CN106899015A - A kind of underground garage power supply-distribution system - Google Patents

A kind of underground garage power supply-distribution system Download PDF

Info

Publication number
CN106899015A
CN106899015A CN201710186535.6A CN201710186535A CN106899015A CN 106899015 A CN106899015 A CN 106899015A CN 201710186535 A CN201710186535 A CN 201710186535A CN 106899015 A CN106899015 A CN 106899015A
Authority
CN
China
Prior art keywords
power
module
distribution
power supply
electrical equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710186535.6A
Other languages
Chinese (zh)
Inventor
李恩虎
宁海涛
袁庆民
茹永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Tgood Intelligent Charging Technology Co Ltd
Original Assignee
Xian Tgood Intelligent Charging Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Tgood Intelligent Charging Technology Co Ltd filed Critical Xian Tgood Intelligent Charging Technology Co Ltd
Priority to CN201710186535.6A priority Critical patent/CN106899015A/en
Publication of CN106899015A publication Critical patent/CN106899015A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
    • H02J13/0006
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/22Flexible AC transmission systems [FACTS] or power factor or reactive power compensating or correcting units
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses a kind of underground garage power supply-distribution system, including being distributed in each parking stall for providing the distribution bus Z of power taking interface, intelligent power distribution cabinet for gathering electrical equipment service data on power taking interface, with the concentration background monitoring that intelligent power distribution cabinet carries out data interaction, and for providing the power supply of electric energy for system, concentrating electricity price or step price of the background monitoring according to setting, realize the power output of each electrical equipment, metering and information exchange are so as to realize the accurate metering of the electricity charge, and power terminal interface can meet the power taking demand of various electrical equipments.

