CN106894787A - A kind of single deck tape-recorder watt big orifice bridging plug and its set method - Google Patents

A kind of single deck tape-recorder watt big orifice bridging plug and its set method Download PDF

Info

Publication number
CN106894787A
CN106894787A CN201710127538.2A CN201710127538A CN106894787A CN 106894787 A CN106894787 A CN 106894787A CN 201710127538 A CN201710127538 A CN 201710127538A CN 106894787 A CN106894787 A CN 106894787A
Authority
CN
China
Prior art keywords
bridging plug
single deck
deck tape
central tube
big orifice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710127538.2A
Other languages
Chinese (zh)
Inventor
杨小城
邹刚
汪建
周歆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SJS Ltd
Original Assignee
SJS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SJS Ltd filed Critical SJS Ltd
Priority to CN201710127538.2A priority Critical patent/CN106894787A/en
Publication of CN106894787A publication Critical patent/CN106894787A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/134Bridging plugs

Abstract

The present invention relates to a kind of oil drilling and extracting equipment, particularly a kind of single deck tape-recorder watt big orifice bridging plug, including top connection, unidirectional tooth entirety slips, central tube, packing element, cone and guide shoe, central tube is axially hollow structure, packing element is sheathed on center pipe outer wall, the bottom section of cone is taper, in wedging the space between unidirectional tooth entirety slips and central tube, the upper lumen of the central tube has the diameter-changing cavity for placing solvable ball, the internal diameter of diameter-changing cavity from top to bottom reduces, central tube lower end is provided with groove uniform at 4, the boss being engaged with aforementioned grooves at 4 circumferentially and inside the lower end of guide shoe is circumferentially equipped with inside unidirectional tooth entirety slips, solvable ball is dissolvable in water electrolyte solution.Also disclose foregoing bridging plug sets method.The present invention grinds without boring, and only need to inject electrolyte solution just can be completely dissolved dissolvable ball, and the big orifice for leaving bridging plug is used for subsequent production.

