A kind of gardens quick sprinkler of shrub
Technical field
The present invention relates to a kind of gardens sprinkler, more particularly to a kind of gardens quick sprinkler of shrub.
Background technology
Shrub is the xylophyta without obvious trunk, and plant is typically shorter and smaller, not over 6 meters.From subaerial
Place begins to the limb for and growing wild of growing thickly.All it is perennial.Generally broad leaved plant, it is shrub also to have some confierophytes,
Such as Chinese juniper.If above ground portion is withered when surviving the winter, but root is still survived, and Second Year continues to germinate shoot, then be referred to as " half filling
Wood ".It is also perennial woody plant such as some wormwood artemisia class plants, but winter is withered.
At present when being sprayed water to garden shrub species, major part is that shrub is carried out using man-hour manually hand-held sprinkler
Water spray, but so having the drawback that wastes time and energy, and cannot accomplish to carry out large area and big angle in the short period of time
The water spray of degree, thus so very the need for time and manpower.
Therefore need that a kind of water spray that larger area can be carried out to shrub of research and development, water spray process be time saving and energy saving badly, water spray not
Need substantial amounts of artificial gardens and overcome with the quick sprinkler of shrub at present using manually carrying out water spray to shrub has nothing
Method shrub is carried out the water spray of larger area, water spray process waste time and energy, the substantial amounts of artificial shortcoming of needs of spraying water.
The content of the invention
(1)The technical problem to be solved
The present invention in order to overcome at present using it is artificial shrub is carried out water spray exist shrub cannot be carried out larger area water spray,
Water spray process wastes time and energy, the substantial amounts of artificial shortcoming of needs of spraying water, and the technical problem to be solved in the present invention is to provide can be right
Shrub carries out that the water spray of larger area, water spray process be time saving and energy saving, water spray does not need a kind of substantial amounts of artificial gardens to use shrub
Quick sprinkler.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides the such a gardens quick sprinkler of shrub, bottom is included
Plate, water tank, water pump, flexible pipe, the first guide rail, the first guide pin bushing, handle, placement ring, the second guide rail, baffle plate, the second guide pin bushing, fixation
Block, the first shower nozzle, the first screw rod and the first briquetting, the mode that base plate upside right is bolted are provided with water tank, water tank
The mode that interior left side lower section is bolted is provided with water pump, and flexible pipe is connected with water pump, and base plate upside left is by welding
Mode the first guide rail is installed, slidingtype is connected with the first guide pin bushing on the first guide rail, and the first guide pin bushing right-hand member is by the side welded
Formula is provided with handle, and the first guide pin bushing left side lower section is provided with placement ring by way of welding, flexible pipe one end by placing ring, the
One guide pin bushing left side central portion is provided with the second guide rail by way of welding, and the second guide rail left end is provided with gear by way of welding
Plate, slidingtype is connected with the second guide pin bushing on the second guide rail, and the second guide pin bushing downside is provided with fixed block by way of welding, fixed
The mode that block downside is bolted is provided with the first shower nozzle, and flexible pipe left end reaches fixed block right side by solid by placing ring
Determine block to reach on the first shower nozzle, upside is provided with the first screwed hole in the second guide pin bushing, and the first screw rod is placed with the first screwed hole, the
One screw rod and the first screwed hole coordinate, and the first screw rod lower end is rotatably connected with the first briquetting.
Preferably, right side in the first motor, first gear and the first tooth bar, the first guide pin bushing is also included to be bolted
Mode the first motor is installed, the first motor output shaft on front side of the first motor is connected with first gear by shaft coupling,
The mode that one guide rail right side is bolted is provided with the first tooth bar, and first gear is engaged with the first tooth bar.
Preferably, injection apparatus on a large scale is also included, injection apparatus includes fixed plate, the second motor, fan on a large scale
Shape gear, rotating shaft, second gear, runner, connecting plate, fixed case, water pipe, water filling port, the second shower nozzle, contiguous block and spring, the
Two guide pin bushings downside is provided with injection apparatus on a large scale, and the second guide pin bushing downside is provided with fixed plate by way of welding, before fixed plate
The mode that side top is bolted is provided with the second motor, and the second motor output shaft on front side of the second motor passes through shaft coupling
Sector gear is connected with, fixed plate front side lower section is provided with rotating shaft by way of welding, and rotating shaft is located at the second motor lower section, turns
Axle side rotary of going forward is connected with second gear, and second gear is engaged with sector gear, and second gear front side is by the side welded
Formula is provided with runner, and runner is arranged on front side in rotating shaft by way of welding, and runner lower section is provided with by way of welding
Connecting plate, connecting plate downside is provided with the mode that lower section is bolted in fixed case, fixed case by way of welding and pacified
Equipped with water pipe, the mode that fixed case right side is bolted is provided with water filling port, and water filling port is connected with water pipe, fixed case downside
The mode being bolted is provided with the second shower nozzle, and the second shower nozzle is connected with water pipe, and fixed plate left side lower section is by welding
Mode is provided with contiguous block, and contiguous block downside is provided with spring by way of welding, and lower spring end is pacified by way of welding
Mounted in fixed case left side lower section.
Preferably, the second tooth bar, the 3rd motor and the 3rd gear, the side being bolted on the second guide rail are also included
Formula is provided with the mode that upside is bolted in the second tooth bar, the second guide pin bushing and is provided with the 3rd motor, the 3rd motor front side
The 3rd motor output shaft the 3rd gear is connected with by shaft coupling, the 3rd gear is engaged with the second tooth bar.
