CN106894585A - Reconstruction construction of waterproof layer technique - Google Patents

Reconstruction construction of waterproof layer technique Download PDF

Info

Publication number
CN106894585A
CN106894585A CN201710102167.2A CN201710102167A CN106894585A CN 106894585 A CN106894585 A CN 106894585A CN 201710102167 A CN201710102167 A CN 201710102167A CN 106894585 A CN106894585 A CN 106894585A
Authority
CN
China
Prior art keywords
construction
hole
waterproof
waterproof layer
layer technique
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710102167.2A
Other languages
Chinese (zh)
Inventor
吴红亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan World Waterproof Polytron Technologies Inc Without Leakage
Original Assignee
Henan World Waterproof Polytron Technologies Inc Without Leakage
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan World Waterproof Polytron Technologies Inc Without Leakage filed Critical Henan World Waterproof Polytron Technologies Inc Without Leakage
Priority to CN201710102167.2A priority Critical patent/CN106894585A/en
Publication of CN106894585A publication Critical patent/CN106894585A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/04Watertight packings for use under hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

Reconstruction construction of waterproof layer technique, comprises the following steps:1)Injected hole is worn in construction surface, and Grouting Pipe is buried in hole;2)By Grouting Pipe first to back side filler is injected in hole, waterproof material is reinjected;3)After construction terminates, ascending pipe, plugging construction hole are removed.Base plate underground can be expelled to by equipment using construction technology of the invention, one layer of waterproof layer is reproduced, and repair underplate concrete crack automatically and block water entry, seal channeling water passage;Channeling water layer becomes sealant, so as to reach sealing purpose.