Description

A kind of single deck tape-recorder watt big orifice bridging plug and its set method
Technical field
The present invention relates to a kind of oil drilling and extracting equipment, particularly a kind of single deck tape-recorder watt big orifice bridging plug and its method is set.
Background technology
Currently, the separate stratum fracfturing exploitation of unconventionaloil pool is mainly based upon the staged fracturing of composite bridging plug, but multiple Conjunction bridging plug is set after the completion of perforating and fracturing, and the later stage needs disposable boring to grind, still time-consuming;Simultaneously with unconventionaloil pool exploitation Depth increases, and particularly in ultradeep well or inclined shaft, the difficulty ground using continuous tubing drill is increasing, therefore urgent need will be developed A kind of bridging plug that need not bore mill, for staged fracturing of horizontal well.
The content of the invention
It is an object of the invention to overcome above-mentioned deficiency, there is provided a kind of single deck tape-recorder watt big orifice bridging plug, ground without boring, only need note Entering electrolyte solution just can be completely dissolved dissolvable ball, and the big orifice for leaving bridging plug is used for subsequent production.
To realize above-mentioned technical purpose, the scheme that the present invention is provided is:A kind of single deck tape-recorder watt big orifice bridging plug, including above connect Head, unidirectional tooth entirety slips, central tube, packing element, cone and guide shoe, central tube is axially hollow structure, and packing element is sheathed on center Pipe outer wall, the bottom section of cone is taper, in the space between the unidirectional tooth entirety slips of wedging and central tube, the central tube Upper lumen there is the diameter-changing cavity for placing solvable ball, the internal diameter of diameter-changing cavity from top to bottom reduces, and the section of the diameter-changing cavity is in cone The conical surface for 15 °~30 ° is spent, 71mm is not less than at inner diameter of centerpipe minimum, central tube lower end is provided with groove uniform at 4, single To circumferentially and inside the lower end of guide shoe being circumferentially equipped with the boss that is engaged with aforementioned grooves at 4 inside tooth entirety slips, Solvable ball is dissolvable in water electrolyte solution.
And, the solvable ball is polymerized by the thermoplasticity that almag, water-soluble di acid and dihydroxylic alcohols are polymerized Thing is made.
And, with central tube using being threadedly coupled, top connection upper end is provided with wedge-shaped protrusion uniform at 4 for the top connection, Uniform groove is adapted at wedge-shaped protrusion and central tube lower end 4, and top connection lower end is the conical surface that taper is 30 °~50 °.
And, the cone is sheathed on the outer wall of central tube by the first lock ring, and the guide shoe is arranged by the second lock ring In the outer wall of central tube, the inside and outside wall of the first lock ring and the second lock ring is buttless thread structure, and outer wall thread pitch is more than Buttless thread and center pipe outer wall buttless thread teeth directional are conversely, the first lock in inner thread pitch, the first lock ring and the second lock ring Ring and the outer buttless thread of the second lock ring are with cone, guide shoe buttless thread teeth directional conversely, cone and guide shoe and center pipe outer wall sawtooth Screw thread teeth directional is identical, and the inwall of the first lock ring and the second lock ring coordinates with central tube outer wall thread, and the first lock ring and second is locked The outer wall of ring coordinates with the inner thread of cone and guide shoe respectively.
And, the cone is connected by the first startup pin with central tube, and cone has the first tightening pin with the first lock ring Nail connection;The guide shoe has the second tightening pin to be connected with the second lock ring, the central tube lower end 4 at groove interval outside Wall is provided with pin hole at 4, and pin hole is connected with guide shoe by the second startup pin.
And, the both ends external diameter of the packing element is less than middle part external diameter, and the outside at packing element both ends is arranged with packing element gear Ring;Ring-like projection is provided with the inside of packing element both ends.
And, the two ends of the packing element are respectively provided with back band, and the back band is made up of inside and outside back band, pass through between inside and outside back band Back band pin is connected.
And, round section joint ring is provided between the packing element and central tube, it is cased with holding on the round section joint ring and stays ring.
And, the unidirectional tooth entirety slips outer surface is provided with equally distributed stress concentration groove vertically;It is described unidirectional Tooth entirety slips bottom surface is provided with one 5 °~10 ° of the conical surface.
The present invention also provides a kind of method that sets of use single deck tape-recorder watt big orifice bridge plugging Oil/gas Well, including following step Suddenly.
Step one, the elastic pawl one end on setting tool is contacted with the guide shoe on single deck tape-recorder watt big orifice bridging plug, elasticity Shear joint end contact on the other end and setting tool of ratchet.