Description

A kind of underground garage power supply-distribution system
Technical field
The invention belongs to charging electric vehicle technical field, and in particular to a kind of underground garage power supply-distribution system.
Background technology
(2015) are sent out on the instruction and the Office of the State Council for accelerating charging electric vehicle infrastructure construction by the General Office of the State Council " in principle, New Dwelling answers 100% construction electrically-charging equipment or reserved building peace with parking stall is built for No. 73 file related content requirements Dress condition, palace appertaining parking, public parking builds electrically-charging equipment or reserved construction mounting condition Parking stall ratio be not less than 10% ".At this stage, due to effectively solving cell underground garage parking stall without perfect scheme and product The problem of power supply, causes the policy only to rest on policy aspect, and charging pile is made slow progress into underground garage.
In existing underground garage, for the car owner for having fixed parking stall, grid company can be consulted or infrastructure management company enters Row is interim to be socketed cable or installs corresponding charging socket, meets the power supply requirement of electric motor car charging.But this scheme exist with Lower problem:
1st, Electricity customers are more dispersed, and Utilities Electric Co.'s inconvenience meterage, property does not have sale of electricity authority, causes electricity consumption visitor Family power taking is difficult;
2nd, the dispersion multiple bracing wire of Electricity customers power taking connects conductance and causes repeatedly construction, costly;
3rd, the interim cable that sockets has electric shock, the potential safety hazard of electric leakage;
4th, interim socket power has and usurps risk by other Electricity customers;
For the car owner without fixed parking stall, charging problems of the electric motor car in underground garage cannot be even more solved;Due to parking stall Do not fix, it is impossible to meet charge requirement by the way of interim overlap joint cable;With the access of charging pile, its to underground garage His electrical equipment (fire protection warning, personnel positioning, illumination, Temperature and Humidity, ground lock, communication etc.) equipment is also no suitable convenient Power taking interface, causes these necessary electrical equipments in increase extremely difficult, and cannot accurately be counted to charging vehicle Take.
The content of the invention
In order to solve the above problems, it is an object of the invention to provide a kind of underground garage power supply-distribution system, backstage is being concentrated Monitoring can according to setting electricity price or step price, realize each electrical equipment power output, metering and information exchange so as to The accurate metering of the electricity charge is realized, and power terminal interface (i.e. the power taking interface that distribution bus Z is provided) can meet various electricity consumptions The power taking demand of equipment.
To achieve these goals, the technical solution adopted by the present invention is, a kind of underground garage power supply-distribution system, including point Cloth is in each parking stall for providing the distribution bus Z of power taking interface, for gathering electrical equipment service data on power taking interface Intelligent power distribution cabinet and intelligent power distribution cabinet carry out the concentration background monitoring of data interaction and the confession for providing electric energy for system Power supply, wherein:
The power input of intelligent power distribution cabinet is connected with the output end of power supply, and the power output end of intelligent power distribution cabinet connects Distribution bus Z is connected to, metering module and communication module are provided with intelligent power distribution cabinet, wherein, communication module is used to realize measuring Data interaction between the data interaction of electrical equipment in module and power taking interface, and metering module and concentration background monitoring; Metering module gathers the data of electrical equipment on each parking stall power taking interface, and the data of electrical equipment include voltage and current, go forward side by side Row output electric energy power measurement obtains power consumption information, and power consumption information is sent into concentration background monitoring;
Concentrate the power input of background monitoring to be connected with the output end of power supply, fallen into a trap for receiving intelligent power distribution cabinet The power consumption information that amount module sends, and electrical equipment is calculated with the electricity price of setting according to the power consumption information for receiving Real-time expense.
Reactive-load compensation table is additionally provided with intelligent power distribution cabinet, the power factor for detecting output loading works as power factor During less than lower limit set in advance, the compensation of power factor is realized by switching inductance or electric capacity.
Energy-storage battery is additionally provided with the intelligent power distribution cabinet, the power input of energy-storage battery passes through electric wire and is arranged on Outdoor solar panel and/or wind electricity generating system connection are charged.
The attachable electrical equipments of distribution bus Z include following at least one:AC charging module, DC charging module and Monitoring module, wherein monitoring module include following at least one:Underground lighting module, ambient temperature and humidity monitoring alarm module, car Position ground lock control module, raising fire alarms module and personnel positioning module.
The output end of power supply is connected with some intelligent power distribution cabinets, and the output end of each intelligent power distribution cabinet is respectively connected with some Distribution bus Z, the distribution bus Z are single-phase or three-phase distribution bus.
Connected using RS485 or CAN mode between the metering module and communication module, metering module and each car The data interactive mode of electrical equipment is wirelessly or non-wirelessly mode on the power taking interface of position.
The concentration background monitoring is arranged on property Control Room, and intelligent power distribution cabinet is arranged on underground community parking field, described Power supply is property transformer or resident's transformer or dedicated transformer.