Description

Reconstruction construction of waterproof layer technique
Technical field
The invention belongs to ground roof waterproof maintenance engineering, and in particular to one kind reconstruction construction of waterproof layer technique.
Background technology
At present, although basement roofing and side wall are coated with waterproof layer in work progress, but still it is susceptible to seepage Serious problems, through analysis, its reason be broadly divided into it is following some:1st, roofing element is more, and lamp socket stationary nodes penetrate waterproof layer;2、 Node is more, and waterproof layer and top board have quality problems from impervious concrete;3rd, the construction method of waterproof layer is improper, major embodiment In place where troops were originally stationed water layer, a little intake, everywhere channeling water, be not reaching to the antiseep requirement for closing completely;4th, roofing winter is cold, summer heat Protective layer, waterproof layer and its waterproof efficacy from impervious concrete are destroyed after causing existing Stress Release Deng micro-strain;5、 Uneven resistance to plucking, resistance to compression and the temperature difference release etc. occurs in roofing causes former design waterproof layer to receive different degrees of heavy damage; 6th, after roofing floor tile adhesive, expanded with heat and contract with cold, stress extruding causes have peeling between waterproof layer;7th, under floor tile Water enters, rainwater play everywhere inside waterproof layer, leaks down from weakness.
The waterproof object of Chinese architecture more than 90% is concrete structure, and waterproof layer can not be carried out effectively to concrete structure Sealing, break a bit, leak a piece of, cause whole waterproof system to fail.The reason for concrete construction anti-shipwreck, also resides in concrete Fire resistance characteristic is more complicated, is embodied in:1)Infiltration characteristic(Concrete structure has pore, porosity to account for 25% or so);2)Cracking Property, crack dynamic(The factors such as the temperature difference, load-bearing, vibration, dry and wet);3)It is dampness, out-of-flatness, unclean(Concrete basal plane is because overworking The reasons such as phase, weather).
Therefore, a kind of construction of waterproof layer technique of reproducing is developed to prevent the ground of appearance, roofing in the existing construction building of solution Water maintenance problem is very necessary.
The content of the invention
It is an object of the invention to provide one kind reconstruction construction of waterproof layer technique, existing construction is simply and quickly solved Ground, the roof waterproof maintenance problem occurred in building.
To achieve the above object, the present invention uses following technical scheme:
Reconstruction construction of waterproof layer technique, comprises the following steps:
1)Injected hole is worn in construction surface, and Grouting Pipe is buried in hole;
2)By Grouting Pipe first to back side filler is injected in hole, waterproof material is reinjected;
3)After construction terminates, ascending pipe, plugging construction hole are removed.
Step 1)In, perforate to place where troops were originally stationed water depth, a diameter of 15~18mm of Grouting Pipe.
Step 2)In, the back side filler is waterborne polyurethane foaming grouting material;The waterproof material is uncured rubber Glue asphalt waterproofing paint.
Step 3)In, using RE-PH mortars and non-woven fabrics plugging construction hole.
Each slip casting pitch of holes is worn in construction surface for 0.5~1.5m.
Step 2)In, during injection back side filler and/or waterproof material, until occur adverse current in surrounding injected hole can stop Only.Step 2)In, the pressure for injecting waterproof material is 20~30bar, and speed is 25~75L/min.
Base plate underground can be expelled to by equipment using construction technology of the invention, one layer of waterproof layer is reproduced, and repair automatically Multiple underplate concrete crack blocks water entry, seals channeling water passage;Channeling water layer becomes sealant, and existing so as to reach sealing purpose There is technology to compare, beneficial effects of the present invention are:
1)Small perforation, reproduces Durable Water Repellant;
2)Water penetration is solved, destruction is no longer expanded from this;
3)Channeling water layer becomes sealant;
4)Unknown water entry is repaired automatically;
5)Distress in concrete leakage point automatic-sealed.
Specific embodiment
With specific embodiment, the present invention will be further described below.
Waterborne polyurethane foaming grouting material used is to be reacted by Hydrophilicrto polyether polyalcohol and isocyanates in embodiment 1-3 End contain a kind of polymeric grouting materialses of isocyanato.The material chemically reacts after meeting water, Elasticity glue induration is formed, is a kind of new waterproof leak stopping high pressure pouring material so as to reach good sealing purpose;
Uncured rubber asphalt waterproof coating used is the flexible waterproof coating of a kind of high polymer and pitch mixing, can directly be smeared Used in basic unit, treat that moisture evaporation forms one layer of fine and close waterproof membrane of sticky body of paste.
Above two material is provided without leakage waterproof Science and Technology Co., Ltd. all over the world by Henan.
Embodiment 1
Reconstruction construction of waterproof layer technique, comprises the following steps:
1)Injected hole is worn in construction surface, and Grouting Pipe is buried in hole;
2)By Grouting Pipe first to back side filler is injected in hole, waterproof material is reinjected;
3)After construction terminates, ascending pipe, plugging construction hole are removed.
Step 1)In, perforating to place where troops were originally stationed water depth, Grouting Pipe a diameter of 16mm wears each slip casting pitch of holes in construction surface It is 1.0m.
Step 2)In, the back side filler is waterborne polyurethane foaming grouting material;The waterproof material is uncured rubber Glue asphalt waterproofing paint;The pressure for injecting waterproof material is 25bar, and speed is 50L/min;Inject back side filler and/or prevent During water material, until occur adverse current in surrounding injected hole can stop.
Step 3)In, using RE-PH mortars and non-woven fabrics plugging construction hole.
Embodiment 2
Reconstruction construction of waterproof layer technique, comprises the following steps:
1)Injected hole is worn in construction surface, and Grouting Pipe is buried in hole;
2)By Grouting Pipe first to back side filler is injected in hole, waterproof material is reinjected;
3)After construction terminates, ascending pipe, plugging construction hole are removed.
Step 1)In, perforating to place where troops were originally stationed water depth, Grouting Pipe a diameter of 15mm wears each slip casting pitch of holes in construction surface It is 0.5m.
Step 2)In, the back side filler is waterborne polyurethane foaming grouting material;The waterproof material is uncured rubber Glue asphalt waterproofing paint;Never to solidify waterproof material, the pressure for injecting waterproof material is 20bar, speed to the waterproof material It is 25L/min;During injection back side filler and/or waterproof material, until occur adverse current in surrounding injected hole can stop.
Step 3)In, using RE-PH mortars and non-woven fabrics plugging construction hole.
Embodiment 3
Reconstruction construction of waterproof layer technique, comprises the following steps:
1)Injected hole is worn in construction surface, and Grouting Pipe is buried in hole;
2)By Grouting Pipe first to back side filler is injected in hole, waterproof material is reinjected;
3)After construction terminates, ascending pipe, plugging construction hole are removed.
Step 1)In, perforating to place where troops were originally stationed water depth, Grouting Pipe a diameter of 18mm wears each slip casting pitch of holes in construction surface It is 1.5m.
Step 2)In, the back side filler is waterborne polyurethane foaming grouting material;The waterproof material is uncured rubber Glue asphalt waterproofing paint;Never to solidify waterproof material, the pressure for injecting waterproof material is 30bar, speed to the waterproof material It is 75L/min;During injection back side filler and/or waterproof material, until occur adverse current in surrounding injected hole can stop.
Step 3)In, using RE-PH mortars and non-woven fabrics plugging construction hole.