Step 2, single deck tape-recorder watt big orifice bridging plug, end face and the single deck tape-recorder watt of setting sleeve are directed at by the setting sleeve in setting tool The top connection of big orifice bridging plug is in contact, and is fixed the position of setting sleeve and single deck tape-recorder watt big orifice bridging plug by pull bar.
Step 3, single deck tape-recorder watt big orifice bridging plug is transferred to the precalculated position in sleeve pipe by cable or coiled tubing.
Step 4, starts setting tool, and setting sleeve pushes the top connection end face of single deck tape-recorder watt big orifice bridging plug, shear joint band Cone, the first lock ring, the second lock ring, the back of the body on the guide shoe and center pipe outer wall of elastic pawl promotion single deck tape-recorder watt big orifice bridging plug Circle, packing element baffle ring and packing element are up, the annular space of packing single deck tape-recorder watt big orifice bridging plug and sleeve pipe, and grappling single deck tape-recorder watt big orifice bridge Plug, disconnection pull bar is fixedly connected with shear joint, setting tool is separated with single deck tape-recorder watt big orifice bridging plug.
Step 5, the setting tool that with single deck tape-recorder watt big orifice bridging plug will separate proposes ground, delivers solvable ball to single deck tape-recorder watt In the diameter-changing cavity of top connection one end of big orifice bridging plug, completion is set, carry out pressing crack construction.
Step 6, after pressing crack construction, solvable ball voluntarily dissolves in the presence of formation fluid.
The beneficial effects of the present invention are:Ground without boring, only need to inject electrolyte solution just can be completely molten by dissolvable ball Solution, the big orifice for leaving bridging plug is used for subsequent production;Latus rectum is big in bridging plug, meets the continuous oil pipe operation of general requirements; It is applied widely when needing to bore mill bridging plug under special operation condition, it is also possible to bored and ground off.
Brief description of the drawings
Fig. 1 is big orifice bridging plug assembly figure.
Fig. 2 is bridging plug and setting tool connection diagram.
Fig. 3 is the structural representation of central tube.
Fig. 4 is the axial, cross-sectional view of unidirectional tooth entirety slips.
Fig. 5 is the longitudinal section view of unidirectional tooth entirety slips.
Fig. 6 is the axial, cross-sectional view of guide shoe.
Fig. 7 is the longitudinal section view of guide shoe.
Fig. 8 is the structural representation of top connection.
Fig. 9 is the structural representation of packing element.
Figure 10 is the structural representation of back band.
Wherein, 1, solvable ball, 2, top connection, the 3, first outer back band, the 4, first back band pin, back band in 5, first, 6, One packing element baffle ring, 7, packing element, 8, round section joint ring, 9, hold and stay ring, the 10, second packing element baffle ring, back band in 11, second, 12, second back of the body Circle pin, the 13, second outer back band, the 14, first tightening pin, the 15, first lock ring, the 16, cone, 17, first startup pin, 18, Unidirectional tooth entirety slips, 19, guide shoe, the 20, second tightening pin, the 21, second lock ring, 22, second starts pin, and 23, central tube, 24th, setting sleeve, 25, elastic pawl, 26, shear joint, 27, shear pin, 28, pull bar, 29, diameter-changing cavity, 30, groove, 31, pin Nail, 32, slips internal boss, 33, guide shoe internal boss, 34, wedge-shaped protrusion, 35, ring-like projection.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
The present embodiment provides a kind of single deck tape-recorder watt big orifice bridging plug, as shown in Fig. 1 ~ Fig. 2, including top connection 2, unidirectional tooth entirety Slips 18, central tube 23, packing element 7, cone 16 and guide shoe 19, central tube 23 are axially hollow structure, and packing element 7 is sheathed on central tube 23 outer walls, the bottom section of cone 16 is taper, described in the space between the unidirectional tooth entirety slips 18 of wedging and central tube 23 The upper lumen of central tube 23 has the diameter-changing cavity 29 for placing solvable ball 1, as shown in figure 3, the internal diameter of diameter-changing cavity 29 is from top to bottom Reduce, it is 15 °~30 ° of the conical surface that the section of the diameter-changing cavity 29 is tapered, and the minimum place of the internal diameter of central tube 23 is not less than 71mm, center The lower end of pipe 23 is provided with groove 30 uniform at 4, as shown in Fig. 4 ~ Fig. 7, inside unidirectional tooth entirety slips 18 circumferentially and guide shoe 19 Lower end inside be circumferentially equipped with the boss being engaged with aforementioned grooves 30 at 4(Slips internal boss 32, guide shoe internal boss 33), solvable ball 1 is dissolvable in water electrolyte solution.
The thermoplastic polymer system that the solvable ball 1 is polymerized by almag, water-soluble di acid and dihydroxylic alcohols Into can pressure-resistant 50~100MPa, 80~177 DEG C of heatproof, and being dissolved by electrolyte solution.