Background monitoring is concentrated to be provided with control module, control module is used to gather each branch current of intelligent power distribution cabinet and electricity Pressure, when branch road actual loading power allows power output more than the branch road, does not allow newly-increased electricity consumption to load to the branch road;Control Account balance data when module is additionally operable to start the real-time expense of electrical equipment with the electrical equipment are compared in real time, when When the real-time expense of electrical equipment increases to account balance when starting equal to the electrical equipment, intelligence is issued a command under control module Energy power distribution cabinet disconnects the power supply of the electrical equipment.
When branch road actual loading power allows power output 105% and during more than 30 seconds more than the branch road, under control module Intelligent power distribution cabinet is issued a command to, intelligent power distribution cabinet is loaded further according to the branch road electricity consumption load priority breaking part, until actual 95% of bearing power less than permission power output.
Distribution bus Z includes multiple distribution busbar modules, and distribution busbar module includes mounting bracket and is arranged in mounting bracket Interior copper bar, being surrounded on copper bar has multistage insulating barrier, and the gap for exposing copper bar, power taking branch are provided between adjacent two sections of insulating barriers Frame is covered on gap and is fixedly connected with mounting bracket, and jack, the exposed part of jack correspondence copper bar are offered on power taking support; The two ends of copper bar are provided with cascade screw in distribution busbar module, and cascade cable two ends are connected to two distribution busbar moulds In block on the cascade screw of copper bar one end, the cascade between adjacent distribution busbar module is realized.
The insulating barrier is fastened on the heat-shrink tube outside copper bar for pyrocondensation.
Compared with prior art, the present invention at least has the advantages that the present invention is capable of achieving by once construction The inexpensive power supply covering on all parking stalls in underground, construction cost is low, and the power taking interface set on distribution bus can realize electricity The quick power taking of electrical automobile and other electrical equipments, solves the problems, such as that Electricity customers power taking is difficult, and security performance is high, also effectively The interim electric shock hidden danger for socketing cable presence is avoided, and the data is activation of electrical equipment is gathered to collection by intelligent power distribution cabinet Middle Background control, realizes automatic electricity quantity metering and concentrates remote meter-reading function, facilitates Utilities Electric Co. according to step price plan Slightly carry out meterage.
Further, the present invention can be according to distribution capacity from the load of all electrical equipments of moving constraint, and according to metering Charge situation realizes being controlled according to payment situation the remote auto break-make of each electric terminal.
Further, communication module can realize the friendship of data using wireless communication mode classification in control system of the invention Mutually, hardware cost and fault rate are reduced.
Further, energy-storage battery is additionally provided with intelligent power distribution cabinet, energy-storage battery is charged using wind energy and luminous energy, Green clean energy resource, energy-conserving and environment-protective are largely used.
Further, the power taking interface of distribution bus has preferable scalability, can be various electrical equipments and end End is powered.
Further, distribution bus include some distribution busbar modules, and distribution busbar model structural design is rationally, convenient to use Family operates, it is easy to accomplish cascade, the Electrical Safety for having ensured user of high degree and protection;Using cascade cable between busbar Connection, reduces difficulty of construction, is capable of the adaptation scene complexity demand of high degree;And distribution busbar module design standard, Reserved external connection interface section, is easy to later stage dilatation according to demand.
Brief description of the drawings
Fig. 1 is underground garage power supply-distribution system schematic diagram of the invention;
Fig. 2 is distribution busbar modular structure schematic diagram;
In accompanying drawing, 1- mounting brackets, 2- copper bars, 4- power taking supports, 5- jacks, L- phase lines, PE- ground, N- zero lines.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
As shown in figure 1, a kind of underground garage power supply-distribution system, the system from property transformer or resident's transformer or Dedicated transformer power taking, according to cell structure layout and parking stall quantity, it is considered to cable wiring cost factor, sets at least one intelligence Energy power distribution cabinet B is in underground community parking field;
From the parking stall of the distribution bus Z covering intelligent power distribution cabinet B regions of intelligent power distribution cabinet B output single-phases or three-phase, On the distribution bus of each parking stall, at least one electrical equipment M can again be installed according to the parking stall demand later stage, electrical equipment M can be with It is AC charging equipment, DC charging equipment or intelligent monitoring device, all electrical equipment M take alternating current from distribution bus Source;The power input of intelligent power distribution cabinet B is connected with the output end of power supply, the power output end connection of intelligent power distribution cabinet B There is distribution bus Z, metering module and communication module are provided with intelligent power distribution cabinet B, wherein, metering module connects with each parking stall power taking Electrical equipment carries out data interaction on mouth, for carrying out each branch road output electric energy power measurement;Communication module is used to realize measuring Data interaction between the data interaction of electrical equipment in module and power taking interface, and metering module and concentration background monitoring, Metering module gathers the data of electrical equipment on each parking stall power taking interface, and the data of electrical equipment include voltage and current, go forward side by side Row output electric energy power measurement obtains power consumption information, and power consumption information is sent into concentration background monitoring.
