 is provided with cushion 18, and brace 15 is located at the outside of cushion 18.
In sum, the breakage-proof formula geotechnical investigation soil sample storage box, by set fixed block 11, article putting groove 12,
Fixed plate 13, third through-hole 14 and Sponge protection layer 17, will be placed with the test tube of soil sample and is inserted in article putting groove 12 along third through-hole 14,
Article putting groove 12 is fixed to the bottom of test tube, and to being fixed at the top of test tube, dual fixation makes to fix more third through-hole 14
Plus it is steady, while coordinating Sponge protection layer 17, prevent the bottom land collision in bumpy sections test tube bottom and article putting groove 12 from causing test tube
Breakage, has reached the effect for preventing test tube damaged, safer, solves soil sample in storage box and preserves asking for test tube cracky
Topic.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating
In any this actual relation or order.And, term " including ", "comprising" or its any other variant be intended to
Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those
Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment
Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that
Also there is other identical element in process, method, article or equipment including the key element.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding can carry out various changes, modification, replacement to these embodiments without departing from the principles and spirit of the present invention
And modification, the scope of the present invention be defined by the appended.
Claims (7)
1. a kind of breakage-proof formula geotechnical investigation soil sample storage box, including casing(1), it is characterised in that:The casing(1)It is left
The upper surface of side plate is hinged with top cover(2), the top cover(2)Lower surface is away from casing(1)Side be fixedly connected with fixture block
(3), the fixture block(3)Front offer first through hole(4), the casing(1)Draw-in groove is offered at the top of right flank(5),
The casing(1)Opened up at the top of right flank fluted(6), the groove(6)Side inwall offer connection draw-in groove(5)One
Second through hole of side(7), second through hole(7)Inside be plugged with kelly(8), the kelly(8)Positioned at groove(6)It is interior
The surface of portion one end is fixedly connected with connector(9), the connector(9)Away from kelly(8)One end pass groove(6)And with
Positioned at groove(6)The push-and-pull block in outside(10)One side be fixedly connected, the casing(1)The bottom surface of inner chamber is fixedly connected with
Determine block(11), the fixed block(11)Upper surface offer article putting groove(12), the casing(1)It is provided with the middle part of inner chamber solid
Fixed board(13)Surface offer third through-hole(14), the casing(1)The back side brace is installed(15).
2. a kind of breakage-proof formula geotechnical investigation soil sample storage box according to claim 1, it is characterised in that:The card
Bar(8)Diameter and first through hole(4)Diameter it is identical.
3. a kind of breakage-proof formula geotechnical investigation soil sample storage box according to claim 1, it is characterised in that:The top
Lid(2)Handle is installed in the middle part of upper surface(16).
4. a kind of breakage-proof formula geotechnical investigation soil sample storage box according to claim 1, it is characterised in that:It is described to put
Thing groove(12)Diameter and third through-hole(14)Diameter it is identical, and article putting groove(12)Axle center and third through-hole(14)The center of circle
Positioned at same straight line.
5. a kind of breakage-proof formula geotechnical investigation soil sample storage box according to claim 1, it is characterised in that:It is described to put
Thing groove(12)Inwall be fixedly connected with Sponge protection layer(17).
6. a kind of breakage-proof formula geotechnical investigation soil sample storage box according to claim 1, it is characterised in that:The case
Body(1)The back side cushion is installed(18), the brace(15)Positioned at cushion(18)Outside.
7. a kind of breakage-proof formula geotechnical investigation soil sample storage box according to claim 1, it is characterised in that:The case
Body(1)Bottom surface universal wheel is installed(19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710149627.7A CN106904357A (en) | 2017-03-14 | 2017-03-14 | A kind of breakage-proof formula geotechnical investigation soil sample storage box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710149627.7A CN106904357A (en) | 2017-03-14 | 2017-03-14 | A kind of breakage-proof formula geotechnical investigation soil sample storage box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106904357A true CN106904357A (en) | 2017-06-30 |
Family
ID=59187069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710149627.7A Pending CN106904357A (en) | 2017-03-14 | 2017-03-14 | A kind of breakage-proof formula geotechnical investigation soil sample storage box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106904357A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108516198A (en) * | 2018-05-29 | 2018-09-11 | 中国地质大学(武汉) | A kind of large size water conservancy and hydropower geotechnical investigation soil sample storage box |
CN108750296A (en) * | 2018-07-17 | 2018-11-06 | 唐加林 | Pathogenic soil microorganism detection samples and storage device |
CN109367985A (en) * | 2018-10-31 | 2019-02-22 | 扬中市佳阳氟塑有限公司 | A kind of instrument storage water-tight equipment with locomotive function |
CN109538201A (en) * | 2018-12-28 | 2019-03-29 | 中水淮河规划设计研究有限公司 | Portable sonic drills continuous sampling equipment and sample storage cabinet |