When needing to bridging plug top payzone pressure break, pitching pumps solvable ball 1 to the diameter-changing cavity 29 on the top of central tube 23, close Being honored as a queen carries out pressure break.After the completion of measure, certain density electrolyte solution is added in displacement fluid, solvable ball 1 will be certain Time in dissolved, leave the big orifice of bridging plug for subsequent production.
Further, the top connection 2 is used with central tube 23 and is threadedly coupled, as shown in figure 8, the upper end of top connection 2 is provided with 4 The uniform wedge-shaped protrusion 34 in place, uniform groove 30 is adapted at wedge-shaped protrusion 34 and the lower end 4 of central tube 23, and effect is to bore mill bridge During plug, four grooves 30 for not having the bottom of Zuan Mowan rear center pipe 23 with the preceding paragraph form wedging function, when can prevent from boring mill A upper bridging plug spins, and cannot bore mill.The lower end of top connection 2 is the conical surface that taper is 30 °~50 °, with back band coordinate, make it is interior, Outer back band is easy to strut.
Further, the cone 16 is sheathed on the outer wall of central tube 23 by the first lock ring 15, and the guide shoe 19 passes through Second lock ring 21 is sheathed on the outer wall of central tube 23, and the inside and outside wall of the first lock ring 15 and the second lock ring 21 is buttless thread knot Structure, and outer wall thread pitch is more than inner thread pitch, buttless thread and central tube 23 in the first lock ring 15 and the second lock ring 21 Outer wall buttless thread teeth directional is conversely, the first lock ring 15 and the outer buttless thread of the second lock ring 21 and cone 16, the buttless thread of guide shoe 19 Teeth directional conversely, cone 16 and guide shoe 19 are identical with the outer wall buttless thread teeth directional of central tube 23, the first lock ring 15 and the second lock ring 21 Inwall coordinate with the outer wall thread of central tube 23, the outer wall of the first lock ring 15 and the second lock ring 21 respectively with cone 16 and guide shoe 19 inner thread coordinates.
The outer wall thread that cone 16 matches with lock ring will not occur relative displacement when bridging plug sets generation axial movement, and The internal thread that central tube 23 matches with lock ring can then occur unidirectional irreversible upstream displacement.Buttless thread and center on lock ring inwall Buttless thread on the outer wall of pipe 23 is engaged, and lock ring will be locked on central tube 23, and holding pushes load prevents resilience.
Further, the cone 16 is connected by the first startup pin 17 with central tube 23, the lock ring of cone 16 and first 15 have the first tightening pin 14 to connect, and the first startup pin 17 is used to fix cone 16, and when shearing force reaches setting value, this One startup pin 17 is cut, and cone 16 just can be moved in the axial direction;The lock ring 21 of the guide shoe 19 and second has the second tightening pin Nail 20 is connected, the lower end of the central tube 23 4 at the interval outer wall of groove 30 be provided with pin hole 31 at 4, pin hole 31 with Guide shoe 19 is connected by the second startup pin 22, and fashionable midway sets under preventing bridging plug.
Further, the both ends external diameter of the packing element 7 is less than middle part external diameter, as shown in figure 9, the both ends of packing element 7 is outer Side is arranged with packing element baffle ring(First packing element baffle ring 6 and the second packing element baffle ring 10), the first packing element baffle ring 6 and the second packing element baffle ring 10 are respectively sleeved in the small place of the two ends external diameter of packing element 7, for pushing down the two ends of packing element 7, better seal.The both ends of packing element 7 it is interior Side is provided with ring-like raised 35, similar to round section joint ring structure, further center seal pipe 23 after being set for packing element 7.
Further, the two ends of the packing element 7 are respectively provided with back band, and as shown in Figure 10, the back band is made up of inside and outside back band (The outer back band 3 of back band 5 and second in first, the outer back band 13 of back band 11 and second in second), back band pin is passed through between inside and outside back band Nail(First back band pin 4, the second back band pin 12)Connection.
Further, round section joint ring 8 is provided between the packing element 7 and central tube 23, is cased with holding on the round section joint ring 8 and is stayed ring 9.This holds and stays ring 9 that the gap of packing element 7 and central tube 23 is further sealed in 7 pressure-bearing of packing element with round section joint ring 8.
Further, unidirectional tooth entirety slips 18 outer surface is provided with equally distributed stress concentration groove vertically, really Protect uniform force after slips rupture;Unidirectional tooth entirety slips 18 bottom surface is provided with one 5 °~10 ° of the conical surface, is easy to slips to break Slid in and out after splitting.
Step one, the one end of elastic pawl 25 on setting tool is contacted with the guide shoe 19 on single deck tape-recorder watt big orifice bridging plug, The end contact of shear joint 26 on the other end and setting tool of elastic pawl 25.
Step 2, single deck tape-recorder watt big orifice bridging plug, the end face and list of setting sleeve 24 are directed at by the setting sleeve 24 in setting tool The top connection 2 of slips big orifice bridging plug is in contact, and is consolidated the position of setting sleeve 24 and single deck tape-recorder watt big orifice bridging plug by pull bar 28 It is fixed.