Claims (7)

1. construction of waterproof layer technique is reproduced, it is characterised in that comprised the following steps:
1)Injected hole is worn in construction surface, and Grouting Pipe is buried in hole;
2)By Grouting Pipe first to back side filler is injected in hole, waterproof material is reinjected;
3)After construction terminates, ascending pipe, plugging construction hole are removed.
2. it is as claimed in claim 1 to reproduce construction of waterproof layer technique, it is characterised in that step 1)In, perforation to place where troops were originally stationed water layer Depth, a diameter of 15~18mm of Grouting Pipe.
3. it is as claimed in claim 1 to reproduce construction of waterproof layer technique, it is characterised in that step 2)In, the back side filler It is waterborne polyurethane foaming grouting material;The waterproof material is uncured rubber asphalt waterproof coating.
4. it is as claimed in claim 1 to reproduce construction of waterproof layer technique, it is characterised in that step 3)In, using RE-PH mortars and Non-woven fabrics plugging construction hole.
5. it is as claimed in claim 1 to reproduce construction of waterproof layer technique, it is characterised in that each slip casting pitch of holes is worn in construction surface It is 0.5~1.5m.
6. it is as claimed in claim 1 to reproduce construction of waterproof layer technique, it is characterised in that step 2)In, inject back side filler And/or during waterproof material, until occur adverse current in surrounding injected hole can stop.
7. it is as claimed in claim 1 to reproduce construction of waterproof layer technique, it is characterised in that step 2)In, injection waterproof material Pressure is 20~30bar, and speed is 25~75L/min.
CN201710102167.2A 2017-02-24 2017-02-24 Reconstruction construction of waterproof layer technique Pending CN106894585A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710102167.2A CN106894585A (en) 2017-02-24 2017-02-24 Reconstruction construction of waterproof layer technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710102167.2A CN106894585A (en) 2017-02-24 2017-02-24 Reconstruction construction of waterproof layer technique

Publications (1)

Publication Number Publication Date
CN106894585A true CN106894585A (en) 2017-06-27

Family

ID=59185221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710102167.2A Pending CN106894585A (en) 2017-02-24 2017-02-24 Reconstruction construction of waterproof layer technique

Country Status (1)

Country Link
CN (1) CN106894585A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809913A (en) * 2020-07-21 2020-10-23 四川童燊防水工程有限公司 Construction method for water seepage and leakage stoppage of front-mounted roof
CN112878727A (en) * 2021-02-23 2021-06-01 安徽墨砂工程修缮技术有限公司 Method for reconstructing waterproof layer by minimally invasive technology
CN114541486A (en) * 2022-03-02 2022-05-27 山东金城建设有限公司 Construction method for reconstructing anti-floating layer by existing building waterproof bottom plate
CN117145262A (en) * 2023-09-01 2023-12-01 温州市市政工程建设开发有限公司 Basement wall seepage crack plugging construction method and construction device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140137503A1 (en) * 2012-11-20 2014-05-22 Donald E. Wheatley System And Method Of Concrete Crack Repair
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack
CN105756101A (en) * 2016-03-01 2016-07-13 上海东方雨虹防水工程有限公司 Building basement, subway and tunnel expansion joint waterproof maintenance and irrigation filling construction method
CN107514150A (en) * 2017-09-25 2017-12-26 韩旭 A kind of construction technology of utilization space displacement method reconstruction Durable Water Repellant