Preferably, also include whirligig, whirligig include bearing block, rotating ring, the 4th gear, place block,
4th motor, the 5th gear, block, the first travel switch, the second travel switch and feeler lever, the second guide pin bushing are provided with rotating dress
Put, the mode that the first guide pin bushing upside is bolted is provided with bearing block, bearing block to be installed by way of interference is connected
There is rotating ring, rotation is changed and is enclosed within the first guide rail, rotating ring left side top is provided with the second guide rail by way of welding, rotates
The mode that ring outside is bolted is provided with the 4th gear, and the first guide pin bushing right side top is provided with by way of welding puts
Block is put, the mode being bolted on block is placed and the 4th motor is installed, the 4th motor output shaft of the 4th motor upper end leads to
Cross shaft coupling and be connected with the 5th gear, the 5th gear is engaged with the 4th gear, and the mode that the first guide pin bushing passes on left welding is installed
There is block, the mode that block rear side is bolted is provided with the first travel switch, the side that block rear side is bolted
Formula is provided with the second travel switch, and the second guide rail lower right-hand side is provided with feeler lever by way of welding, after feeler lever is located at block
Side.
Preferably, support block, ring-shaped guide rail, arc guide pin bushing, the second screw rod and the second briquetting are also included, under the first guide pin bushing
Side right is provided with support block by way of welding, and ring-shaped guide rail is installed in support block lower end by way of welding, and annular is led
Rail is enclosed within the first guide rail outside, and slidingtype is connected with arc guide pin bushing on ring-shaped guide rail, and arc guide pin bushing inner side is provided with the second screwed hole,
Somebody's screw rod is placed in second screwed hole, the second screw rod and the second screwed hole coordinate, the outer side rotary of the second screw rod is connected with
Second briquetting, arc guide pin bushing outside is provided with block by way of welding.
Preferably, baseboard material is stainless steel.
Preferably, the material of rotating ring is Q235 steel.
Preferably, the first motor, the second motor, the 3rd motor and the 4th motor are servomotor.
Operation principle:When user needs to spray water the shrub in gardens, user can open water pump, and water pump is from water
During water is extracted in case out by flexible pipe to the first shower nozzle, the first shower nozzle is sprayed water to shrub, and now user can move second and lead
Set, so that the eject position of mobile first shower nozzle, then rotates the first screw rod, the first screw rod passes through the first screwed hole precession first
In guide pin bushing, the first screw rod promotes the first briquetting, the first briquetting to extrude the second guide rail, so as to the second guide pin bushing is fixed on into the second guide rail
This position on.User can also promote handle, and handle drives the first guide pin bushing to be moved up and down on the first slide rail, so as to drive
First shower nozzle is moved up and down, and can so change the area that the first shower nozzle is ejected on shrub.
Because also including the first motor, first gear and the first tooth bar, right side is bolted in the first guide pin bushing
Mode is provided with the first motor, and the first motor output shaft on front side of the first motor is connected with first gear, first by shaft coupling
The mode that guide rail right side is bolted is provided with the first tooth bar, and first gear is engaged with the first tooth bar, when user's needs are right
When first guide pin bushing is moved up or down, the first motor can be opened, the first motor drives first gear rotation, and first gear exists
Rotated on first tooth bar, so that drive the first guide pin bushing to be moved on the first guide rail, so as to avoid the need for user with hand propelled first
Some troubles of guide pin bushing and photograph.
Because also including injection apparatus on a large scale, injection apparatus includes fixed plate, the second motor, sector on a large scale
Wheel, rotating shaft, second gear, runner, connecting plate, fixed case, water pipe, water filling port, the second shower nozzle, contiguous block and spring, second leads
Set downside is provided with injection apparatus on a large scale, and the second guide pin bushing downside is provided with fixed plate by way of welding, on fixed plate front side
The mode that side is bolted is provided with the second motor, and the second motor output shaft on front side of the second motor is connected by shaft coupling
There is sector gear, fixed plate front side lower section is provided with rotating shaft by way of welding, and rotating shaft is located at the second motor lower section, in rotating shaft
Front side is rotatably connected with second gear, and second gear is engaged with sector gear, and second gear front side is pacified by way of welding
Equipped with runner, runner is arranged on front side in rotating shaft by way of welding, and runner lower section is provided with connection by way of welding
Plate, connecting plate downside is provided with the mode that lower section is bolted in fixed case, fixed case by way of welding and is provided with
Water pipe, the mode that fixed case right side is bolted is provided with water filling port, and water filling port is connected with water pipe, and fixed case downside passes through
Bolted mode is provided with the second shower nozzle, and the second shower nozzle is connected with water pipe, and fixed plate left side lower section is by way of welding
Contiguous block is installed, contiguous block downside is provided with spring by way of welding, and lower spring end is arranged on by way of welding
Fixed case left side lower section, when user needs to increase the scope of injection, user can open the second motor, and the second motor drives fan
Shape gear turns clockwise, and sector gear rotarily drives the second gear being engaged with rotate counterclockwise in rotating shaft, the second tooth
Wheel rotarily drives runner rotate counterclockwise, and runner rotarily drives connecting plate rotation, and connecting plate rotarily drives fixed case and revolves counterclockwise
Turn, so as to drive the second shower nozzle rotate counterclockwise, now fixed case pulls on spring, and now spring belongs to extended state, second
Shower nozzle rotation will have bigger spray regime, so as to realize spraying more shrubs, when sector gear rotate to not with
When second gear is engaged, spring will recover from extended state, fixed case be pulled around rotating shaft rotate counterclockwise, so as to carry out
One rotation back and forth.