Step 3, single deck tape-recorder watt big orifice bridging plug is transferred to the precalculated position in sleeve pipe by cable or coiled tubing.
Step 4, starts setting tool, and setting sleeve 24 pushes the end face of top connection 2 of single deck tape-recorder watt big orifice bridging plug, and shearing connects First 26 promote the cone 16, first on the guide shoe 19 and the outer wall of central tube 23 of single deck tape-recorder watt big orifice bridging plug to lock with elastic pawl 25 Ring 15, the second lock ring 21, back band, packing element baffle ring and packing element 7 are up, the annular space of packing single deck tape-recorder watt big orifice bridging plug and sleeve pipe, and Grappling single deck tape-recorder watt big orifice bridging plug, disconnection pull bar 28 is fixedly connected with shear joint 26, makes setting tool logical greatly with single deck tape-recorder watt Footpath bridging plug is separated.
Step 5, the setting tool that with single deck tape-recorder watt big orifice bridging plug will separate proposes ground, delivers solvable ball 1 to single deck tape-recorder watt In the diameter-changing cavity 29 of one end of top connection 2 of big orifice bridging plug, completion is set, carry out pressing crack construction.
Step 6, after pressing crack construction, solvable ball 1 voluntarily dissolves in the presence of formation fluid.
Operation principle:After predetermined level is pumped into, cable igniting, cable setting tool transmitting thrust to setting sleeve 24 On, setting sleeve 24 props up the upper surface of top connection 2, while pull bar 28 is up with shear joint 26 by shear pin 27, shearing Joint 26 cuts the second startup pin 22 and promotes guide shoe 19 up with elastic pawl 25, and guide shoe 19 drives the second lock ring 21, list Simultaneously up to tooth entirety slips 18, unidirectional tooth entirety slips 18 promotes the cutting of 16 and first lock ring of cone 15 first to start pin 17 is up, in the presence of axial force, back band 11, the inside and outside back of the body in the second outer back band 13 and second of the up extruding bottom of cone 16 Circle is expanded outwardly upwards simultaneously, and the packing element baffle ring 10 of packing element 7 and second is simultaneously up under responsive to axial force, and with a little drum Rise, while the outer back band 3 of back band 5 and first and the first packing element baffle ring 6 in the first of the extruding of packing element 7 bottom, above-mentioned part is simultaneously Continue to extrude unidirectional tooth entirety slips 18, unidirectional tooth entirety slips 18 reaches unidirectional tooth entirety slips under the support of guide shoe 19 After 18 rupture force value, unidirectional tooth entirety slips 18 is displaced outwardly, and is engaged sleeve pipe, the blow-up of packing element 7, sealing sleeve pipe, while cone 16 The first lock ring 15, guide shoe 19 is driven to drive the second lock ring 21 to be locked on central tube 23, reach the shear pin 27 on pull bar 28 Force value after, setting tool is slipped out of the hand with bridging plug, completes to set.When needing to bridging plug top payzone pressure break, pitching pumping ball 1 is arrived On the diameter-changing cavity 29 on the top of central tube 23, pressure break is carried out after sealing.After the completion of measure, added in displacement fluid certain density Electrolyte solution, solvable ball 1 will dissolve within the regular hour, leave the big orifice of bridging plug for subsequent production.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvement or deformation can also be made, these are improved or deformation also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of single deck tape-recorder watt big orifice bridging plug, including top connection, unidirectional tooth entirety slips, central tube, packing element, cone and guide shoe, Central tube is axially hollow structure, and packing element is sheathed on center pipe outer wall, and the bottom section of cone is taper, wedges unidirectional tooth entirety In space between slips and central tube, it is characterised in that:The upper lumen of the central tube has the reducing for placing solvable ball Chamber, the internal diameter of diameter-changing cavity from top to bottom reduces, and it is 15 °~30 ° of the conical surface that the section of the diameter-changing cavity is tapered, and inner diameter of centerpipe is most Small place is not less than 71mm, and central tube lower end is provided with groove uniform at 4, inside unidirectional tooth entirety slips circumferentially and under guide shoe End is internal to be circumferentially equipped with the boss being engaged with aforementioned grooves at 4, and solvable ball is dissolvable in water electrolyte solution.
2. a kind of single deck tape-recorder watt big orifice bridging plug according to claim 1, it is characterised in that:The solvable ball is closed by magnalium The thermoplastic polymer that gold, water-soluble di acid and dihydroxylic alcohols are polymerized is made.
3. a kind of single deck tape-recorder watt big orifice bridging plug according to claim 1, it is characterised in that:The top connection is adopted with central tube With threaded connection, top connection upper end is provided with wedge-shaped protrusion uniform at 4, uniform groove at wedge-shaped protrusion and central tube lower end 4 It is adapted, top connection lower end is the conical surface that taper is 30 °~50 °.