Concentrate background monitoring to be arranged on property Control Room, concentrate the power input of background monitoring and the output of power supply End connection, including for realizing the communication module of communication, the power consumption information for receiving intelligent power distribution cabinet B transmissions, Yi Jigen The control module of real-time expense is calculated with electricity price set in advance in system according to the power consumption information for receiving, backstage prison is concentrated Control realizes concentration remote meter reading and the charging of electrical equipment.
In a preferred embodiment of the invention, the control module of background monitoring is concentrated to be additionally operable to realize each power supply interface state Detect, data interaction, the remote auto break-make control of each electric terminal, and all electricity consumptions are automatically obtained according to distribution capacity and set Standby load constraint;That is, control module is used to gather each branch current of intelligent power distribution cabinet and voltage, when branch road actual loading power When allowing power output more than the branch road, newly-increased electricity consumption is not allowed to load to the branch road;When the actual loading power of branch road is more than Allow bearing power 105% and during more than 30 seconds, issue a command to intelligent power distribution cabinet B under control module, intelligent power distribution cabinet B further according to Electricity consumption load priority breaking part is loaded, until real output is less than the 95% of permission power output.Control module will Account balance data when the real-time expense of each electrical equipment starts with the electrical equipment are compared in real time, when electrical equipment When real-time expense increases to account balance when starting equal to the electrical equipment, intelligent power distribution cabinet B is issued a command under control module Disconnect the power supply of the electrical equipment.
In a preferred embodiment of the invention, reactive-load compensation table is additionally provided with intelligent power distribution cabinet B, for detecting that output is negative The power factor of load, when power factor is less than lower limit set in advance, power factor is realized by switching inductance or electric capacity Compensation;Meanwhile, energy-storage battery is additionally provided with intelligent power distribution cabinet B, the power input of energy-storage battery is by electric wire and setting Charged in outdoor solar panel and/or wind electricity generating system connection.
Communication module between intelligent power distribution cabinet B and concentration background monitoring uses wireless communication module, with each parking stall power taking The wirelessly or non-wirelessly mode data interaction of electrical equipment on interface;Communication module is that intelligent power distribution cabinet B is used for the upper logical company assigned Equipment is connect, communication module is attached with metering module using modes such as RS485 or CAN, and intelligent power distribution cabinet B is to lower by having Line or wireless mode gather the service data and state of each electrical equipment, by after wired or wireless mode and concentration on Communicated between platform monitoring, uploaded the data and state of each electrical equipment and intelligent power distribution cabinet B, assigned and concentrate background monitoring Various control instructions.
Distribution bus Z pre-sets supply line, facilitates later stage electrical equipment power taking;Distribution bus Z includes multiple distribution Busbar module, as shown in Fig. 2 distribution busbar module includes mounting bracket 1 and the copper bar 2 being arranged in mounting bracket 1, on copper bar 2 Encirclement has multistage insulating barrier, and the gap for exposing copper bar 2 is provided between adjacent two sections of insulating barriers, and power taking support 4 is covered in gap It is fixedly connected above and with mounting bracket 1, jack 5, the exposed part of the correspondence copper bar 2 of jack 5 is offered on power taking support 4;With the goddess of lightning The two ends of copper bar 2 are provided with cascade screw in row's module, and cascade cable two ends are connected in two distribution busbar modules On the cascade screw of copper bar one end, the cascade between adjacent distribution busbar module is realized, insulating barrier is fastened on outside copper bar 2 for pyrocondensation Heat-shrink tube.
Cascade cable between multiple busbars is flexible cable connection, reduces difficulty of construction, uses live complexity demand;It is female Row's design standard, reserves external connection interface section, according to demand later stage dilatation;Busbar length can change according to site environment, lead to Cross apolegamy disparate modules (charging module, intelligent monitoring) and realize difference in functionality;And, distribution busbar module is individual layer standard female Row, when load current increases, can by by distribution busbar module carry out multiple-layer stacked placement and power taking mouth carry out interlayer The mode of UNICOM carries out capacity extension, so as to meet the need for electricity of different capacity grade.
In a certain embodiment of the invention, distribution bus Z accesses single phase poaer supply, and three are provided with distribution busbar module Copper bar 2, the power access end of three copper bars 2 is respectively connected to L (phase line), N (zero line), PE (ground wire), by power taking support 4 by copper Row 2 is arranged on mounting bracket 1, and distribution busbar module is installed on underground garage by user by way of lifting or fixedly mounting In, user makes electricity under busbar when power taking is needed, first, opens power taking velar plate, and electrical equipment is arranged on into correspondence position In power taking mouthful;Busbar cascades (parallel connection), and multiple busbar components can be realized cascading by flexible cable, increase installing on busbar Load number.
Certainly, in other embodiments of the invention, distribution bus Z also can access three phase mains, when selecting three phase mains When, it is provided with five copper bars 2 in distribution busbar module, five copper bars 2 are connected respectively L1 (phase line), L2 in three phase mains (phase line), L3 (phase line), N (zero line), PE (ground wire).
Electrical equipment M on distribution bus Z of the invention is included but is not limited to:AC charging module, DC charging module, Monitoring module, communication apparatus etc.;Wherein monitoring module centrally-controlled is included but is not limited to:Underground lighting module, ambient temperature and humidity prison Control alarm module, parking stall ground lock control module, raising fire alarms module, personnel positioning module.