Because also including the second tooth bar, the 3rd motor and the 3rd gear, the mode being bolted on the second guide rail
The mode that upside is bolted in second tooth bar, the second guide pin bushing is installed the 3rd motor is installed, on front side of the 3rd motor
3rd motor output shaft is connected with the 3rd gear by shaft coupling, and the 3rd gear is engaged with the second tooth bar, when user needs movement
During the second guide pin bushing, user can open the 3rd motor, and the 3rd motor drives the rotation of the 3rd gear, and the 3rd gear is on the second tooth bar
Rotation, so as to drive the second guide pin bushing to be moved left and right on the second guide rail.
Because also including whirligig, whirligig includes bearing block, rotating ring, the 4th gear, placement block, the 4th
Motor, the 5th gear, block, the first travel switch, the second travel switch and feeler lever, the second guide pin bushing are provided with whirligig, the
The mode that one guide pin bushing upside is bolted is provided with bearing block, bearing block and is provided with rotation by way of interference is connected
Ring, rotation is changed and is enclosed within the first guide rail, and rotating ring left side top is provided with the second guide rail, rotating ring outside by way of welding
The mode being bolted is provided with the 4th gear, and the first guide pin bushing right side top is provided with placement block by way of welding,
Place the mode being bolted on block and the 4th motor is installed, the 4th motor output shaft of the 4th motor upper end passes through shaft coupling
Device is connected with the 5th gear, and the 5th gear is engaged with the 4th gear, and the mode that the first guide pin bushing passes on left welding is provided with block,
The mode that block rear side is bolted is provided with the first travel switch, and the mode that block rear side is bolted is provided with
Second travel switch, the second guide rail lower right-hand side is provided with feeler lever by way of welding, and feeler lever is located at block rear side, works as user
When needing to spray water numerous shrubs, user can open the 4th motor, and the 4th motor drives the rotation of the 5th gear, the 5th
Gear rotarily drives rotating ring rotation, and rotating ring rotation will drive the rotation of the second guide rail, so that drive the second shower nozzle to rotate, so that
The second shower nozzle is set to be sprayed water against the very large area centered on rotating ring, when the second guide rail rotates, the second guide rail also will
Band movable feeler lever rotation, feeler lever rotate to a circle touch front side the second travel switch when, the second travel switch is triggered, control
4th motor is reversely rotated, and is reversely rotated so as to ring is rotated, and is turned around when feeler lever revolves again, touches the first row of rear side
Cheng Kaiguan, the first travel switch is switched on, and the 4th motor of control is reversely rotated again.
Because also including support block, ring-shaped guide rail, arc guide pin bushing, the second screw rod and the second briquetting, the first guide pin bushing downside
Right is provided with support block by way of welding, and ring-shaped guide rail, ring-shaped guide rail are installed in support block lower end by way of welding
The first guide rail outside is enclosed within, slidingtype is connected with arc guide pin bushing on ring-shaped guide rail, arc guide pin bushing inner side is provided with the second screwed hole, the
Somebody's screw rod is placed in two screwed holes, the second screw rod coordinates with the second screwed hole, side rotary is connected with the to the second screw rod outward
Two briquettings, arc guide pin bushing outside is provided with block by way of welding, is carried out when user needs change rotating ring rotation to turn around
Commutate rotation position when, user can move arc guide pin bushing, and arc guide pin bushing is moved on ring-shaped guide rail, needed for moving to user
Position when, rotate the second screw rod, the second screw rod is by the way that in the cooperation precession arc guide pin bushing with the second screwed hole, the second screw rod is pushed away
Dynamic second briquetting, the second briquetting extruding ring-shaped guide rail, arc guide pin bushing is fixed on this position on ring-shaped guide rail.
Because baseboard material is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture service life.
Because the material of rotating ring is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device more
It is long.
Because the first motor, the second motor, the 3rd motor and the 4th motor are servomotor, anti-overload ability is strong, at a high speed
Performance is good, can be precisely controlled its rotating speed.
(3)Beneficial effect
Invention achieves water spray, water spray process that larger area can be carried out to shrub it is time saving and energy saving, water spray need not be a large amount of
Artificial effect, using sector gear drive fixed case rotate so as to drive the second shower nozzle rotate by way of, not only can
Enough accomplish to spray water greater area of shrub, and the saving to water resource can be reached, because being no longer only opposite single
One shrub is sprayed water, by way of the second shower nozzle being rotarily driven using rotating ring and is rotated around rotating ring, can be to bigger
The shrub of area sprayed water, that is, saved many times.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the invention.
Fig. 2 is second main structure diagram of the invention.
Fig. 3 is the first main structure diagram of injection apparatus on a large scale of the invention.
Fig. 4 is the third main structure diagram of the invention.
Fig. 5 is the first main structure diagram of whirligig of the present invention.
Fig. 6 is second main structure diagram of whirligig of the present invention.
Fig. 7 is the overlooking the structure diagram of ring-shaped guide rail of the present invention.