4. a kind of single deck tape-recorder watt big orifice bridging plug according to claim 1, it is characterised in that:The cone passes through the first lock ring The outer wall of central tube is sheathed on, the guide shoe is sheathed on the outer wall of central tube, the first lock ring and the second lock ring by the second lock ring Inside and outside wall be buttless thread structure, and outer wall thread pitch is more than inner thread pitch, in the first lock ring and the second lock ring Buttless thread is with center pipe outer wall buttless thread teeth directional conversely, the first lock ring and the outer buttless thread of the second lock ring and cone, guide shoe Buttless thread teeth directional conversely, cone and guide shoe are identical with center pipe outer wall buttless thread teeth directional, the first lock ring and the second lock ring Inwall coordinates with central tube outer wall thread, the outer wall of the first lock ring and the second lock ring respectively with cone and the inner thread of guide shoe Coordinate.
5. a kind of single deck tape-recorder watt big orifice bridging plug according to claim 4, it is characterised in that:The cone starts by first Pin is connected with central tube, and cone has the first tightening pin to be connected with the first lock ring;The guide shoe and the second lock ring have second tight Rationed marketing nail connection, the central tube lower end 4 at the interval outer wall of groove be provided with pin hole at 4, pin hole leads to guide shoe Cross the second startup pin connection.
6. a kind of single deck tape-recorder watt big orifice bridging plug according to claim 1, it is characterised in that:The both ends external diameter of the packing element Less than middle part external diameter, the outside at packing element both ends is arranged with packing element baffle ring;Ring-like projection is provided with the inside of packing element both ends.
7. a kind of single deck tape-recorder watt big orifice bridging plug according to claim 1, it is characterised in that:The two ends of the packing element are respectively provided with Back band, the back band is made up of inside and outside back band, is connected by back band pin between inside and outside back band.
8. a kind of single deck tape-recorder watt big orifice bridging plug according to claim 1, it is characterised in that:Between the packing element and central tube Round section joint ring is provided with, is cased with holding on the round section joint ring and is stayed ring.
9. a kind of single deck tape-recorder watt big orifice bridging plug according to claim 1, it is characterised in that:Outside the unidirectional tooth entirety slips Surface is provided with equally distributed stress concentration groove vertically;The unidirectional tooth entirety slips bottom surface is provided with one 5 °~10 ° of cone Face.
10. it is a kind of using as in claim 1 ~ 9 any single deck tape-recorder watt big orifice bridge plugging Oil/gas Well set method, including such as Lower step:
Step one, the elastic pawl one end on setting tool is contacted with the guide shoe on single deck tape-recorder watt big orifice bridging plug, elastic pawl The other end and setting tool on shear joint end contact;
Step 2, single deck tape-recorder watt big orifice bridging plug is directed at by the setting sleeve in setting tool, and the end face of setting sleeve is logical greatly with single deck tape-recorder watt The top connection of footpath bridging plug is in contact, and is fixed the position of setting sleeve and single deck tape-recorder watt big orifice bridging plug by pull bar;
Step 3, single deck tape-recorder watt big orifice bridging plug is transferred to the precalculated position in sleeve pipe by cable or coiled tubing;
Step 4, starts setting tool, and setting sleeve pushes the top connection end face of single deck tape-recorder watt big orifice bridging plug, and shear joint is with bullet Property ratchet promote single deck tape-recorder watt big orifice bridging plug guide shoe and center pipe outer wall on cone, the first lock ring, the second lock ring, back band, Packing element baffle ring and packing element are up, the annular space of packing single deck tape-recorder watt big orifice bridging plug and sleeve pipe, and grappling single deck tape-recorder watt big orifice bridging plug, break Being fixedly connected for pull bar and shear joint is opened, setting tool is separated with single deck tape-recorder watt big orifice bridging plug;
Step 5, the setting tool that with single deck tape-recorder watt big orifice bridging plug will separate proposes ground, delivers solvable ball logical greatly to single deck tape-recorder watt In the diameter-changing cavity of top connection one end of footpath bridging plug, completion is set, carry out pressing crack construction;
Step 6, after pressing crack construction, solvable ball voluntarily dissolves in the presence of formation fluid.
CN201710127538.2A 2017-03-06 2017-03-06 A kind of single deck tape-recorder watt big orifice bridging plug and its set method Pending CN106894787A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710127538.2A CN106894787A (en) 2017-03-06 2017-03-06 A kind of single deck tape-recorder watt big orifice bridging plug and its set method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710127538.2A CN106894787A (en) 2017-03-06 2017-03-06 A kind of single deck tape-recorder watt big orifice bridging plug and its set method