Claims (10)

1. a kind of underground garage power supply-distribution system, it is characterised in that including being distributed in each parking stall for providing power taking interface Distribution bus Z, carry out data for gathering the intelligent power distribution cabinet and intelligent power distribution cabinet of electrical equipment service data on power taking interface Interactive concentration background monitoring and the power supply for providing electric energy for system, wherein:
The power input of intelligent power distribution cabinet is connected with the output end of power supply, and the power output end of intelligent power distribution cabinet is connected with Distribution bus Z, is provided with metering module and communication module in intelligent power distribution cabinet, wherein, communication module is used to realize metering module With the data interaction between the data interaction of electrical equipment on power taking interface, and metering module and concentration background monitoring;Metering Module gathers the data of electrical equipment on each parking stall power taking interface, and the data of electrical equipment include voltage and current, and carry out defeated Go out electric energy power measurement and obtain power consumption information, and power consumption information is sent to concentration background monitoring;
Concentrate the power input of background monitoring to be connected with the output end of power supply, measure mould in intelligent power distribution cabinet for receiving The power consumption information that block sends, and the real-time of electrical equipment is calculated with the electricity price of setting according to the power consumption information for receiving Expense.
2. a kind of underground garage power supply-distribution system according to claim 1, it is characterised in that also set up in intelligent power distribution cabinet There is reactive-load compensation table, the power factor for detecting output loading, when power factor is less than lower limit set in advance, passes through Switching inductance or electric capacity realize the compensation of power factor.
3. a kind of underground garage power supply-distribution system according to claim 1, it is characterised in that in the intelligent power distribution cabinet also Energy-storage battery is provided with, the power input of energy-storage battery passes through electric wire and the solar panel and/or wind being disposed in the outdoor Energy TRT connection is charged.
4. a kind of underground garage power supply-distribution system according to claim 1, it is characterised in that distribution bus Z is attachable Electrical equipment includes following at least one:AC charging module, DC charging module and monitoring module, wherein monitoring module include It is following at least one:Underground lighting module, ambient temperature and humidity monitoring alarm module, parking stall ground lock control module, raising fire alarms mould Block and personnel positioning module.
5. a kind of underground garage power supply-distribution system according to claim 1, it is characterised in that the output end of power supply connects Some intelligent power distribution cabinets are connected to, the output end of each intelligent power distribution cabinet is respectively connected with some distribution bus Z, and the distribution bus Z is Single-phase or three-phase distribution bus.
6. a kind of underground garage power supply-distribution system according to claim 1, it is characterised in that the metering module with communicate Connected using RS485 or CAN mode between module, the data of metering module and electrical equipment on each parking stall power taking interface Interactive mode is wirelessly or non-wirelessly mode.
7. a kind of underground garage power supply-distribution system according to claim 1, it is characterised in that the concentration background monitoring sets Put in property Control Room, intelligent power distribution cabinet is arranged on underground community parking field, the power supply is property transformer or residence Mass uprising depressor or dedicated transformer.
8. a kind of underground garage power supply-distribution system according to claim 1, it is characterised in that concentrate background monitoring to be provided with Control module, control module is used to gather each branch current of intelligent power distribution cabinet and voltage, is somebody's turn to do when branch road actual loading power is more than When branch road allows power output, newly-increased electricity consumption is not allowed to load to the branch road;Control module is additionally operable to the real-time of electrical equipment Account balance data when expense starts with the electrical equipment are compared in real time, when the real-time expense of electrical equipment is increased to During account balance when the electrical equipment starts, the confession that intelligent power distribution cabinet disconnects the electrical equipment is issued a command under control module Electricity.
9. a kind of underground garage power supply-distribution system according to claim 8, it is characterised in that when branch road actual loading power Power output 105% is allowed more than the branch road and during more than 30 seconds, intelligent power distribution cabinet, intelligent power distribution are issued a command under control module Cabinet is loaded further according to the branch road electricity consumption load priority breaking part, until actual loading power is less than permission power output 95%.
10. a kind of underground garage power supply-distribution system according to claim 1, it is characterised in that distribution bus Z includes multiple Distribution busbar module, distribution busbar module includes mounting bracket (1) and the copper bar (2) being arranged in mounting bracket (1), copper bar (2) Upper encirclement has multistage insulating barrier, and the gap for exposing copper bar (2), power taking support (4) covering are provided between adjacent two sections of insulating barriers It is fixedly connected on gap and with mounting bracket (1), jack (5) is offered on power taking support (4), jack (5) correspondence copper bar (2) Exposed part;The two ends of copper bar (2) are provided with cascade screw in distribution busbar module, and cascade cable two ends are connected to two In individual distribution busbar module on the cascade screw of copper bar one end, the cascade between adjacent distribution busbar module is realized.
CN201710186535.6A 2017-03-24 2017-03-24 A kind of underground garage power supply-distribution system Pending CN106899015A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710186535.6A CN106899015A (en) 2017-03-24 2017-03-24 A kind of underground garage power supply-distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710186535.6A CN106899015A (en) 2017-03-24 2017-03-24 A kind of underground garage power supply-distribution system