Mark in accompanying drawing for:1- base plates, 2- water tanks, 3- water pumps, 4- flexible pipes, the guide rails of 5- first, the guide pin bushings of 6- first, 7- is pushed away
8- places ring, the guide rails of 9- second, 10- baffle plates, the guide pin bushings of 11- second, 12- fixed blocks, the shower nozzles of 13- first, the screw threads of 14- first
Hole, the screw rods of 15- first, the briquettings of 16- first, the motors of 17- first, 18- first gears, the tooth bars of 19- first, 20- sprays on a large scale
Device, 201- fixed plates, the motors of 202- second, 203- sector gears, 204- rotating shafts, 205- second gears, 206- runners, 207-
Connecting plate, 208- fixed cases, 209- water pipes, 2010- water filling ports, the shower nozzles of 2011- second, 2012- contiguous blocks, 2013- springs,
The tooth bars of 111- second, the motors of 112- the 3rd, the gears of 113- the 3rd, 21- whirligigs, 211- bearing blocks, 212- rotating rings, 213-
4th gear, 214- places block, the motors of 215- the 4th, the gears of 216- the 5th, 217- blocks, the travel switches of 218- first, 219-
Second travel switch, 2110- feeler levers, 2171- support blocks, 2172- ring-shaped guide rails, 2173- arc guide pin bushings, the screw threads of 2174- second
Hole, the screw rods of 2175- second, the briquettings of 2176- second.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of gardens quick sprinkler of shrub, as shown in figs. 1-7, includes base plate 1, water tank 2, water pump 3, flexible pipe 4, first
Guide rail 5, the first guide pin bushing 6, handle 7, placement ring 8, the second guide rail 9, baffle plate 10, the second guide pin bushing 11, fixed block 12, the first shower nozzle
13rd, the first screw rod 15 and the first briquetting 16, the mode that the upside right of base plate 1 is bolted is provided with water tank 2, in water tank 2
The mode that left side lower section is bolted is provided with water pump 3, and flexible pipe 4 is connected with water pump 3, and the upside left of base plate 1 is by weldering
The mode for connecing is provided with the first guide rail 5, and slidingtype is connected with the first guide pin bushing 6 on the first guide rail 5, and the right-hand member of the first guide pin bushing 6 is by weldering
The mode for connecing is provided with handle 7, and the left side of the first guide pin bushing 6 lower section is provided with placement ring 8 by way of welding, and the one end of flexible pipe 4 leads to
Placement ring 8 is crossed, the left side central portion of the first guide pin bushing 6 is provided with the second guide rail 9 by way of welding, and the left end of the second guide rail 9 is by weldering
The mode for connecing is provided with baffle plate 10, and slidingtype is connected with the second guide pin bushing 11 on the second guide rail 9, and the downside of the second guide pin bushing 11 is by welding
Mode fixed block 12 is installed, the mode that the downside of fixed block 12 is bolted is provided with the first shower nozzle 13, the left end of flexible pipe 4
The right side of fixed block 12 is reached by placing ring 8 to be reached on the first shower nozzle 13 by fixed block 12, in the second guide pin bushing 11 on the upside of be provided with
First screwed hole 14, the first screw rod 15 is placed with the first screwed hole 14, and the first screw rod 15 coordinates with the first screwed hole 14, and first
The lower end of screw rod 15 is rotatably connected with the first briquetting 16.
Embodiment 2
A kind of gardens quick sprinkler of shrub, as shown in figs. 1-7, includes base plate 1, water tank 2, water pump 3, flexible pipe 4, first
Guide rail 5, the first guide pin bushing 6, handle 7, placement ring 8, the second guide rail 9, baffle plate 10, the second guide pin bushing 11, fixed block 12, the first shower nozzle
13rd, the first screw rod 15 and the first briquetting 16, the mode that the upside right of base plate 1 is bolted is provided with water tank 2, in water tank 2
The mode that left side lower section is bolted is provided with water pump 3, and flexible pipe 4 is connected with water pump 3, and the upside left of base plate 1 is by weldering
The mode for connecing is provided with the first guide rail 5, and slidingtype is connected with the first guide pin bushing 6 on the first guide rail 5, and the right-hand member of the first guide pin bushing 6 is by weldering
The mode for connecing is provided with handle 7, and the left side of the first guide pin bushing 6 lower section is provided with placement ring 8 by way of welding, and the one end of flexible pipe 4 leads to
Placement ring 8 is crossed, the left side central portion of the first guide pin bushing 6 is provided with the second guide rail 9 by way of welding, and the left end of the second guide rail 9 is by weldering
The mode for connecing is provided with baffle plate 10, and slidingtype is connected with the second guide pin bushing 11 on the second guide rail 9, and the downside of the second guide pin bushing 11 is by welding
Mode fixed block 12 is installed, the mode that the downside of fixed block 12 is bolted is provided with the first shower nozzle 13, the left end of flexible pipe 4
The right side of fixed block 12 is reached by placing ring 8 to be reached on the first shower nozzle 13 by fixed block 12, in the second guide pin bushing 11 on the upside of be provided with
First screwed hole 14, the first screw rod 15 is placed with the first screwed hole 14, and the first screw rod 15 coordinates with the first screwed hole 14, and first
The lower end of screw rod 15 is rotatably connected with the first briquetting 16.