Publications (1)

Publication Number Publication Date
CN106894787A true CN106894787A (en) 2017-06-27

Family

ID=59185474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710127538.2A Pending CN106894787A (en) 2017-03-06 2017-03-06 A kind of single deck tape-recorder watt big orifice bridging plug and its set method

Country Status (1)

Country Link
CN (1) CN106894787A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107255023A (en) * 2017-08-18 2017-10-17 中国石油集团川庆钻探工程有限公司 Exempt to bore bridging plug with the big orifice for setting function of giving up
CN107724995A (en) * 2017-11-28 2018-02-23 西安石油大学 A kind of mechanical-set half dissolving bridging device and its fracturing process
CN108104765A (en) * 2018-02-09 2018-06-01 四机赛瓦石油钻采设备有限公司 A kind of solvable bridge plug of single deck tape-recorder whole pottery
CN108716379A (en) * 2018-07-25 2018-10-30 百勤能源科技(惠州)有限公司 A kind of solvable bridge plug of big orifice
CN109025898A (en) * 2018-10-11 2018-12-18 天津市玛特瑞科技有限公司 A kind of solvable bridge plug
CN109083616A (en) * 2018-11-02 2018-12-25 陕西航天德林科技集团有限公司 A kind of solvable bridge plug
CN109138955A (en) * 2018-08-29 2019-01-04 中国石油集团渤海钻探工程有限公司 A kind of solvable fracturing sliding bush of variable diameter spherically seated full-bore
CN109267964A (en) * 2018-08-31 2019-01-25 西安威尔格德能源技术有限公司 A kind of metal variable diameter sealed soluble press-fracturing bridge plug
CN109505558A (en) * 2018-08-14 2019-03-22 中国石油集团西部钻探工程有限公司 Easily bore bridge plug
CN110067529A (en) * 2019-05-24 2019-07-30 北京易联结科技发展有限公司 A kind of solvable bridge plug of single deck tape-recorder watt
CN110185414A (en) * 2019-07-05 2019-08-30 山东博赛特石油技术有限公司 A kind of solvable bridge plug of outer expanding
CN112576231A (en) * 2021-02-24 2021-03-30 四川省威沃敦化工有限公司 All-metal soluble fracturing sectionalizer
CN112647891A (en) * 2020-12-24 2021-04-13 中石化石油工程技术服务有限公司 Full-soluble bridge plug
CN112682002A (en) * 2020-12-30 2021-04-20 中石化石油工程技术服务有限公司 All-metal soluble bridge plug
CN113833431A (en) * 2020-06-23 2021-12-24 中国石油天然气股份有限公司 Connecting device of setting tool
CN114016932A (en) * 2021-11-05 2022-02-08 中煤科工集团西安研究院有限公司 Cable disconnecting device, cable conveying assembly and timing recovery method
CN115443368A (en) * 2020-05-07 2022-12-06 贝克休斯油田作业有限责任公司 Chemical injection system for completing a wellbore
CN116892378A (en) * 2023-09-11 2023-10-17 大庆信辰油田技术服务有限公司 Soluble bridge plug special for oil and gas well production increase
CN109505558B (en) * 2018-08-14 2024-04-26 中国石油天然气集团有限公司 Easy drilling bridge plug

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612626A (en) * 2015-02-11 2015-05-13 四机赛瓦石油钻采设备有限公司 Bridge plug with large drift diameter
CN104632126A (en) * 2014-12-26 2015-05-20 杰瑞能源服务有限公司 Bridge plug with large drift diameter and setting method of bridge plug
US20150159463A1 (en) * 2008-12-23 2015-06-11 Magnum Oil Tools International, Ltd. Down hole tool
CN204532243U (en) * 2015-04-01 2015-08-05 中国石油化工股份有限公司江汉油田分公司采油工艺研究院 A kind of big orifice press-fracturing bridge plug
US20160290096A1 (en) * 2015-04-06 2016-10-06 Schlumberger Technology Corporation Actuatable plug system for use with a tubing string

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150159463A1 (en) * 2008-12-23 2015-06-11 Magnum Oil Tools International, Ltd. Down hole tool
CN104632126A (en) * 2014-12-26 2015-05-20 杰瑞能源服务有限公司 Bridge plug with large drift diameter and setting method of bridge plug
CN104612626A (en) * 2015-02-11 2015-05-13 四机赛瓦石油钻采设备有限公司 Bridge plug with large drift diameter
CN204532243U (en) * 2015-04-01 2015-08-05 中国石油化工股份有限公司江汉油田分公司采油工艺研究院 A kind of big orifice press-fracturing bridge plug
US20160290096A1 (en) * 2015-04-06 2016-10-06 Schlumberger Technology Corporation Actuatable plug system for use with a tubing string