Publications (1)

Publication Number Publication Date
CN106899015A true CN106899015A (en) 2017-06-27

Family

ID=59193479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710186535.6A Pending CN106899015A (en) 2017-03-24 2017-03-24 A kind of underground garage power supply-distribution system

Country Status (1)

Country Link
CN (1) CN106899015A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111507519A (en) * 2020-04-14 2020-08-07 国网北京市电力公司 Parking space layout method and device for parking lot, storage medium and processor

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055214A (en) * 2010-09-30 2011-05-11 国家电网公司 Electric energy supply system for electric vehicle
CN202443306U (en) * 2012-01-12 2012-09-19 温州电力局 Intelligent energy efficiency integrated monitoring and management system for building
CN203504293U (en) * 2013-09-30 2014-03-26 河南开启电力实业有限公司 Intelligent integrated power distribution cabinet
CN203554313U (en) * 2013-10-29 2014-04-16 广东志成冠军集团有限公司 High-voltage direct current system
CN203813519U (en) * 2013-12-27 2014-09-03 浙江盛锋成套电气有限公司 Centralized-control intelligent power distribution cabinet
CN204315929U (en) * 2014-11-28 2015-05-06 深圳市爱科泰创电气技术有限公司 A kind of there is distribution groove confluence copper bar bus base and with the use of elasticity inserted sheet