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140137503A1 (en) * 2012-11-20 2014-05-22 Donald E. Wheatley System And Method Of Concrete Crack Repair
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack
CN105756101A (en) * 2016-03-01 2016-07-13 上海东方雨虹防水工程有限公司 Building basement, subway and tunnel expansion joint waterproof maintenance and irrigation filling construction method
CN107514150A (en) * 2017-09-25 2017-12-26 韩旭 A kind of construction technology of utilization space displacement method reconstruction Durable Water Repellant

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809913A (en) * 2020-07-21 2020-10-23 四川童燊防水工程有限公司 Construction method for water seepage and leakage stoppage of front-mounted roof
CN112878727A (en) * 2021-02-23 2021-06-01 安徽墨砂工程修缮技术有限公司 Method for reconstructing waterproof layer by minimally invasive technology
CN114541486A (en) * 2022-03-02 2022-05-27 山东金城建设有限公司 Construction method for reconstructing anti-floating layer by existing building waterproof bottom plate
CN117145262A (en) * 2023-09-01 2023-12-01 温州市市政工程建设开发有限公司 Basement wall seepage crack plugging construction method and construction device
CN117145262B (en) * 2023-09-01 2024-04-05 温州市市政工程建设开发有限公司 Basement wall seepage crack plugging construction method and construction device

Similar Documents

Publication Publication Date Title
CN106894585A (en) Reconstruction construction of waterproof layer technique
CN202730973U (en) Concrete outer wall bolt hole leakproof structure
CN101545285B (en) Self-adhering rubber water-proof coiled material and method for preparing same
CN205077733U (en) Waterproof roof boarding of flat roof deck
CN105400429A (en) No-curing high-molecular modification asphalt waterproof paint and preparation method therefor
CN108412222A (en) A kind of construction leakage internal maintenance waterproof layer structure and construction technology
FI64976C (en) FOERFARANDE FOER TAETNING AV SPRICKOR OCH KAVITETER I OLIKA SLG AV BYGGNADSBERK SAOSOM BYGGNADSVERK I BERG BETONG MURVE RKCH TRAE
CN205077739U (en) Plant roof waterproof roof boarding
CN107448008A (en) A kind of construction technology that Durable Water Repellant is reproduced using minimally invasive method
CN111561332A (en) Construction method of mountain tunnel shock-insulation waterproof heat-insulation high polymer
EP3392322A1 (en) Efficient aqueous nano-silicon rubber sealing and waterproofing agent
CN106978886A (en) Protect concrete waterproof system and its construction method
KR100949479B1 (en) The hole open flume type asphalt compound waterproofing method that i applied a high adhesion model waterproofing seal to the sheet upper part opened up, and a section let you break
CN212507541U (en) Roof waterproof repairing structure
CN102092157B (en) Water swellable waterproof membrane and preparation method thereof
CN206529789U (en) Offshore wind turbine foundation concrete cushion cap waterproof sealing structure
CN205224089U (en) Basement waterproofing side wall
CN204531198U (en) A kind of compound water-proof thermal-insulation integral system
CN105239732B (en) A kind of construction method of the stretching roofing pipe of rainwater leakage prevention
KR101028953B1 (en) Complex water proof treatment construction methode using surface treatment and water proof sheet and water proof structure and composite thereof
TWI624578B (en) Acrylic wear-resistant waterproof layer structure and construction method
CN113738152A (en) Leakage maintenance construction method for water-return beam
CN111561174A (en) Construction method for roof waterproof repair and roof waterproof repair structure
CN207376387U (en) A kind of light-concrete structure with high-durability energy
KR20210105091A (en) How to repair the leaky part of the roof floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627