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107255023A (en) * 2017-08-18 2017-10-17 中国石油集团川庆钻探工程有限公司 Exempt to bore bridging plug with the big orifice for setting function of giving up
CN107724995A (en) * 2017-11-28 2018-02-23 西安石油大学 A kind of mechanical-set half dissolving bridging device and its fracturing process
CN108104765A (en) * 2018-02-09 2018-06-01 四机赛瓦石油钻采设备有限公司 A kind of solvable bridge plug of single deck tape-recorder whole pottery
CN108716379A (en) * 2018-07-25 2018-10-30 百勤能源科技(惠州)有限公司 A kind of solvable bridge plug of big orifice
CN109505558B (en) * 2018-08-14 2024-04-26 中国石油天然气集团有限公司 Easy drilling bridge plug
CN109505558A (en) * 2018-08-14 2019-03-22 中国石油集团西部钻探工程有限公司 Easily bore bridge plug
CN109138955A (en) * 2018-08-29 2019-01-04 中国石油集团渤海钻探工程有限公司 A kind of solvable fracturing sliding bush of variable diameter spherically seated full-bore
CN109138955B (en) * 2018-08-29 2020-07-03 中国石油集团渤海钻探工程有限公司 Reducing ball seat type full-bore soluble fracturing sliding sleeve
CN109267964A (en) * 2018-08-31 2019-01-25 西安威尔格德能源技术有限公司 A kind of metal variable diameter sealed soluble press-fracturing bridge plug
CN109267964B (en) * 2018-08-31 2023-08-29 西安威尔格德能源技术有限公司 Metal reducing sealing soluble fracturing bridge plug
CN109025898A (en) * 2018-10-11 2018-12-18 天津市玛特瑞科技有限公司 A kind of solvable bridge plug
CN109083616A (en) * 2018-11-02 2018-12-25 陕西航天德林科技集团有限公司 A kind of solvable bridge plug
CN109083616B (en) * 2018-11-02 2024-01-12 陕西航天德林科技集团有限公司 Soluble bridge plug
CN110067529A (en) * 2019-05-24 2019-07-30 北京易联结科技发展有限公司 A kind of solvable bridge plug of single deck tape-recorder watt
CN110185414A (en) * 2019-07-05 2019-08-30 山东博赛特石油技术有限公司 A kind of solvable bridge plug of outer expanding
CN110185414B (en) * 2019-07-05 2024-03-19 山东博赛特石油技术有限公司 External expansion type soluble bridge plug
CN115443368B (en) * 2020-05-07 2024-01-23 贝克休斯油田作业有限责任公司 Chemical injection system for well completion
CN115443368A (en) * 2020-05-07 2022-12-06 贝克休斯油田作业有限责任公司 Chemical injection system for completing a wellbore
CN113833431A (en) * 2020-06-23 2021-12-24 中国石油天然气股份有限公司 Connecting device of setting tool
CN112647891A (en) * 2020-12-24 2021-04-13 中石化石油工程技术服务有限公司 Full-soluble bridge plug
CN112682002B (en) * 2020-12-30 2022-12-09 中石化石油工程技术服务有限公司 All-metal soluble bridge plug
CN112682002A (en) * 2020-12-30 2021-04-20 中石化石油工程技术服务有限公司 All-metal soluble bridge plug
CN112576231A (en) * 2021-02-24 2021-03-30 四川省威沃敦化工有限公司 All-metal soluble fracturing sectionalizer
CN114016932B (en) * 2021-11-05 2023-11-21 中煤科工集团西安研究院有限公司 Cable disengaging device, cable conveying assembly and timing recovery method
CN114016932A (en) * 2021-11-05 2022-02-08 中煤科工集团西安研究院有限公司 Cable disconnecting device, cable conveying assembly and timing recovery method
CN116892378B (en) * 2023-09-11 2023-12-19 大庆信辰油田技术服务有限公司 Soluble bridge plug special for oil and gas well production increase
CN116892378A (en) * 2023-09-11 2023-10-17 大庆信辰油田技术服务有限公司 Soluble bridge plug special for oil and gas well production increase

Similar Documents

Publication Publication Date Title
CN106894787A (en) A kind of single deck tape-recorder watt big orifice bridging plug and its set method
CN209228337U (en) A kind of dissolvable bridge plug
CN108716379A (en) A kind of solvable bridge plug of big orifice
CN104612626A (en) Bridge plug with large drift diameter
CN108343395A (en) A kind of single deck tape-recorder watt big orifice exempts to bore mill composite bridge plug and its sets method
CN108104765A (en) A kind of solvable bridge plug of single deck tape-recorder whole pottery
CN104879090B (en) A kind of single deck tape-recorder watt double acting speed bores composite bridge plug
US20200018135A1 (en) Dissolvable bridge plug
CN207161042U (en) One kind hydrolysis bridging plug
CN115749677B (en) Small-diameter soluble bridge plug for staged fracturing C-type shale casing variable well
CN208718615U (en) A kind of solvable bridge plug of big orifice
CN205605160U (en) Formula of breaking tail pipe blanking plug
CN110552659B (en) All-metal soluble bridge plug
CN107255023A (en) Exempt to bore bridging plug with the big orifice for setting function of giving up
CN105840154B (en) A kind of novel clamp tile style underground throttle device
CN105971557A (en) Completely-dissolvable bridge plug
CN111021990A (en) Soluble toe end sliding sleeve for well cementation and completion and using method thereof
CN108894749A (en) A kind of screw thread is given up solvable bridge plug
CN207122297U (en) It is a kind of that there is the big orifice for setting function of giving up to exempt to bore bridging plug
CN211874445U (en) Well cementation is soluble toe end sliding sleeve for well completion
CN204677158U (en) A kind of big orifice bridging plug
WO2023197948A1 (en) Positioning and orientating apparatus for branch well, and positioning and orientating method
CN203515462U (en) Composite bridge plug and central pipe thereof
CN112253044A (en) High-ductility small-diameter dissolvable bridge plug
CN210530797U (en) Soluble bridge plug capable of synchronously feeding balls

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627