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055214A (en) * 2010-09-30 2011-05-11 国家电网公司 Electric energy supply system for electric vehicle
CN202443306U (en) * 2012-01-12 2012-09-19 温州电力局 Intelligent energy efficiency integrated monitoring and management system for building
CN203504293U (en) * 2013-09-30 2014-03-26 河南开启电力实业有限公司 Intelligent integrated power distribution cabinet
CN203554313U (en) * 2013-10-29 2014-04-16 广东志成冠军集团有限公司 High-voltage direct current system
CN203813519U (en) * 2013-12-27 2014-09-03 浙江盛锋成套电气有限公司 Centralized-control intelligent power distribution cabinet
CN204315929U (en) * 2014-11-28 2015-05-06 深圳市爱科泰创电气技术有限公司 A kind of there is distribution groove confluence copper bar bus base and with the use of elasticity inserted sheet

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吕明;秦立刚;田永利;: "远程智能低压采集系统与费控智能电能表" *
陈恩;: "某商业综合体地下车库电动汽车充电桩的电气设计" *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111507519A (en) * 2020-04-14 2020-08-07 国网北京市电力公司 Parking space layout method and device for parking lot, storage medium and processor

Similar Documents

Publication Publication Date Title
US8981716B2 (en) Power share system for electric vehicle service equipment
CN102819258B (en) Intelligent cell total management system
CN107539144A (en) One multiple gun alternating-current charging pile and charging system
CN106169708A (en) A kind of comprehensive electric power system with remotely monitoring
CN203312656U (en) An intelligent energy-saving-type outdoor switching station
CN103414114B (en) Drawer-type intelligent comprehensive low-voltage distribution JP cabinet
US20120223675A1 (en) Power Share System for Electric Vehicle Service Equipment
CN106129879A (en) A kind of high integration multifunctional comprehensive box-type substation
CN104993554A (en) Electric automobile charging device and operation method thereof
CN202735829U (en) Intelligent residential district integrated management system
CN108288174B (en) Electric energy safety management system and method based on cloud platform
CN107379979A (en) The quick vehicle-mounted emergent charging system of Multifunctional mobile
CN104778552A (en) Village-level power grid configuring and implementing method
CN206685900U (en) A kind of underground garage power supply-distribution system
CN202737589U (en) Low-voltage intelligent comprehensive distribution box
CN106899015A (en) A kind of underground garage power supply-distribution system
CN205791071U (en) A kind of Intelligent platform zone distribution box
CN206884779U (en) The quick vehicle-mounted emergent charging system of Multifunctional mobile
CN208904261U (en) A kind of quick transfer box of cable connector
CN208368860U (en) Intelligent charge socket
CN203456781U (en) Drawer type intelligent comprehensive low-voltage distribution JP cabinet
CN204793630U (en) Frame is inserted to distribution
CN209296829U (en) A kind of power supply line's line loss detection circuit
CN204832290U (en) Electric meter box
CN209561989U (en) A kind of prefabricated cabin formula Wind Power Project electrical equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 710065 R&D Building E206-2, E Building, No. 211 Tiangu Eighth Road, Xi'an High-tech Zone, Shaanxi Province

Applicant after: XI'AN TGOOD INTELLIGENT CHARGING TECHNOLOGY Co.,Ltd.

Address before: 710077 R & D building 101, 102-2, C science and Technology Industrial Park, 211 Tiangu Road, Xi'an, Shaanxi

Applicant before: XI'AN TGOOD INTELLIGENT CHARGING TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information
CB02 Change of applicant information

Address after: 710065 R&D Building E206-2, E Building, No. 211 Tiangu Eighth Road, Xi'an High-tech Zone, Shaanxi Province

Applicant after: Xi'an Telai Intelligent Charging Technology Co.,Ltd.

Address before: 710065 R&D Building E206-2, E Building, No. 211 Tiangu Eighth Road, Xi'an High-tech Zone, Shaanxi Province

Applicant before: XI'AN TGOOD INTELLIGENT CHARGING TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information