The first motor 17, the tooth bar 19 of first gear 18 and first are also included, right side is bolted in the first guide pin bushing 6
Mode the first motor 17 is installed, the output shaft of the first motor 17 of the front side of the first motor 17 is connected with the first tooth by shaft coupling
Wheel 18, the mode that the right side of the first guide rail 5 is bolted is provided with the first tooth bar 19, and first gear 18 is nibbled with the first tooth bar 19
Close.
Embodiment 3
A kind of gardens quick sprinkler of shrub, as shown in figs. 1-7, includes base plate 1, water tank 2, water pump 3, flexible pipe 4, first
Guide rail 5, the first guide pin bushing 6, handle 7, placement ring 8, the second guide rail 9, baffle plate 10, the second guide pin bushing 11, fixed block 12, the first shower nozzle
13rd, the first screw rod 15 and the first briquetting 16, the mode that the upside right of base plate 1 is bolted is provided with water tank 2, in water tank 2
The mode that left side lower section is bolted is provided with water pump 3, and flexible pipe 4 is connected with water pump 3, and the upside left of base plate 1 is by weldering
The mode for connecing is provided with the first guide rail 5, and slidingtype is connected with the first guide pin bushing 6 on the first guide rail 5, and the right-hand member of the first guide pin bushing 6 is by weldering
The mode for connecing is provided with handle 7, and the left side of the first guide pin bushing 6 lower section is provided with placement ring 8 by way of welding, and the one end of flexible pipe 4 leads to
Placement ring 8 is crossed, the left side central portion of the first guide pin bushing 6 is provided with the second guide rail 9 by way of welding, and the left end of the second guide rail 9 is by weldering
The mode for connecing is provided with baffle plate 10, and slidingtype is connected with the second guide pin bushing 11 on the second guide rail 9, and the downside of the second guide pin bushing 11 is by welding
Mode fixed block 12 is installed, the mode that the downside of fixed block 12 is bolted is provided with the first shower nozzle 13, the left end of flexible pipe 4
The right side of fixed block 12 is reached by placing ring 8 to be reached on the first shower nozzle 13 by fixed block 12, in the second guide pin bushing 11 on the upside of be provided with
First screwed hole 14, the first screw rod 15 is placed with the first screwed hole 14, and the first screw rod 15 coordinates with the first screwed hole 14, and first
The lower end of screw rod 15 is rotatably connected with the first briquetting 16.
The first motor 17, the tooth bar 19 of first gear 18 and first are also included, right side is bolted in the first guide pin bushing 6
Mode the first motor 17 is installed, the output shaft of the first motor 17 of the front side of the first motor 17 is connected with the first tooth by shaft coupling
Wheel 18, the mode that the right side of the first guide rail 5 is bolted is provided with the first tooth bar 19, and first gear 18 is nibbled with the first tooth bar 19
Close.
Also include injection apparatus 20 on a large scale, on a large scale injection apparatus 20 include fixed plate 201, the second motor 202,
Sector gear 203, rotating shaft 204, second gear 205, runner 206, connecting plate 207, fixed case 208, water pipe 209, water filling port
2010th, the second shower nozzle 2011, contiguous block 2012 and spring 2013, the downside of the second guide pin bushing 11 are provided with injection apparatus 20 on a large scale, the
The downside of two guide pin bushing 11 is provided with fixed plate 201, the mode that the front side top of fixed plate 201 is bolted by way of welding
Second motor 202 is installed, the output shaft of the second motor 202 of the front side of the second motor 202 is connected with sector gear by shaft coupling
203, the front side of fixed plate 201 lower section is provided with rotating shaft 204 by way of welding, and rotating shaft 204 is located at the lower section of the second motor 202,
The side rotary of going forward of rotating shaft 204 is connected with second gear 205, and second gear 205 is engaged with sector gear 203, second gear 205
Front side is provided with runner 206 by way of welding, and runner 206 is arranged on front side, runner in rotating shaft 204 by way of welding
206 lower sections are provided with connecting plate 207 by way of welding, and the downside of connecting plate 207 is provided with fixed case by way of welding
208, the mode that lower section is bolted in fixed case 208 is provided with water pipe 209, and the right side of fixed case 208 is bolted
Mode water filling port 2010 is installed, water filling port 2010 is connected with water pipe 209, the side that the downside of fixed case 208 is bolted
Formula is provided with the second shower nozzle 2011, and the second shower nozzle 2011 is connected with water pipe 209, the side that the left side of fixed plate 201 lower section passes through welding
Formula is provided with contiguous block 2012, and the downside of contiguous block 2012 is provided with spring 2013 by way of welding, and the lower end of spring 2013 leads to
The mode for crossing welding is arranged on the left side of fixed case 208 lower section.