CN111591565A (en) * | 2020-06-19 | 2020-08-28 | 王金龙 | Protection device for storing RTK measuring equipment |
CN112707026A (en) * | 2021-01-21 | 2021-04-27 | 广东海洋大学 | A categorised equipment of placing of laboratory analysis sample for sewage treatment experiment |
CN113086381A (en) * | 2021-04-23 | 2021-07-09 | 徐鹏飞 | Division of endocrinology is with test tube storage device for spot check sample |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB190902580A (en) * | 1909-02-03 | 1909-12-02 | Walter Harold Rogers | Improvements in and relating to Means for Opening Tins. |
JPH0918166A (en) * | 1995-06-27 | 1997-01-17 | Kawamura Electric Inc | Box for housing electric apparatus |
CN201292100Y (en) * | 2008-11-11 | 2009-08-19 | 黎会明 | Sparking plug packaging box |
CN102241293A (en) * | 2011-05-09 | 2011-11-16 | 蒋晓煜 | Automatic opening/closing environmentally-friendly box |
CN202542065U (en) * | 2012-04-01 | 2012-11-21 | 青岛山海家居用品有限公司 | Sealing cover of storage bottle and storage bottle |
CN202728743U (en) * | 2012-08-30 | 2013-02-13 | 中国国际海运集装箱(集团)股份有限公司 | Tray case lockset and tray case |
CN202879993U (en) * | 2012-11-08 | 2013-04-17 | 吉林大学 | Eye medicine storage box |
CN205256899U (en) * | 2015-12-14 | 2016-05-25 | 重庆博士泰生物技术有限公司 | Reagent packing carton |
CN205366470U (en) * | 2016-01-25 | 2016-07-06 | 东北电力大学 | Prevent extrudeing packing box |
-
2017
- 2017-03-14 CN CN201710149627.7A patent/CN106904357A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB190902580A (en) * | 1909-02-03 | 1909-12-02 | Walter Harold Rogers | Improvements in and relating to Means for Opening Tins. |
JPH0918166A (en) * | 1995-06-27 | 1997-01-17 | Kawamura Electric Inc | Box for housing electric apparatus |
CN201292100Y (en) * | 2008-11-11 | 2009-08-19 | 黎会明 | Sparking plug packaging box |
CN102241293A (en) * | 2011-05-09 | 2011-11-16 | 蒋晓煜 | Automatic opening/closing environmentally-friendly box |
CN202542065U (en) * | 2012-04-01 | 2012-11-21 | 青岛山海家居用品有限公司 | Sealing cover of storage bottle and storage bottle |
CN202728743U (en) * | 2012-08-30 | 2013-02-13 | 中国国际海运集装箱(集团)股份有限公司 | Tray case lockset and tray case |
CN202879993U (en) * | 2012-11-08 | 2013-04-17 | 吉林大学 | Eye medicine storage box |
CN205256899U (en) * | 2015-12-14 | 2016-05-25 | 重庆博士泰生物技术有限公司 | Reagent packing carton |
CN205366470U (en) * | 2016-01-25 | 2016-07-06 | 东北电力大学 | Prevent extrudeing packing box |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108516198A (en) * | 2018-05-29 | 2018-09-11 | 中国地质大学(武汉) | A kind of large size water conservancy and hydropower geotechnical investigation soil sample storage box |
CN108750296A (en) * | 2018-07-17 | 2018-11-06 | 唐加林 | Pathogenic soil microorganism detection samples and storage device |
CN109367985A (en) * | 2018-10-31 | 2019-02-22 | 扬中市佳阳氟塑有限公司 | A kind of instrument storage water-tight equipment with locomotive function |
CN109538201A (en) * | 2018-12-28 | 2019-03-29 | 中水淮河规划设计研究有限公司 | Portable sonic drills continuous sampling equipment and sample storage cabinet |
CN111591565A (en) * | 2020-06-19 | 2020-08-28 | 王金龙 | Protection device for storing RTK measuring equipment |
CN111591565B (en) * | 2020-06-19 | 2023-10-27 | 根创规划设计有限公司 | Protection device for storing RTK measuring equipment |
CN112707026A (en) * | 2021-01-21 | 2021-04-27 | 广东海洋大学 | A categorised equipment of placing of laboratory analysis sample for sewage treatment experiment |
CN113086381A (en) * | 2021-04-23 | 2021-07-09 | 徐鹏飞 | Division of endocrinology is with test tube storage device for spot check sample |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106904357A (en) | A kind of breakage-proof formula geotechnical investigation soil sample storage box | |
CN206572180U (en) | A kind of land surveying horizontal fixture | |
Effect of K0-K0 mixing on CP asymmetries in weak decays of D and B mesons | ||
CN214165919U (en) | Novel blood transport case is used at blood station | |
CN211889114U (en) | Basketball stand column drilling machine | |
CN212340712U (en) | Coal mining subsidence investigation soil sampling equipment | |
CN211281936U (en) | Storage device for mapping engineering | |
CN210829066U (en) | Drilling equipment is used in construction | |
CN211901430U (en) | Portable geographic information system data acquisition unit | |
CN206859830U (en) | A kind of portable municipal guardrail | |
CN211205811U (en) | Deep type exploration rig for geological exploration | |
CN207620735U (en) | A kind of precision rest frame for probing drilling machine | |
CN209427272U (en) | A kind of soil sample classification storage equipment used for geological prospecting | |
CN206556907U (en) | Towed road surface core drilling machine | |
CN218613980U (en) | Novel soil investigation toolbox | |
CN215632753U (en) | Storable drilling device for geological exploration | |
CN209908096U (en) | Road construction seals quick splicing apparatus of way board | |
CN109210347A (en) | A kind of overhead system intelligence prospecting device of the construction of the highway convenient for folding | |
Mason et al. | Water Resources Data for Wyoming, Water Year 2000 | |
CN214730857U (en) | Precision component transportation equipment for surveying and mapping engineering | |
CN213875065U (en) | Soil sampling device for agricultural technology research and development | |
CN214175495U (en) | Portable portable sand table | |
CN214113549U (en) | Protection type precision surveying instrument case | |
CN206648644U (en) | A kind of self-support Sopwith staff | |
CN211237422U (en) | Economics teaching display device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170630 |
|
WD01 | Invention patent application deemed withdrawn after publication |