Embodiment 4
A kind of gardens quick sprinkler of shrub, as shown in figs. 1-7, includes base plate 1, water tank 2, water pump 3, flexible pipe 4, first
Guide rail 5, the first guide pin bushing 6, handle 7, placement ring 8, the second guide rail 9, baffle plate 10, the second guide pin bushing 11, fixed block 12, the first shower nozzle
13rd, the first screw rod 15 and the first briquetting 16, the mode that the upside right of base plate 1 is bolted is provided with water tank 2, in water tank 2
The mode that left side lower section is bolted is provided with water pump 3, and flexible pipe 4 is connected with water pump 3, and the upside left of base plate 1 is by weldering
The mode for connecing is provided with the first guide rail 5, and slidingtype is connected with the first guide pin bushing 6 on the first guide rail 5, and the right-hand member of the first guide pin bushing 6 is by weldering
The mode for connecing is provided with handle 7, and the left side of the first guide pin bushing 6 lower section is provided with placement ring 8 by way of welding, and the one end of flexible pipe 4 leads to
Placement ring 8 is crossed, the left side central portion of the first guide pin bushing 6 is provided with the second guide rail 9 by way of welding, and the left end of the second guide rail 9 is by weldering
The mode for connecing is provided with baffle plate 10, and slidingtype is connected with the second guide pin bushing 11 on the second guide rail 9, and the downside of the second guide pin bushing 11 is by welding
Mode fixed block 12 is installed, the mode that the downside of fixed block 12 is bolted is provided with the first shower nozzle 13, the left end of flexible pipe 4
The right side of fixed block 12 is reached by placing ring 8 to be reached on the first shower nozzle 13 by fixed block 12, in the second guide pin bushing 11 on the upside of be provided with
First screwed hole 14, the first screw rod 15 is placed with the first screwed hole 14, and the first screw rod 15 coordinates with the first screwed hole 14, and first
The lower end of screw rod 15 is rotatably connected with the first briquetting 16.
The first motor 17, the tooth bar 19 of first gear 18 and first are also included, right side is bolted in the first guide pin bushing 6
Mode the first motor 17 is installed, the output shaft of the first motor 17 of the front side of the first motor 17 is connected with the first tooth by shaft coupling
Wheel 18, the mode that the right side of the first guide rail 5 is bolted is provided with the first tooth bar 19, and first gear 18 is nibbled with the first tooth bar 19
Close.
Also include injection apparatus 20 on a large scale, on a large scale injection apparatus 20 include fixed plate 201, the second motor 202,
Sector gear 203, rotating shaft 204, second gear 205, runner 206, connecting plate 207, fixed case 208, water pipe 209, water filling port
2010th, the second shower nozzle 2011, contiguous block 2012 and spring 2013, the downside of the second guide pin bushing 11 are provided with injection apparatus 20 on a large scale, the
The downside of two guide pin bushing 11 is provided with fixed plate 201, the mode that the front side top of fixed plate 201 is bolted by way of welding
Second motor 202 is installed, the output shaft of the second motor 202 of the front side of the second motor 202 is connected with sector gear by shaft coupling
203, the front side of fixed plate 201 lower section is provided with rotating shaft 204 by way of welding, and rotating shaft 204 is located at the lower section of the second motor 202,
The side rotary of going forward of rotating shaft 204 is connected with second gear 205, and second gear 205 is engaged with sector gear 203, second gear 205
Front side is provided with runner 206 by way of welding, and runner 206 is arranged on front side, runner in rotating shaft 204 by way of welding
206 lower sections are provided with connecting plate 207 by way of welding, and the downside of connecting plate 207 is provided with fixed case by way of welding
208, the mode that lower section is bolted in fixed case 208 is provided with water pipe 209, and the right side of fixed case 208 is bolted
Mode water filling port 2010 is installed, water filling port 2010 is connected with water pipe 209, the side that the downside of fixed case 208 is bolted
Formula is provided with the second shower nozzle 2011, and the second shower nozzle 2011 is connected with water pipe 209, the side that the left side of fixed plate 201 lower section passes through welding
Formula is provided with contiguous block 2012, and the downside of contiguous block 2012 is provided with spring 2013 by way of welding, and the lower end of spring 2013 leads to
The mode for crossing welding is arranged on the left side of fixed case 208 lower section.
The second tooth bar 111, the 3rd motor 112 and the 3rd gear 113 are also included, is bolted on the second guide rail 9
Mode the second tooth bar 111 is installed, the mode that upside is bolted in the second guide pin bushing 11 is provided with the 3rd motor 112,
The output shaft of 3rd motor 112 of the front side of the 3rd motor 112 is connected with the 3rd gear 113 by shaft coupling, the 3rd gear 113 and the
Two tooth bars 111 are engaged.
Also include whirligig 21, whirligig 21 includes bearing block 211, rotating ring 212, the 4th gear 213, puts
Put block 214, the 4th motor 215, the 5th gear 216, block 217, the first travel switch 218, the second travel switch 219 and feeler lever
2110, the second guide pin bushing 11 is provided with whirligig 21, and the mode that the upside of the first guide pin bushing 6 is bolted is provided with bearing block
211, rotating ring 212 is installed in bearing block 211 by way of interference is connected, rotation is changed and is enclosed within the first guide rail 5, rotating ring
212 left sides top are provided with the second guide rail 9 by way of welding, and the mode that the outside of rotating ring 212 is bolted is installed
There is the 4th gear 213, the right side of the first guide pin bushing 6 top is provided with placement block 214 by way of welding, places and pass through on block 214
Bolted mode is provided with the 4th motor 215, and the output shaft of the 4th motor 215 of the upper end of the 4th motor 215 passes through shaft coupling
The 5th gear 216 is connected with, the 5th gear 216 is engaged with the 4th gear 213, the mode that the first guide pin bushing 6 passes on left welding is pacified
Equipped with block 217, the mode that the rear side of block 217 is bolted is provided with the first travel switch 218, and the rear side of block 217 is logical
Cross bolted mode and the second travel switch 219 is installed, the lower right-hand side of the second guide rail 9 is provided with tactile by way of welding
Bar 2110, feeler lever 2110 is located at the rear side of block 217.
Also include support block 2171, ring-shaped guide rail 2172, arc guide pin bushing 2173, the second screw rod 2175 and the second briquetting
2176, the downside right of the first guide pin bushing 6 is provided with support block 2171 by way of welding, and the lower end of support block 2171 is by welding
Mode installs ring-shaped guide rail 2172, and ring-shaped guide rail 2172 is enclosed within the outside of the first guide rail 5, and slidingtype is connected with ring-shaped guide rail 2172
Arc guide pin bushing 2173, the inner side of arc guide pin bushing 2173 is provided with the second screwed hole 2174, and somebody's spiral shell is placed in the second screwed hole 2174
Bar, the second screw rod 2175 coordinates with the second screwed hole 2174, and the outer side rotary of the second screw rod 2175 is connected with the second briquetting 2176,
The outside of arc guide pin bushing 2173 is provided with block 217 by way of welding.
The material of base plate 1 is stainless steel.
The material of rotating ring 212 is Q235 steel.
First motor 17, the second motor 202, the 3rd motor 112 and the 4th motor 215 are servomotor.
Operation principle:When user needs to spray water the shrub in gardens, user can open water pump 3, water pump 3 from
Water is extracted in water tank 2 out by the way that in the shower nozzle of flexible pipe 4 to the first 13, the first shower nozzle 13 is sprayed water to shrub, and now user can move
Dynamic second guide pin bushing 11, so that the eject position of mobile first shower nozzle 13, then rotates the first screw rod 15, and the first screw rod 15 is by the
In the first guide pin bushing of precession 6 of one screwed hole 14, the first screw rod 15 promotes the first briquetting 16, the first briquetting 16 to extrude the second guide rail 9, from
And the second guide pin bushing 11 is fixed on this position of the second guide rail 9.User can also promote handle 7, handle 7 to drive first to lead
Set 6 is moved up and down on the first slide rail, so as to drive the first shower nozzle 13 to move up and down, can so be changed the first shower nozzle 13 and be sprayed
Area on to shrub.
Because also including the first motor 17, the tooth bar 19 of first gear 18 and first, right side passes through bolt in the first guide pin bushing 6
The mode of connection is provided with the first motor 17, and the output shaft of the first motor 17 of the front side of the first motor 17 is connected with the by shaft coupling
One gear 18, the mode that the right side of the first guide rail 5 is bolted is provided with the first tooth bar 19, the tooth bar of first gear 18 and first
19 engagements, when user needs to move up or down the first guide pin bushing 6, can open the first motor 17, the band of the first motor 17
Dynamic first gear 18 rotates, and first gear 18 rotates on the first tooth bar 19, so as to drive the first guide pin bushing 6 on the first guide rail 5
It is mobile, so as to avoid the need for some troubles that user is shone with the first guide pin bushing of hand propelled 6.
Because also including injection apparatus 20 on a large scale, injection apparatus 20 includes fixed plate 201, the second motor on a large scale
202nd, sector gear 203, rotating shaft 204, second gear 205, runner 206, connecting plate 207, fixed case 208, water pipe 209, water filling
The 2010, second shower nozzle 2011 of mouth, contiguous block 2012 and spring 2013, the downside of the second guide pin bushing 11 are provided with injection apparatus 20 on a large scale,
The downside of second guide pin bushing 11 is provided with fixed plate 201, the side that the front side top of fixed plate 201 is bolted by way of welding
Formula is provided with the second motor 202, and the output shaft of the second motor 202 of the front side of the second motor 202 is connected with sector by shaft coupling
Wheel 203, the front side of fixed plate 201 lower section is provided with rotating shaft 204 by way of welding, and rotating shaft 204 is located under the second motor 202
Side, the side rotary of going forward of rotating shaft 204 is connected with second gear 205, and second gear 205 is engaged with sector gear 203, second gear
205 front sides are provided with runner 206 by way of welding, and runner 206 is arranged on front side in rotating shaft 204 by way of welding,
The lower section of runner 206 is provided with connecting plate 207 by way of welding, and the downside of connecting plate 207 is provided with solid by way of welding
Determine the mode that lower section is bolted in case 208, fixed case 208 and water pipe 209 is installed, the right side of fixed case 208 passes through bolt
The mode of connection is provided with water filling port 2010, and water filling port 2010 is connected with water pipe 209, and the downside of fixed case 208 is bolted
Mode the second shower nozzle 2011 is installed, the second shower nozzle 2011 is connected with water pipe 209, and the left side of fixed plate 201 lower section is by welding
Mode contiguous block 2012 is installed, the downside of contiguous block 2012 is provided with spring 2013 by way of welding, under spring 2013
End is arranged on the left side of fixed case 208 lower section by way of welding, and when user needs to increase the scope of injection, user can beat
The second motor 202 is driven, the second motor 202 drives sector gear 203 to turn clockwise, and sector gear 203 rotarily drives to be nibbled therewith
The second gear 205 of conjunction rotate counterclockwise in rotating shaft 204, second gear 205 rotarily drives the rotate counterclockwise of runner 206, turns
Wheel 206 rotarily drives connecting plate 207 and rotates, and connecting plate 207 rotarily drives the rotate counterclockwise of fixed case 208, so as to drive second
The rotate counterclockwise of shower nozzle 2011, now fixed case 208 pull on spring 2013, now spring 2013 belongs to extended state, second
Shower nozzle 2011 rotates will bigger spray regime, so that realize spraying more shrubs, when sector gear 203 is rotated to
When engagement with second gear 205, spring 2013 will recover from extended state, pull fixed case 208 around rotating shaft 204
Rotate counterclockwise, so as to carry out a rotation back and forth.
Because also including the second tooth bar 111, the 3rd motor 112 and the 3rd gear 113, bolt is passed through on the second guide rail 9
The mode of connection is provided with the second tooth bar 111, and the mode that upside is bolted in the second guide pin bushing 11 is provided with the 3rd motor
112, the output shaft of the 3rd motor 112 of the front side of the 3rd motor 112 is connected with the 3rd gear 113, the 3rd gear 113 by shaft coupling
Engaged with the second tooth bar 111, when user needs mobile second guide pin bushing 11, user can open the 3rd motor 112, the 3rd motor
112 the 3rd gears 113 of drive rotate, and the 3rd gear 113 rotates on the second tooth bar 111, so as to drive the second guide pin bushing 11 the
Moved left and right on two guide rails 9.
Because also including whirligig 21, whirligig 21 includes bearing block 211, rotating ring 212, the 4th gear
213rd, block 214, the 4th motor 215, the 5th gear 216, block 217, the first travel switch 218, the second travel switch 219 are placed
With feeler lever 2110, the second guide pin bushing 11 is provided with whirligig 21, and the mode that the upside of the first guide pin bushing 6 is bolted is provided with axle
Rotating ring 212 is installed by way of interference is connected, rotation is changed and is enclosed within the first guide rail 5, is revolved in bearing 211, bearing block 211
The left side of change 212 top is provided with the second guide rail 9, the mode that the outside of rotating ring 212 is bolted by way of welding
4th gear 213 is installed, the right side of the first guide pin bushing 6 top is provided with placement block 214 by way of welding, placed on block 214
The mode being bolted is provided with the 4th motor 215, and the output shaft of the 4th motor 215 of the upper end of the 4th motor 215 is by connection
Axle device is connected with the 5th gear 216, and the 5th gear 216 is engaged with the 4th gear 213, and the first guide pin bushing 6 passes on left the side of welding
Formula is provided with block 217, and the mode that the rear side of block 217 is bolted is provided with the first travel switch 218, after block 217
The mode that side is bolted is provided with the second travel switch 219, and the lower right-hand side of the second guide rail 9 is installed by way of welding
There is a feeler lever 2110, feeler lever 2110 is located at the rear side of block 217, when user needs to spray water numerous shrubs, user can be with
The 4th motor 215 is opened, the 4th motor 215 drives the 5th gear 216 to rotate, and the 5th gear 216 rotarily drives rotating ring 212 and revolves
Turn, rotating ring 212 rotates will drive the second guide rail 9 to rotate, so that drive the second shower nozzle 2011 to rotate, so that the second shower nozzle
2011 are sprayed water against the very large area centered on rotating ring 212, and when the second guide rail 9 rotates, the second guide rail 9 is also by band
Movable feeler lever 2110 rotates, feeler lever 2110 rotate to a circle touch front side the second travel switch 219 when, the second travel switch
219 are triggered, and the 4th motor 215 of control is reversely rotated, and is reversely rotated so as to ring 212 is rotated, when feeler lever 2110 revolves again
Turn around, touch the first travel switch 218 of rear side, the first travel switch 218 is switched on, the 4th motor 215 of control is again
Reversely rotate.
Because also including support block 2171, ring-shaped guide rail 2172, arc guide pin bushing 2173, the second screw rod 2175 and the second pressure
Block 2176, the downside right of the first guide pin bushing 6 is provided with support block 2171 by way of welding, and the lower end of support block 2171 is by welding
Mode ring-shaped guide rail 2172 is installed, ring-shaped guide rail 2172 is enclosed within the outside of the first guide rail 5, slidingtype connection on ring-shaped guide rail 2172
There is arc guide pin bushing 2173, the inner side of arc guide pin bushing 2173 is provided with the second screwed hole 2174, somebody is placed in the second screwed hole 2174
Screw rod, the second screw rod 2175 coordinates with the second screwed hole 2174, and the outer side rotary of the second screw rod 2175 is connected with the second briquetting
2176, the outside of arc guide pin bushing 2173 is provided with block 217 by way of welding, when user needs change rotating ring 212 to rotate
When one circle carries out the position of commutation rotation, user can move arc guide pin bushing 2173, and arc guide pin bushing 2173 is in ring-shaped guide rail 2172
Upper movement, when moving to user desired position, rotate the second screw rod 2175, the second screw rod 2175 by with the second screwed hole
In 2174 cooperation precession arc guide pin bushing 2173, the second screw rod 2175 promotes the second briquetting 2176, the extrusion ring of the second briquetting 2176
Shape guide rail 2172, arc guide pin bushing 2173 is fixed on this position on ring-shaped guide rail 2172.
Because the material of base plate 1 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, can extension fixture service life.
Because the material of rotating ring 212 is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device
It is longer.
Because the first motor 17, the second motor 202, the 3rd motor 112 and the 4th motor 215 are servomotor, overload-resistant
Ability is strong, and high speed performance is good, can be precisely controlled its rotating speed.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations, improvement can also be made and substituted, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.